CN209947225U - Real device of instructing of multi-functional measurement - Google Patents
Real device of instructing of multi-functional measurement Download PDFInfo
- Publication number
- CN209947225U CN209947225U CN201920374233.6U CN201920374233U CN209947225U CN 209947225 U CN209947225 U CN 209947225U CN 201920374233 U CN201920374233 U CN 201920374233U CN 209947225 U CN209947225 U CN 209947225U
- Authority
- CN
- China
- Prior art keywords
- cavity
- simulation
- voltage
- chamber
- instructing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005259 measurement Methods 0.000 title claims abstract description 6
- 238000004088 simulation Methods 0.000 claims abstract description 31
- 238000012549 training Methods 0.000 claims abstract description 15
- 238000001514 detection method Methods 0.000 claims abstract description 9
- 238000004891 communication Methods 0.000 claims description 7
- 230000005611 electricity Effects 0.000 claims description 5
- 230000001105 regulatory effect Effects 0.000 claims description 5
- 238000010168 coupling process Methods 0.000 claims description 4
- 238000005859 coupling reaction Methods 0.000 claims description 4
- 230000008878 coupling Effects 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 12
- 238000000034 method Methods 0.000 abstract description 4
- 239000002699 waste material Substances 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000012212 insulator Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The utility model discloses a real device of instructing of multi-functional measurement, including the batch meter body, this internal first cavity, second cavity and the third cavity of being provided with of batch meter, the top layer is equipped with overhead line analogue means on the first cavity, and the area is provided with detection device in the second cavity, installs the high tension current voltage transformer and the current shunting device that carry out the current-voltage simulation in the third cavity. The utility model discloses simple structure, convenient operation has assembleed case, high-pressure electric energy meter, low pressure electric energy meter installation to and wiring and debugging training, make the various work techniques of skilled grasp of staff, the effectual work efficiency who improves the staff.
Description
Technical Field
The utility model relates to a real device of instructing of multi-functional measurement.
Background
The installation and debugging of the high-low voltage electric energy meter and the meter collecting box electric energy meter are contents of the informed meeting of the rural power grid power distribution major in the power industry. However, at present, a teaching aid integrating various electric energy meters and meter collecting boxes and installing, wiring and debugging is not provided, and when wiring training is caused, a power distribution cabinet is used for wiring, so that the problems of labor waste, time waste and material waste are solved urgently.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide a real device of instructing of multi-functional measurement.
The technical problem is solved, the utility model discloses a batch meter body, its structural feature is this internal first cavity, second cavity and the third cavity that is provided with of batch meter, and the top layer is equipped with overhead line analogue means on the first cavity, and the area is provided with detection device in the second cavity, installs the high tension current voltage transformer and the current shunting device that carry out the current-voltage simulation in the third cavity.
The overhead line simulation device comprises a simulation frame symmetrically arranged at the opening of the first cavity and a three-phase four-wire simulation line overhead and 485 communication line simulation line overhead arranged on the simulation frame, and a fixing plate is covered at the opening of the first cavity.
The fixed plate of opening part switch is installed to second cavity opening part, and detection device installs in the second cavity, detection device includes touch screen and dress table and connects real board of instructing of electricity.
The third cavity divide into two cavities about, is provided with high-voltage current transformer and high-voltage transformer in the cavity of a left side, is equipped with the electric current in the cavity of the right side and transfers a class device, the electric current transfers a class device to include autotransformer and ampere meter.
The two side plates of the first cavity close to the upper top plate are symmetrically provided with simulation frames, each simulation frame comprises a connecting plate and a plurality of groups of supporting plates, the connecting plates are fixedly installed along the vertical direction of the side plates of the first cavity, and the supporting plates and the connecting plates are perpendicular to each other and are arranged on the fixing plate at intervals.
The utility model discloses advantage effect: the device is divided into a plurality of chambers by arranging the baffle plates in the metering box body, so that the labor division setting device is more convenient to use, the overhead line simulation device arranged on the first chamber can simulate the simulation of field low-voltage incoming lines, the touch screen of the second chamber can check related processes and installation processes, and can automatically time and give an error warning, the meter mounting and electricity connection practical training plate arranged in the second chamber can carry out the practical training of meter mounting and electricity connection of a high-supply meter and a low-supply meter metering device, the high-voltage current transformer and the high-voltage transformer arranged in the third chamber can carry out current and voltage simulation, and the self-coupling voltage regulator and the ammeter can respectively regulate current, the utility model has the advantages of simple structure and convenient operation, and integrates the installation of a meter collecting box, a high-voltage electric energy meter and a low-voltage electric energy meter, and the wiring and debugging training, the working staff can master various working skills skillfully, and the working efficiency of the working staff is effectively improved.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Detailed Description
Referring to the attached drawings, the utility model comprises a metering box body 1, the metering box body 1 is a box body which is formed by splicing a plurality of baffles and is closed and opened in front, a plurality of chambers are arranged in the metering box body 1 through baffle partitions, from top to bottom, a first chamber 2, a second chamber 3 and a third chamber 4 are respectively arranged, an overhead line simulator 5 is arranged on the first chamber 2, the overhead line simulator 5 comprises a simulation frame 13 which is symmetrically arranged on two side baffles of the opening of the first chamber 2 close to the upper end edge and a three-phase four-wire simulation line overhead and 485 communication line simulation line overhead which are arranged on the simulation frame 13, a fixed plate 10 which covers the opening is arranged at the front opening of the chamber, the fixed plate 10 can simulate the wall during installation during design, the installation of a meter box is completed on the wall, and the simulation frame 13 is symmetrically arranged on two side plates of the first chamber 2 close to the upper top plate, the simulation frame 13 comprises a connecting plate and a plurality of supporting plates, the connecting plate is vertically and fixedly installed along the side plate of the opening of the first cavity 2, the supporting plates and the connecting plate are perpendicular to each other and are arranged on the fixing plate 10 at intervals, a three-phase four-wire simulation line and a 485 communication line are installed on the supporting plates, and the three-phase four-wire simulation line overhead and the 485 communication line overhead are arranged and can be used for training workers to install and operate the three-phase four-wire and 485 communication lines and installing the matching equipment thereof, such as insulators and the like; a fixed plate 10 which can be opened and closed at an opening is installed at the front opening of the second chamber 3, the installation of a meter collecting box can be simulated on the fixed plate 10, a detection device is installed in the second chamber 3, the detection device comprises a touch screen 11 installed on one side in the chamber, and a high-supply high-meter and low-supply low-meter installation meter power connection practical training plate 12 arranged in the chamber, and the high-supply high-meter and low-supply low-meter installation meter power connection practical training plate 12 can be directly replaced by a rear bottom plate of the chamber during the setting; the third chamber 4 is divided into a left chamber and a right chamber by a vertical baffle, a high-voltage current transformer 8 and a high-voltage transformer 9 are arranged in the left chamber, a switch door is arranged at the opening of the left chamber by a hinge during design, the high-voltage current transformer 8 is arranged on the lower bottom plate of the chamber, the high-voltage transformer 9 is arranged on the rear baffle of the chamber, the high-voltage current transformer 8 and the high-voltage transformer 9 can be used for current and voltage simulation, a current flow regulating device 7 is arranged in the right chamber, the current flow regulating device 7 comprises a self-coupling voltage regulator and an ammeter which are arranged in the right chamber, the self-coupling voltage regulator and the ammeter can respectively regulate current, and when the third chamber is designed and used, a meter box can be used for simulating the installation of a set on a fixing plate 10 arranged at the front opening of the first chamber 2 and the second chamber 3, and the, and an external power line is arranged on one side wall of the metering box body 1 and is used for connecting an external power supply and supplying power to each device in each metering box body 1.
During the use, be located the overhead line analogue means 5 that sets up on first cavity 2 and can be used for training the staff to the simulation installation and the connection of three-phase four-wire and 485 communication lines, the height that is located the setting of second cavity 3 supplies high count and the low real board 12 of instructing of installing the table of supplying low count, can be used for simulating the connection and the installation of circuit such as installation high-voltage electricity ammeter and low-voltage line node table, touch-control screen 11 through its one side, can carry out relevant process, looking over of mounting process, and can the automatic timing, wrong early warning, when using third cavity 4, can simulate the erection joint training to high-voltage transformer 9 and high swallow current transformer in left cavity, voltage regulator and the ampere meter that set up in the right cavity, can adjust work such as the electric current respectively when training. The foregoing is only a preferred embodiment of the present invention, and is not intended to limit the scope of the inventionFor limitingThe utility model discloses. The foregoing embodiments have described the present invention in detailIt will be apparent to those skilled in the art that modifications may be made to the above-described embodiments, or equivalents may be substituted for elements thereof. However, any modification, equivalent replacement, improvement and the like made within the scope of the inventive concept are all included within the protection scope of the present invention.
Claims (5)
1. The utility model provides a real device of instructing of multi-functional measurement, includes batch meter body (1), its characterized in that: the metering box is characterized in that a first cavity (2), a second cavity (3) and a third cavity (4) are arranged in the metering box body (1), an overhead line simulation device (5) is arranged on the first cavity (2), a detection device is arranged in the second cavity (3), and a high-voltage current transformer (8), a high-voltage transformer (9) and a current flow regulating device (7) for current and voltage simulation are installed in the third cavity (4).
2. The multifunctional metering training device of claim 1, wherein: the overhead line simulation device (5) comprises a simulation frame (13) symmetrically arranged at the opening of the first chamber (2) and a three-phase four-wire simulation line overhead and 485 communication line simulation line overhead arranged on the simulation frame (13), and a fixing plate (10) is covered at the opening of the first chamber (2).
3. The multifunctional metering training device of claim 1, wherein: the utility model discloses a real board of instructing of dress table electricity, including second cavity (3), detection device installs at second cavity (3) opening part and connects real board (12) of instructing including touch screen (11) and dress table, fixed plate (10) at the opening part switch are installed to second cavity (3) opening part, detection device.
4. The multifunctional metering training device of claim 1, wherein: the third chamber (4) divide into about two cavities, are provided with high-voltage current transformer (8) and high-voltage potential transformer (9) in the cavity of a left side, are equipped with current flow regulating device (7) in the cavity of the right side, current flow regulating device (7) include auto coupling voltage regulator and ampere meter.
5. The multifunctional metering training device of claim 2, wherein: the two side plates of the first cavity (2) close to the upper top plate are symmetrically provided with simulation frames (13), each simulation frame (13) comprises a connecting plate and a plurality of groups of supporting plates, the connecting plates are fixedly installed along the vertical direction of the side plates of the first cavity (2) with openings, and the supporting plates and the connecting plates are perpendicular to each other and are arranged on the fixing plate (10) at intervals.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920374233.6U CN209947225U (en) | 2019-03-23 | 2019-03-23 | Real device of instructing of multi-functional measurement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920374233.6U CN209947225U (en) | 2019-03-23 | 2019-03-23 | Real device of instructing of multi-functional measurement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209947225U true CN209947225U (en) | 2020-01-14 |
Family
ID=69125004
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920374233.6U Active CN209947225U (en) | 2019-03-23 | 2019-03-23 | Real device of instructing of multi-functional measurement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209947225U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109754685A (en) * | 2019-03-23 | 2019-05-14 | 国网山东省电力公司高密市供电公司 | A kind of Multifunctional measuring actual training device |
-
2019
- 2019-03-23 CN CN201920374233.6U patent/CN209947225U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109754685A (en) * | 2019-03-23 | 2019-05-14 | 国网山东省电力公司高密市供电公司 | A kind of Multifunctional measuring actual training device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106556759B (en) | A kind of power distribution automation apparatus debugging method and debugging system | |
CN105845002B (en) | A kind of low-voltage distribution transformer platform district failure simulation device | |
CN202042078U (en) | Automatic comprehensive-skill training table | |
CN209947225U (en) | Real device of instructing of multi-functional measurement | |
CN104091502B (en) | Low-tension centralized meter reading and installation training device based on carrier technology | |
CN104851343A (en) | Demonstration and training device for electric equipment | |
CN208891884U (en) | A kind of integrated classroom multi-purpose computer desk convenient for wiring | |
CN212302787U (en) | New energy automobile alternating-current charging stake fault diagnosis training platform that charges | |
CN109754685A (en) | A kind of Multifunctional measuring actual training device | |
CN204808689U (en) | Power equipment demonstrates training set | |
CN102723675B (en) | Instrument box wiring fixture | |
CN206379025U (en) | Electric energy metrical actual training device | |
CN107528449A (en) | Portable multi-function is adjustable alternating current-direct current power box for high tension testing | |
CN204117459U (en) | Typical low pressure fault handling training platform device | |
CN206271238U (en) | Intelligent electric meter information gathers actual training device | |
CN207458419U (en) | A kind of chamber | |
CN204166720U (en) | Single-phase intelligent expense control electric energy meter is installed concentratedly and training set | |
CN209543629U (en) | A kind of connection box of electric energy meter actual training device | |
CN210039205U (en) | LED photoelectric technology training platform | |
CN205546307U (en) | Fill electric pile power data collecting terminal | |
CN210777438U (en) | Combined typical network distribution electrical equipment high-voltage switch cabinet teaching and cultivating device | |
CN105185207B (en) | A kind of intelligent substation training system of layering and zoning structure | |
CN205028498U (en) | Real standard system is organized in track traffic driving | |
CN209248333U (en) | LKJ auxiliary device detection device | |
CN210039337U (en) | Maintenance electrician training and examination training device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |