CN204808689U - Power equipment demonstrates training set - Google Patents
Power equipment demonstrates training set Download PDFInfo
- Publication number
- CN204808689U CN204808689U CN201520391945.0U CN201520391945U CN204808689U CN 204808689 U CN204808689 U CN 204808689U CN 201520391945 U CN201520391945 U CN 201520391945U CN 204808689 U CN204808689 U CN 204808689U
- Authority
- CN
- China
- Prior art keywords
- wall
- training set
- current
- mounting platform
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000005540 biological transmission Effects 0.000 claims abstract description 4
- 238000004088 simulation Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 3
- 229940052961 longrange Drugs 0.000 abstract 1
- 230000002194 synthesizing effect Effects 0.000 abstract 1
- 238000009434 installation Methods 0.000 description 9
- 238000005516 engineering process Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 230000000739 chaotic effect Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000013642 negative control Substances 0.000 description 1
Abstract
The utility model provides a power equipment demonstrates training set, including mounting platform and remote computer, carry out data transmission through wireless network between mounting platform and the remote computer, the mounting platform includes wall body and base, the base is front end open -ended cavity structures, is equipped with on -the -spot check gauge in the cavity, wall fixing is at the base upper surface, the inside voltage electric current equipment that is equipped with of wall body, wall body front end surface is equipped with electric energy meter, terminal box, current transformer, power consumption information acquisition terminal, load switch, three phase voltage wiring end and three phase current wiring end, three phase voltage wiring end with three phase current the wiring hold and be connected with voltage electric current equipment. The professional on -the -spot operating environment of the device altitude simulation marketing can develop the multi -specialized rehearsal of synthesizing to long -range analog operation can be carried out, the real effect of instructing of electric power marketing can be comprehensively improved.
Description
Technical field
The utility model relates to power marketing training field, particularly a kind of power equipment demonstration training set.
Background technology
Along with the development of power technology, power equipment function is also more and more diversified, requires that each associate power personnel must be familiar with grasping professional operation skill, and carrying out real training work is that improve specialized capability ability necessity of electric power personnel, effective mode.In the power marketing real training course of work in the past, personnel are field integrated real training condition for want of, and specialty is different with involved equipment, carries out real training work generally separately, does not have the application of comprehensive practical traning wall aspect.
Present marketing work not only professional division more and more refinement, and each specialty is connected contact closely mutually, independently carries out real training separately, can not complete embodiment result of training, causes teaching result undesirable.The real training demand that the utility model power marketing comprehensive practical traning wall can concentrate marketing such as solving electric energy metrical, power utility check, data acquisition, spatial load forecasting multi-specialized.
Utility model content
For solving above-mentioned defect of the prior art, the utility model provides a kind of power equipment demonstration training set, solves the problem that existing teaching result is single, teaching result is not good.
For solving the problems of the technologies described above, the utility model scheme comprises: power equipment demonstration training set, is characterized in that, comprise mounting platform and remote computer, carry out data transmission between mounting platform and remote computer by wireless network; Described mounting platform comprises body of wall and base, described base is the cavity body structure of front opening, on-site calibrator is provided with in cavity, described body of wall is fixed on base upper surface, body of wall inside is provided with electric current and voltage equipment, body of wall front-end surface is provided with electric energy meter, terminal box, current transformer, power information acquisition terminal, on-load switch, three-phase voltage terminals and three-phase current terminals, three-phase voltage terminals and three-phase current terminals and electric current and voltage equipment connection.
Further, the appliance case of top and the cable box of below is divided into by dividing plate in the cavity of described base, deposit the electric equipments such as on-site calibrator, electric energy meter, terminal box, current transformer, power information acquisition terminal, on-load switch in appliance case, in cable box, deposit the wire cable of various model.
Further, described electric energy meter, terminal box, current transformer, power information acquisition terminal, on-load switch are connected with surface of wall respectively by bolt, make electric energy meter, terminal box, current transformer, power information acquisition terminal, on-load switch can from surface of wall quick-detachment and installation.
Further, described surface of wall is provided with some T-shaped mounting holes, and electric energy meter, terminal box, current transformer, power information acquisition terminal, on-load switch are fixed on body of wall respectively by T-shaped mounting hole.
Further, the corner, four, bottom of described base is respectively equipped with a roller.
The beneficial effects of the utility model are:
1, combination property is strong, applied widely.Relate to metering installation, power information collection, spatial load forecasting, the most of reality teaches pattern of power utility check four, each Marketing Major both can carry out real training separately, also can carry out comprehensive practical traning work.
2, high analogue simulation degree.Power marketing comprehensive practical traning wall can carry out the installation of measuring apparatus, existing school; Collecting device Installation and Debugging; The Installation and Debugging of load-control equipment; The multi-specialized integrated rehearsals such as meter, stealing Inspection and analysis are leaked in metering, contain the on-the-spot various practical training project of marketing, the on-the-spot running environment of altitude simulation Marketing Major.
3, can brick pattern disassembly and assembly.Each equipment utilization bolt is fixed, and body of wall has been provided with T-shaped mounting hole, and the installation that can adapt to the electric energy meter of dissimilar size, acquisition terminal, mutual inductor, terminal box and wiring etc. is fixed, and its dismounting is flexible.
4, operated from a distance is simulated.Utilize wireless network, the power information acquisition terminal on remote computer and mounting platform is connected as a single entity, the simulation training of the Marketing Major remote technologies such as remote meter reading, long-range negative control, teledata monitoring can be carried out
5, whole mounting platform floor area is little, builds easily, conveniently moving, and can multiplely arrange, can meet the start-up of a greater number at same batch, save the training time.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model mounting platform;
Equipment connection theory diagram when Fig. 2 is the utility model training.
In Fig. 1: 1 body of wall, 2 bases, 21 dividing plates, 22 appliance cases, 23 cable box, 3 on-site calibrators, 4 electric energy meters, 5 terminal boxes, 6 current transformers, 7 three-phase current terminals, 8 three-phase voltage terminals, 9 power information acquisition terminals, 10 on-load switches.
Embodiment
Below in conjunction with accompanying drawing, concrete enforcement of the present utility model is described, should be appreciated that exemplifying embodiment described herein is only for instruction and explanation of the utility model, and be not used in restriction the utility model.
Power equipment demonstration training set as shown in Figure 1, comprises mounting platform and remote computer, carries out data transmission between mounting platform and remote computer by wireless network; Described mounting platform comprises body of wall 1 and base 2, described base 2 is the cavity body structure of front opening, the appliance case 22 of top and the cable box 23 of below is divided into by dividing plate 21 in the cavity of described base 2, deposit the electric equipments such as on-site calibrator 3, electric energy meter, terminal box, current transformer, power information acquisition terminal, on-load switch in appliance case 22, in cable box 23, deposit the wire cable of various model; Described body of wall 1 is fixed on base 2 upper surface, body of wall 1 inside is provided with electric current and voltage equipment, body of wall 1 front-end surface is provided with electric energy meter 4, terminal box 5, current transformer 6, power information acquisition terminal 9, on-load switch 10, three-phase voltage terminals 8 and three-phase current terminals 7, three-phase voltage terminals and three-phase current terminals and electric current and voltage equipment connection.
Further, described electric energy meter, terminal box, current transformer, power information acquisition terminal, on-load switch are connected with surface of wall respectively by bolt, make electric energy meter, terminal box, current transformer, power information acquisition terminal, on-load switch can from surface of wall quick-detachment and installation.
Further, described surface of wall is provided with some T-shaped mounting holes, and electric energy meter, terminal box, current transformer, power information acquisition terminal, on-load switch are fixed on body of wall respectively by T-shaped mounting hole.
Further, the corner, four, bottom of described base is respectively equipped with a roller, and mounting platform can be facilitated to move integrally.
During training, can be divided into and install and be connected two parts and operate, concrete grammar is:
Before installation operation is carried out, the electric energy meter of surface of wall, terminal box, current transformer, power information acquisition terminal and on-load switch all need to unload from surface of wall, and be placed in appliance case, after installation operation starts, start-up identifies rapidly different equipment, and they are arranged on corresponding position, as shown in Figure 1, electric energy meter is positioned at the upper left corner, terminal box is positioned at the below of electric energy meter, current transformer is positioned at the below of terminal box, power information acquisition terminal is positioned at the upper right corner, on-load switch is positioned at the lower right corner, why arrange like this, be conducive to the carrying out of patching operations, can not be chaotic during wiring.
When patching operations starts, be divided into metering, power information collection, spatial load forecasting, power utility check 4 part to carry out, be specially:
When metering is carried out, by the primary circuit input end of three-phase current terminals and current transformer, three-phase voltage terminals are connected with the voltage interface of terminal box, the secondary circuit output terminal of current transformer is connected with the current interface of terminal box, current interface and the voltage interface of electric energy meter are connected current interface and the voltage interface of terminal box respectively, should with shown in Fig. 2 when wiring completes.After wiring completes, open electric current and voltage equipment, electric energy meter should start counting, occurs reading.
When carrying out power information measurement, access power information acquisition terminal provide working power by terminal box (or electric energy meter) shunt voltage, acquisition terminal 485 Interface Terminal access electric energy meter 485 Interface Terminal reading power meters data, wiring final effect as shown in Figure 2.After wiring completes, power information acquisition terminal is connected with remote computer power information system, by data upload system by wireless network.
When carrying out spatial load forecasting operation, power information acquisition terminal control loop Interface Terminal is connected with on-load switch control loop terminal, as shown in Figure 2.Now, computing machine power information system by wireless network to acquisition terminal transmitting order to lower levels, the tripping operation of control overhead switch and closed.
During power utility check, according to the operation of metering, have complete electric current and voltage equipment in body of wall, table top is provided with three-phase current terminals, can connect current transformer primary circuit input terminal, can inject primary current.Table top three-phase voltage terminals are by terminal box access electrical energy meter electricity hydraulic circuit simultaneously.On-site calibrator takes out in appliance case, and on-site calibrator voltage and current connection terminal thereto (or electric energy meter) corresponding voltage and current wiring terminal, can carry out check analysis work, wiring effect as shown in Figure 2.
Should be understood that; the above-mentioned description for preferred embodiment is comparatively detailed; therefore the restriction to the utility model scope of patent protection can not be thought; those of ordinary skill in the art is under enlightenment of the present utility model; do not departing under the ambit that the utility model claim protects; can also make the various deformation such as replacement, simple combination, these all fall within protection domain of the present utility model, and request protection domain of the present utility model should be as the criterion with claims.
Claims (5)
1. power equipment demonstration training set, is characterized in that, comprise mounting platform and remote computer, carry out data transmission between mounting platform and remote computer by wireless network; Described mounting platform comprises body of wall and base, described base is the cavity body structure of front opening, on-site calibrator is provided with in cavity, described body of wall is fixed on base upper surface, body of wall inside is provided with electric current and voltage equipment, body of wall front-end surface is provided with electric energy meter, terminal box, current transformer, power information acquisition terminal, on-load switch, three-phase voltage terminals and three-phase current terminals, three-phase voltage terminals and three-phase current terminals and electric current and voltage equipment connection.
2. power equipment demonstration training set according to claim 1, is characterized in that, be divided into the appliance case of top and the cable box of below in the cavity of described base by dividing plate.
3. power equipment demonstration training set according to claim 1, it is characterized in that, described electric energy meter, terminal box, current transformer, power information acquisition terminal, on-load switch are connected with surface of wall respectively by bolt.
4. power equipment demonstration training set according to claim 1, it is characterized in that, described surface of wall is provided with some T-shaped mounting holes, and electric energy meter, terminal box, current transformer, power information acquisition terminal, on-load switch are fixed on body of wall respectively by T-shaped mounting hole.
5. power equipment demonstration training set according to claim 1, it is characterized in that, the corner, four, bottom of described base is respectively equipped with a roller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520391945.0U CN204808689U (en) | 2015-06-09 | 2015-06-09 | Power equipment demonstrates training set |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520391945.0U CN204808689U (en) | 2015-06-09 | 2015-06-09 | Power equipment demonstrates training set |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204808689U true CN204808689U (en) | 2015-11-25 |
Family
ID=54593473
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520391945.0U Expired - Fee Related CN204808689U (en) | 2015-06-09 | 2015-06-09 | Power equipment demonstrates training set |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204808689U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106485974A (en) * | 2016-11-18 | 2017-03-08 | 国家电网公司 | A kind of power department training secondary connection analogue means |
CN110208586A (en) * | 2019-05-15 | 2019-09-06 | 广州供电局有限公司 | Multiplexing electric abnormality analog circuit and multiplexing electric abnormality analog machine |
CN112489540A (en) * | 2020-11-23 | 2021-03-12 | 南昌工程学院 | Electric power marketing power consumption net wiring model |
-
2015
- 2015-06-09 CN CN201520391945.0U patent/CN204808689U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106485974A (en) * | 2016-11-18 | 2017-03-08 | 国家电网公司 | A kind of power department training secondary connection analogue means |
CN110208586A (en) * | 2019-05-15 | 2019-09-06 | 广州供电局有限公司 | Multiplexing electric abnormality analog circuit and multiplexing electric abnormality analog machine |
CN112489540A (en) * | 2020-11-23 | 2021-03-12 | 南昌工程学院 | Electric power marketing power consumption net wiring model |
CN112489540B (en) * | 2020-11-23 | 2022-06-28 | 南昌工程学院 | Electric power marketing power consumption net wiring model |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104851343A (en) | Demonstration and training device for electric equipment | |
CN103123758B (en) | A kind of dispatching automation numeral physical mixed simulation training system | |
CN104483643B (en) | Modeling method based on detection platform of fault indicator for physical simulation of power distribution network | |
CN104537936A (en) | Low-voltage transformer area simulation practical training device for rural network low-voltage distribution box | |
CN103439967A (en) | Closed loop test system of flexible direct current transmission control protection system | |
CN104423373A (en) | Closed-loop test system of flexible direct current transmission system control and protection system | |
CN104020374A (en) | Intelligent substation secondary equipment site-wide simulation test system | |
CN204808689U (en) | Power equipment demonstrates training set | |
CN205068942U (en) | Experimental hybrid simulation system of high -voltage electrical | |
CN104569657A (en) | Simulation testing device for mutual inductor of LTE wireless communication intelligent substation | |
CN203324463U (en) | Performance test and evaluation platform for small-current grounding line selection device | |
CN202816254U (en) | Integrated training device for power cable test and fault detection | |
CN105608966A (en) | Electric power metering device simulated field multifunctional training working table | |
CN106383308A (en) | Charge control circuit breaker automatic breaking/closing test device | |
CN104298127A (en) | Micro-grid semi-digital semi-physical real-time simulation system based on RT-LAB | |
CN105608949A (en) | Split type electric energy metering device and terminal installation wiring practical training apparatus | |
CN104407519A (en) | Semi-physical simulation system of AC-DC-AC metallurgy rolling mill transmission system | |
CN104091502B (en) | Low-tension centralized meter reading and installation training device based on carrier technology | |
CN104238371A (en) | Portable electric system digital simulation instrument | |
CN203397574U (en) | Intelligent training device capable of preventing electricity stealing | |
CN205067670U (en) | A anti -interference medium simulator for high -voltage electrical is experimental | |
CN107134768B (en) | Simulation method and system for direct-current power distribution network | |
CN203733400U (en) | Low-voltage reactive compensation simulation practical training apparatus | |
CN106646271B (en) | Shore power supply test system | |
CN202285151U (en) | Double-path working power supply of integrative experimental device with electricity-theft prevention for simulating working condition of metering of electric energy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151125 Termination date: 20190609 |
|
CF01 | Termination of patent right due to non-payment of annual fee |