Prior art keywords
vertical
transverse rod
vertical rods
construction
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920366475.0U
Other languages
Chinese (zh)
Inventor
郑斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Hongsheng Construction Group Co Ltd
Original Assignee
Fujian Hongsheng Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Hongsheng Construction Group Co Ltd filed Critical Fujian Hongsheng Construction Group Co Ltd
Priority to CN201920366475.0U priority Critical patent/CN209874520U/en
Application granted granted Critical
Publication of CN209874520U publication Critical patent/CN209874520U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides an face frontier defense guardrail in construction, including three piece at least vertical poles, the positive upper and lower both ends of vertical pole all are provided with an angle bar, vertical pole passes through the angle bar and fixes the scissors wall inboard at construction, transversely be provided with a plurality of protection component on three vertical poles, protection component includes from last first horizontal pole, second horizontal pole and the third horizontal pole that sets gradually extremely down, and first horizontal pole and third horizontal pole transversely set up on three vertical poles, three vertical poles openly are provided with the block subassembly of multiunit, and the block subassembly of every group is including three fastener, the fastener includes vertical board and "L" shape limiting plate, the second horizontal pole is erect on the three fastener of three vertical poles. The utility model discloses can protect the limit that faces of construction entrance to a cave, improve the safety of construction.

Description

Face frontier defense guardrail in construction
Technical Field
The utility model relates to a building engineering technical field, especially an face frontier defense guardrail in construction.
Background
In a construction site, when no protective facilities are arranged at the edge of a working face or the height of the protective facilities is less than 0.8 m, the edge-facing operation is carried out. In the construction process, each construction worker faces the safety problem of 'four-opening and five-edge'. The four openings refer to a stair opening, an elevator opening, a reserved hole opening and a passage opening; the five adjacent edges refer to the periphery of a balcony, the periphery of a floor, the periphery of a roof, the side edges of a runway and a chute and the side edge of a discharging platform; these near-edge openings are all dangerous sources of high-altitude falling accidents.
The traditional near-edge cave entrance guard railing is constructed temporarily and is constructed in a near-edge cave entrance corridor, so that the width of the corridor is reduced, and constructors cannot pass through the corridor easily; in addition, unnecessary troubles and inconvenience are brought to later-stage building construction. Along with the working procedures of masonry construction of secondary structural engineering, plastering and putty scraping of decoration and finishing engineering, cleaning work and decoration of bay windows, air-conditioning plates and the like of external walls, the guard railing of the adjacent edge opening needs to be detached from time to time, and needs to be restored afterwards. Different processes, different time, the installation of protection railing is demolishd, and not only the time and the work of wasting time are not resumeed after the rail guard is disassembled at will sometimes moreover, just can make and face the limit entrance to a cave and lose the protection, buries down hidden danger for the safety construction.
Disclosure of Invention
In order to overcome the problems, the utility model aims to provide an edge guard fence is faced in construction, this rail guard sets up and faces limit entrance to a cave inboard, and the construction need not often be demolishd like this, and it is more convenient to operate.
The utility model discloses a following scheme realizes: a limb guardrail in building construction comprises at least three vertical rods, wherein the three vertical rods are sequentially arranged from left to right, angle irons are arranged at the upper end and the lower end of the front of each vertical rod, the vertical rods are fixed on the inner side of a shear wall in building construction through the angle irons, a plurality of protective components are transversely arranged on the three vertical rods, each protective component comprises a first transverse rod, a second transverse rod and a third transverse rod which are sequentially arranged from top to bottom, a distance is reserved among the first transverse rod, the second transverse rod and the third transverse rod, the first transverse rod and the third transverse rod are transversely arranged on the three vertical rods, a plurality of groups of clamping components are arranged on the front faces of the three vertical rods, the number of the clamping components is the same as that of the protective components, each group of clamping components comprises three clamping pieces, each clamping piece comprises a vertical plate and an L-shaped limiting plate, the vertical plates are fixed on the front faces of the vertical rods, the L-shaped limiting plate is perpendicularly connected with the bottom of the vertical plate, the tail end of the L-shaped limiting plate is tilted outwards, a protruding portion is arranged on the inner side of the L-shaped limiting plate, concave portions are arranged at the left end, the middle portion and the right end of the second transverse rod and matched with the protruding portions, and the second transverse rod is erected on three clamping pieces of the three vertical rods.
Furthermore, one end of the angle iron is welded on the vertical rod, and the other end of the angle iron is fixed on the wall of the scissors through an expansion screw.
Further, the first cross rod and the third cross rod are transversely welded or fixed on the three vertical rods through bolts.
The beneficial effects of the utility model reside in that: set up the rail guard in facing limit entrance to a cave inside, the rail guard can not occupy the space that faces limit entrance to a cave corridor like this, and secondary structure engineering's brickwork is built by laying bricks or stones, the operation of plastering, puttying is to facing the limit entrance to a cave outside and going on, can not demolish the rail guard like this, demolish again when needs are to facing limit entrance to a cave inside construction, just the utility model discloses a second horizontal pole can be followed the rail guard and lift off or install, and it is also very convenient when needing to face limit entrance to a cave inside construction operation like this, has improved the security of construction.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic structural view of the first usage state of the engaging member of the present invention.
Fig. 3 is a schematic structural view of the second usage state of the engaging member of the present invention.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
Please refer to fig. 1 to 3, the utility model relates to a face frontier defense guardrail in construction, including three piece at least vertical poles 1, three vertical poles 1 set gradually from a left side to the right side, and the positive upper and lower both ends of vertical pole 1 all are provided with an angle bar 11, vertical pole 1 passes through angle bar 11 to be fixed at construction's scissors wall (not shown) inboard, owing to set up the rail guard in facing frontier opening inboard, the rail guard can not occupy the space that faces frontier opening corridor like this, and the masonry of secondary structure engineering is built by laying bricks or stones, is decorated the decoration engineering, the operation of scraping putty is all to facing frontier opening outside and is gone on, can not demolish the rail guard like this. The three vertical rods 1 are transversely provided with a plurality of protection components 2, each protection component 2 comprises a first transverse rod 21, a second transverse rod 22 and a third transverse rod 23 which are sequentially arranged from top to bottom, a distance d is reserved between each first transverse rod 21, each second transverse rod 22 and each third transverse rod 23, the first transverse rods 21 and the third transverse rods 23 are transversely arranged on the three vertical rods 1, the front surfaces of the three vertical rods 1 are provided with a plurality of groups of clamping components 3, the number of the clamping components 3 is the same as that of the protection components 2, each group of clamping components 3 comprises three clamping parts 31, each clamping part 31 comprises a vertical plate 311 and an L-shaped limiting plate 312, the vertical plate 311 is fixed on the front surface of each vertical rod 1, the L-shaped limiting plate 312 is vertically connected with the bottom of the vertical plate 311, the tail end of the L-shaped limiting plate 312 tilts outwards, the inner side of the L-shaped limiting plate 312 is provided with a protruding part 313, the left end, the middle part and the right end of the second cross rod 22 are provided with concave parts 221 which are matched with the convex parts 313, and the second cross rod 22 is erected on the three clamping pieces 31 of the three vertical rods 1. When the second cross rod 22 is clamped in the vertical plate, the protrusion of the L-shaped limiting plate 312 can clamp the second cross rod 22, so that the second cross rod 22 is not easy to move on the clamping piece 31, and the safety is improved. When the inner side of the adjacent edge hole needs to be operated, the second cross rod 22 is detached, and then a constructor can drill into the adjacent edge hole for operation through the distance between the first cross rod and the third cross rod.
In the present invention, one end of the angle iron 11 is welded to the vertical rod 1, and the other end of the angle iron is fixed to the scissor wall (not shown) by an expansion screw (not shown). So that the guard rail can be mounted or dismounted from the scissor wall.
The first cross bar 21 and the third cross bar 23 are transversely welded or fixed on the three vertical bars 1 through bolts. So that the guard rail can be more firm.
In a word, the utility model discloses set up the rail guard in facing limit entrance to a cave inboard, the rail guard can not occupy the space that faces limit entrance to a cave corridor like this, and secondary structure engineering's brickwork is built by laying bricks or stones, the operation of plastering, puttying is all to facing the limit entrance to a cave outside and going on, can not demolish the rail guard like this, need to remove as long as with the angle bar on three vertical poles when facing limit entrance to a cave inside construction, the rail guard whole can dismantle the operation like this, just the utility model discloses a second horizontal pole can be followed and lifted off or install from the rail guard, and it is also very convenient when carrying out construction operation to facing limit entrance to a cave inside like this, has improved the security of construction.
The above is only the preferred embodiment of the present invention, and all the equivalent changes and modifications made according to the claims of the present invention should be covered by the present invention.

Claims (3)

1. The utility model provides an face frontier defense guardrail in construction which characterized in that: the shear wall comprises at least three vertical rods, the three vertical rods are sequentially arranged from left to right, angle irons are arranged at the upper end and the lower end of the front of each vertical rod, the vertical rods are fixed on the inner side of a shear wall in building construction through the angle irons, a plurality of protective components are transversely arranged on the three vertical rods, each protective component comprises a first transverse rod, a second transverse rod and a third transverse rod which are sequentially arranged from top to bottom, a distance is reserved among the first transverse rod, the second transverse rod and the third transverse rod, the first transverse rod and the third transverse rod are transversely arranged on the three vertical rods, a plurality of groups of clamping components are arranged on the front of the three vertical rods, the number of the clamping components is equal to that of the protective components, each group of the clamping components comprises three clamping parts, each clamping part comprises a vertical plate and an L-shaped limiting plate, the vertical plate is fixed on the front of the vertical rods, and the L-shaped limiting plate is vertically connected with the bottom of, the tail end of the L-shaped limiting plate is tilted outwards, a protruding portion is arranged on the inner side of the L-shaped limiting plate, concave portions are arranged at the left end, the middle portion and the right end of the second transverse rod and matched with the protruding portions, and the second transverse rod is erected on three clamping pieces of the three vertical rods.
2. The frontier defense guardrail in building construction according to claim 1, characterized in that: one end of the angle iron is welded on the vertical rod, and the other end of the angle iron is fixed on the scissor wall through an expansion screw.
3. The frontier defense guardrail in building construction according to claim 1, characterized in that: the first cross rod and the third cross rod are transversely welded or fixed on the three vertical rods through bolts.
CN201920366475.0U 2019-03-21 2019-03-21 Face frontier defense guardrail in construction Active CN209874520U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920366475.0U CN209874520U (en) 2019-03-21 2019-03-21 Face frontier defense guardrail in construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920366475.0U CN209874520U (en) 2019-03-21 2019-03-21 Face frontier defense guardrail in construction

Publications (1)

Publication Number Publication Date
CN209874520U true CN209874520U (en) 2019-12-31

Family

ID=68956072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920366475.0U Active CN209874520U (en) 2019-03-21 2019-03-21 Face frontier defense guardrail in construction

Country Status (1)

Country Link
CN (1) CN209874520U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112608103A (en) * 2020-12-18 2021-04-06 福建宏盛建设集团有限公司 High-strength concrete for building construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112608103A (en) * 2020-12-18 2021-04-06 福建宏盛建设集团有限公司 High-strength concrete for building construction
CN112608103B (en) * 2020-12-18 2022-09-06 福建宏盛建设集团有限公司 High-strength concrete for building construction

Similar Documents

Publication Publication Date Title
AU723378B2 (en) Dismantable facade scaffold
CN110670867B (en) Construction method of scaffold for improving outer vertical surface of existing building
WO2014174269A1 (en) Balcony
CN209874520U (en) Face frontier defense guardrail in construction
CN204899260U (en) Assembled guardrail bar of can relieving a garrison
CN203374008U (en) Elevator shaft titling plane protective structure
CN105088979A (en) Demolition blasting method for large bridge
CN210713745U (en) Synchronous construction scaffold system for multiple working faces of super high-rise building
CN209568688U (en) A kind of elevating construction platform
CN208363666U (en) It is a kind of for build face side construction safety protection frame
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
GB2580760A (en) A hatch
CN216866080U (en) Elevator shaft protection device and system
CN205444955U (en) Protection device for be used for elevator well
CN210460171U (en) Face limit entrance to a cave regularization railing
CN215212255U (en) Suspension type frame combined high-altitude operation platform
CN204781872U (en) Regularization post reinforcement operation platform
AU2017268495A1 (en) Scaffolding System
CN111663758A (en) Suspended scaffold and construction method
CN111155775A (en) Safety protection device for reserved hole and construction method thereof
AU2017101328A4 (en) Rooftop access and safety system
KR100901016B1 (en) Safety bracket to external wall scaffolding for a structure
CN219794744U (en) Shaping edge opening protecting device
ES2156525A1 (en) System for attaching stone slabs to the facades of buildings.
CN220580598U (en) Elevator shaft internal fixation railing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant