CN209854765U - Long fiber plastic inner angle template for pipe gallery concrete structure construction - Google Patents
Long fiber plastic inner angle template for pipe gallery concrete structure construction Download PDFInfo
- Publication number
- CN209854765U CN209854765U CN201822196240.XU CN201822196240U CN209854765U CN 209854765 U CN209854765 U CN 209854765U CN 201822196240 U CN201822196240 U CN 201822196240U CN 209854765 U CN209854765 U CN 209854765U
- Authority
- CN
- China
- Prior art keywords
- formwork
- construction
- ribs
- long
- concrete structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004033 plastic Substances 0.000 title claims abstract description 44
- 239000000835 fiber Substances 0.000 title claims abstract description 42
- 238000010276 construction Methods 0.000 title claims abstract description 32
- 238000009415 formwork Methods 0.000 claims abstract description 87
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 10
- 239000000463 material Substances 0.000 abstract description 9
- 238000000034 method Methods 0.000 abstract description 7
- 230000008569 process Effects 0.000 abstract description 5
- 239000002253 acid Substances 0.000 abstract description 3
- 239000003513 alkali Substances 0.000 abstract description 3
- 238000005260 corrosion Methods 0.000 abstract description 3
- 230000007797 corrosion Effects 0.000 abstract description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 3
- 239000002131 composite material Substances 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 6
- 239000002023 wood Substances 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 230000007306 turnover Effects 0.000 description 5
- 239000004743 Polypropylene Substances 0.000 description 4
- 239000003365 glass fiber Substances 0.000 description 4
- -1 polypropylene Polymers 0.000 description 4
- 229920001155 polypropylene Polymers 0.000 description 4
- 239000011347 resin Substances 0.000 description 4
- 229920005989 resin Polymers 0.000 description 4
- 230000007613 environmental effect Effects 0.000 description 3
- 101100334009 Caenorhabditis elegans rib-2 gene Proteins 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000009430 construction management Methods 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000011120 plywood Substances 0.000 description 1
- 238000000275 quality assurance Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 238000004078 waterproofing Methods 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本实用新型属于建筑工程技术领域,具体涉及管廊砼结构施工用的长纤维塑料内角模板,包括模板底板和垂直设置围挡在模板底板四周的纵、横边肋,边肋由内外两层构成,两层边肋之间具有间隔距离,并在中间设有若干加强筋;在两个横向方向的内外两层边肋上并排设有若干连接孔,在两个纵向方向的内外层边肋上设有一穿墙拉杆孔,连接孔内穿过连接手柄固定相邻的两个内角模板;该模板加快了施工进度,保证了混凝土结构质量,减少了传统工艺上周转料的投入,节约了施工成本,产生了可观的效益,模板可回收再生,是一种环保高科技复合材料模板,节约资源;不吸水不变形,保证混凝土结构质量;脱模方便,使得工人更易操作;并且耐腐蚀、耐酸、耐碱好。
The utility model belongs to the technical field of construction engineering, and in particular relates to a long-fiber plastic inner corner formwork used in the construction of concrete structures in pipe corridors. , there is a distance between the two layers of side ribs, and a number of reinforcing ribs are provided in the middle; a number of connecting holes are arranged side by side on the inner and outer side ribs in the two transverse directions, and a number of connecting holes are arranged side by side on the inner and outer side ribs in the two longitudinal directions. There is a tie rod hole through the wall, and the connecting handle is passed through the connecting hole to fix the two adjacent inner corner formworks; the formwork speeds up the construction progress, ensures the quality of the concrete structure, reduces the input of the traditional process of circulating materials, and saves the construction cost , has produced considerable benefits, the formwork can be recycled and regenerated, it is an environmentally friendly high-tech composite formwork, which saves resources; it does not absorb water and does not deform, ensuring the quality of the concrete structure; it is easy to demould, making it easier for workers to operate; and it is corrosion-resistant, acid-resistant, Good alkali resistance.
Description
技术领域technical field
本实用新型属于建筑工程技术领域,具体涉及管廊砼结构施工用的长纤维塑料内角模板。The utility model belongs to the technical field of construction engineering, in particular to a long-fiber plastic inner angle formwork used for the construction of a concrete structure of a pipe gallery.
背景技术Background technique
城市综合管廊作为近年来各级地方政府大力推行建设的市政基础设施工程,方便了各类城市管线的施工、维修和管理,同时,节约了长远投资,一次新建合格,可以使用长达100 年,很大程度上方便了人民群众的生产生活。但在传统工艺的基础上,大部分使用竹胶板、木模板或者钢模板,这三种模板不可回收,竹胶板和木模板吸水易变形,钢模板难度大,竹胶板、木模板和钢模板的耐腐蚀、耐酸、耐碱性差,且可重复使用额次数少,不利于环保和节约成本。所以,如何快速的保质、保量新建一条城市综合管廊,并投入使用,及时产生效益,是工程技术人员不断改进施工方法、科技创新的原动力。As a municipal infrastructure project vigorously promoted by local governments at all levels in recent years, urban comprehensive pipe gallery facilitates the construction, maintenance and management of various urban pipelines. At the same time, it saves long-term investment. Once a new construction is qualified, it can be used for up to 100 years , To a large extent, it facilitates the production and life of the people. However, on the basis of traditional crafts, most of them use bamboo plywood, wood formwork or steel formwork. These three forms are not recyclable. The corrosion resistance, acid resistance, and alkali resistance of steel formwork are poor, and the number of times of repeated use is small, which is not conducive to environmental protection and cost saving. Therefore, how to quickly build a comprehensive urban utility corridor with high quality and quantity, put it into use, and generate benefits in a timely manner is the driving force for engineering and technical personnel to continuously improve construction methods and technological innovation.
实用新型内容Utility model content
针对现有技术中的问题,本实用新型提供了管廊砼结构施工用的长纤维塑料内角模板,形成了长纤维加筋带肋塑料模板施工工法,加快了施工进度,保证了混凝土结构质量,减少了传统工艺上周转料的投入,节约了施工成本,产生了可观的效益。Aiming at the problems in the prior art, the utility model provides a long-fiber plastic inner corner formwork for the construction of the concrete structure of the pipe gallery, forming a construction method of the long-fiber reinforced ribbed plastic formwork, which speeds up the construction progress and ensures the quality of the concrete structure. It reduces the input of the traditional craft workweek, saves the construction cost, and produces considerable benefits.
为实现上述技术目的,本实用新型采用的技术方案如下:For realizing above-mentioned technical purpose, the technical scheme that the utility model adopts is as follows:
管廊砼结构施工用的长纤维塑料内角模板,包括模板底板和垂直设置围挡在模板底板四周的纵、横边肋,纵、横边肋围成矩形,且边肋由内外两层构成,两层边肋之间具有间隔距离,内外两层边肋之间设有若干加强筋;在两个横向方向的内外两层边肋上并排设有若干连接孔,在两个纵向方向的内外层边肋上设有一穿墙拉杆孔,连接孔内穿过连接手柄固定相邻的两个内角模板。The long-fiber plastic inner corner formwork used for the construction of the concrete structure of the pipe gallery includes the formwork bottom plate and the vertical and horizontal side ribs arranged vertically around the formwork bottom plate. The vertical and horizontal side ribs form a rectangle, and the side ribs are composed of inner and outer layers. There is a distance between the two layers of side ribs, and several reinforcing ribs are arranged between the inner and outer two layers of side ribs; a number of connecting holes are arranged side by side on the inner and outer two layers of side ribs in the two transverse directions, A tie rod hole through the wall is provided on the side rib, and two adjacent inner corner formworks are fixed through the connecting handle in the connecting hole.
采用此设计的长纤维塑料内角模板,适用于城市综合管廊模板工程施工,由于边肋由双层构成,减轻模板的整体重量,保证本身的结构质量和强度,使得成型的混凝土结构更牢固,由于采用了连接手柄,能够方便工人进行拆、装,更快速的完成整个工程模板的安装,加快施工效率。The long-fiber plastic inner corner formwork with this design is suitable for the construction of urban comprehensive pipe gallery formwork. Since the side ribs are composed of double layers, the overall weight of the formwork can be reduced, and the structural quality and strength of the formwork can be guaranteed, making the formed concrete structure stronger. Due to the use of the connecting handle, it is convenient for workers to disassemble and assemble, and the installation of the entire project formwork can be completed more quickly, and the construction efficiency can be accelerated.
进一步限定,在纵向和横向的边肋之间设有十字形加强肋,更进一步的加强整个模板的承受强度。It is further defined that cross-shaped reinforcing ribs are provided between the longitudinal and transverse side ribs to further strengthen the bearing strength of the entire formwork.
进一步限定,所述十字形加强肋由内外两层构成,中间设有若干连接筋,在保证模板的整体结构质量的情况下减轻质量,方便工人安装时省时省力,还节约材料的用度。It is further defined that the cross-shaped reinforcing rib is composed of inner and outer layers, with several connecting ribs in the middle, which can reduce the quality while ensuring the overall structural quality of the formwork, which is convenient for workers to save time and effort during installation, and also saves the cost of materials.
进一步限定,所述连接孔呈蝶形状。Further defined, the connecting hole is butterfly-shaped.
进一步限定,所述连接手柄呈L型,它包括圆筒状的主体部和U型状的手柄部,所述主体部上粗下细,所述主体部的下端设有突出于外壁且对称设计的突出块,突出块和主体部的形状与蝶形状的连接孔匹配,所述主体部的上端设有旋转孔;U型手柄部内设有弧形筋,并且手柄部沿着其长度方向并排有若干力矩孔。It is further defined that the connection handle is L-shaped, which includes a cylindrical main body and a U-shaped handle. The protruding block, the shape of the protruding block and the main body match the butterfly-shaped connecting hole, the upper end of the main body is provided with a rotation hole; the U-shaped handle is provided with arc-shaped ribs, and the handles are side by side along its length There are several moment holes.
进一步限定,内角模板的材料由聚丙烯树脂和玻璃纤维构成。Further defined, the material of the inner corner formwork is composed of polypropylene resin and glass fiber.
进一步限定,聚丙烯树脂和玻璃纤维材料混合的比例为7:3。Further defined, the mixing ratio of polypropylene resin and glass fiber material is 7:3.
与现有技术相比,本实用新型做出的有益效果是:塑料内角模板形成了长纤维加筋带肋塑料模板施工工法,加快了施工进度,保证了混凝土结构质量,减少了传统工艺上周转料的投入,节约了施工成本,产生了可观的效益,设计使用100次,质量保证使用60次,模板可回收再生,是一种环保高科技复合材料模板。Compared with the prior art, the utility model has the beneficial effects that: the plastic inner corner formwork forms the construction method of the long-fiber reinforced ribbed plastic formwork, which speeds up the construction progress, ensures the quality of the concrete structure, and reduces the turnover of the traditional process. The input of materials saves construction costs and produces considerable benefits. The design is used 100 times, and the quality is guaranteed to be used 60 times. The formwork can be recycled and regenerated. It is an environmentally friendly high-tech composite material formwork.
长纤维塑料内角模板还可以回收使用,节约资源;不吸水不变形,保证混凝土结构质量;脱模方便,使得工人更易操作;并且耐腐蚀、耐酸、耐碱好,在室外使用的时候更牢固。The long-fiber plastic inner corner formwork can also be recycled and used to save resources; it does not absorb water and deform, ensuring the quality of the concrete structure; it is easy to demould, making it easier for workers to operate; and it is corrosion-resistant, acid-resistant, and alkali-resistant, and it is stronger when used outdoors.
附图说明Description of drawings
图1为本实用新型的主视结构示意图;Fig. 1 is the main view structure schematic diagram of the utility model;
图2为图1的仰视结构示意图;Fig. 2 is a schematic diagram of the bottom view of Fig. 1;
图3为图1的右视结构示意图;Fig. 3 is a schematic diagram of the right view structure of Fig. 1;
图4为连接手柄的立体结构示意图;Fig. 4 is a three-dimensional structural schematic diagram of the connecting handle;
图5为管廊砼结构施工用的长纤维塑料内角模板的连接安装主视结构示意图。Fig. 5 is a schematic structural diagram of the front view of the connection and installation of the long-fiber plastic inner corner formwork used for the construction of the concrete structure of the pipe gallery.
具体实施方式Detailed ways
为了使本领域的技术人员可以更好地理解本发明,下面结合附图和实施例对本实用新型技术方案进一步说明。In order to enable those skilled in the art to better understand the present invention, the technical solution of the present utility model will be further described below in conjunction with the accompanying drawings and embodiments.
如图1、图2、图3、图4、图5所示的管廊砼结构施工用的长纤维塑料内角模板,内角模板的材料由聚丙烯树脂和玻璃纤维构成,聚丙烯树脂和玻璃纤维材料混合的优选比例为7:3,长纤维塑料内角模板包括模板底板1和垂直设置围挡在模板底板1四周的纵边肋2和横边肋3,纵、横边肋围成矩形与模板底板1一体设计,采用LET-D直接工艺在线模压成型工艺一体成型,另外,纵边肋2和横边肋3由内外两层构成,两层边肋之间具有间隔距离,纵边肋2和横边肋3的内外两层边肋之间设有若干加强筋4;在两个两层的横边肋3上并排设有若干连接孔5,在两个内外层纵边肋2上设有一穿墙拉杆孔6,连接孔5内穿过连接手柄7 固定相邻的两个内角模板,所述连接孔5呈蝶形状。The long-fiber plastic inner angle formwork used for the construction of the pipe gallery concrete structure shown in Figure 1, Figure 2, Figure 3, Figure 4, and Figure 5, the material of the inner angle formwork is composed of polypropylene resin and glass fiber, polypropylene resin and glass fiber The preferred ratio of material mixing is 7:3. The long-fiber plastic inner corner formwork includes a formwork bottom plate 1 and vertical ribs 2 and transverse ribs 3 that are vertically arranged around the formwork bottom plate 1. The longitudinal and transverse ribs form a rectangle and formwork. Bottom plate 1 is designed in one piece, and is integrally formed by LET-D direct process online molding process. In addition, longitudinal rib 2 and transverse rib 3 are composed of inner and outer layers, and there is a distance between the two layers of ribs. A number of reinforcing ribs 4 are provided between the inner and outer two-layer side ribs of the horizontal side rib 3; a number of connecting holes 5 are arranged side by side on the two two-layer horizontal side ribs 3, and a number of connecting holes 5 are arranged on the two inner and outer layer longitudinal side ribs 2 The tie rod hole 6 through the wall, the connecting handle 7 passes through the connecting hole 5 to fix two adjacent inner corner formworks, and the connecting hole 5 is butterfly-shaped.
所述连接手柄7呈L型,它包括圆筒状的主体部71和U型状的手柄部72,所述主体部71上粗下细,主体部71的下半段穿在连接孔5内、上半段具有限位作用,所述主体部71的下端设有突出于外壁且对称设计的突出块73,突出块73和主体部71的形状与蝶形状的连接孔5匹配,所述主体部71的上端设有旋转孔711,旋转孔711内可插入杠杆工具,用于旋转连接手柄7安装在连接孔5内的位置,主体部71穿过连接孔5旋转后将突出块73与连接孔 5错开,就形成锁止状态,连接手柄7就无法拔出连接孔5,可以稳定的连接两个相邻的长纤维塑料内角模板;U型手柄部72内设有弧形筋,中空的手柄部72是为了节省材料,弧形筋具有加强手柄部72的强度作用,并且手柄部72沿着其长度方向并排有若干力矩孔721,杠杆工具插入力矩孔721内,通过调整与主体部71的距离来调整力矩,使得更易旋转连接手柄 7,便于工人更好的安装。The connecting handle 7 is L-shaped, and it includes a cylindrical main body 71 and a U-shaped handle 72. The main body 71 is thicker at the top and thinner at the bottom, and the lower half of the main body 71 is passed through the connecting hole 5. 1. The upper half has a position-limiting effect. The lower end of the main body 71 is provided with a protruding block 73 that protrudes from the outer wall and is symmetrically designed. The shapes of the protruding block 73 and the main body 71 match the butterfly-shaped connecting hole 5. The main body The upper end of part 71 is provided with rotating hole 711, and lever tool can be inserted in rotating hole 711, is used for rotating the position that connecting handle 7 is installed in connecting hole 5, and after main body part 71 passes through connecting hole 5, protruding block 73 is connected with Holes 5 are staggered to form a locked state, and the connecting handle 7 cannot be pulled out of the connecting hole 5, which can stably connect two adjacent long-fiber plastic inner angle formworks; The handle part 72 is in order to save material. The arc-shaped rib has the effect of strengthening the strength of the handle part 72, and the handle part 72 has several torque holes 721 arranged side by side along its length direction. The lever tool is inserted into the torque hole 721. The torque is adjusted according to the distance, so that it is easier to rotate the connecting handle 7, which is convenient for workers to install better.
在纵边肋2和横边肋3之间设有十字形加强肋8,所述十字形加强肋8由内外两层构成,中间设有若干连接筋81,十字形加强肋8横向和纵向的跨连在模板底板1上,四端连接在纵边肋2和横边肋3的内侧,即固定加强边肋的强度,又加强模板底板1的强度。Between the longitudinal side rib 2 and the transverse side rib 3, a cross-shaped reinforcing rib 8 is provided. The straddle is connected on the formwork bottom plate 1, and the four ends are connected to the inner sides of the longitudinal side ribs 2 and the transverse side ribs 3, that is, the strength of the side ribs is fixed and strengthened, and the strength of the formwork bottom plate 1 is strengthened.
安装时以管廊外墙厚400mm、内墙厚300mm为例,长纤维塑料内角模板采用80mm的厚度,外龙骨采用48mm×3.5mm双钢管,侧墙设置穿墙拉杆,穿墙拉杆穿过穿墙拉杆孔6,穿墙拉杆通过“ε”型卡、螺母与十字形加强肋连接,对拉螺杆间距400×400mm。对有防水要求的外侧墙体采用防水对拉螺杆,止水螺杆长度为墙的厚度H+2*280mm。在长纤维塑料内角模板拆除后,及时将螺杆外露部分用切割机切除,长纤维塑料内角模板间采用专用手柄连接。When installing, take the outer wall thickness of 400mm and the inner wall thickness of 300mm as an example, the long-fiber plastic inner corner formwork adopts a thickness of 80mm, the outer keel adopts 48mm×3.5mm double steel pipes, and the side wall is set The wall-through tie rod, the wall-through tie rod passes through the wall-through tie rod hole 6, the wall-through tie rod is connected with the cross-shaped reinforcing rib through the "ε" type card and nut, and the distance between the pull screw rods is 400×400mm. For the outer wall that requires waterproofing, use waterproof opposite pull screws, and the length of the waterproof screw is the thickness of the wall H+2*280mm. After the long-fiber plastic inner corner formwork is removed, cut off the exposed part of the screw with a cutting machine in time, and use a special handle to connect the long-fiber plastic inner corner formwork.
墙体侧模拆模时要根据气温及混凝土的级别和强度增长速度,依据试验室提供的数据,常温下混凝土必须达到1MPa时方可拆模板,冬施时混凝土必须达到受冻临界强度方可拆模,同时保证拆模时墙体不缺角、不粘模。The side formwork of the wall should be removed according to the air temperature and the grade and strength growth rate of the concrete. According to the data provided by the laboratory, the concrete must reach 1MPa at room temperature before the formwork can be removed, and the concrete must reach the critical strength of freezing in winter. Remove the formwork, and at the same time ensure that the wall is not missing corners and does not stick to the formwork when removing the formwork.
长纤维塑料内角模板从上而下进行拆除,严禁强行硬拆模板;拆模过程必须有专人指挥;拆除后的小配件集中堆放,防止丢失;长纤维塑料内角模板清理干净后,涂刷脱模剂,堆放整齐待用。The long-fiber plastic inner corner formwork is dismantled from top to bottom, and it is strictly forbidden to forcibly remove the formwork; the demoulding process must be directed by a special person; the small parts after dismantling are stacked together to prevent loss; after the long-fiber plastic inner corner formwork is cleaned, brush and demould Agents, stacked neatly for use.
长纤维塑料内角模板的质量控制要符合《城市综合管廊工程技术规范》(GB50838)、《给水排水构筑物工程施工及验收规范》(GB 50141)、《混凝土结构工程施工质量验收规范》(GB 50204)、《建筑施工模板安全技术规范》(JGJ 162)规范标准要求,长纤维塑料内角模板组合尺寸偏差如下表:The quality control of the long-fiber plastic inner corner formwork must comply with the "Technical Specifications for Urban Comprehensive Pipe Gallery Engineering" (GB50838), "Code for Construction and Acceptance of Water Supply and Drainage Structure Engineering" (GB 50141), "Code for Construction Quality Acceptance of Concrete Structure Engineering" (GB 50204 ), "Building Construction Formwork Safety Technical Specifications" (JGJ 162) standard requirements, long-fiber plastic inner corner formwork combination size deviation is as follows:
长纤维塑料内角模板外观质量要求如下表:The appearance quality requirements of long fiber plastic inner corner formwork are as follows:
长纤维塑料内角模板的质量保证措施:Quality assurance measures for long fiber plastic inner corner formwork:
1、长纤维塑料内角模板及其支架满足浇筑混凝土时的承载力、刚度和稳定性要求,且安装牢固,符合方案要求。1. The long-fiber plastic inner corner formwork and its support meet the requirements of bearing capacity, stiffness and stability when pouring concrete, and the installation is firm, which meets the requirements of the scheme.
2、各部位的长纤维塑料内角模板安装位置正确、拼缝紧密不漏浆;对拉螺栓、垫块等安装稳固;长纤维塑料内角模板上的预埋件、预留孔洞不得遗漏,且安装牢固。2. The installation position of the long-fiber plastic inner corner formwork in each part is correct, and the joints are tight without leakage; the pull bolts and spacers are installed firmly; the embedded parts and reserved holes on the long-fiber plastic inner corner formwork must not be missed, and the installation firm.
3、长纤维塑料内角模板清洁、脱模剂涂刷均匀,钢筋和混凝土接茬处无污渍。3. The long-fiber plastic inner corner formwork is clean, the release agent is evenly applied, and there is no stain on the steel bar and concrete stubble.
4、浇筑混凝土前,长纤维塑料内角模板内的杂物需清理干净。4. Before pouring concrete, the debris in the long-fiber plastic inner corner formwork must be cleaned.
长纤维塑料内角模板检验依据如下表:The basis for inspection of long-fiber plastic inner corner formwork is as follows:
长纤维塑料内角模板属节能环保新材料,科技含量高,能多次重复使用,并可回收再生利用;同时,与传统木模板相比,无需大量使用钢管、木材。另外,因加筋带肋,较少了剪力墙内龙骨的设置,降低了人工、机具、铁钉的使用,文明施工管理成效显著提高,符合“节能减排”,带来了良好的环保和节能效益。Long-fiber plastic inner corner formwork is a new energy-saving and environmentally friendly material with high technological content, can be reused many times, and can be recycled and recycled; at the same time, compared with traditional wood formwork, it does not need to use a large amount of steel pipes and wood. In addition, due to the reinforcement and ribs, the setting of keels in the shear wall is reduced, and the use of labor, machinery and nails is reduced, and the effectiveness of civilized construction management is significantly improved, which is in line with "energy saving and emission reduction" and brings good environmental protection and energy saving benefits.
长纤维塑料内角模板周转次数高,且可以全部回收再生,完全消除环境污染,体现了易安特模板具有良好的环境效益。例如:以综合管廊标准段(20m)为例,分别使用长纤维塑料内角模板和传统木模进行项目施工。计算可得传统木模造价合计约为10万元,长纤维塑料内角模板造价合计约为28万元。因长纤维塑料内角模板的使用周转次数可达到60-80次,而传统木模使用周转次数平均为3~5次,在施工使用周转12次左右传统木模费用与长纤维塑料内角模板费用趋于相同,使用周转次数大于12次后,长纤维塑料内角模板的综合经济效益大于传统木模。综上分析可知,长纤维塑料内角模板的经济效益与使用次数的增加呈正相关关系,科学、合理使用后,塑料模板的经济效益远高于传统木模。The long-fiber plastic inner corner formwork has a high turnover rate, and can be completely recycled, completely eliminating environmental pollution, which reflects the good environmental benefits of Eante formwork. For example: Taking the standard section (20m) of the comprehensive pipe gallery as an example, the long-fiber plastic inner corner formwork and traditional wood formwork are used for project construction. It can be calculated that the total cost of traditional wooden formwork is about 100,000 yuan, and the total cost of long-fiber plastic inner corner formwork is about 280,000 yuan. Because the turnover times of long-fiber plastic inner corner formwork can reach 60-80 times, while the average turnover times of traditional wooden formwork is 3-5 times, and the cost of traditional wooden formwork and long-fiber plastic inner corner formwork tends to be about 12 times during construction. In the same way, after using more than 12 turnover times, the comprehensive economic benefits of the long-fiber plastic inner corner formwork are greater than that of the traditional wood formwork. From the above analysis, it can be seen that the economic benefits of long-fiber plastic inner corner formwork are positively correlated with the increase in the number of uses. After scientific and reasonable use, the economic benefits of plastic formwork are much higher than that of traditional wood formwork.
以上对本实用新型提供的管廊砼结构施工用的长纤维塑料内角模板进行了详细介绍。具体实施例的说明只是用于帮助理解本实用新型的方法及其核心思想。应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以对本实用新型进行若干改进和修饰,这些改进和修饰也落入本实用新型权利要求的保护范围内。The long-fiber plastic inner corner formwork used for the construction of the concrete structure of the pipe gallery provided by the utility model has been introduced in detail above. The description of specific embodiments is only used to help understand the method and core idea of the present invention. It should be pointed out that for those of ordinary skill in the art, without departing from the principle of the utility model, some improvements and modifications can also be made to the utility model, and these improvements and modifications also fall into the protection of the claims of the utility model. within range.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822196240.XU CN209854765U (en) | 2018-12-26 | 2018-12-26 | Long fiber plastic inner angle template for pipe gallery concrete structure construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822196240.XU CN209854765U (en) | 2018-12-26 | 2018-12-26 | Long fiber plastic inner angle template for pipe gallery concrete structure construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209854765U true CN209854765U (en) | 2019-12-27 |
Family
ID=68929393
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822196240.XU Expired - Fee Related CN209854765U (en) | 2018-12-26 | 2018-12-26 | Long fiber plastic inner angle template for pipe gallery concrete structure construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209854765U (en) |
-
2018
- 2018-12-26 CN CN201822196240.XU patent/CN209854765U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106121107B (en) | Assemble type concrete slab and its plate dry type connection method | |
CN203080911U (en) | Inner formwork for concrete walls at deformation joint | |
CN101538901A (en) | FRP connecting piece of prefabricated heat preservation wall body | |
CN115653173A (en) | Take precast concrete heat preservation composite floor that GFRP strengthened | |
CN209854765U (en) | Long fiber plastic inner angle template for pipe gallery concrete structure construction | |
CN103437494A (en) | Engineered wood-profiled steel sheet-lightweight aggregate concrete composite beam and preparation and installation method thereof | |
CN102127965B (en) | Prefabricated stress template of combined material | |
CN204781356U (en) | Steel core concrete column and outsourcing U -shaped steel -concrete composite beam connected node | |
CN204552104U (en) | A kind of flooring aluminum alloy building template form removal instrument | |
CN204225483U (en) | GIS pier aluminium alloy fixed shape template system | |
CN203891470U (en) | Fastening bolt for shear wall formwork | |
CN103410344B (en) | A kind of steel concrete wall beam strengthen device and wall beam Enhancement Method | |
CN203145444U (en) | Novel three-layer composite hollow plastic building template | |
CN203200982U (en) | Steel bar truss buckling hanging type floor support plate | |
CN206607880U (en) | A kind of unidirectional detachable split bolt | |
CN105239752A (en) | Reinforced energy consumption wood joist | |
CN206289736U (en) | A kind of assembly concrete beam-column connection | |
CN207892081U (en) | One body composite board T shape walls of Fast Installation heat insulation decorative load-bearing | |
CN204040457U (en) | Wood frame plastic formwork system | |
CN206289866U (en) | A kind of FRP pipes and half prefabricated half cast-in-place construction refuse regenerated concrete combination column | |
CN208473286U (en) | A kind of wall form of car ramp circular arc wall | |
CN207110140U (en) | A kind of honeycomb board member for being used to make concrete curtain wall plate | |
CN206568301U (en) | A kind of reserved hand hole shaping jig of prefabricated panel | |
WO2017092145A1 (en) | Recombined modular formwork of building | |
CN205530683U (en) | Concatenation formula steel framework structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191227 |
|
CF01 | Termination of patent right due to non-payment of annual fee |