CN205530683U CN201620050443.6U CN201620050443U CN205530683U CN 205530683 U CN205530683 U CN 205530683U CN 201620050443 U CN201620050443 U CN 201620050443U CN 205530683 U CN205530683 U CN 205530683U
Authority
CN
China
Prior art keywords
steel
steel column
column
horizontal girder
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620050443.6U
Other languages
Chinese (zh)
Inventor
张帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620050443.6U priority Critical patent/CN205530683U/en
Application granted granted Critical
Publication of CN205530683U publication Critical patent/CN205530683U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a concatenation formula steel framework structure, including erecting steel column and horizontal girder steel, wherein, it all includes the cavity steel column to erect steel column and horizontal girder steel, be formed with strengthening rib and recess on the cavity steel column surface, cavity steel column inboard is equipped with the sliding lock, erecting the upper portion of steel column and connecting the apical grafting head, connect at the bottom of the sub -unit connection, the centre is equipped with the side and connects, the both ends of horizontal girder steel were located in other joint of perpendicular steel column, apical grafting head, the end connect stretches into cavity steel column and fixed mutually with the sliding lock, be equipped with L shaped steel area on the perpendicular steel column, L shaped steel area is fixed in the recess. The utility model provides a concatenation formula steel framework structure through adopting the cavity steel column as erecting steel column and horizontal girder steel, utilizes recess, sliding lock and joint to realize erecting the concatenation between steel column and the horizontal girder steel, saves the screw bolt and nut, also need not welding process to building engineering efficiency can be improved greatly, the cost of labor is reduced, and simple structure, easy to carry out.

Description

A kind of spliced steel bar framework structure
Technical field
This utility model relates to a kind of steel bar framework structure, particularly relates to a kind of spliced steel bar framework structure.
Background technology
Existing armored concrete/stone column construction method: cost, construction, durability, shock resistance, safety, engineering Second-rate inefficient with space serviceability.Existing armored concrete/stone column building course is as follows: first stay Space (Leave Gap), installs steel bar framework structure (Steel Reinforcement), then by plank/timber template Support and go along with sb. to guard him and separate (Timber Formwork), then pour into concrete (Pour Concrete).Reinforcing bar mixes Solidifying earth pillar dry rear (after 3 days), by plank/timber form removable and repairing bubble, total time-consuming about 5 days.
Present in prior art, shortcoming is as follows: need ironworker craftsman, carpenter, concrete craftsman and bricklayer association Making just to complete work, architectural engineering efficiency is low, and considerably increases cost of labor.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of spliced steel bar framework structure, it is possible to significantly carry High building engineering efficiency, reduces cost of labor, and simple in construction, it is easy to implement.
This utility model employed technical scheme comprise that a kind of spliced steel bar framework of offer for solving above-mentioned technical problem Structure, including perpendicular steel column and horizontal girder steel, wherein, described perpendicular steel column and horizontal girder steel all include hollow steel column, described in It is formed with reinforcement and groove on empty steel column outer surface, inside described hollow steel column, is provided with sliding lock, described perpendicular steel column Top connects apical grafting head, joint at the bottom of the connection of bottom, and centre is provided with other joint, and perpendicular steel is located at the two ends of described horizontal girder steel In the other joint of post, described apical grafting head, end joint put in hollow steel column and fix with sliding lock, on described perpendicular steel column Being provided with L-type steel band, described L-type steel band is fixing in a groove.
Above-mentioned spliced steel bar framework structure, wherein, described sliding lock includes two guiding draw runners being oppositely arranged.
This utility model contrast prior art has a following beneficial effect: the spliced reinforcing steel bar frame that this utility model provides Shelf structure, by using hollow steel column as perpendicular steel column and horizontal girder steel, utilizes groove, sliding lock and joint to realize perpendicular steel Splicing between post and horizontal girder steel, saves screw bolt and nut, without welding process such that it is able to is greatly improved and builds Build engineering efficiency, reduce cost of labor, and simple in construction, it is easy to implement.
Accompanying drawing explanation
Fig. 1 is this utility model spliced steel bar framework structural representation;
Fig. 2 is the perpendicular steel column structure schematic diagram of the spliced steel bar framework of this utility model;
Fig. 3 is the attachment structure schematic diagram that this utility model erects steel column and horizontal girder steel.
In figure:
1 hollow steel column 2 apical grafting head 3 end joint
4 other joint 5 reinforcement 6 sliding locks
7 grooves 8 erect the horizontal girder steel of steel column 9
10 L-type steel bands
Detailed description of the invention
The utility model will be further described with embodiment below in conjunction with the accompanying drawings.
Fig. 1 is this utility model spliced steel bar framework structural representation;Fig. 2 is the spliced reinforcing bar of this utility model The perpendicular steel column structure schematic diagram of framework;Fig. 3 is the attachment structure schematic diagram that this utility model erects steel column and horizontal girder steel.
Referring to Fig. 1, Fig. 2 and Fig. 3, the spliced steel bar framework structure that this utility model provides, including perpendicular steel column 8 and horizontal girder steel 9, wherein, described perpendicular steel column 8 and horizontal girder steel 9 all include hollow steel column 1, described hollow steel column 1 It is formed with reinforcement 5 and groove 7 on outer surface, inside described hollow steel column 1, is provided with sliding lock 6, described perpendicular steel column 8 Top connect apical grafting head 2, joint 3 at the bottom of the connection of bottom, centre is provided with other joint 4, the two ends of described horizontal girder steel 9 Being located in the other joint 4 of perpendicular steel column, described apical grafting head 2, end joint 3 put in hollow steel column 1 and consolidate with sliding lock 6 phase Fixed, described perpendicular steel column 8 is provided with L-type steel band 10, and described L-type steel band 10 is fixed in groove 7.
The spliced steel bar framework structure that this utility model provides, wherein, described sliding lock 6 includes that two are oppositely arranged Guiding draw runner.During installation, sliding lock on hollow steel column 1 is entered upper and lower steel joint/mouth, connect apical grafting head 2 and the end Joint 3, erects and positions perpendicular steel column 8, after measuring and correcting, and stickfast or firm upper and lower steel joint/mouth, always Time-consuming about 5 minutes.
The spliced steel bar framework structure that this utility model provides, by bending iron craftsman, carpenter, concrete craftsman and mud The work of water craftsman becames one, and only just need to can complete work with bricklayer, improves efficiency for architectural engineering.During installation Two people are only needed just can easily to erect installation, without using crane.Install appropriate after just can build a wall at once, thus province Time, accelerate the progress of engineering.Additionally, steel bar framework of the present utility model uses the design of simple slidingtype to fix steel Anti-.Meanwhile, the work difference connecting steel reinforcement post girder construction pipe can allow the length of perpendicular steel column/horizontal girder steel obtain retractility Adjustment.These designs eliminate use screw bolt and nut, without welding process.Concrete advantage is as follows: 1) subtract Reinforced beam and a large amount of cement construction material are lacked;2) substantial amounts of structure in each construction link is decreased The waste of producing material material;3) building is no longer necessary to high-volume cob brick timber, environmental protection, low-carbon (LC), energy-conservation, comprehensively utilizes valency Value resource is obvious;4) produced on-site assembles, and decreases the dependence to other traditional building materials and uses and consume, contracting Short construction period;5) service life is minimum more than 100 years, and building is energy-conservation reaches 90%;Reduce discharging pollution and reach 95%; The shortening engineering time reaches 80%;Construction costs is low, saves building cost more than 30%;6) structure set and decorating integrative Change, factorial praluction, Assembling, the environmental pollution such as less sewage, dust, noise;7) raw from construction material The application of product, building design and construction, constructing operation, remove and the aspect such as build again and consider, with traditional building material (as Thorough piece of Rhizoma Begoniae Willsonii, concrete) build ratio, can save energy 90%, reduce discharging 95%, save soil 100%, water saving 90%, save wood 90%, Shorten the production and construction time 90%, reduce cost more than 30%;8) whether with xoncrete structure, steel construction, space The structure design of the aspects such as structure, combinative structure, ground and basis, and earthquake resistant engineering, to subtract shock insulation be all special Superior.
Although this utility model discloses as above with preferred embodiment, so it is not limited to this utility model, appoints What those skilled in the art, without departing from spirit and scope of the present utility model, when making a little amendment and complete Kind, protection domain the most of the present utility model is when with being as the criterion that claims are defined.

Claims (2)

1. a spliced steel bar framework structure, including perpendicular steel column (8) and horizontal girder steel (9), it is characterised in that Described perpendicular steel column (8) and horizontal girder steel (9) all include hollow steel column (1), on described hollow steel column (1) outer surface Being formed with reinforcement (5) and groove (7), described hollow steel column (1) inner side is provided with sliding lock (6), described perpendicular steel The top of post connects apical grafting head (2), joint (3) at the bottom of the connection of bottom, and centre is provided with other joint (4), described horizontal steel The two ends of beam (9) are located in the other joint (4) of perpendicular steel column, during described apical grafting head (2), end joint (3) put in Empty steel column (1) also fixes with sliding lock (6), and described perpendicular steel column (8) is provided with L-type steel band (10), described L Steel band of model (10) is fixed in groove (7).
Spliced steel bar framework structure the most as claimed in claim 1, it is characterised in that described sliding lock (6) wraps Include two guiding draw runners being oppositely arranged.
CN201620050443.6U 2016-01-19 2016-01-19 Concatenation formula steel framework structure Expired - Fee Related CN205530683U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620050443.6U CN205530683U (en) 2016-01-19 2016-01-19 Concatenation formula steel framework structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620050443.6U CN205530683U (en) 2016-01-19 2016-01-19 Concatenation formula steel framework structure

Publications (1)

Publication Number Publication Date
CN205530683U true CN205530683U (en) 2016-08-31

Family

ID=56766425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620050443.6U Expired - Fee Related CN205530683U (en) 2016-01-19 2016-01-19 Concatenation formula steel framework structure

Country Status (1)

Country Link
CN (1) CN205530683U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760500A (en) * 2017-03-07 2017-05-31 中国五冶集团有限公司 A kind of formwork support structure of hole to be provided top cover construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760500A (en) * 2017-03-07 2017-05-31 中国五冶集团有限公司 A kind of formwork support structure of hole to be provided top cover construction
CN106760500B (en) * 2017-03-07 2023-06-27 中国五冶集团有限公司 Template supporting structure for construction of reserved hole top cover

Similar Documents

Publication Publication Date Title
CN104532953B (en) 3D printing based assembly type special-shaped column framework structure and construction method thereof
CN104895193B (en) Prefabricated outer wall panel connects box and connecting node
CN108661202A (en) A kind of large area hollow out lattice brick curtain wall construction modelled after an antique and construction method
CN103741970A (en) Assembled machining shed for building construction and manufacture and installation method thereof
CN206428805U (en) A kind of concrete prefabricated balcony of assembled steel
CN108755990A (en) The light-duty lattice band reinforcing bar disassembly-free thermal-insulation form board of external wall
CN205976215U (en) Compound box roof beam of assembled concrete
CN205530683U (en) Concatenation formula steel framework structure
CN201495664U (en) Novel hollow floor slab with precast prestress
CN211691443U (en) Cast-in-place construction formwork trolley for building infilled wall
CN206267522U (en) The buttress template support system of shock isolating pedestal
CN211228607U (en) Integrally formed construction structure of outer wall and bottom plate of cast-in-place concrete structure of structure
CN105839851B (en) Using the construction method for the prefabricated frame trestle that segmentation connection is formed
CN108729466B (en) Large formwork supporting method for constructing anchor-free concrete retaining wall
CN204356896U (en) Based on the assembling Framed Structure with Special-Shaped Columns that 3D prints
CN203947493U (en) Assembling type device for detecting manhole
CN207160448U (en) A kind of assembled architecture reinforced concrete stairs structure
CN205116717U (en) Cast -in -place stair template reinforced structure
CN105422140A (en) Template supporting device for concrete supporting construction of shaft and lane engineering
CN205348390U (en) Connection structure of precast concrete roof beam and cast -in -place post
CN205636493U (en) A device that is used for high mound of hollow thin wall of bridge to bind
CN207110140U (en) A kind of honeycomb board member for being used to make concrete curtain wall plate
CN111809792A (en) Assembled precast concrete wallboard
CN207277367U (en) Reinforcement of retaining wall structure
CN2926393Y (en) Multifunctional building template

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831