A cast-in-place construction formwork trolley for building infill walls Download PDFInfo
- Publication number
- CN211691443U CN211691443U CN201922262451.3U CN201922262451U CN211691443U CN 211691443 U CN211691443 U CN 211691443U CN 201922262451 U CN201922262451 U CN 201922262451U CN 211691443 U CN211691443 U CN 211691443U
- Authority
- CN
- China
- Prior art keywords
- template
- trolley
- slide rail
- formwork
- cast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑工程技术领域,具体地说是一种建筑填充墙现浇施工模板台车。The utility model relates to the technical field of construction engineering, in particular to a cast-in-place construction formwork trolley for a building filling wall.
背景技术Background technique
目前建筑填充墙已有使用泡沫混凝土现浇施工工艺,但模板体系依然是传统的铝模板、木模板结合钢管主龙骨和方木次龙骨通过人工进行安拆,人工作业的劳动量大、效率低、材料损耗大、周转率低、非常不经济。当前亟待需求一种周转率高、方便拆卸安装、组装省时省力的施工模板装置。At present, the construction technology of foam concrete cast-in-place has been used for building infill walls, but the formwork system is still the traditional aluminum formwork, wood formwork combined with steel pipe main keel and square wood secondary keel to install and dismantle manually, which is labor-intensive and efficient. Low, material loss, low turnover, very uneconomical. At present, there is an urgent need for a construction formwork device with high turnover rate, convenient disassembly and installation, and time-saving and labor-saving assembly.
发明内容SUMMARY OF THE INVENTION
本实用新型的技术任务是解决现有技术的不足,提供一种建筑填充墙现浇施工模板台车。The technical task of the utility model is to solve the deficiencies of the prior art and provide a cast-in-place construction formwork trolley for a building filling wall.
本实用新型的技术方案是按以下方式实现的,本实用新型的一种建筑填充墙现浇施工模板台车,其结构包括前置模板组件、后置模板组件、侧边模板组件、前置台车、后置台车,The technical scheme of the present utility model is realized in the following ways. The present utility model is a cast-in-place construction formwork trolley for a building infill wall. Its structure includes a front formwork assembly, a rear formwork assembly, a side formwork assembly, and a front table. car, rear trolley,
前置模板组件由前模板和前模板龙骨构成,前模板龙骨固定连接在前模板的前置板面上;The front formwork assembly is composed of a front formwork and a front formwork keel, and the front formwork keel is fixedly connected to the front plate surface of the front formwork;
后置模板组件由后模板和后模板龙骨构成,后模板龙骨固定连接在后模板的后置板面上;The rear template assembly is composed of a rear template and a rear template keel, and the rear template keel is fixedly connected to the rear plate surface of the rear template;
侧边模板组件由侧模板和侧模板龙骨构成,侧模板龙骨固定连接在侧模板的外围板面上;The side formwork assembly is composed of a side formwork and a side formwork keel, and the side formwork keel is fixedly connected to the outer surface of the side formwork;
前置模板组件和后置模板组件相平行,且与前后方向对应设置;The front formwork assembly and the rear formwork assembly are parallel and corresponding to the front and rear directions;
前置模板组件和后置模板组件的左右两个端部分别对应固定连接左位的和右位的侧边模板组件;The left and right ends of the front formwork assembly and the rear formwork assembly correspond to the left and right side formwork assemblies fixedly connected respectively;
前置模板组件、后置模板组件、以及左、右的侧边模板组件固定连接围成上下开放的预浇空间模板,预浇空间模板内围空间构成建筑填充墙预浇空间;The front formwork assembly, the rear formwork assembly, and the left and right side formwork assemblies are fixedly connected to form a precast space formwork open up and down, and the inner space of the precast space formwork constitutes the precast space of the building infill wall;
于前置模板组件的前模板龙骨前侧固定连接有前置滑轨,于前置滑轨和前模板龙骨的固定连接处的前模板龙骨上同平面固定设置有与前模板龙骨固定连接的前置十字斜叉加强筋骨;A front slide rail is fixedly connected to the front side of the front formwork keel of the front formwork assembly, and a front formwork keel is fixedly connected to the front formwork keel on the same plane at the fixed connection between the front slide rail and the front formwork keel. Set cross inclined forks to strengthen muscles and bones;
于后置模板组件的后模板龙骨后侧固定连接有后置滑轨,于后置滑轨和后模板龙骨的固定连接处的后模板龙骨上同平面固定设置有与后模板龙骨固定连接的后置十字斜叉加强筋骨;The rear slide rail is fixedly connected to the rear side of the rear formwork keel of the rear formwork assembly, and the rear formwork keel is fixed on the same plane at the fixed connection between the rear slide rail and the rear formwork keel. Set cross inclined forks to strengthen muscles and bones;
前置台车的后框架面上固定连接有前置配合滑轨;前置配合滑轨和前置滑轨滑动配合连接;The rear frame surface of the front trolley is fixedly connected with a front matching slide rail; the front matching slide rail and the front sliding rail are slidably connected;
后置台车的前框架面上固定连接有后置配合滑轨;后置配合滑轨和后置滑轨滑动配合连接;The front frame surface of the rear-mounted trolley is fixedly connected with a rear-mounted matching slide rail;
预浇空间模板的前置滑轨、后置滑轨的组合体在前置台车、后置台车的前置配合滑轨、后置配合滑轨的组合体上具有竖直上下滑动的行程。The combination of the front sliding rail and the rear sliding rail of the precast space formwork has a vertical sliding stroke on the front trolley, the front matching sliding rail of the rear trolley, and the combination of the rear matching sliding rail.
前置滑轨在前模板龙骨前侧至少配置有平行的两道前置滑轨;The front slide rail is provided with at least two parallel front slide rails on the front side of the front formwork keel;
后置滑轨在后模板龙骨后侧至少配置有平行的两道后置滑轨。The rear sliding rail is provided with at least two parallel rear sliding rails on the rear side of the rear formwork keel.
前置滑轨竖直设置,前置滑轨与前置模板组件等高;The front slide rail is set vertically, and the front slide rail and the front formwork assembly have the same height;
后置滑轨竖直设置,后置滑轨与后置模板组件等高。The rear slide rail is vertically arranged, and the rear slide rail and the rear formwork assembly have the same height.
前置配合滑轨和前置滑轨的滑动防脱配合、后置配合滑轨和后置滑轨的滑动防脱配合均采用轨条和滑轨的防脱滑动配合连接。The front-fitted slide rails and the sliding anti-displacement fit of the front slide rails, and the rear-fitted slide rails and the sliding anti-drop-off fit of the rear slide rails are connected by the anti-drop-off sliding fit of the rails and the slide rails.
前置台车、后置台车均采用三棱柱固定架,三棱柱固定架的棱边均水平设置。The front trolley and the rear trolley both use a triangular prism fixing frame, and the edges of the triangular prism fixing frame are set horizontally.
前置台车、后置台车的底端平面均水平设置,且前置台车、后置台车的底端分别固定配置有定向轮或万向轮。The bottom planes of the front trolley and the rear trolley are arranged horizontally, and the bottom ends of the front trolley and the rear trolley are respectively fixed with directional wheels or universal wheels.
前置配合滑轨的长度大于前置滑轨的长度;The length of the front matching slide rail is greater than the length of the front slide rail;
后置配合滑轨的长度大于后置滑轨的长度。The length of the rear mating rail is greater than the length of the rear rail.
预浇空间模板的前置模板组件、后置模板组件、以及左、右的侧边模板组件的相临对接部通过销片销栓固定连接、或通过拉结螺栓拉结连接。The front formwork assembly, the rear formwork assembly, and the adjacent butt joints of the left and right side formwork assemblies of the precast space formwork are fixedly connected by pins and bolts, or are connected by pull-tie bolts.
前置配合滑轨和前置滑轨之间的滑动配合行程上设置有相对应的等距间隔的销接定位孔,销接定位孔上定位销栓;Corresponding equidistantly spaced pinned positioning holes are arranged on the sliding matching stroke between the front matching slide rail and the front sliding rail, and the positioning pins on the pinning positioning holes;
后置配合滑轨和后置滑轨之间的滑动配合行程上设置有相对应的等距间隔的销接定位孔,销接定位孔上定位销栓。Corresponding equidistantly spaced pin-connected positioning holes are arranged on the sliding matching stroke between the rear-mounted matching slide rail and the rear-mounted sliding rail, and the positioning pin bolts on the pin-connected positioning holes are arranged.
前模板、后模板、侧模板均采用木模板或铝模板。The front formwork, rear formwork and side formwork are all made of wood formwork or aluminum formwork.
侧模板龙骨上固定连接有同平面的侧置十字斜叉加强筋骨。The side template keel is fixedly connected with the side cross inclined fork reinforcing tendons and bones on the same plane.
本实用新型与现有技术相比所产生的有益效果是:Compared with the prior art, the beneficial effects produced by the present utility model are:
本实用新型的一种建筑填充墙现浇施工模板台车利用模板台车的机动性,快速的安拆建筑填充墙模板;模板台车与模板体系采用分体设计,一台模板台车可以配备多套模板,方便进行流水施工。A formwork trolley for cast-in-place construction of a building infill wall of the utility model utilizes the mobility of the formwork trolley to quickly install and dismantle the formwork for the building infill wall; the formwork trolley and the formwork system adopt a separate design, and one formwork trolley can be equipped with Multiple sets of templates are available to facilitate flow construction.
本实用新型用于建筑工程二次结构填充墙施工,结合补偿收缩泡沫混凝土现浇工艺,可替代传统增压加气块及混凝土砖砌筑工艺。相比传统工艺,具有工期短、成本低、美观、能耗低的特点,符合绿色施工理念。模板台车相比传统铝模板、木模板,具有拆卸方便、机动性强、效率高的特点。The utility model is used for the construction of the filling wall of the secondary structure of the construction project, and can replace the traditional pressurized air-entraining block and the concrete brick masonry technology in combination with the in-situ technology of compensating shrinkage foam concrete. Compared with the traditional process, it has the characteristics of short construction period, low cost, beautiful appearance and low energy consumption, which is in line with the concept of green construction. Compared with traditional aluminum formwork and wooden formwork, the formwork trolley has the characteristics of convenient disassembly, strong mobility and high efficiency.
针对本实用新型适用的泡沫混凝土浇筑建筑体系,由于泡沫混凝土密度远小于普通水泥混凝土,对模板侧压力也远小于普通水泥混凝土,因此模板强度、刚度、稳定性的要求不需要像混凝土模板那样高,所以本实用新型的各部件可采用耐腐蚀的传统钢筋、角钢、方钢或其他形式的金属材料。For the foam concrete pouring building system applicable to the present invention, because the density of foam concrete is much lower than that of ordinary cement concrete, and the pressure on the side of the formwork is also much smaller than that of ordinary cement concrete, the requirements for the strength, stiffness and stability of the formwork do not need to be as high as those of the concrete formwork. Therefore, the components of the present utility model can adopt corrosion-resistant traditional steel bars, angle steels, square steels or other forms of metal materials.
本实用新型的一种建筑填充墙现浇施工模板台车设计合理、结构简单、安全可靠、使用方便、易于维护,具有很好的推广使用价值。The cast-in-place construction template trolley of the building filling wall of the utility model has the advantages of reasonable design, simple structure, safety and reliability, convenient use and easy maintenance, and has good popularization and use value.
附图说明Description of drawings
附图1是本实用新型的立体结构示意图;
附图2是本实用新型的装配有前置滑轨、后置滑轨的预浇空间模板的结构示意图;Accompanying
附图3是本实用新型的预浇空间模板的结构示意图;Accompanying
附图4是本实用新型的前置模板组件的结构示意图;Accompanying drawing 4 is the structural representation of the front formwork assembly of the present utility model;
附图5是本实用新型的侧边模板组件的结构示意图;5 is a schematic structural diagram of the side template assembly of the present invention;
附图6是本实用新型的后置模板组件的前视结构示意图;Accompanying drawing 6 is the front view structure schematic diagram of the rear template assembly of the present invention;
附图7是本实用新型的前置台车的结构示意图。FIG. 7 is a schematic structural diagram of the front trolley of the present invention.
附图中的标记分别表示:The symbols in the attached drawings represent:
1、前置模板组件,2、前模板,3、前模板龙骨,1. Front formwork assembly, 2. Front formwork, 3. Front formwork keel,
4、后置模板组件,5、后模板,6、后模板龙骨,4. Rear formwork components, 5. Rear formwork, 6. Rear formwork keel,
7、侧边模板组件,8、侧模板,9、侧模板龙骨,7. Side formwork components, 8. Side formwork, 9. Side formwork keel,
10、预浇空间模板,10. Pre-cast space template,
11、建筑填充墙预浇空间,11. Precast space for building infill walls,
12、前置滑轨,13、前置十字斜叉加强筋骨,12. Front slide rail, 13. Front cross inclined fork to strengthen muscles and bones,
14、后置滑轨,15、后置十字斜叉加强筋骨,14. Rear slide rails, 15. Rear cross inclined forks to strengthen muscles and bones,
16、前置台车,17、前置配合滑轨,16. Front trolley, 17. Front matching slide rail,
18、后置台车,19、后置配合滑轨,18. Rear trolley, 19. Rear matching slide rail,
20、销接定位孔,21、定位销栓,22、侧置十字斜叉加强筋骨。20. Pin the positioning hole, 21. Positioning pin, 22. The lateral cross inclined fork strengthens the muscles and bones.
具体实施方式Detailed ways
下面结合附图对本实用新型的一种建筑填充墙现浇施工模板台车作以下详细说明。The following detailed description is given of a cast-in-place construction formwork trolley for a building infill wall of the present invention in conjunction with the accompanying drawings.
如附图所示,本实用新型的一种建筑填充墙现浇施工模板台车,其结构包括前置模板组件、后置模板组件、侧边模板组件、前置台车、后置台车,As shown in the accompanying drawings, a cast-in-place construction formwork trolley for a building infill wall of the present invention has a structure including a front formwork assembly, a rear formwork assembly, a side formwork assembly, a front trolley, and a rear trolley.
前置模板组件1由前模板2和前模板龙骨3构成,前模板龙骨3固定连接在前模板2的前置板面上;The
后置模板组件4由后模板5和后模板龙骨6构成,后模板龙骨6固定连接在后模板5的后置板面上;The rear template assembly 4 is composed of a rear template 5 and a rear template keel 6, and the rear template keel 6 is fixedly connected to the rear plate surface of the rear template 5;
侧边模板组件7由侧模板8和侧模板龙骨9构成,侧模板龙骨9固定连接在侧模板8的外围板面上;The
前置模板组件1和后置模板组件4相平行,且与前后方向对应设置;The
前置模板组件1和后置模板组件4的左右两个端部分别对应固定连接左位的和右位的侧边模板组件7;The left and right ends of the
前置模板组件1、后置模板组件4、以及左、右的侧边模板组件7固定连接围成上下开放的预浇空间模板10,预浇空间模板内围空间构成建筑填充墙预浇空间11;The
于前置模板组件的前模板龙骨3前侧固定连接有前置滑轨12,于前置滑轨和前模板龙骨的固定连接处的前模板龙骨上同平面固定设置有与前模板龙骨固定连接的前置十字斜叉加强筋骨13;A
于后置模板组件的后模板龙骨6后侧固定连接有后置滑轨14,于后置滑轨和后模板龙骨的固定连接处的后模板龙骨上同平面固定设置有与后模板龙骨固定连接的后置十字斜叉加强筋骨15;A
前置台车16的后框架面上固定连接有前置配合滑轨17;前置配合滑轨17和前置滑轨12滑动配合连接;A front
后置台车18的前框架面上固定连接有后置配合滑轨19;后置配合滑轨19和后置滑轨14滑动配合连接;A rear
预浇空间模板10的前置滑轨12、后置滑轨14的组合体在前置台车16、后置台车18的前置配合滑轨17、后置配合滑轨19的组合体上具有竖直上下滑动的行程。The combination of the
前置滑轨在前模板龙骨前侧至少配置有平行的两道前置滑轨;The front slide rail is provided with at least two parallel front slide rails on the front side of the front formwork keel;
后置滑轨在后模板龙骨后侧至少配置有平行的两道后置滑轨。The rear sliding rail is provided with at least two parallel rear sliding rails on the rear side of the rear formwork keel.
前置滑轨竖直设置,前置滑轨与前置模板组件等高;The front slide rail is set vertically, and the front slide rail and the front formwork assembly have the same height;
后置滑轨竖直设置,后置滑轨与后置模板组件等高。The rear slide rail is vertically arranged, and the rear slide rail and the rear formwork assembly have the same height.
前置配合滑轨和前置滑轨的滑动防脱配合、后置配合滑轨和后置滑轨的滑动防脱配合均采用轨条和滑轨的防脱滑动配合连接。The front-fitted slide rails and the sliding anti-displacement fit of the front slide rails, and the rear-fitted slide rails and the sliding anti-drop-off fit of the rear slide rails are connected by the anti-drop-off sliding fit of the rails and the slide rails.
前置台车、后置台车均采用三棱柱固定架,三棱柱固定架的棱边均水平设置。The front trolley and the rear trolley both use a triangular prism fixing frame, and the edges of the triangular prism fixing frame are set horizontally.
前置台车、后置台车的底端平面均水平设置,且前置台车、后置台车的底端分别固定配置有定向轮或万向轮。The bottom planes of the front trolley and the rear trolley are arranged horizontally, and the bottom ends of the front trolley and the rear trolley are respectively fixed with directional wheels or universal wheels.
前置配合滑轨的长度大于前置滑轨的长度;The length of the front matching slide rail is greater than the length of the front slide rail;
后置配合滑轨的长度大于后置滑轨的长度。The length of the rear mating rail is greater than the length of the rear rail.
预浇空间模板的前置模板组件、后置模板组件、以及左、右的侧边模板组件的相临对接部通过销片销栓固定连接、或通过拉结螺栓拉结连接。The front formwork assembly, the rear formwork assembly, and the adjacent butt joints of the left and right side formwork assemblies of the precast space formwork are fixedly connected by pins and bolts, or are connected by pull-tie bolts.
前置配合滑轨和前置滑轨之间的滑动配合行程上设置有相对应的等距间隔的销接定位孔20,销接定位孔上定位销栓21;Corresponding equidistantly spaced pinned positioning holes 20 are provided on the sliding matching stroke between the front matching slide rail and the front sliding rail, and the positioning pins 21 on the pinning positioning holes;
后置配合滑轨和后置滑轨之间的滑动配合行程上设置有相对应的等距间隔的销接定位孔,销接定位孔上定位销栓。Corresponding equidistantly spaced pin-connected positioning holes are arranged on the sliding matching stroke between the rear-mounted matching slide rail and the rear-mounted sliding rail, and the positioning pin bolts on the pin-connected positioning holes are arranged.
前模板、后模板、侧模板均采用木模板或铝模板。The front formwork, rear formwork and side formwork are all made of wood formwork or aluminum formwork.
侧模板龙骨上固定连接有同平面的侧置十字斜叉加强筋骨22。The side formwork keel is fixedly connected with the side cross inclined
本实用新型的一种建筑填充墙现浇施工模板台车利用模板台车的机动性,快速的安拆建筑填充墙模板,模板可配置有五种宽度型号,和两种长度型号,长度方向为锁口连接,宽度方向用销钉、销片连接,可适用于任何尺寸平面填充墙体。A formwork trolley for cast-in-place construction of a building infill wall of the utility model utilizes the mobility of the formwork trolley to quickly install and remove the formwork for the building infill wall. The formwork can be configured with five width models and two length models. The length direction is The lock connection, the width direction is connected by pins and pins, and it can be applied to any size of plane filling wall.
本实用新型解决了传统现浇填充墙模板安拆效率低、模板搬运劳动量大、墙体外观不佳的问题。本实用新型机动性强、安拆速度快、材料损耗低、适用各种尺寸填充墙体。The utility model solves the problems of low installation and dismantling efficiency of traditional cast-in-place filling wall formwork, large formwork handling labor and poor appearance of the wall body. The utility model has strong mobility, fast installation and disassembly speed, low material loss, and is suitable for filling walls of various sizes.
针对建筑施工现场使,在设计要求直接施工腻子的墙面采用光面模板,可以省去抹灰工序;在设计要求铺贴墙面砖的墙面可采用表面带有竖向压槽的模板。For the construction site, the smooth formwork can be used on the wall where the putty is required to be directly applied in the design, which can save the plastering process; the formwork with vertical grooves on the surface can be used on the wall where the wall tiles are required by the design.
台车立杆和模板体系主龙骨所用管件,可采用中空方管,长边反向对中开槽。The pipe fittings used for the trolley pole and the main keel of the formwork system can be hollow square pipes, and the long sides are reversely centered and slotted.
模板标准节段,板面形式有光面和带竖向压槽面,模板背面采用轻钢龙骨加固,与主龙骨接触部位预留螺杆孔,将不同宽度模板(2m、1m、0.5m、0.3m、0.2m、0.1m)组合,以满足各种层高需求施工。The standard segment of the formwork, the form of the plate surface has a smooth surface and a surface with a vertical pressure groove, the back of the formwork is reinforced with light steel keel, and screw holes are reserved for the contact part with the main keel, and the different width formwork (2m, 1m, 0.5m, 0.3 m, 0.2m, 0.1m) combination to meet the construction requirements of various floor heights.
侧向模板,模板面带有横向条纹状压槽,中间开孔,孔径8mm。侧向模板与正面模板采用销片连接。Lateral formwork, the formwork surface has horizontal stripe-shaped grooves, and the middle opening is 8mm. The side formwork and the front formwork are connected by pins.
台车立杆和模板体系主龙骨连接细部,主龙骨与模板固定后可上下调节高度,以适应不同层高。可采用螺杆加螺母连接加以固定。The connection details of the trolley pole and the main keel of the formwork system. After the main keel and the formwork are fixed, the height can be adjusted up and down to adapt to different storey heights. It can be fixed by screw and nut connection.
用于建筑填充墙施工时的具体流程为:The specific process for building infill wall construction is as follows:
1、地面弹线。1, the ground elastic line.
2、模板台车就位。2. The template trolley is in place.
3、根据层高拼装主龙骨杆件和模板,并调节到合适高度(主龙骨杆件上部与梁内预埋PVC管持平)。3. Assemble the main keel rod and formwork according to the storey height, and adjust to the appropriate height (the upper part of the main keel rod is the same as the pre-embedded PVC pipe in the beam).
4、墙体内部双层双向布置6mm螺纹钢筋网片,一端与剪力墙或柱植筋搭接,另一端从侧模孔洞穿出。4. The inner wall is double-layered with 6mm threaded steel mesh, one end is overlapped with the shear wall or column planting reinforcement, and the other end is pierced through the side mold hole.
5、另一台模板台车合模,主龙骨杆件顶部和下部穿对拉螺杆,锁紧。5. The other template trolley is closed, and the top and bottom of the main keel rod are threaded through the opposite pull screws and locked.
6、补偿收缩泡沫混凝土制备、泵送,由模板下部灌入,待侧模顶部排气孔处喷浆,停止泵送,封堵排气孔。6. The shrinkage-compensating foam concrete is prepared and pumped. It is poured from the lower part of the formwork and sprayed at the vent hole at the top of the side mold, and the pumping is stopped to block the vent hole.
7、主龙骨杆件与模板台车立杆分离,移开模板台车,进行下一段填充墙施工。7. The main keel member is separated from the vertical pole of the formwork trolley, and the formwork trolley is removed to proceed to the next section of infill wall construction.
8、待泡沫混凝土强度达到2.5Mpa时,移动模板台车,主龙骨杆件与模板台车立杆重新连接,拆除模板。8. When the strength of the foam concrete reaches 2.5Mpa, move the formwork trolley, reconnect the main keel member and the formwork trolley pole, and remove the formwork.
施工流程:铝模板拼装并与模板台车固定-模板台车移动就位-钢筋网片安装-沿墙轮廓线贴止浆条-对拉螺杆及斜撑安装-泡沫混凝土制备、连续浇筑-模板主楞与台车立杆分离-模板拼装、台车移位、进行下一工作面施工。Construction process: aluminum formwork is assembled and fixed with the formwork trolley - the formwork trolley is moved into place - the installation of the steel mesh - the sticking of the grout along the wall contour line - the installation of the tension screw and the diagonal brace - the preparation of foam concrete, continuous pouring - the formwork The main corrugated and the trolley pole are separated - the template is assembled, the trolley is shifted, and the next working face construction is carried out.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922262451.3U CN211691443U (en) | 2019-12-13 | 2019-12-13 | A cast-in-place construction formwork trolley for building infill walls |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201922262451.3U CN211691443U (en) | 2019-12-13 | 2019-12-13 | A cast-in-place construction formwork trolley for building infill walls |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN211691443U true CN211691443U (en) | 2020-10-16 |
Family
ID=72791731
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201922262451.3U Active CN211691443U (en) | 2019-12-13 | 2019-12-13 | A cast-in-place construction formwork trolley for building infill walls |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN211691443U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113417452A (en) * | 2021-05-31 | 2021-09-21 | 中国十七冶集团有限公司 | Disassembly-free composite template and construction process thereof |
| CN115874530A (en) * | 2022-11-09 | 2023-03-31 | 江苏四通路桥工程有限公司 | Anticollision wall template trolley of large-scale flexible safe platform |
-
2019
- 2019-12-13 CN CN201922262451.3U patent/CN211691443U/en active Active
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113417452A (en) * | 2021-05-31 | 2021-09-21 | 中国十七冶集团有限公司 | Disassembly-free composite template and construction process thereof |
| CN113417452B (en) * | 2021-05-31 | 2022-05-13 | 中国十七冶集团有限公司 | Non-dismantling composite formwork and construction process thereof |
| CN115874530A (en) * | 2022-11-09 | 2023-03-31 | 江苏四通路桥工程有限公司 | Anticollision wall template trolley of large-scale flexible safe platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202483046U (en) | Self-heat-preservation sound-insulation rib floor | |
| CN107401217B (en) | A kind of beamless hollow floor-chamber concrete-filled steel tube shear wall combined structure system and method | |
| WO2013185277A1 (en) | Constructing method for concrete cylinder of construction steel bar of high-rise steel structure | |
| CN205935643U (en) | Outer wall is from climbing die carrier | |
| CN102661019A (en) | Heat preservation and decoration integrated construction method for outer wall of building | |
| CN208203298U (en) | A kind of big punching block of rail type side wall | |
| CN111809660A (en) | Rectangular trolley for integrated pipe gallery and construction method | |
| CN108252504A (en) | Tube shear wall concrete structure large form hoisting type construction method and constructing device | |
| CN103206088B (en) | Parts of shear wall structure wall, slab integral pouring construction method | |
| CN216552610U (en) | Cast-in-place area of assembled superimposed sheet hangs mould device can have enough to meet need | |
| CN116290483A (en) | A prefabricated steel frame composite shear wall structure | |
| CN204983661U (en) | Light steel is framed greatly, integrative -in -place mould support system is decorated in protection that keeps warm | |
| CN204728698U (en) | The closed formwork structure of a kind of concrete suspension bridging piece | |
| CN215483062U (en) | A formwork device for layered pouring of large-volume concrete caps | |
| CN205918108U (en) | Portable combination steel mould component of arc parapet concrete | |
| CN207643373U (en) | A kind of prefabricated anchor block adjustable composite steel form | |
| CN114875955B (en) | Ultra-long concrete straight retaining wall template mounting device and construction method thereof | |
| CN205314161U (en) | Shaft runner template | |
| CN104453235A (en) | Convertor station firewall construction technology | |
| CN205742259U (en) | One lower channel side wall assembled template over long distances | |
| CN108930406A (en) | Construction method for large-formwork narrow-space wall based on integral assembly | |
| CN112176885B (en) | Rapid construction method of overmoulding for high hollow piers of viaduct | |
| CN205036082U (en) | Aluminum alloy template is c reinforcement member that appears for system | |
| CN115467687A (en) | Integrated pouring system for super large diameter tunnel inner wall panels and top corbels | |
| CN209907886U (en) | An adjustable prefabricated stair construction platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |