CN209834231U - Building wallboard storage device - Google Patents

Building wallboard storage device Download PDF

Info

Publication number
CN209834231U
CN209834231U CN201920749026.4U CN201920749026U CN209834231U CN 209834231 U CN209834231 U CN 209834231U CN 201920749026 U CN201920749026 U CN 201920749026U CN 209834231 U CN209834231 U CN 209834231U
Authority
CN
China
Prior art keywords
support frame
base
rain shielding
shielding cloth
rain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920749026.4U
Other languages
Chinese (zh)
Inventor
郭香敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Technology and Business University
Original Assignee
Sichuan Technology and Business University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Technology and Business University filed Critical Sichuan Technology and Business University
Priority to CN201920749026.4U priority Critical patent/CN209834231U/en
Application granted granted Critical
Publication of CN209834231U publication Critical patent/CN209834231U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Special Wing (AREA)

Abstract

The utility model belongs to the technical field of building equipment, in particular to a building wallboard storage device, which comprises a base for containing wallboards and a fence around the base, wherein a fixed cylinder is fixedly arranged at the side surface of the base at intervals, the fixed cylinder is vertically arranged, a plurality of support frames are arranged on the base, each support frame comprises two vertical rods and a cross rod for connecting the upper ends of the two vertical rods, the lower end of each vertical rod is inserted into the fixed cylinder, a slip ring is sleeved on each support frame, a plurality of the support frames are covered with rain shielding cloth, the rain shielding cloth is provided with a spring clasp corresponding to the slip ring, the rain shielding cloth is supported by the support frames, the rain shielding cloth is prevented from contacting with the steel bars of prefabricated parts, thereby avoiding that the steel bars puncture the rain shielding cloth in the rain shielding process, when the vertical rods need to be hoisted, the support frames can be dismantled only by pulling out the vertical rods from the fixed, the prefabricated wall plate can be directly hoisted from the base by the tower crane.

Description

Building wallboard storage device
Technical Field
The utility model belongs to the technical field of architectural equipment, especially, relate to a building wallboard storage device.
Background
The fabricated building is a building formed by assembling prefabricated parts on a construction site, prefabricated parts are manufactured in advance in a factory according to drawings, after being transported to a construction site by a truck, the tower crane is temporarily stacked near the construction site to wait for hoisting by the tower crane, in order to facilitate storage and lifting, a prefabricated member storage platform is usually arranged near a construction site, rails are arranged around the prefabricated member storage platform, and after the prefabricated member is unloaded from a truck, is placed on the storage platform in an upright posture, so that the prefabricated parts are regularly stored and are convenient to hoist, and the problems exist at present, in rainy weather, in order to prevent the prefabricated parts from getting wet, a rain-proof cloth is usually laid on the prefabricated parts, and the prefabricated parts are connected with other parts, having the steel reinforcement that stretches out externally, the steel reinforcement often punctures the cloth of hiding rain, consequently, needs one kind to satisfy covering of prefabricated component, and convenient to detach does not influence the wallboard storage device of hoist and mount simultaneously.
SUMMERY OF THE UTILITY MODEL
A brief summary of the present invention is provided below in order to provide a basic understanding of some aspects of the present invention. It should be understood that this summary is not an exhaustive overview of the invention. It is not intended to identify key or critical elements of the invention or to delineate the scope of the invention. Its sole purpose is to present some concepts in a simplified form as a prelude to the more detailed description that is discussed later.
In view of the above, the utility model provides a building wallboard storage device with simple structure and reasonable design, which meets the rain shielding requirement when the prefabricated part is stored in the assembly building process, is convenient to assemble and disassemble, and does not affect the hoisting;
the technical scheme of the utility model:
the utility model provides a building wallboard storage device, is including base and base rail all around that are used for holding the wallboard, the fixed solid fixed cylinder that is provided with in side interval of base, the vertical setting of solid fixed cylinder, be provided with a plurality of support frame on the base, every support frame all includes two pole settings and a horizontal pole of being connected two pole settings upper ends, the lower extreme of pole setting inserts in the solid fixed cylinder, every a sliding ring has all been cup jointed on the support frame, and the solid fixed ring of one of them pole setting lower extreme fixedly connected with of support frame, a plurality of the support frame coats to be stamped the waterproof cloth, on the waterproof cloth with the sliding ring correspondence is provided with the spring clip.
Further, the top of the support frame is a herringbone or an inclined plane.
Furthermore, two ends of the cross rod are respectively and fixedly connected with a cross rod fixing cylinder, and the upper end of the vertical rod is inserted into the cross rod fixing cylinder.
Furthermore, a pull ring is further arranged on the rain shielding cloth.
The utility model has the advantages that:
1. the utility model discloses a be provided with a plurality of support frame on the base, the support frame coats and is stamped the raincloth, props up the raincloth through the support frame, makes the raincloth avoid with prefabricated component's reinforcing bar contact to avoid hiding the rain in-process, the reinforcing bar punctures the raincloth.
2. The utility model discloses a support frame includes pole setting and horizontal pole, and in the lower extreme of pole setting inserted the solid fixed cylinder, when needs hide rain through inserting the solid fixed cylinder with the lower extreme of pole setting, when needs hoist and mount, only need extract the pole setting from the solid fixed cylinder, can demolish the support frame, make the tower crane can directly hoist prefabricated wallboard from the base.
3. The utility model discloses a rain-proof cloth one end is passed through the spring clip and is connected with the sliding ring that cup joints on the support frame, when hiding, only needs to stimulate rain-proof cloth, makes the one end of rain-proof cloth slide to the other end along with the sliding ring from the one end of support frame, accomplishes and covers.
Drawings
FIG. 1 is a schematic view of the overall construction of a building wall storage device;
figure 2 is a schematic view of a partial structure of the vertical pole of figure 1;
FIG. 3 is a schematic structural diagram of one embodiment of the present invention;
in the figure: 1-a base; 2-fencing; 3-fixing the cylinder; 4-erecting a rod; 5-a cross bar; 6-a slip ring; 7-fixing the ring; 8-rain shielding cloth; 9-spring clasp; 10-a cross bar fixing cylinder; 11-a pull ring.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings:
detailed description of the invention
The building wallboard storage device disclosed by the embodiment is shown by combining fig. 1 and fig. 2, and comprises a base 1 for containing wallboards and a fence 2 around the base 1, wherein fixed cylinders 3 are fixedly arranged on the side surface of the base 1 at intervals, the fixed cylinders 3 are vertically arranged, a plurality of support frames are arranged on the base 1, each support frame comprises two vertical rods 4 and a cross rod 5 for connecting the upper ends of the two vertical rods 4, the lower ends of the vertical rods 4 are inserted into the fixed cylinders 3, each support frame is sleeved with a sliding ring 6, the lower end of one vertical rod 4 of each support frame is fixedly connected with a fixed ring 7, a plurality of support frames are covered with a rain shielding cloth 8, and a spring clasp 9 is arranged on each rain shielding cloth 8 corresponding to the sliding ring 6;
when the prefabricated wall body is built, the prefabricated wall body is conveyed to a construction site by a truck, the prefabricated wall body is placed in a placing groove formed by a base 1 and a fence 2, the lower end of a vertical rod 4 of a support frame is inserted into a fixed cylinder 3 and is fixed through a pin, after all the support frames are installed, one end of a rain shielding cloth 8 is fixed with a fixed ring 7 on the vertical rod 4, the other end of the rain shielding cloth 8 is fixed with a sliding ring 6 on the vertical rod 4 through a spring clip 9, the sliding ring 6 is pulled along the support frames, the sliding ring 6 slides along the vertical rod 4 to the other side by bypassing a cross rod 5 and is fixed with the bottom of the vertical rod 4, so that the rain shielding cloth 8 is covered on a frame formed by a plurality of support frames, under the support of the rain shielding cloth 8 by the support frames, gaps exist between the rain shielding cloth 8 and exposed reinforcing steel bars on the side surface of the prefabricated wall body, the rain shielding cloth 8 is prevented, the laying mode is simple quick, compares with current direct covering raincloth and can avoid puncturing, compares with building the rainshelter, can carry out the dismouting fast, avoids influencing the hoist and mount.
Detailed description of the invention
On the basis of the first specific implementation mode, specifically, as shown in fig. 1 and 3, the top of the supporting frame is a herringbone or an inclined plane, and the top of the herringbone or the inclined plane is convenient for rainwater to slide off, so that rainwater is prevented from being accumulated to change the shape of the rain shielding cloth, and the rain shielding cloth is made to contact with the wall steel bars.
Detailed description of the invention
In this embodiment, on the basis of the second specific embodiment, specifically, as shown in fig. 1, two ends of the cross bar 5 are respectively and fixedly connected with a cross bar fixing cylinder 10, and the upper end of the vertical rod 4 is inserted into the cross bar fixing cylinder 10;
when the prefabricated wall is built, the prefabricated wall is transported to a construction site by a truck, the prefabricated wall is placed in a placing groove formed by a base 1 and a fence 2, two upright posts 4 and a cross rod 5 are taken out, the upper ends of the upright posts 4 are inserted into cross rod fixing cylinders 10 arranged at the end parts of the cross rods 5 and are fixed through pins, so that the two upright posts 4 and the cross rod 5 form a support frame of a door frame structure, the lower ends of the upright posts 4 of the support frame are inserted into the fixing cylinders 3 and are fixed through the pins, after all the support frames are installed, one end of a rain shielding cloth 8 is fixed with a fixing ring 7 on the upright posts 4, the other end of the rain shielding cloth 8 is fixed with a sliding ring 6 on the upright posts 4 through a spring clip 9, the sliding ring 6 is pulled along the support frame, the sliding ring 6 slides to the other side around the cross rods 5 along the upright posts 4 and is fixed with the bottoms of the upright posts, under the support of the support frame for the rain shielding cloth 8, a gap exists between the rain shielding cloth 8 and the exposed steel bar on the side surface of the prefabricated wall body, the steel bar is prevented from puncturing the rain shielding cloth 8, meanwhile, only the sliding ring 6 needs to be pulled when the rain shielding cloth 8 is covered, the laying mode is simple and quick, compared with the existing method for directly covering the rain shielding cloth, the puncture can be avoided, compared with the method for building a rain shelter, the disassembly and assembly can be quickly carried out, and the influence on the hoisting is avoided;
the cross rod 5 and the upright rod 4 are connected in a plug-in mounting mode, so that the support frame can be detached when being stored or not used, the size of the support frame is reduced, and the storage and the transportation are facilitated.
Detailed description of the invention
In this embodiment, on the basis of the first specific embodiment, specifically, a pull ring 11 is further disposed on the rain shielding cloth 8, and the pull ring 11 is connected to one end of the rain shielding cloth 8, which is connected to the slip ring 6, through a rope;
when the prefabricated wall is built, the prefabricated wall board is conveyed to a construction site by a truck, the prefabricated wall board is placed in a placing groove formed by a base 1 and a fence 2, the lower end of a vertical rod 4 of a support frame is inserted into a fixed cylinder 3 and is fixed through a pin, after all the support frames are installed, one end of a rain shielding cloth 8 is fixed with a fixed ring 7 on the vertical rod 4, the other end of the rain shielding cloth 8 is fixed with a sliding ring 6 on the vertical rod 4 through a spring clip 9, a pull ring 11 is thrown to the other side from the upper part of the support frame on one side of the support frame, the pull ring 11 is pulled on the other side of the support frame, the pull ring 6 is pulled through a rope, the sliding ring 6 is pulled along the support frame, the sliding ring 6 slides to the other side along the vertical rod 4 and bypasses a cross rod 5 and is fixed with the bottom of the vertical rod 4, so that the rain shielding cloth 8 covers, the gap exists between the rain shielding cloth 8 and the exposed steel bars on the side surface of the prefabricated wall body, so that the rain shielding cloth 8 is prevented from being punctured by the steel bars, meanwhile, only the sliding ring 6 needs to be pulled when the rain shielding cloth 8 is covered, the laying mode is simple and quick, the puncturing can be avoided compared with the existing rain shielding cloth directly covered, and compared with the building of a rain shelter, the dismounting can be quickly carried out, so that the hoisting is prevented from being influenced;
when the rain-proof cloth is detached, one side of the rain-proof cloth 8, which is connected with the sliding ring 6, is disconnected from the support frame, the pull ring 11 is thrown to the other side of the support frame, the pull ring 11 is pulled on the other side, the pull ring 11 pulls the sliding ring 6 through a rope, the sliding ring 6 is pulled along the support frame, the sliding ring 6 slides along the vertical rod 4, bypasses the cross rod 5 to slide to the other side and is fixed with the bottom of the vertical rod 4, so that the rain-proof cloth 8 slides off a frame formed by a plurality of support frames, and the support; the rain shielding structure is convenient and quick to dismantle, so that the hoisting of the wallboard is not influenced;
the pull ring 11 is used for pulling to cover and remove the rain shielding cloth 8, the structure is simple, and the operation is convenient.
The above embodiments are merely illustrative of the present patent and do not limit the scope of the patent, and those skilled in the art can make modifications to the parts thereof without departing from the spirit and scope of the patent.

Claims (4)

1. The utility model provides a building wallboard storage device, is including base (1) and base (1) fence (2) all around that are used for holding the wallboard, a serial communication port, the fixed solid fixed cylinder (3) that is provided with in side interval of base (1), the vertical setting of solid fixed cylinder (3), be provided with a plurality of support frame on base (1), every support frame all includes two pole setting (4) and one horizontal pole (5) of connecting two pole setting (4) upper ends, insert the lower extreme of pole setting (4) in solid fixed cylinder (3), every a sliding ring (6) has all been cup jointed on the support frame, and one of them pole setting (4) lower extreme fixedly connected with solid fixed ring (7), a plurality of the support frame coats and is stamped rain-proof cloth (8), on rain-proof cloth (8) with sliding ring (6) correspond and are provided with spring clip (9).
2. An architectural wall storage arrangement according to claim 1, wherein the top of the support frame is chevron or beveled.
3. An architectural wall storage device according to claim 2, wherein a cross bar fixing cylinder (10) is fixedly connected to both ends of the cross bar (5), respectively, and the upper end of the vertical rod (4) is inserted into the cross bar fixing cylinder (10).
4. An architectural wall storage system according to claim 1, wherein a pull ring (11) is further provided on the tarpaulin (8).
CN201920749026.4U 2019-05-23 2019-05-23 Building wallboard storage device Expired - Fee Related CN209834231U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920749026.4U CN209834231U (en) 2019-05-23 2019-05-23 Building wallboard storage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920749026.4U CN209834231U (en) 2019-05-23 2019-05-23 Building wallboard storage device

Publications (1)

Publication Number Publication Date
CN209834231U true CN209834231U (en) 2019-12-24

Family

ID=68897707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920749026.4U Expired - Fee Related CN209834231U (en) 2019-05-23 2019-05-23 Building wallboard storage device

Country Status (1)

Country Link
CN (1) CN209834231U (en)

Similar Documents

Publication Publication Date Title
CN102505708B (en) Construction method of tunnel at oversized cross section open cut area in track traffic
CN111395730A (en) Curtain wall construction system and method suitable for high-rise building with special-shaped giant columns
CN111908320A (en) Method for quickly converting steel wire rope for hoisting ultra-deep underground continuous wall
CN209834231U (en) Building wallboard storage device
CN211469702U (en) Concrete raw material conveying device with shielding shed for environment-friendly concrete production
CN109083456A (en) Assembled mill construction and its method of construction
CN110512766B (en) Fabricated structure system of steel plate concrete shear wall and construction method thereof
CN216549362U (en) Assembling and hoisting device for components above foundation pit
CN213573080U (en) Prefabricated plate installation auxiliary device
CN115110765A (en) Construction method and device for shear wall at deformation joint
CN213950418U (en) Portable prefabricated plate hoist device
CN212957184U (en) Low-rise building assembled roof
CN209906186U (en) Building template cross-floor transportation equipment
CN206495535U (en) A kind of fast construction formula house
CN110054104B (en) Transport and hoist integrated detachable multipurpose movable support
CN110077952B (en) Building template cross-floor transportation equipment and transportation method
CN215854681U (en) Truss hanging track device
CN110359697A (en) The modular aerial sliding concatenation platform in high-altitude
CN217078715U (en) Tip beating frame for steel reinforcement cage
CN218265926U (en) Lining cutting platform truck is used in highway tunnel construction
CN220746666U (en) Adjustable highway limit for height frame
RU107248U1 (en) MAST Dismountable Construction
CN210457366U (en) High-rise ALC wallboard corollary equipment
CN212613654U (en) Curtain wall construction system suitable for high-rise building with special-shaped giant columns
CN213329962U (en) Split type lifting scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191224

Termination date: 20200523

CF01 Termination of patent right due to non-payment of annual fee