CN209799359U - Climbing formwork scaffold - Google Patents
Climbing formwork scaffold Download PDFInfo
- Publication number
- CN209799359U CN209799359U CN201920115389.2U CN201920115389U CN209799359U CN 209799359 U CN209799359 U CN 209799359U CN 201920115389 U CN201920115389 U CN 201920115389U CN 209799359 U CN209799359 U CN 209799359U
- Authority
- CN
- China
- Prior art keywords
- formwork
- platform
- operation platform
- building
- supporting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a creeping formwork scaffold frame, include: the multi-layer operation platforms are sequentially connected along the vertical direction and can be connected to the outer wall of the building in a vertically movable mode; wherein, multilayer operation platform is provided with the template and stacks the platform including a formwork operation platform, one side that formwork operation platform kept away from the building outer wall, and the template is stacked the platform and is used for stacking the building templates to in the building work progress, can place the building templates and stack the bench at the template and along with creeping formwork scaffold whole lifting, need not to adopt hoist and mount building templates repeatedly. The problem of scaffold among the prior art can't provide the operating space of compound die and form removal and lead to concrete placement efficiency of construction low is solved.
Description
Technical Field
the utility model relates to a building construction equipment field particularly, relates to a creeping formwork scaffold.
Background
The scaffold is necessary construction equipment for building construction, the mould closing and removing work of the template is frequently carried out in the concrete pouring process of the building construction, the existing scaffold cannot provide an operation space for mould closing and removing in the construction process, the template removed in the mould removing process cannot be placed, the removed template can only be dropped on the ground through hoisting equipment, and when the mould closing operation of the upper layer is carried out, the template on the ground is hoisted to a mould closing construction layer again, so that the process is time-consuming and labor-consuming, low in efficiency and low in safety.
Disclosure of Invention
The utility model aims to provide a creeping formwork scaffold to solve the problem that the operation space that the scaffold among the prior art can't provide compound die and form removal leads to concrete placement efficiency of construction to hang down at least.
In order to achieve the above object, the utility model provides a creeping formwork scaffold, include: the multi-layer operation platforms are sequentially connected along the vertical direction and can be connected to the outer wall of the building in a vertically movable mode; the multi-layer operating platform comprises a formwork supporting operating platform, a formwork stacking table is arranged on one side, away from the building outer wall, of the formwork supporting operating platform, and the formwork stacking table is used for stacking building formworks.
Further, the formwork stack table includes: the supporting seats are connected to the formwork supporting operation platform; the object placing bedplate is arranged on the plurality of supporting seats along the transverse extending direction of the formwork supporting operation platform; wherein, the object placing bedplate is used for stacking the building templates.
Further, the object placing table plate is provided with an object placing groove extending along the transverse extending direction of the formwork supporting operation platform, and the building formwork is placed in the object placing groove.
Furthermore, the storage bedplate is made of channel steel or I-steel.
further, the supporting seat is a triangular support.
Further, the multi-layer operation platform further comprises: and the reinforcement binding operation platform is positioned on the upper part of the formwork supporting operation platform.
Further, the multi-layer operation platform further comprises: and the climbing operation platform is positioned at the lower part of the formwork supporting operation platform.
further, the multi-layer operation platform further comprises: and the disassembling, cleaning and maintaining platform is positioned at the lower part of the climbing operation platform.
furthermore, one side of the multilayer operation platform, which is close to the building outer wall, is provided with a connecting seat, and the multilayer operation platform is connected to the building outer wall through the connecting seat.
further, the connecting seat is a plurality of, and a plurality of connecting seats set up along multilayer operation platform's vertical direction interval.
Use the utility model discloses technical scheme's creeping formwork scaffold frame, include: the multi-layer operation platforms are sequentially connected along the vertical direction and can be connected to the outer wall of the building in a vertically movable mode; wherein, multilayer operation platform is provided with the template and stacks the platform including a formwork operation platform, one side that formwork operation platform kept away from the building outer wall, and the template is stacked the platform and is used for stacking the building templates to in the building work progress, can place the building templates and stack the bench at the template and along with creeping formwork scaffold whole lifting, need not to adopt hoist and mount building templates repeatedly. The problem of scaffold among the prior art can't provide the operating space of compound die and form removal and lead to concrete placement efficiency of construction low is solved.
Drawings
the accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the invention without undue limitation to the invention. In the drawings:
Fig. 1 is a schematic view of an alternative connection structure of a creeping formwork scaffold and a building outer wall according to an embodiment of the present invention;
Fig. 2 is a schematic structural diagram of an optional formwork stacking table of the climbing formwork scaffold according to an embodiment of the present invention;
Fig. 3 is a schematic view of a connection structure of a support seat of a formwork stacking table of a climbing formwork scaffold according to an embodiment of the present invention; and
Fig. 4 is a schematic structural diagram of an alternative supporting seat of a climbing formwork scaffold according to an embodiment of the present invention.
Wherein the figures include the following reference numerals:
10. An operating platform; 11. a formwork operation platform is supported; 12. binding the reinforcement operation platform; 13. climbing an operation platform; 14. disassembling, cleaning and maintaining the platform; 20. building exterior walls; 30. a formwork stacking table; 31. a supporting seat; 32. a storage bedplate; 40. a connecting seat.
Detailed Description
In order to make the technical solution of the present invention better understood, the technical solution of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts shall belong to the protection scope of the present invention.
according to the utility model discloses creeping formwork scaffold frame, as shown in fig. 1 and fig. 2, include: the multi-layer operation platform 10 is characterized in that the multi-layer operation platforms 10 are sequentially connected along the vertical direction, and the multi-layer operation platforms 10 are connected to the building outer wall 20 in a vertically movable mode; the multi-layer operating platform 10 comprises a formwork supporting operating platform 11, a formwork stacking table 30 is arranged on one side, away from the building outer wall 20, of the formwork supporting operating platform 11, and the formwork stacking table 30 is used for stacking building formworks.
Use the utility model discloses technical scheme's creeping formwork scaffold frame, include: the multi-layer operation platform 10 is characterized in that the multi-layer operation platforms 10 are sequentially connected along the vertical direction, and the multi-layer operation platforms 10 are connected to the building outer wall 20 in a vertically movable mode; wherein, multilayer operation platform 10 is provided with template stacking platform 30 including formwork operation platform 10, formwork operation platform 10 one side of keeping away from building outer wall 20, and template stacking platform 30 is used for stacking the building templates to in the building work progress, can place the building templates and stack platform 30 on the template and along with climbing formwork scaffold whole lift, need not to adopt hoist and mount building templates repeatedly. The problem of scaffold among the prior art can't provide the operating space of compound die and form removal and lead to concrete placement efficiency of construction low is solved.
In specific implementation, as shown in fig. 1, a plurality of connecting seats 40 are provided on one side of the multi-deck operation platform 10 close to the building outer wall 20, optionally, the plurality of connecting seats 40 are provided at intervals along the vertical direction of the multi-deck operation platform 10, and the multi-deck operation platform 10 is connected to the building outer wall 20 through the connecting seats 40.
The multilayer operation platform 10 further comprises a reinforcement binding operation platform 12, a climbing operation platform 13 and a dismounting cleaning maintenance platform 14, wherein the reinforcement binding operation platform 12 is located on the upper portion of the formwork supporting operation platform 11, the climbing operation platform 13 is located on the lower portion of the formwork supporting operation platform 11, and the dismounting cleaning maintenance platform 14 is located on the lower portion of the climbing operation platform 13. Namely, the reinforcement binding operation platform 12, the formwork supporting operation platform 11, the climbing operation platform 13 and the dismounting, cleaning and maintaining platform 14 are sequentially arranged from top to bottom along the vertical direction of the formwork climbing scaffold.
As shown in fig. 2 to 4, the formwork stack table 30 includes: the support base 31 is a triangular support, one side edge of the support base 31 is connected with the support mold operating platform 11, the other side edge of the support base 31 forms a fixing plane for fixing the support base 32, and the support base 32 is arranged on the fixing plane formed by the other side edge of the support base 31 along the transverse extension direction of the support mold operating platform 11; when the building templates are dismantled, the dismantled building template placing bedplate 32 can be used for stacking the building templates and enabling the building templates to ascend to a new construction layer along with the whole climbing formwork scaffold for formwork supporting operation.
In order to prevent that the building templates of placing on putting the thing platen 32 from dropping, furtherly, have the thing groove of putting that extends along a formwork operation platform 11 horizontal extending direction on putting the thing platen 32, the bottom of building templates is placed in putting the thing groove, and the upper end of building templates leans on a formwork operation platform 11's outside support body, not only can put the building templates steadily, and when formwork operation, the constructor of being convenient for takes the building templates simultaneously. In particular, the storage deck 32 may be made of channel steel or I-steel. The channel steel or the i-steel is punched, and then the channel steel or the i-steel is fixed on each support seat 31 by using bolts.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of improvements and decorations can be made without departing from the principle of the present invention, and these improvements and decorations should also be regarded as the protection scope of the present invention.
Claims (10)
1. a formwork scaffold, comprising:
The multi-layer operation platform (10), the multi-layer operation platform (10) is connected in sequence along the vertical direction, and the multi-layer operation platform (10) is connected to the building outer wall (20) in a manner of moving up and down along the vertical direction;
the multi-layer operating platform (10) comprises a formwork supporting operating platform (11), a formwork stacking platform (30) is arranged on one side, away from the building outer wall (20), of the formwork supporting operating platform (11), and the formwork stacking platform (30) is used for stacking building formworks.
2. The scaffolding according to claim 1, wherein the formwork stack station (30) comprises:
a plurality of supporting seats (31) connected to the formwork operating platform (11);
The object placing bedplate (32) is arranged on the plurality of supporting seats (31) along the transverse extending direction of the formwork supporting operation platform (11);
wherein, the object placing bedplate (32) is used for stacking the building templates.
3. The scaffolding of claim 2, wherein the shelving unit (32) has a shelving slot extending in a direction transverse to the formwork operation platform (11), the formwork being placed in the shelving slot.
4. The creeper scaffold according to claim 3, wherein the storage deck (32) is made of channel steel or I-steel.
5. The climbing formwork scaffold according to claim 2, characterized in that the supporting seat (31) is a triangular seat.
6. The scaffolding according to claim 1, characterized in that the plurality of layers of the operating platform (10) further comprises:
And the reinforcement binding operation platform (12) is positioned at the upper part of the formwork supporting operation platform (11).
7. the scaffolding according to claim 1, characterized in that the plurality of layers of the operating platform (10) further comprises:
The climbing operation platform (13) is positioned at the lower part of the formwork supporting operation platform (11).
8. The scaffolding according to claim 7, characterized in that the plurality of layers of the operating platform (10) further comprises:
A disassembly cleaning maintenance platform (14), wherein the disassembly cleaning maintenance platform (14) is positioned at the lower part of the climbing operation platform (13).
9. The climbing formwork scaffold according to claim 1, wherein a connecting seat (40) is arranged on one side of the plurality of layers of the operating platforms (10) close to the building outer wall (20), and the plurality of layers of the operating platforms (10) are connected to the building outer wall (20) through the connecting seat (40).
10. The climbing formwork scaffold according to claim 9, wherein the connecting seats (40) are provided in plurality, and the plurality of connecting seats (40) are arranged at intervals along the vertical direction of the multi-layer operating platform (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920115389.2U CN209799359U (en) | 2019-01-24 | 2019-01-24 | Climbing formwork scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920115389.2U CN209799359U (en) | 2019-01-24 | 2019-01-24 | Climbing formwork scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209799359U true CN209799359U (en) | 2019-12-17 |
Family
ID=68820749
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920115389.2U Active CN209799359U (en) | 2019-01-24 | 2019-01-24 | Climbing formwork scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209799359U (en) |
-
2019
- 2019-01-24 CN CN201920115389.2U patent/CN209799359U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101824910B (en) | Quick template supporting construction method of elevator shaft | |
CN209780230U (en) | Construction hydraulic pressure template climbing device | |
CN112177321B (en) | Creeping formwork construction equipment and method for building external wall and floor slab | |
CN210636796U (en) | High-rise elevator shaft jacking formwork system | |
CN111550041A (en) | Climbing formwork for penetrating plate | |
CN104674672B (en) | High pier construction crawler type circulation template | |
CN209799359U (en) | Climbing formwork scaffold | |
CN206681359U (en) | One kind cheats new formwork system in hole | |
CN110274744B (en) | Form removal method for internal mold support system of wind tunnel diffusion section | |
CN209482678U (en) | Integrally hoisting steel platform for irregular wall construction | |
CN110905260A (en) | Construction method and jacking device for earth-covered oil tank and using method of jacking device | |
CN104131635A (en) | Method and platform for constructing peripheral shear wall of prefabricated staircase | |
CN105298114A (en) | Aluminum alloy formwork and climbing frame matched construction method | |
CN212249235U (en) | Separate and pour device | |
CN211714541U (en) | Special handling frame for installing shear wall template in elevator shaft | |
CN210973541U (en) | Lock connecting structure for dismantling and hoisting temporary concrete support | |
CN109403674B (en) | Assembled prefabrication factory for bridge construction and construction method thereof | |
CN203924652U (en) | The operation platform of periphery shear wall between a kind of precast stair | |
CN202689494U (en) | Elevator shaft template support | |
JP7097203B2 (en) | Climbing telpher and how to demolish a building | |
CN202000659U (en) | Climbing mould system structure | |
CN217054265U (en) | Elevator well head operation platform | |
JP2944998B1 (en) | Scaffolding equipment for building tower structures | |
CN109877940A (en) | The production of prefabricated board, lifting and secondary pour integrated apparatus and construction method | |
CN110980549A (en) | Tower crane inner climbing machine and mounting method thereof |