CN209779692U - Ventilation equipment to reverse construction method underground construction - Google Patents

Ventilation equipment to reverse construction method underground construction Download PDF

Info

Publication number
CN209779692U
CN209779692U CN201920513850.XU CN201920513850U CN209779692U CN 209779692 U CN209779692 U CN 209779692U CN 201920513850 U CN201920513850 U CN 201920513850U CN 209779692 U CN209779692 U CN 209779692U
Authority
CN
China
Prior art keywords
pipe
transition
ventilation
underground construction
elasticity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920513850.XU
Other languages
Chinese (zh)
Inventor
钱海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920513850.XU priority Critical patent/CN209779692U/en
Application granted granted Critical
Publication of CN209779692U publication Critical patent/CN209779692U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Duct Arrangements (AREA)

Abstract

the utility model discloses a ventilation equipment to reverse construction method underground construction, including the fan, the fan communicate the one end of ventilation house steward, the other end of ventilation house steward run through the top of soil intercommunication intermediate pipe, the side of intermediate pipe and the left surface fixed connection of interior tuber pipe and intercommunication, the left side of the right surface fixed connection elasticity soft cloth of interior tuber pipe, and the right surface of interior tuber pipe cup joints in the transition pipe, the right side of elasticity soft cloth and the left side fixed connection of transition pipe, the bottom of transition pipe be provided with the air outlet; the utility model discloses a carry out the form that cup joints to the transition pipe to where the underground construction has arrived, can concentrate through the extension and ventilate to where, in addition, through the fixed ear of second, realized on the one hand that the ventilation pipe is fixed at the top surface of stratum underground, on the other hand passes through the slider and can adjust the air outlet size of the transition pipe that corresponds. Thereby delivering more wind to the end of the underground construction.

Description

Ventilation equipment to reverse construction method underground construction
Technical Field
The utility model relates to an underground construction field, more specifically say, relate to a ventilation equipment to reverse construction method underground construction.
Background
the reverse construction method comprises the following steps of firstly constructing an underground continuous wall supporting structure along the outer wall of a basement of a building before excavation of a foundation pit, constructing a pile foundation, pouring a reinforced concrete column, installing a steel column butted with the concrete column or the pile foundation, constructing a first floor, connecting the underground continuous wall, the pile foundation and the column together through the first floor, and using the underground continuous wall, the pile foundation and the column as a supporting structure for bearing the self weight and the construction load of an upper structure during construction; the reverse construction method is the most advanced construction technical method of high-rise buildings at present;
In underground construction, because be in the underground, so the circulation of air is not smooth, so in order to guarantee constructor's safety, need carry out underground ventilation, and underground construction mainly is that the underground need ventilate before not digging through, and digs through the back, forms the back of crossing the hall wind, and the ventilation also needs, but is unlikely to the circulation of air not smooth, and if carry out from down up the pipeline of ventilating, one section of just need be beaten one section air pipe to the construction one section, unusual trouble.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
Arrange difficult problem to the air pipe that exists among the prior art, the utility model aims to provide a ventilation equipment to reverse construction method underground construction, it can realize arranging air pipe fast.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
The utility model provides a ventilation equipment to reverse construction method underground construction, includes the fan, fan intercommunication ventilation house steward's one end, the other end of ventilation house steward run through the top of soil intercommunication intervalve, the side of intervalve and the left surface fixed connection and the intercommunication of interior tuber pipe, the left side of the soft cloth of right flank fixed connection elasticity of interior tuber pipe, and the right flank of interior tuber pipe cup joints in the transition intraductally, the right side of the soft cloth of elasticity and the left side fixed connection of transition pipe, the bottom of transition pipe be provided with the air outlet.
Preferably, the two sides of the middle pipe are fixedly connected with first fixing lugs, and the two sides of one end, close to the middle pipe, of the inner air pipe and the two sides of one end, close to the middle pipe, of the transition pipe are rotatably connected with one end of a second fixing lug.
Preferably, the number of the transition pipes is several, and the adjacent transition pipes are sleeved.
preferably, the two sides of the transition pipe are provided with connecting holes, and the connecting holes are connected with sealing covers.
preferably, the lower surface of the second fixing lug is provided with a comb-shaped groove, a sliding block is connected in the groove in a sliding manner, and one end of a fine wire is fixedly connected to the bottom end of the sliding block;
Transition pipe under the bottom be hollow structure, hollow structure inside is provided with the elasticity cloth layer, elasticity cloth layer all around and hollow structure inward flange fixed connection, the elasticity hole of matching with the air outlet is seted up at the middle part, the elasticity hole about both ends connect the other end of fine rule.
Preferably, the inside air-out pipe that is provided with of transition pipe, the one end of air-out pipe pass behind the ventilation house steward and be connected with subaerial air exhauster, the connecting hole is connected to the other end, air-out pipe be the scalable form of fold.
3. Advantageous effects
compared with the prior art, the utility model has the advantages of: the utility model discloses a carry out the form that cup joints to the transition pipe to where the underground construction has arrived, can concentrate through the extension and ventilate to where, in addition, through the fixed ear of second, realized on the one hand that the ventilation pipe is fixed at the top surface of stratum underground, on the other hand passes through the slider and can adjust the air outlet size of the transition pipe that corresponds. Thereby delivering more wind to the end of the underground construction.
drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the connection structure of the intermediate pipe, the inner air pipe and the transition pipe of the present invention;
FIG. 3 is a cross-sectional view of the intermediate pipe, the inner air pipe and the transition pipe of the present invention;
Fig. 4 is a schematic cross-sectional view of the transition pipe of the present invention;
Fig. 5 is a schematic structural view of a second fixing lug of the present invention.
The reference numbers in the figures illustrate:
1. a fan; 2. a ventilation main pipe; 3. an intermediate pipe; 4. an inner air duct; 5. elastic soft cloth; 6. a transition duct; 7. an air outlet; 8. a first fixing lug; 9. a second fixing lug; 10. connecting holes; 11. a groove; 12. a slider; 13. a thin wire; 14. and an elastic hole.
Detailed Description
The drawings in the embodiments of the present invention will be combined; the technical scheme in the embodiment of the utility model is clearly and completely described; obviously; the described embodiments are only some of the embodiments of the present invention; rather than all embodiments. Based on the embodiment of the utility model; all other embodiments obtained by a person skilled in the art without making any inventive step; all belong to the protection scope of the utility model.
referring to fig. 1-5, a ventilation device for underground construction by reverse construction method comprises a fan 1, wherein the fan 1 is communicated with one end of a ventilation main pipe 2, the other end of the ventilation main pipe 2 penetrates through soil and is communicated with the top end of a middle pipe 3, the side surface of the middle pipe 3 is fixedly connected and communicated with the left side surface of an inner air pipe 4, the right side surface of the inner air pipe 4 is fixedly connected with the left side of an elastic soft cloth 5, the right side surface of the inner air pipe 4 is sleeved in a transition pipe 6, the right side of the elastic soft cloth 5 is fixedly connected with the left side of the transition pipe 6, and an air outlet 7 is arranged at the bottom end of the transition pipe 6.
The two sides of the middle pipe 3 are fixedly connected with first fixing lugs 8, and the two sides of one end of the inner air pipe 4 and one end of the transition pipe 6 close to the middle pipe 3 are rotatably connected with one end of a second fixing lug 9.
The transition pipes 6 are provided with a plurality of transition pipes, and the adjacent transition pipes 6 are sleeved.
Two sides of the transition pipe 6 are provided with connecting holes 10, and the connecting holes 10 are connected with sealing covers.
The lower surface of the second fixing lug 9 is provided with a comb-shaped groove 11, a sliding block 12 is connected in the groove 11 in a sliding manner, and one end of a fine wire 13 is fixedly connected to the bottom end of the sliding block 12;
The bottom is hollow structure under the transition pipe 6, and hollow structure is inside to be provided with the elasticity cloth layer, elasticity cloth layer around and hollow structure inward flange fixed connection, the middle part seted up with the air outlet elastic hole 14 that matches, the other end of fine rule 13 is connected at the left and right both ends in elastic hole 14.
The inside air-out pipe that is provided with of transition pipe 6, the one end that goes out the air pipe is connected with subaerial air exhauster after passing ventilation house steward 2, and the connecting hole 10 is connected to the other end, goes out the air pipe and is the scalable form of fold.
the working principle is as follows:
The utility model discloses when practical, at first dig a passageway in underground construction layer and bottom surface support can, also can arrange the ventilation house steward along the exit on underground construction layer and go, then the top surface on underground construction layer sets up the intermediate pipe, the intermediate pipe is inside to be provided with the arc surface, turn into the wind of vertical decurrent wind into horizontally wind, the first fixed ear of intermediate pipe top simultaneously passes through the long screw to be fixed in the top surface on underground construction layer, later intermediate layer fixed connection interior tuber pipe, interior tuber pipe passes through elasticity soft cloth and transition union coupling, the main effect of elasticity soft cloth is that both can realize interior tuber pipe and transition union coupling, also can realize when the transition pipe separates from interior tuber pipe or transition pipe and transition pipe, still can realize sealedly, the transition pipe is made for light material, when a plurality of transition pipes cup joint, worry not because weight and too big problem of gravity; by the utility model, the pipeline can be stretched and constructed, namely stretched;
Under the condition that the power of the fan is fixed, the input wind is also fixed, when the construction length is longer, constructors concentrate on the position far away from the outlet, namely the position far away from the middle pipe, at the moment, if the wind power of the transition pipe close to the middle pipe is not reduced, little fresh wind is left for conveying to the tail end, so after the transition pipe is extended, the second fixing lug of the inner section can automatically bounce, the automatic bouncing technology is not the prior art, or the second fixing lug is made of rubber materials, the compressed state is always treated because of the transition pipe, in a word, when the transition pipe is not arranged outside the second fixing lug, the second fixing lug can automatically bounce to drive a thin wire and further drive an elastic hole to elongate, the elastic hole becomes flat when elongate, the area of the elastic hole becomes small, the introduced wind at the moment can be reduced, if the elastic hole at the position is closed, the sliding block is moved to the farthest position far away from the transition pipe, at the moment, the larger the pulling force received by the elastic hole is, the area is infinitely close to zero, meanwhile, after the second fixing lug bounces, the second fixing lug needs to be fastened with the top surface of the underground construction layer through a long screw, and after the second fixing lug is fastened, the sliding of the sliding block is not influenced by the nut of the long screw; by the utility model, the wind power at each transition pipe can be changed, and the wind can be intensively conveyed to the tail end;
When needs carry out the exhaust, go deep into the transition intraductal with the hand through the air outlet, then extend to going out the tuber pipe, then carry out threaded connection with the connecting hole, then connect the tuber pipe of going out with the connecting hole in the outside, then open the air exhauster, go out the convulsions, go out the tuber pipe and run through behind the ventilation house steward and be connected with the air exhauster, go out tuber pipe surface and ventilation house steward's wall sealing connection, when not needing the exhaust, seal up the connecting hole with sealed lid.
The above; is only a preferred embodiment of the present invention; however, the scope of protection of the present invention is not limited thereto; any person skilled in the art is within the technical scope of the present disclosure; according to the technical scheme of the utility model and the improvement conception, equivalent substitution or change is carried out; are all covered by the protection scope of the utility model.

Claims (6)

1. a ventilation equipment to reverse construction method underground construction, includes fan (1), its characterized in that: fan (1) intercommunication ventilation house steward (2) one end, the other end of ventilation house steward (2) run through the top of soil intercommunication intermediate tube (3), the side of intermediate tube (3) and the left surface fixed connection and the intercommunication of interior tuber pipe (4), the left side of the soft cloth of right flank fixed connection elasticity (5) of interior tuber pipe (4), and the right flank cup joint of interior tuber pipe (4) in transition pipe (6), the right side of the soft cloth of elasticity (5) and the left side fixed connection of transition pipe (6), the bottom of transition pipe (6) be provided with air outlet (7).
2. A ventilation apparatus for topdown underground construction according to claim 1, wherein: the middle pipe (3) is fixedly connected with first fixing lugs (8) on two sides, and the inner air pipe (4) and the transition pipe (6) are rotatably connected with one end of the second fixing lug (9) on two sides of one end close to the middle pipe (3).
3. a ventilation apparatus for topdown underground construction according to claim 1, wherein: the transition pipes (6) are provided with a plurality of transition pipes, and the adjacent transition pipes (6) are sleeved.
4. A ventilation apparatus for topdown underground construction according to claim 1 or 2 or 3, characterized in that: connecting holes (10) are formed in two sides of the transition pipe (6), and sealing covers are connected to the connecting holes (10).
5. A ventilation apparatus for topdown underground construction according to claim 2, wherein: the lower surface of the second fixing lug (9) is provided with a comb-shaped groove (11), a sliding block (12) is connected in the groove (11) in a sliding manner, and one end of a fine wire (13) is fixedly connected to the bottom end of the sliding block (12);
Transition pipe (6) lower bottom be hollow structure, the inside elasticity cloth layer that is provided with of hollow structure, elasticity cloth layer all around and hollow structure inward flange fixed connection, elasticity hole (14) that match with the air outlet are seted up at the middle part, elasticity hole (14) about both ends connect the other end of fine rule (13).
6. A ventilation apparatus for topdown construction according to claim 4, wherein: transition pipe (6) inside be provided with out the tuber pipe, the one end of going out the tuber pipe pass behind ventilation house steward (2) and be connected with subaerial air exhauster, connecting hole (10) are connected to the other end, the play tuber pipe be the scalable form of fold.
CN201920513850.XU 2019-04-16 2019-04-16 Ventilation equipment to reverse construction method underground construction Expired - Fee Related CN209779692U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920513850.XU CN209779692U (en) 2019-04-16 2019-04-16 Ventilation equipment to reverse construction method underground construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920513850.XU CN209779692U (en) 2019-04-16 2019-04-16 Ventilation equipment to reverse construction method underground construction

Publications (1)

Publication Number Publication Date
CN209779692U true CN209779692U (en) 2019-12-13

Family

ID=68802726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920513850.XU Expired - Fee Related CN209779692U (en) 2019-04-16 2019-04-16 Ventilation equipment to reverse construction method underground construction

Country Status (1)

Country Link
CN (1) CN209779692U (en)

Similar Documents

Publication Publication Date Title
CN108729949B (en) Rapid sealing device for underground communication roadway and using method thereof
CN209779692U (en) Ventilation equipment to reverse construction method underground construction
US20090293182A1 (en) Method for Air Removal from a Water-Closet Bowl and a Device for air removal from a water-closet bowl
CN205858397U (en) Inclined shaft and positive hole ventilating system in constructing tunnel
CN204164508U (en) Double wall sound insulating structure worn by a kind of pipeline
CN206279701U (en) A kind of drainage arrangement of the protecting against shock of skyscraper
WO2018054318A1 (en) Air-supported membrane structure and internal ventilation duct for same
CN207776899U (en) Water-bound is blown in a kind of coal mine gas extraction
CN110107063A (en) Unilateral apparatus of plastering for small space
CN209588322U (en) The vertical air duct connecting structure of assembled
CN214940063U (en) Ventilation and rain shielding device for hole of manual hole digging pile
CN209816909U (en) Composite cable utility tunnel unit and composite cable utility tunnel
CN205296741U (en) Modular exhaust passage
CN207032712U (en) A kind of building window awning
CN102235133B (en) Opening system for pressure relief windows
CN206706959U (en) A kind of integrated prefabricated valve well
CN209874011U (en) Integral type drop inspection shaft
JPH05231100A (en) Ventilating partition for tunnel
CN112984681A (en) Reinforced passive ventilation system suitable for arch kiln resident houses and construction process thereof
CN206495535U (en) A kind of fast construction formula house
CN220285796U (en) Portable underground ventilation device
CN206071107U (en) Between a kind of environmentally-friendly sanitary
CN206917105U (en) A kind of eaves structure with mine dam
CN109881867B (en) Clear away interior foul smell's of downstairs engineering ditch device
CN214835290U (en) Super large span seals feed bin based on independent air rib formula membrane structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191213

Termination date: 20210416