Prior art keywords
vertical
wind tube
fresh wind
floor plate
fresh
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920288385.4U
Other languages
Chinese (zh)
Inventor
郭金成
居发礼
祝根原
雷维
邓福华
荣东杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING HAIRUN ENERGY SAVING TECHNOLOGY Co Ltd
Original Assignee
CHONGQING HAIRUN ENERGY SAVING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING HAIRUN ENERGY SAVING TECHNOLOGY Co Ltd filed Critical CHONGQING HAIRUN ENERGY SAVING TECHNOLOGY Co Ltd
Priority to CN201920288385.4U priority Critical patent/CN209588322U/en
Application granted granted Critical
Publication of CN209588322U publication Critical patent/CN209588322U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Duct Arrangements (AREA)

Abstract

The utility model relates to a kind of vertical air duct connecting structures of assembled, including vertical fresh wind tube, the vertical fresh wind tube is set between adjacent upper floor plate and lower floor plate, the upper floor plate and lower floor plate offer fresh air through-hole and the fresh air through-hole is less than the inner hole of vertical fresh wind tube, the both ends of the vertical fresh wind tube are respectively embedded into the lower surface of upper floor plate and the upper surface of lower floor plate, and the fresh air through-hole of upper floor plate and lower floor plate is connected to the inner hole of vertical fresh wind tube.The connection structure of the utility model, it can solve the too long overweight problem of vertical mechanism existing for the fresh air system using vertical wind form of tubes, make each section of vertical fresh wind tube by corresponding floor layer come load-bearing, fresh air through-hole on floor layer also constitutes a part in fresh air system air duct, guarantee stability in use and safety in utilization, this connection structure is easy to construct, simple and reliable with the connection of floor, assembles easy for installation.

Description

The vertical air duct connecting structure of assembled
Technical field
The utility model belongs to fixed buildings foundation engineering component technology field, and in particular to a kind of assembled vertical wind Pipe connecting structure.
Background technique
Fresh air system in modern building using more and more, fresh air conditioner as disclosed in CN109253516A etc. is set It is standby, but existing fresh air system is applied to single room more, or is placed newly in each floor by special equipment room Blower fan group connects the Fresh air handling units of this layer by horizontal air hose, and then horizontal air hose is located in the ceiling in room It is connected to each room of this layer, needs to occupy more computer room in this way, also requires the interlamellar spacing of each floor larger.
Also come the technical research to solve the above problems, i.e., fresh air host is set to more about in the form of vertical air hose The top layer of layer building, fresh air host connect vertical fresh wind tube mechanism, and vertical fresh wind tube mechanism successively passes through downwards tier building The floor of object and the bottom for extending to multi-story structure, vertical fresh wind tube mechanism is all provided in each interlayer of multi-story structure has family Interior air outlet is to be passed through fresh air to corresponding interior, certainly, the vertical air-exhausting duct mechanism of Corresponding matching like configurations is needed to form The circulatory system.But the form of vertical air hose will cause vertical fresh wind tube mechanism vertically mistake when corresponding building is higher Long, the excessive problem of weight causes safety in utilization, stability in use that cannot preferably guarantee, there is also vertical air hose and buildings The not easy to handle problem in the junction of plate.
Summary of the invention
For the above-mentioned deficiency of the prior art, the technical problem to be solved by the present invention is to provide a kind of assembled is vertical Air duct connecting structure avoids building is higher from causing vertical air hose vertically too long, weight it is excessive and cause safety in utilization, The problem of stability in use cannot preferably guarantee, acquirement are easy to construct, the simple and reliable effect with the connection of floor.
In order to solve the above technical problems, the utility model adopts the following technical solution:
The vertical air duct connecting structure of assembled, including vertical fresh wind tube, the vertical fresh wind tube are set to adjacent upper floor plate Between lower floor plate, the upper floor plate and lower floor plate offer fresh air through-hole and the fresh air through-hole is less than vertical fresh wind tube Inner hole, the both ends of the vertical fresh wind tube are respectively embedded into the lower surface of upper floor plate and the upper surface of lower floor plate, upper floor plate and downstairs The fresh air through-hole of plate is connected to the inner hole of vertical fresh wind tube.
The connection structure of the utility model can solve vertical mechanism existing for the fresh air system using vertical wind form of tubes Too long overweight problem makes each section of vertical fresh wind tube by corresponding floor layer come load-bearing, the also structure of the fresh air through-hole on floor layer At a part in fresh air system air duct, guarantee stability in use and safety in utilization.This connection structure is easy to construct, embedded category Type can be detachable installation, or with building contemporary designs and building, be fixedly connected in architectural process with floor.This connection After the vertical multilayer connection of structure, fresh air host is connected in upper end or lower end, so that it may solve to need to pass through in each floor special The problem of Fresh air handling units are placed in the equipment room of door, occupy more computer room, it is corresponding to can provide more usable area, preferably Using limited land resource.
When implementation, the floor can be floor layer, balcony floors layer or specially vertical spaced convex on exterior wall Play mounting platform etc..
Above-mentioned technical proposal is further improved, the lower surface of the upper floor plate offers on a circle on the outside of its fresh air through-hole Installation groove, the upper surface of the lower floor plate offer installation groove under a circle on the outside of its fresh air through-hole, and the upper installation is recessed Slot and lower installation groove are corresponding with the tube wall of the cross section of vertical fresh wind tube, the both ends of vertical fresh wind tube be inserted into respectively install it is recessed Slot and lower installation groove.
In this way, connection is simple and reliable, it is easy for installation.When implementation, to implement installation, vertical fresh wind tube can also be divided into assembly Two sections of connection.
Further, the lower end of vertical fresh wind tube and the slot bottom of lower installation groove abut against, the upper end of vertical fresh wind tube with There is gap, the gap is greater than the depth of lower installation groove in order to detachable installation between the slot bottom of upper installation groove.
In this way, can be carried out installing, vertical fresh wind tube can also be used as in architectural process or after building completion Integral installation;When building is installed after completing, first vertical fresh wind tube is slightly tilted, the upper end of vertical fresh wind tube is inserted After entering upper installation groove and being abutted with the slot bottom of upper installation groove, then vertical fresh wind tube is vertical, vertical fresh wind tube is put down, vertically The lower end of fresh wind tube falls into lower installation groove and abuts against with the slot bottom of lower installation groove, and still there is portion in the upper end of vertical fresh wind tube Divide in upper installation groove.
Further, sealing ring, lower peace are equipped between the cell wall of upper installation groove and the tube wall of corresponding vertical fresh wind tube It fills and is equipped with sealing ring between the cell wall and the tube wall of corresponding vertical fresh wind tube of groove.
In this way, not leaking out, while can also play the role of water leakage, ensure that the functionality of vertical air hose and solve with Floor connection there may be the problem of.
Further, the tube wall of the vertical fresh wind tube is equipped with the cleaning door of salable closing and cleans pipe to open Road inner wall.
In this way, convenient for falling the cleaning of ash, another advantage protruded of the utility model construction lies also in cleaning aspect, water Flat air hose is easy to fall grey dust stratification and is difficult to clean, and after factory, will not clean inner wall again substantially, or use dedicated cleaning machine People cleans, but application is few, and vertical air hose form, will not dust stratification, riser tubing cleannes, conducive to Gao Pin is built Matter indoor environment.
Further, ventilation opening is offered on the vertical fresh wind tube.
In this way, providing fresh air in interlayer;When implementation, the form of multiple vertical fresh wind tubes can be used, in each of interlayer The interior space for needing to be passed through fresh air all wears the vertical fresh wind tube of this connection structure, and passes through ventilation opening to corresponding Interior Space Between fresh air is provided, just without each layer of the layings horizontal pipe in building, it is high that correspondence can be not take up layer, can suitably increase rule Number of floor levels is drawn, more usable area is provided, there is very high economic value.
Further, the vertical fresh wind tube is equipped with fire resisting damper.
In this way, meeting fire safety requirements.
Further, the vertical fresh wind tube is equipped with Detection of Air Quality sensor.
The vertical fresh wind tube of this connection structure is worn in each interior space for needing to be passed through fresh air in this way, corresponding to, And it is equipped with Detection of Air Quality sensor, indoor air quality can be monitored;When implementation, Detection of Air Quality sensor can be made It is electrically connected to controller, controller control connection fresh air host, controller passes through the feedback of Detection of Air Quality sensor and pre- If comparing to automatically adjust the revolving speed of fresh air host for value, guarantees indoor air quality;Air quality can also be set indoors Monitoring panel and manipulation end panel, air quality monitoring panel is connect with Detection of Air Quality sensor to be detected for showing Value in order to indoor user observe understand, manipulation end panel be electrically connected with the controller for indoor use on demand into Row manually adjusts, and changes the revolving speed of fresh air host.
Compared with prior art, the utility model has the following beneficial effects:
1, the connection structure of the utility model can solve vertical machine existing for the fresh air system using vertical wind form of tubes The too long overweight problem of structure makes fresh air through-hole of each section of vertical fresh wind tube by corresponding floor layer come load-bearing, on floor layer The a part in fresh air system air duct is constituted, guarantees stability in use and safety in utilization.
2, the connection structure of the utility model is easy to construct, simple and reliable with the connection of floor, easy for installation;It was building In journey or after building completion, it can be carried out installing.
3, the vertical fresh wind tube of the utility model will not dust stratification, be also convenient for falling the cleaning of ash, improve pipe cleanness, benefit In building high-quality indoor environment.
4, after the connection structure of the utility model vertically goes up multilayer connection, fresh air host is connected in upper end or lower end, just Needs be can solve the problem of each floor places Fresh air handling units by special equipment room, occupies more computer room;Laterally On in each interior space for needing to be passed through fresh air of interlayer wear the vertical fresh wind tube of this connection structure, and pass through ventilation Mouth provides fresh air to the corresponding interior space, and just without each layer of laying horizontal pipe in building, correspondence can be not take up Layer is high, can suitably increase planning number of floor levels;Corresponding to can provide more usable area, the preferably limited soil of application provides Source.
Detailed description of the invention
The structural schematic diagram of the vertical air duct connecting structure of Fig. 1-specific embodiment assembled;
The connection schematic diagram (amplification) of lower floor plate and vertical fresh wind tube in Fig. 2-specific embodiment;
The connection schematic diagram (amplification) of upper floor plate and vertical fresh wind tube in Fig. 3-specific embodiment;
Wherein, vertical fresh wind tube 1, cleaning door 11, ventilation opening 12, Detection of Air Quality sensor 13, fire resisting damper 14, upstairs Plate 2, upper installation groove 21, lower floor plate 3, lower installation groove 31, fresh air through-hole 4, gap 5, sealing ring 6.
Specific embodiment
Specific embodiment of the present utility model is described in further detail with reference to the accompanying drawing.
Referring to figures 1-3, the vertical air duct connecting structure of the assembled of specific embodiment, including vertical fresh wind tube 1, it is described perpendicular It is set between adjacent upper floor plate 2 and lower floor plate 3 to fresh wind tube 1, upper floor plate 2 and lower floor plate 3 offer fresh air through-hole 4 and institute The inner hole that fresh air through-hole 4 is less than vertical fresh wind tube 1 is stated, the both ends of the vertical fresh wind tube 1 are respectively embedded into the lower surface of upper floor plate 2 With the upper surface of lower floor plate 3, the fresh air through-hole 4 of upper floor plate 2 and lower floor plate 3 is connected to the inner hole of vertical fresh wind tube 1.It is embedded in type Can be detachable installation, or with building contemporary designs and building, be fixedly connected in architectural process with floor.When implementation, The floor can be floor layer, balcony floors layer or special vertical spaced raised mounting platform etc. on exterior wall.
Wherein, the lower surface of the upper floor plate 2 offers installation groove 21 on a circle on the outside of its fresh air through-hole 4, described The upper surface of lower floor plate 3 offers installation groove 31 under a circle, the upper installation groove 21 and lower peace on the outside of its fresh air through-hole 4 Shape and the groove width for filling groove 31 are corresponding with the tube wall of cross section of vertical fresh wind tube 1, and groove width can be slightly larger than pipe thickness, erect It is inserted into installation groove 21 and lower installation groove 31 respectively to the both ends of fresh wind tube 1.The lower end of vertical fresh wind tube 1 and lower installation are recessed The slot bottom of slot 31 abuts against, and has gap 5, the gap 5 between the upper end of vertical fresh wind tube 1 and the slot bottom of upper installation groove 21 Greater than lower installation groove 31 depth in order to detachable installation.Two cell walls of upper installation groove 21 with it is corresponding vertical new Sealing ring 6 is equipped between the inside and outside wall of air hose 1, two cell walls of lower installation groove 31 are inside and outside with corresponding vertical fresh wind tube 1 Sealing ring 6 is equipped between wall.In this way, not leaking out, while it can also play the role of water leakage.The tube wall of the vertical fresh wind tube 1 The cleaning door 11 for being equipped with salable closing carrys out cleaning inner-walls of duct to open.It is also successively arranged on the vertical fresh wind tube 1 Ventilation opening 12, Detection of Air Quality sensor 13 and fire resisting damper 14.
When implementation, settable diversion three-way blower (vertical fresh wind tube 1 on 1 pipeline section of vertical fresh wind tube of 12 position of ventilation opening When as intake stack) or three ventilation blowers of interflow when exhaust duct (vertical fresh wind tube 1 as) carry out relay air-supply, be equipped with three ventilations When machine, corresponding fresh air host only needs to meet the static pressure of first branch entrance, improves tunable performance, guarantees system Effect.Ventilation opening 12 is also possible to flanged joint degree of lip-rounding formula to connect horizontal air hose.The upper surface of upper floor plate 2 also is provided with lower peace Groove 31 is filled, the lower surface of lower floor plate 3 also is provided with installation groove 21, in this way convenient for vertically upper multilayer connection.
When implementation, corresponding building is preferably assembled architecture, and floor is prefabricated component, and floor is made when prefabricated Fresh air through-hole 4, upper installation groove 21 and lower installation groove 31 are consequently facilitating assembly installation.Cleaning door 11 is connected by a hinge with can Opening and closing implements sealing by the sealing strip along 11 edge of cleaning door.
When implementation, the connection structure of the utility model can be used for the air draft mechanism in new air circulating system.
Finally, it is stated that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, although ginseng The utility model is described in detail according to preferred embodiment, those skilled in the art should understand that, it can be to this The technical solution of utility model is modified or replaced equivalently, without departing from the objective and model of technical solutions of the utility model It encloses, should all cover in the scope of the claims of the utility model.

Claims (8)

1. the vertical air duct connecting structure of assembled, including vertical fresh wind tube, it is characterised in that: the vertical fresh wind tube is set to adjacent Upper floor plate and lower floor plate between, the upper floor plate and lower floor plate offer fresh air through-hole and the fresh air through-hole be less than it is vertical The both ends of the inner hole of fresh wind tube, the vertical fresh wind tube are respectively embedded into the lower surface of upper floor plate and the upper surface of lower floor plate, upstairs Plate and the fresh air through-hole of lower floor plate are connected to the inner hole of vertical fresh wind tube.
2. the vertical air duct connecting structure of assembled according to claim 1, it is characterised in that: the lower surface of the upper floor plate exists Installation groove on a circle is offered on the outside of its fresh air through-hole, the upper surface of the lower floor plate offers one on the outside of its fresh air through-hole Lower installation groove is enclosed, the upper installation groove and lower installation groove are corresponding with the tube wall of the cross section of vertical fresh wind tube, vertical new Installation groove and lower installation groove are inserted into the both ends of air hose respectively.
3. the vertical air duct connecting structure of assembled according to claim 2, it is characterised in that: the lower end of vertical fresh wind tube is under The slot bottom of installation groove abuts against, and has gap, the gap between the upper end of vertical fresh wind tube and the slot bottom of upper installation groove Greater than lower installation groove depth in order to detachable installation.
4. the vertical air duct connecting structure of assembled according to claim 2, it is characterised in that: the cell wall of upper installation groove with it is right Be equipped with sealing ring between the tube wall for the vertical fresh wind tube answered, the cell wall of lower installation groove and the tube wall of corresponding vertical fresh wind tube it Between be equipped with sealing ring.
5. any one of -4 vertical air duct connecting structure of assembled according to claim 1, it is characterised in that: the vertical fresh air The cleaning door that the tube wall of pipe is equipped with salable closing carrys out cleaning inner-walls of duct to open.
6. the vertical air duct connecting structure of assembled according to claim 5, it is characterised in that: opened up on the vertical fresh wind tube There is ventilation opening.
7. the vertical air duct connecting structure of assembled according to claim 5, it is characterised in that: the vertical fresh wind tube is equipped with Fire resisting damper.
8. the vertical air duct connecting structure of assembled according to claim 5, it is characterised in that: the vertical fresh wind tube is equipped with Detection of Air Quality sensor.
CN201920288385.4U 2019-03-07 2019-03-07 The vertical air duct connecting structure of assembled Active CN209588322U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920288385.4U CN209588322U (en) 2019-03-07 2019-03-07 The vertical air duct connecting structure of assembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920288385.4U CN209588322U (en) 2019-03-07 2019-03-07 The vertical air duct connecting structure of assembled

Publications (1)

Publication Number Publication Date
CN209588322U true CN209588322U (en) 2019-11-05

Family

ID=68356640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920288385.4U Active CN209588322U (en) 2019-03-07 2019-03-07 The vertical air duct connecting structure of assembled

Country Status (1)

Country Link
CN (1) CN209588322U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111023368A (en) * 2019-12-28 2020-04-17 深圳市开普俊梦室内设计有限公司 Building structure with temperature control device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111023368A (en) * 2019-12-28 2020-04-17 深圳市开普俊梦室内设计有限公司 Building structure with temperature control device

Similar Documents

Publication Publication Date Title
CN101187488A (en) Double layer glass curtain aeration technology and method and structure
CN106594955A (en) Prefabricated steel structure house central ventilation system and construction method thereof
Khoukhi et al. Stack pressure and airflow movement in high and medium rise buildings
CN209588322U (en) The vertical air duct connecting structure of assembled
CN200975038Y (en) Three-in-one wall of air-conditioning or outdoor machine of heat pump, solar heat-collector and float window
CN208998272U (en) A kind of ventilation systems in underground car parks system
Lstiburek et al. Air pressure and building envelopes
CN206279817U (en) A kind of underground garage that floor height is reduced by gravity-flow ventilation
CN209541098U (en) The vertical transmission & distribution ventilating system of modular assembly formula
CN111980368B (en) Assembled steel structure combined air duct system and construction method thereof
CN217423531U (en) Fan room structure
CN209541099U (en) Modular assembly formula is erected defeated flat with ventilating system
CN206308763U (en) A kind of public lavatory post unpowered exhaust system of formula
CN102997384A (en) Construction method of air pipe in full displacement type fresh air system
CN211503133U (en) Kitchen fresh air system capable of preventing waste gas from recharging and building comprising kitchen fresh air system
CN210292091U (en) Buried air conditioner installation system and air supply system thereof
CN201165765Y (en) Building fire refuge house
CN211739403U (en) Building ventilation duct based on venturi effect
CN201412928Y (en) Bottom-supply and upper-return full-replacement fresh air pipe laid in side surface of building inner wall
CN201412929Y (en) Up-return down-supply total replacement type fresh air pipeline embedded in building wall body
Feustel et al. Diagnostics and measurements of infiltration and ventilation systems in high rise apartment buildings.
CN206338911U (en) Prefabrication and assembly construction steel house VMC
CN220541281U (en) Structure capable of effectively utilizing elevator ventilation shaft to ventilate building
CN219808772U (en) Assembled bathroom
CN1185394C (en) Environmental protection building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant