CN209723782U - The base configuration of open caisson stereo garage - Google Patents

The base configuration of open caisson stereo garage Download PDF

Info

Publication number
CN209723782U
CN209723782U CN201920272569.1U CN201920272569U CN209723782U CN 209723782 U CN209723782 U CN 209723782U CN 201920272569 U CN201920272569 U CN 201920272569U CN 209723782 U CN209723782 U CN 209723782U
Authority
CN
China
Prior art keywords
steel
cabinet
stereo garage
open caisson
box body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920272569.1U
Other languages
Chinese (zh)
Inventor
林彦
宋健凯
林庆伟
李文明
姜圆圆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jianzhu University
Dayang Parking Co Ltd
Original Assignee
Shandong Jianzhu University
Dayang Parking Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jianzhu University, Dayang Parking Co Ltd filed Critical Shandong Jianzhu University
Priority to CN201920272569.1U priority Critical patent/CN209723782U/en
Application granted granted Critical
Publication of CN209723782U publication Critical patent/CN209723782U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of base configurations of open caisson stereo garage, belong to stereo garage technical field of construction, it includes underground wall body, the underground wall body is divided into several layers up and down along height, every layer is circumferentially divided into several steel base units, it is less than the thickness of the steel base unit positioned at lower layer positioned at the thickness of the steel base unit on upper layer, bindiny mechanism is equipped between two adjacent steel base units, the steel base unit includes steel cabinet, cabinets cavity is equipped in the steel tank body, the steel cabinet is equipped with cast gate, the cabinets cavity, which pours, is inoculated with concrete, the utility model solves underground three-dimensional garage long construction period, structural strength is not high, the high technical problem of manufacturing cost, it is widely used in stereo garage construction.

Description

The base configuration of open caisson stereo garage
Technical field
The utility model relates to stereo garage technical field of construction more particularly to a kind of basic structures of open caisson stereo garage It makes.
Background technique
With the continuous improvement of people's living standards, more and more people have purchased private car;Traffic and ring to city Border plays great influence.And the appearance of parking difficulty problem, also huge business opportunity and wide is brought to Mechanical parking system industry Wealthy market.In this business opportunity and compete and when deposit, the Mechanical parking system industry in China also will from Rapid development stage into Enter the stable development stage.Future market is huge, but the demand to product, it will to two extreme developments: one extremely It is the extreme of price, market largely needs the Mechanical parking system of low price, as long as it can achieve the purpose that increase parking stall, It can guarantee most basic service performance, be dominated the market with price advantage, the market share of this part is estimated to be up to 70%- 80%;Another is extremely exactly the extreme of technology and performance, it is desirable that parking apparatus has superior service performance, easily operates Mode, efficiently access speed.By the summary of domestic and international Mechanical parking system use experience, it can be found that people are in the machine of utilizing When tool parking equipment access vehicle, what is pursued first is access vehicle speed, waiting time and comfort level.In addition, following machine Tool parking apparatus market will more focus on perfect after-sales service system, and remote monitoring system, remote failure lead processing system will It is the target that user pursues.With the development of China's economy continuously and healthily, perfect, the Mechanical parking system industry general of urban planning As an energetic southern exposure industry, the technology of Mechanical parking system will also obtain significant progress.
In today of rapid economic development, surface structures and greening all gradually increase, so that ground parking stall is seriously not Foot, therefore, underground three-dimensional garage become a development trend, and how to construct underground three-dimensional garage is also those skilled in the art The project unanimously studied.
For example, a kind of precast spliced sinking type parking disclosed in the patent of invention application No. is 2017100964937 In the engineering method in library, caisson structure includes several index beds of bottom blade foot layer and top, and the installation accuracy of blade foot layer determines The assembling quality of upper layer open caisson index bed, the construction method of blade foot layer are as follows: be disposed vertically blade foot block, and by several blade foots Block is successively spliced to form pit shaft first layer (blade foot block inner wall lower is connected to form wedge shape section with outer wall diagonally downward), and makes it The method being disposed vertically is to support blade foot block jointly by support frame, positioning limit device, diagonal brace, after a blade foot block is installed Remove support frame, positioning limit device, diagonal brace, the construction method use prefabricated assembled blade foot structure, because component be it is abnormally-structured, Volume is larger, and transport, lifting turnover need two to three times, higher cost, and assembled needs a large amount of Auxiliary support brackets, splicing seams precision It is not easy to guarantee, blade foot solid-section later period waterproof is not easy to handle.
In another example disclosed in the patent of invention application No. is 201711007754.X a kind of sliding formwork component and application its In caisson cutting edge layer slding form operation method, disclose a kind of sliding formwork component, including slideway, exterior sheathing, inner template, two side templates and Several sliding slots installed for exterior sheathing and inner template, the exterior sheathing bottom are arranged on the slideway for several connection fixtures Portion is provided with several outer stabilizer blades, and installation movement along the chute, the inner template bottom is arranged on the outside of slideway in the outer stabilizer blade Several interior stabilizer blades are provided with, installation movement along the chute is arranged on the inside of slideway in the interior stabilizer blade, and the side template setting exists The two sides of inside and outside template are simultaneously connect by connection fixture with inner template and exterior sheathing.Although ensuring that blade foot construction is completed Line style vertical precision afterwards, to guarantee the assembling quality of upper layer open caisson standard segment, however cast in situs leads to long construction period, sternly The construction period of stereo garage is affected again, and the measure bottom and side wall waterproof is all relatively difficult.
These prefabricated components or pouring piece structural strength be not high, and breakage is easy in construction, causes its service life limited, shadow The normal use of stereo garage is rung.Also, these prefabricated components or pouring piece consistency of thickness from top to bottom, cause materials'use Amount is big, increases manufacturing cost.
Therefore, for developing the base configuration of new open caisson stereo garage a kind of, not only there is urgent researching value, With good economic efficiency and commercial application potentiality, this is exactly where the power that the utility model is accomplished and basis.
Utility model content
In order to overcome the defect of the prior art as indicated above, the present inventor has made intensive studies this, is paying After a large amount of creative works, so as to complete the utility model.
Specifically, the technical problem to be solved by the utility model is to provide a kind of basic structures of open caisson stereo garage It makes, to solve the technical problem that underground three-dimensional garage long construction period, structural strength be not high, manufacturing cost is high.
In order to solve the above technical problems, the technical solution of the utility model is: providing a kind of basis of open caisson stereo garage Construction, including underground wall body, the underground wall body are divided into several layers up and down along height, and every layer is circumferentially divided into several steel bases Plinth unit, positioned at upper layer steel base unit thickness be less than positioned at lower layer steel base unit thickness, adjacent two Bindiny mechanism is equipped between a steel base unit, the steel base unit includes steel cabinet, in the steel tank body Equipped with cabinets cavity, the steel cabinet is equipped with cast gate, and the cabinets cavity, which pours, is inoculated with concrete.
In the base configuration of the open caisson stereo garage of the utility model, as a kind of perferred technical scheme, institute The side for stating steel cabinet is equipped with cabinet opening, is welded on the steel cabinet wall opposite with the cabinet open position Several box body bolts, the end of thread of the box body bolt are pierced by the cabinet opening, and the steel cabinet is equipped with for sealing The cabinet plugging plate of the cabinet opening is blocked up, the cabinet plugging plate is equipped with the cast gate, and the cabinet plugging plate is equipped with Through-hole corresponding with the box body bolt, the cabinet plugging plate are fixedly installed in described by the box body bolt and nut On steel cabinet.
In the base configuration of the open caisson stereo garage of the utility model, as a kind of perferred technical scheme, institute Stating bindiny mechanism includes the box body connecting plate for being set to steel cabinet periphery, and the box body connecting plate is connected by fastener It connects.
In the base configuration of the open caisson stereo garage of the utility model, as a kind of perferred technical scheme, institute It states the gap around fastener and pours and be inoculated with concrete.
In the base configuration of the open caisson stereo garage of the utility model, as a kind of perferred technical scheme, lead to It crosses between two pieces of box body connecting plates that fastener is connected and is equipped with water-proof slab.
In the base configuration of the open caisson stereo garage of the utility model, as a kind of perferred technical scheme, phase Drag reduction plate is equipped between two adjacent steel cabinets.
In the base configuration of the open caisson stereo garage of the utility model, as a kind of perferred technical scheme, institute State the outside that drag reduction plate is welded in corresponding steel cabinet.
In the base configuration of the open caisson stereo garage of the utility model, as a kind of perferred technical scheme, institute It states and is equipped with erosion resistant coating around the weld seam of drag reduction plate.
In the base configuration of the open caisson stereo garage of the utility model, as a kind of perferred technical scheme, phase The bindiny mechanism is corresponded between two adjacent steel base units and is equipped with capping plate, and the capping plate is plugged in adjacent two Bucket is poured in the inside in gap between a steel base unit, the capping plate connection.
After above-mentioned technical proposal, the beneficial effects of the utility model are:
(1) underground wall body is divided into steel base unit by the utility model, and the unit volume after segmentation is relatively small, is poured Vibration tamp is easier when filling, and concrete set time is also short, substantially reduces construction period, and steel base unit Compared with traditional precast construction, steel cabinet is used as shell, when production, steel cabinet can be processed in factory, Then at the construction field (site) nearby nearest placing concrete, after solidification transport to site operation, entered without quotient is mixed vehicle Construction site is especially suitable for the transformation of cell garage, improves the environment of construction site, shorten construction period, and at the same time steel Prepared material has good waterproof performance and intensity, plays good protective effect to inner concrete.
(2) thickness for being less than the steel base unit positioned at lower layer due to being located at the thickness of the steel base unit on upper layer, It can either guarantee the use intensity of steel base unit, and reduce the volume of the steel base unit of similar face product, in turn Materials'use is saved, manufacturing cost is reduced.
(3) it due to being welded with several box body bolts on the steel cabinet wall opposite with cabinet open position, ensure that The integrality of steel tank outside improves waterproof effect, when making steel cabinet, protrudes into welding gun out of cabinet opening, welds Box body bolt is connect, welding completes rear seal-cover cabinet plugging plate, cabinet plugging plate is tightened on steel cabinet by box body bolt, And the box body bolt can also stablize the shape of steel cabinet during placing concrete, avoid steel box deformation, pour After the completion of filling, box body bolt plays the role of reinforcing rib, further improves the structural strength of steel base unit.
(4) it is poured due to the gap around fastener and is inoculated with concrete, on the one hand improve the anti-corrosion effect of fastener, extended On the other hand the service life of fastener reduces deflection, improves the strengths in tension and compression of steel base unit, mention Its high using effect.
(5) due to being provided with drag reduction plate, and it is equipped with erosion resistant coating around the weld seam of drag reduction plate, not only to subtract during open caisson Lack sedimentation resistance, and further improved waterproof and anti-corrosion effect, improves the service performance of the utility model.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of underground three-dimensional garage in the utility model embodiment;
Fig. 2 is the structural schematic diagram of steel base unit in the utility model embodiment;
Fig. 3 is Fig. 2 right side structural representation;
Fig. 4 is the partial enlargement structural representation of A in Fig. 1;
Wherein, in Fig. 1 to Fig. 4, each number designation is respectively referred to for following concrete meaning, element and/or component.
In figure: 1, steel base unit, 101, steel cabinet, 102, cabinet plugging plate, 103, box body bolt, 104, coagulation Soil, 105, cast gate, 2, capping plate, 3, parking apparatus steelframe, 4, berth, 5, hoistable platform, 6, ground floor go out enter the room, 7, connection machine Structure, 701, box body connecting plate, 702, fastener, 703, drag reduction plate, 8, water-proof slab, 9, top frame, 10, pouring bucket.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and examples.But the purposes of these exemplary embodiments Only it is used to enumerate the utility model with purpose, any type of any limit not is constituted to the real protection scope of the utility model It is fixed, it is more non-that the protection scope of the utility model is confined to this.
The utility model provides a kind of base configuration of open caisson stereo garage, as shown in Figure 1, include underground wall body, Underground wall body is divided into several layers up and down along height, and every layer is circumferentially divided into several steel base units 1, the steel positioned at upper layer The thickness of base unit 1 is less than the thickness of the steel base unit 1 positioned at lower layer, between two adjacent steel base units 1 It is equipped with bindiny mechanism 7, as shown in Figures 2 and 3, steel base unit 1 includes steel cabinet 101, is equipped in steel cabinet 101 Cabinets cavity, steel cabinet 101 are equipped with cast gate 105, and cabinets cavity, which pours, is inoculated with concrete 104, and concrete 104 is from cast gate 105 Injection.The side of steel cabinet 101 is equipped with cabinet opening, welds on 101 inner wall of steel cabinet opposite with cabinet open position There are several box body bolts 103, the end of thread of box body bolt 103 is pierced by cabinet opening, and steel cabinet 101 is equipped with for blocking The cabinet plugging plate 102 of cabinet opening, cabinet plugging plate 102 are equipped with cast gate 105, and cabinet plugging plate 102 is equipped with and cabinet The corresponding through-hole of bolt 103, cabinet plugging plate 102 are fixedly installed in steel cabinet 101 by box body bolt 103 and nut On.
Underground wall body is divided into steel base unit 1 by the utility model, and the unit volume after segmentation is relatively small, is poured When vibration tamp be easier, and 104 setting time of concrete is also short, substantially reduces construction period, and steel base list Member uses steel cabinet 101 and is used as shell 1 compared with traditional precast construction, and when production, steel can be processed in factory Cabinet 101, then at the construction field (site) nearby nearby placing concrete 104, after solidification transport to site operation, without quotient is mixed Vehicle enters construction site, is especially suitable for the transformation of cell garage, improves the environment of construction site, shorten construction period, And at the same time steel material has good waterproof performance and intensity, good protective effect is played to inner concrete 104, Also, it can be welded with steel structure frame on the inside of steel cabinet 101, intensity is high, convenient for construction, instead of the periphery of stereo garage Steel structure reduces the manufacturing cost of stereo garage.
It is well known that the pressure for being located at soil layer suffered by the steel base unit 1 on upper layer is less than the steel base positioned at lower layer The pressure of soil layer suffered by plinth unit 1, therefore, the utility model are located at the thickness of the steel base unit 1 on upper layer less than under being located at The thickness of the steel base unit 1 of layer, on the one hand, can either guarantee the use intensity of steel base unit 1, and reduce identical The volume of the steel base unit 1 of surface area, and then materials'use is saved, reduce manufacturing cost;On the other hand, in open caisson In the process, upper layer steel base unit 1 is easier, and reduces difficulty of construction, further shortens construction period.
Due to being welded with several box body bolts 103 on 101 inner wall of steel cabinet opposite with cabinet open position, guarantee The integrality of 101 lateral surface of steel cabinet improves waterproof effect, when making steel cabinet 101, protrudes into out of cabinet opening Rear seal-cover cabinet plugging plate 102 is completed in welding gun, welding casing bolt 103, welding, by box body bolt 103 by cabinet plugging plate 102 are tightened on steel cabinet 101, and the box body bolt 103 can also stablize steel tank during placing concrete 104 The shape of body 101 avoids steel cabinet 101 from deforming, and after the completion of pouring, box body bolt 103 plays the role of reinforcing rib, further Improve the structural strength of steel base unit 1.
As shown in figure 4, bindiny mechanism 7 includes the box body connecting plate 701 for being set to 101 periphery of steel cabinet, cabinet connection Plate 701 is connected by fastener 702, and the gap around fastener 702, which is poured, is inoculated with concrete.When the setting of steel cabinet 101 exists When the blade foot layer of the bottom, two sides of upper side and left and right of steel cabinet 101, downside is arranged in box body connecting plate 701 It is provided with blade foot, and when steel cabinet 101 is arranged in index bed, the upside of steel cabinet 101 is arranged in box body connecting plate 701 Two face, downside and left and right sides.
Water-proof slab 8 is equipped between two pieces of box body connecting plates 701 being connected by fastener 702, water-proof slab 8 is logical Often it is rubber slab, further improves waterproof effect.
It is equipped with drag reduction plate 703 between two adjacent steel cabinets 101, drag reduction plate 703 is welded in corresponding steel tank The outside of body 101 is equipped with erosion resistant coating around the weld seam of drag reduction plate 703, and there are many kinds of erosion resistant coating formation means, those skilled in the art Member can implement according to common sense, it is ensured that weld seam anti-corrosion extends service life.And during drag reduction plate 703 not only makes open caisson Reduce sedimentation resistance, and further improve waterproof and anti-corrosion effect, improves the service performance of the utility model.
It is correspondingly connected with mechanism 7 between two adjacent steel base units 1 and is equipped with capping plate 2, capping plate 2 is plugged in adjacent The inside in gap between two steel base units 1, bucket 10 is poured in the capping connection of plate 2, in two adjacent steel base units 1 After completing connection, then capping plate 2 is installed, pours coagulation toward the gap between two steel base units 1 using bucket 10 is poured On the one hand soil improves the anti-corrosion effect of fastener 702, extend the service life of fastener 702, on the other hand, reduces Deflection improves the strengths in tension and compression of steel base unit 1, improves its using effect.
In order to further increase the service performance of the utility model, preservative treatment is also needed in the outside of steel cabinet 101, is prevented Rotten means have very much, can form protective layer by the methods of smearing, spraying, plating, hot dip, spraying plating, not illustrate one by one herein.
The construction step of base configuration construction and underground three-dimensional garage is as follows:
S1, the underground wall body of underground garage is divided into several layers up and down along height, the bottom is blade foot layer, and remainder layer is mark Quasi- layer is poured in steel base unit 1 by cast gate 105 as shown in Figure 1, every layer is circumferentially divided into several steel base units 1 It is inoculated with concrete 104, is equipped with bindiny mechanism 7 between two adjacent steel base units 1;S2, smooth location, measurement are put Line determines open caisson position, which is the preparation before construction, and those skilled in the art commonly use, are not situated between in detail herein It continues;S3, it lays on the outside of the open caisson and sets gutter, sump on the inside of precipitation well point or open caisson, according to construction terrain, this field Technical staff can choose using precipitation well point or gutter or sump;S4, the installation of blade foot layer: steel base unit 1 is led to It crosses bindiny mechanism 7 and is spliced into blade foot layer, the ground that blade foot layer is surrounded, which is excavated, is unearthed, and so that blade foot layer is sunk in place, blade foot layer Structure and open caisson construction are well known to those skilled in the art, and details are not described herein;S5, index bed installation: lifting steel base Unit 1 is spliced with mounted blade foot layer steel base unit 1 by bindiny mechanism 7, is then proceeded to excavate and is unearthed, until the layer Well-sinking is in place;S6, lifting steel base unit 1 are spliced with mounted steel base unit 1 by bindiny mechanism 7, so After continue excavate be unearthed, until this layer of well-sinking in place;S7, the other index beds of S6 step installation are repeated, until pit shaft is layer-by-layer Sink down into predetermined depth;S8, bottom sealing: bottom is followed successively by cement block, waterproof cloth, reinforcing bar with flowing water gap from the bottom to top Concrete floor and ballast concrete sealing bottom, when construction, the infiltration in shaft bottom by the flowing water gap discharge between adjacent cement block, Concentration is taken away, and after the completion of construction, waterproof cloth is laid with above cement block, bottom water-proofing treatment is carried out, then covers reinforced concrete Native bottom plate and ballast concrete, compacting;S9, the installation of stereo garage steel structure: successively parking apparatus steelframe 3, berth 4 are lifted into Position, then hoisting mechanism and hoistable platform 5 are installed;S10, open caisson bind, and install top frame 9 at the top of open caisson, top frame 9 with most The steel base unit 1 of top layer links together, or the fasteners such as welding or bolt are connected to the steel base list of top There is the top steel plate of well head at the top of member 1 in 9 upper berth setting tool of top frame, and pithead position is corresponding with channel position is promoted, In Top steel plate upper berth is set up defences water cloth, then the placing concrete on waterproof cloth, is required, can be filled out above concrete if any greening Soil restores greening, compacting, and installation ground floor goes out to enter the room 6;S11, the guidance of installation vehicle and management system.
It should be appreciated that the purposes of these embodiments is merely to illustrate the utility model and is not intended to limitation the utility model Protection scope.In addition, it should also be understood that, those skilled in the art can be right after having read the technology contents of the utility model The utility model makees various change, modification and/or variation, all these equivalent forms equally fall within right appended by the application and want Seek book within the limits of the protection.

Claims (9)

1. the base configuration of open caisson stereo garage, including underground wall body, the underground wall body is divided into several layers up and down along height, It is characterized in that, every layer is circumferentially divided into several steel base units, and the thickness positioned at the steel base unit on upper layer is less than position Bindiny mechanism, the steel are equipped between the thickness of the steel base unit of lower layer, two adjacent steel base units Base unit includes steel cabinet, and cabinets cavity is equipped in the steel tank body, and the steel cabinet is equipped with cast gate, the case Intracoelomic cavity, which pours, is inoculated with concrete.
2. the base configuration of open caisson stereo garage according to claim 1, which is characterized in that the side of the steel cabinet Equipped with cabinet opening, several box body bolts are welded on the steel cabinet wall opposite with the cabinet open position, The end of thread of the box body bolt is pierced by the cabinet opening, and the steel cabinet is equipped with for blocking the cabinet opening Cabinet plugging plate, the cabinet plugging plate are equipped with the cast gate, and the cabinet plugging plate is equipped with and the box body bolt phase Corresponding through-hole, the cabinet plugging plate are fixedly installed on the steel cabinet by the box body bolt and nut.
3. the base configuration of open caisson stereo garage according to claim 2, which is characterized in that the bindiny mechanism includes setting It is placed in the box body connecting plate on steel cabinet periphery, the box body connecting plate is connected by fastener.
4. the base configuration of open caisson stereo garage according to claim 3, which is characterized in that between around the fastener Gap, which is poured, is inoculated with concrete.
5. the base configuration of open caisson stereo garage according to claim 4, which is characterized in that be connected by fastener Water-proof slab is equipped between two pieces of box body connecting plates.
6. the base configuration of open caisson stereo garage according to claim 5, which is characterized in that two adjacent steel cabinets Between be equipped with drag reduction plate.
7. the base configuration of open caisson stereo garage according to claim 6, which is characterized in that the drag reduction plate is welded in phase The outside for the steel cabinet answered.
8. the base configuration of open caisson stereo garage according to claim 7, which is characterized in that the weld seam week of the drag reduction plate It encloses and is equipped with erosion resistant coating.
9. according to claim 1 to the base configuration of open caisson stereo garage described in any one of 8 claims, which is characterized in that The bindiny mechanism is corresponded between the steel base unit of adjacent two and is equipped with capping plate, and the capping plate is plugged in adjacent Bucket is poured in the inside in gap between two steel base units, the capping plate connection.
CN201920272569.1U 2019-03-01 2019-03-01 The base configuration of open caisson stereo garage Active CN209723782U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920272569.1U CN209723782U (en) 2019-03-01 2019-03-01 The base configuration of open caisson stereo garage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920272569.1U CN209723782U (en) 2019-03-01 2019-03-01 The base configuration of open caisson stereo garage

Publications (1)

Publication Number Publication Date
CN209723782U true CN209723782U (en) 2019-12-03

Family

ID=68685053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920272569.1U Active CN209723782U (en) 2019-03-01 2019-03-01 The base configuration of open caisson stereo garage

Country Status (1)

Country Link
CN (1) CN209723782U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736614A (en) * 2019-03-01 2019-05-10 山东建筑大学 The base configuration of open caisson stereo garage

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736614A (en) * 2019-03-01 2019-05-10 山东建筑大学 The base configuration of open caisson stereo garage

Similar Documents

Publication Publication Date Title
CN106869172B (en) In-situ deposited prefabricated split-mounting type subway underground station construction method
CN109371999A (en) A kind of open caisson construction method of stereo garage
CN109736612A (en) A kind of stereo garage basis open caisson construction method
CN106854873A (en) A kind of engineering method and garage parking in precast spliced sinking type garage parking
CN109736616A (en) The open caisson construction method of stereo garage
CN106639093A (en) Close splicing seam-type laminated slab
CN108265623A (en) A kind of prefabricated superposed type anti-collision wall and its construction method for urban viaduct
CN206545215U (en) A kind of precast spliced sinking type garage parking
CN106284412A (en) A kind of prefabricated pipe gallery and construction method
CN106245544A (en) A kind of L-type assembled steel reinforced concrete guard wall type general channels hole
CN109736614A (en) The base configuration of open caisson stereo garage
CN110219667A (en) Tunnel inverted arch and inverted arch filled layer substitution steel-concrete combined structure and construction technology
CN108978729A (en) A kind of subway station hole for hoist method for blocking
CN209723782U (en) The base configuration of open caisson stereo garage
CN206052778U (en) A kind of steel and Combined concrete piping lane
CN109083179A (en) A kind of open caisson construction method of stereo garage
CN207944339U (en) A kind of prefabricated superposed type anti-collision wall for urban viaduct
CN209723781U (en) A kind of base configuration of open caisson stereo garage
CN205474892U (en) General passageway entrance to a cave of L type assembled reinforced concrete barricade type
CN202401667U (en) Prefabricated column with reserved embedded column porous channel and embedded column type full-assembly anti-seismic building
CN209652963U (en) Mold for assembly concrete hypogee sole plate
CN209194560U (en) A kind of base configuration of open caisson stereo garage
CN209066480U (en) A kind of precast hollow module block type concrete retaining wall
CN110847239A (en) Assembled large reinforced concrete prefabricated inspection well and construction method thereof
CN106088758A (en) A kind of double-deck assembled underground granary

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant