CN108978729A - A kind of subway station hole for hoist method for blocking - Google Patents
A kind of subway station hole for hoist method for blocking Download PDFInfo
- Publication number
- CN108978729A CN108978729A CN201810981669.1A CN201810981669A CN108978729A CN 108978729 A CN108978729 A CN 108978729A CN 201810981669 A CN201810981669 A CN 201810981669A CN 108978729 A CN108978729 A CN 108978729A
- Authority
- CN
- China
- Prior art keywords
- hole
- hoist
- subway station
- cover board
- blocking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/04—Making large underground spaces, e.g. for underground plants, e.g. stations of underground railways; Construction or layout thereof
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
Abstract
The invention discloses a kind of subway station hole for hoist method for blocking, and support end is arranged at hole for hoist when including the following steps the hole for hoist of A production subway station;Several prefabricated cover boards of B, all cover boards successively spliced shape adaptation hole for hoist have gap, have gap between two neighboring cover board between each cover board and hole for hoist side wall;All cover boards of C handling are arranged at hole for hoist, and all cover boards are supported end support;All gaps D are formed using concreting.With this method, in such a way that the prefabricated cover board of handling blocks hole for hoist, compared with traditional support cast-in-place construction, it does not need to set up bracket, installation template, assembling reinforcement and the work of a large amount of casting concretes, difficulty of construction reduces, while noise is small, pollution is small, construction efficiency is high, short time limit used, while gap is crammed using concrete, so that cover board has waterproofness after blocking hole for hoist, meet subway station waterproof requirement, this method step is simple, easy to operate, works well.
Description
Technical field
The present invention relates to subway work technical field, in particular to a kind of subway station hole for hoist method for blocking.
Background technique
With the continuous development of raising and the transport development of china's overall national strength, China's underground traffic infrastructure is rapidly sent out
Exhibition, each big city starts to build subway engineering successively;Subway station generally can all select AT STATION during design and construction
Preformed hole is set on the top plate and middle plate above the area Gui Hang to meet a variety of materials equipment hoisting needs such as the section of track, shield machine;It stands
Interior construction then needs to block these ducts close to complete working hour;Open cut of subway station reserving hole closure at present is generally adopted
With support cast-in-place construction technique, intensive labor is needed, at high cost, low efficiency is unfavorable for the duration.
Summary of the invention
It is an object of the invention to overcome the existing open cut of subway station reserving hole in the presence of the prior art to block one
As use support cast-in-place construction technique, need intensive labor, at high cost, low efficiency is unfavorable for the above-mentioned deficiency of duration, provides
A kind of subway station hole for hoist method for blocking.
In order to achieve the above-mentioned object of the invention, the present invention provides following technical schemes:
A kind of subway station hole for hoist method for blocking, comprising the following steps:
A, when making the hole for hoist of subway station, support end is set in the hole for hoist installation site surrounding;
B, several prefabricated cover boards, all cover boards successively hole for hoist described in spliced shape adaptation are each described
There is gap between cover board and the hole for hoist side wall contacted, there is gap between the two neighboring cover board;
C, all cover boards of handling are arranged at the correspondence hole for hoist, and all cover boards are corresponded to by the hole for hoist
The support end support;
D, all gaps are formed using concreting, are completed the hole for hoist and are blocked.
Using a kind of subway station hole for hoist method for blocking of the present invention, hole for hoist is blocked using the prefabricated cover board of handling
Mode do not need to set up bracket, installation template, assembling reinforcement and largely pour mixed compared with traditional support cast-in-place construction
The work of soil is coagulated, difficulty of construction reduces, while noise is small, pollution is small, and construction efficiency is high, short time limit used, while utilizing coagulation
Soil crams gap, so that cover board has certain waterproofness after blocking hole for hoist, meets subway station waterproof requirement, the closure side
Method step is simple, easy to operate, works well.
Preferably, each cover board connects the side of the support end and is arranged in mismatch, and the top of the side compared with
Lower part is prominent, so that each cover board is overlapped on the support end.
Preferably, the lower shape of each cover board is adapted to the notch that the support end surrounds.
Preferably, in the step D, all gaps are poured using C40 slightly expanded concrete.
Preferably, the size in each gap is 5cm-10cm.
Preferably, concrete is poured using hanging modulus method in the gap between the two neighboring cover board, i.e., described
Sunpender is set in gap, and the sunpender connects bed die, and the sunpender tenses, and the bed die fits in two adjacent lids
Plate, then casting concrete, maintenance remove the bed die after forming in the gap.
Preferably, water-swellable water-stop glue is equipped in each gap, the water-swellable water-stop glue is connected to described
Cover sidewall.
Since subway station needs strict waterproof performance, in this way, part water is leaked into the gap
After concrete, percolating water is after encountering water-swellable water-stop glue, since water-swellable water-stop glue is water expansion one-pack-type sealant,
One it is hardened reform into own vol expansion after the good rubber elastomer of restoration, immersion, filling gap play it is certain only
Water effect.
Preferably, pre-buried angle steel at two angles being oppositely arranged on the two neighboring cover board, when executing the step D,
After pouring all gaps, the welding steel on two adjacent angle steel.
Since subway station needs strict waterproof performance to can be improved two neighboring prefabricated lid in this way
Globality between plate, the waterproof performance of enhancing structure.
Preferably, after executing the step D, cast-in-situ steel reinforced concrete layer is set on all cover boards.
In this way, the integral waterproofing effect after hole for hoist blocks is further increased, simultaneously because cover board is overlap joint
On support end, hole for hoist needs backfill after blocking, and cast-in-situ steel reinforced concrete layer is arranged on the cover board and is capable of enhancing structure
Stability.
Preferably, the cast-in-situ steel reinforced concrete layer with a thickness of 10cm-20cm.
In conclusion by adopting the above-described technical solution, the beneficial effects of the present invention are:
1, with a kind of subway station hole for hoist method for blocking of the present invention, lifting is blocked using the prefabricated cover board of handling
The mode in hole is not needed to set up bracket, installation template, assembling reinforcement and largely be poured compared with traditional support cast-in-place construction
The work of concrete, difficulty of construction reduce, while noise is small, pollution is small, and construction efficiency is high, short time limit used, while utilizing mixed
Solidifying soil crams gap, so that cover board has certain waterproofness after blocking hole for hoist, meets subway station waterproof requirement, the closure
Method and step is simple, easy to operate, works well;
2, it is equipped with that meet water swollen with a kind of subway station hole for hoist method for blocking of the present invention, in each gap
Swollen water-stop glue, the water-swellable water-stop glue are connected to the cover sidewall, since subway station needs strict waterproof performance,
In this way, part water leaks into the gap after concrete, percolating water after encountering water-swellable water-stop glue, by
It is water expansion one-pack-type sealant in water-swellable water-stop glue, one hardened reforms into the good rubber elastomer of restoration, leaching
Own vol expansion, filling gap play certain water-stagnating effect after water;
3, opposite on the two neighboring cover board to set with a kind of subway station hole for hoist method for blocking of the present invention
Pre-buried angle steel at two angles set, when executing the step D, after pouring all gaps, in two adjacent angle steel
Upper welding steel, since subway station needs strict waterproof performance to can be improved two neighboring prefabricated in this way
Globality between cover board, the waterproof performance of enhancing structure;
4, with a kind of subway station hole for hoist method for blocking of the present invention, after executing the step D, in all institutes
Setting cast-in-situ steel reinforced concrete layer on cover board is stated, in this way, further increases the integral waterproofing effect after hole for hoist blocks
Fruit, simultaneously because cover board is overlapped on support end, hole for hoist needs backfill after blocking, and it is mixed that cast in place reinforced bar is arranged on the cover board
Solidifying soil layer is capable of the stability of enhancing structure.
Detailed description of the invention
Fig. 1 is the structure section signal using the subway station of hole for hoist method for blocking in subway station of the present invention
Figure;
Fig. 2 is the partial top view of Fig. 1;
Structure section schematic diagram of the Fig. 3 between two neighboring cover board.
Marked in the figure: 1- hole for hoist, 2- support end, 3- cover board, 31- angle steel, 32- steel plate, the gap 4-, 5- water-swellable stop
Glue, 6- cast-in-situ steel reinforced concrete layer.
Specific embodiment
Below with reference to test example and specific embodiment, the present invention is described in further detail.But this should not be understood
It is all that this is belonged to based on the technology that the content of present invention is realized for the scope of the above subject matter of the present invention is limited to the following embodiments
The range of invention.
Embodiment
As shown in Figure 1-3, a kind of subway station hole for hoist method for blocking of the present invention, comprising the following steps:
A, when making the hole for hoist 1 of subway station, support end 2 is set in the 1 installation site surrounding of hole for hoist;
B, several prefabricated cover boards 3, all cover boards 3 successively hole for hoist 1, Mei Gesuo described in spliced shape adaptation
Stating has gap 4 between cover board 3 and 1 side wall of the hole for hoist contacted, have gap 4 between the two neighboring cover board 3;
C, all settings of cover board 3 of handling are at the corresponding hole for hoist 1, and all cover boards 3 are by the hole for hoist 1
The corresponding support end 2 supports;
D, all gaps 4 are formed using concreting, are completed the hole for hoist 1 and are blocked.
As a preferred embodiment of the present embodiment, the side that each cover board 3 connects the support end 2 is set in mismatch
It sets, and the top lower part of the side is prominent, so that each cover board 3 is overlapped on the support end 2, each lid
The lower shape of plate 3 is adapted to the notch that the support end 2 surrounds.
As a preferred embodiment of the present embodiment, in the step D, all gaps 4 use C40 microdilatancy coagulations
Soil pours, and the size in each gap 4 is 10cm;Concrete uses in the gap 4 between the two neighboring cover board 3
It hangs modulus method to pour, i.e., sunpender is set in the gap 4, the sunpender connects bed die, and the sunpender tenses, the bed die fitting
In two adjacent cover boards 3, then the casting concrete in the gap 4, removes the bed die after maintenance molding;Each
Water-swellable water-stop glue 5 is equipped in the gap 4, the water-swellable water-stop glue 5 is connected to 3 side wall of cover board, due to ground
Iron car station needs strict waterproof performance, and in this way, part water leaks into the gap 4 after concrete, leakage
Water is after encountering water-swellable water-stop glue 5, since water-swellable water-stop glue 5 is water expansion one-pack-type sealant, once hardened
Become own vol expansion after the good rubber elastomer of restoration, immersion, filling gap plays certain water-stagnating effect.
It is pre-buried at two angles being oppositely arranged on the two neighboring cover board 3 as a preferred embodiment of the present embodiment
Angle steel 31, when executing the step D, after pouring all gaps 4, the welding steel on two adjacent angle steel 31
32, since subway station needs strict waterproof performance, in this way, can be improved two neighboring prefabricated cover board 3 it
Between globality, the waterproof performance of enhancing structure;After executing the step D, cast in place reinforced bar coagulation is set on all cover boards 3
Soil layer 6 further increases the integral waterproofing effect after hole for hoist 1 blocks in this way, simultaneously because cover board 3 is overlap joint
On support end 2, hole for hoist 1 needs backfill after blocking, and cast-in-situ steel reinforced concrete layer 6 is arranged on cover board 3 can enhance knot
The stability of structure, the cast-in-situ steel reinforced concrete layer 6 with a thickness of 20cm.
With a kind of subway station hole for hoist method for blocking of the present invention, lifting is blocked using the prefabricated cover board 3 of handling
The mode in hole 1 blocks a hole for hoist 1 and needs 7 days, this method does not need to set up branch compared with traditional support cast-in-place construction
Frame, installation template, assembling reinforcement and the work of a large amount of casting concretes, reduce construction cost and difficulty of construction, while noise
It is small, pollution is small, construction efficiency is high, blocks a hole for hoist 1 it is only necessary to 1 day, shortens the construction period 6 days, and general support cast-in-place blocks,
Old concrete face need to be cut, is plugged into using pre-buried reinforcing bar and carries out reinforcing bar connection after-pouring concrete, this construction technology, reinforcing bar
Mechanical connection quality is uncontrollable, and using this method there is no need to above-mentioned technique, quality is guaranteed, while being filled out using concrete
Stifled gap 4 meets subway station waterproof requirement, the closure side so that cover board 3 has certain waterproofness after blocking hole for hoist 1
Method step is simple, easy to operate, works well.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.
Claims (10)
1. a kind of subway station hole for hoist method for blocking, which comprises the following steps:
A, when making hole for hoist (1) of subway station, support end (2) are set in the hole for hoist (1) installation site surrounding;
B, several prefabricated cover boards (3), all cover boards (3) successively hole for hoist (1) described in spliced shape adaptation, each
There are gap (4) between the cover board (3) and the hole for hoist (1) side wall contacted, between the two neighboring cover board (3)
With gap (4);
C, all cover board (3) settings of handling are at the corresponding hole for hoist (1), and all cover boards (3) are by the lifting
Corresponding support end (2) support in hole (1);
D, all gaps (4) are formed using concreting, complete the hole for hoist (1) closure.
2. hole for hoist method for blocking in subway station according to claim 1, which is characterized in that each cover board (3) is even
The side for connecing the support end (2) is arranged in mismatch, and the top lower part of the side is prominent, so that each cover board
(3) it is overlapped on the support end (2).
3. hole for hoist method for blocking in subway station according to claim 2, which is characterized in that each cover board (3)
Lower shape is adapted to the notch that the support end (2) surrounds.
4. hole for hoist method for blocking in subway station according to claim 1, which is characterized in that in the step D, Suo Yousuo
Gap (4) are stated to pour using C40 slightly expanded concrete.
5. hole for hoist method for blocking in subway station according to claim 1, which is characterized in that each gap (4)
Size is 5cm-10cm.
6. hole for hoist method for blocking in subway station according to claim 1, which is characterized in that the two neighboring cover board
(3) concrete use is hung modulus method and is poured in the gap (4) between, i.e., sunpender, the sunpender are arranged in the gap (4)
Bed die is connected, the sunpender tenses, and the bed die fits in the cover board (3) of adjacent two, then in the gap (4)
Casting concrete.
7. hole for hoist method for blocking in subway station according to claim 1, which is characterized in that in each gap (4)
Equipped with water-swellable water-stop glue (5), the water-swellable water-stop glue (5) is connected to the cover board (3) side wall.
8. hole for hoist method for blocking in subway station according to claim 1, which is characterized in that the two neighboring cover board
(3) pre-buried angle steel (31) at two angles being oppositely arranged on, when executing the step D, after pouring all gaps (4),
Welding steel (32) on the angle steel (31) of adjacent two.
9. hole for hoist method for blocking in subway station according to claim 1-8, which is characterized in that execute the step
After rapid D, cast-in-situ steel reinforced concrete layer (6) are set on all cover boards (3).
10. hole for hoist method for blocking in subway station according to claim 9, which is characterized in that the cast in place reinforced bar coagulation
Soil layer (6) with a thickness of 10cm-20cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810981669.1A CN108978729A (en) | 2018-08-27 | 2018-08-27 | A kind of subway station hole for hoist method for blocking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810981669.1A CN108978729A (en) | 2018-08-27 | 2018-08-27 | A kind of subway station hole for hoist method for blocking |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108978729A true CN108978729A (en) | 2018-12-11 |
Family
ID=64546953
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810981669.1A Pending CN108978729A (en) | 2018-08-27 | 2018-08-27 | A kind of subway station hole for hoist method for blocking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108978729A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112177369A (en) * | 2020-09-23 | 2021-01-05 | 中建二局第三建筑工程有限公司 | Building floor hoist and mount mouthful seal structure |
CN112323965A (en) * | 2020-11-13 | 2021-02-05 | 杭州绿锦建筑设计咨询有限公司 | Blocking structure of basement equipment room and construction method thereof |
CN112814036A (en) * | 2021-01-05 | 2021-05-18 | 中国电建集团华东勘测设计研究院有限公司 | Waterproof sealing cover plate structure for underwater manhole and construction method thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203923887U (en) * | 2014-06-27 | 2014-11-05 | 中铁第一勘察设计院集团有限公司 | The anti-freeze thawing board connecting structure of pier in a kind of bridge water |
CN204097884U (en) * | 2014-09-28 | 2015-01-14 | 广州瀚阳工程咨询有限公司 | A kind of Novel stopper for precast segment beam lifting hole |
CN204609008U (en) * | 2015-05-14 | 2015-09-02 | 江苏筑森建筑设计有限公司 | A kind of basement roof reserves equipment hoisting mouth plugging structure |
US20160369473A1 (en) * | 2015-06-18 | 2016-12-22 | Berndorf Baderbau S.R.O. | Closure, particularly for closing construction and technological apertures |
CN106988436A (en) * | 2017-03-28 | 2017-07-28 | 中国水利水电第十二工程局有限公司 | A kind of method of reserving hole closure |
-
2018
- 2018-08-27 CN CN201810981669.1A patent/CN108978729A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203923887U (en) * | 2014-06-27 | 2014-11-05 | 中铁第一勘察设计院集团有限公司 | The anti-freeze thawing board connecting structure of pier in a kind of bridge water |
CN204097884U (en) * | 2014-09-28 | 2015-01-14 | 广州瀚阳工程咨询有限公司 | A kind of Novel stopper for precast segment beam lifting hole |
CN204609008U (en) * | 2015-05-14 | 2015-09-02 | 江苏筑森建筑设计有限公司 | A kind of basement roof reserves equipment hoisting mouth plugging structure |
US20160369473A1 (en) * | 2015-06-18 | 2016-12-22 | Berndorf Baderbau S.R.O. | Closure, particularly for closing construction and technological apertures |
CN106988436A (en) * | 2017-03-28 | 2017-07-28 | 中国水利水电第十二工程局有限公司 | A kind of method of reserving hole closure |
Non-Patent Citations (3)
Title |
---|
刘福等: "北京雁栖湖某小区配套公建结构设计", 《建筑结构》 * |
张昭等: "地下室顶板预留洞临时封堵施工技术探讨", 《科研》 * |
张美玲: "吊模法在地铁车站预留孔封堵施工中的应用", 《铁道建筑》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112177369A (en) * | 2020-09-23 | 2021-01-05 | 中建二局第三建筑工程有限公司 | Building floor hoist and mount mouthful seal structure |
CN112323965A (en) * | 2020-11-13 | 2021-02-05 | 杭州绿锦建筑设计咨询有限公司 | Blocking structure of basement equipment room and construction method thereof |
CN112814036A (en) * | 2021-01-05 | 2021-05-18 | 中国电建集团华东勘测设计研究院有限公司 | Waterproof sealing cover plate structure for underwater manhole and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108978729A (en) | A kind of subway station hole for hoist method for blocking | |
CN105839667B (en) | The construction manufacture craft of complete prefabricated overlapping assembled underground pipe gallery | |
CN103410317A (en) | Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part | |
CN101158161A (en) | Underwater no-bottom closing concrete boxed cofferdam and method of use thereof | |
CN106499070B (en) | The construction method of connecting sewing between assembled architecture component and component | |
CN104652495B (en) | Internal support of foundation pit column and base plate node waterproof construction technology | |
CN106284412A (en) | A kind of prefabricated pipe gallery and construction method | |
CN106759563A (en) | A kind of device for pile foundation repairing and reinforcing and the construction method using the device | |
CN201943086U (en) | Underground building wall body | |
CN205776348U (en) | A kind of overlapping monoblock type pipe gallery prefabricated assembly structural | |
CN206052778U (en) | A kind of steel and Combined concrete piping lane | |
CN108560588A (en) | Assembled pipe gallery and its construction method | |
CN211114261U (en) | Precast concrete shear force wall panel structure | |
CN105862894B (en) | A kind of installation method of catch pit anti-floating integral mold plate | |
CN107237408A (en) | It is a kind of to prevent the construction method of expansion joint position seepage | |
CN108726348B (en) | Horizontal prefabrication, overturning and hoisting method for pipe gallery segments | |
CN110965473A (en) | Construction method of bridge bearing platform | |
CN207633546U (en) | Toilet concrete sealing prefabricated components | |
CN106930391B (en) | Cast-in-place drainage channel structure of top plate for formwork-free construction and construction method | |
CN207686288U (en) | The manufacture of the horizontal hole to be provided of wall and plugging device | |
CN109653223A (en) | River anti-floating weighting board construction method | |
CN103541372A (en) | Concrete poured communication through-type 4.0 manhole and construction method thereof | |
CN109371906B (en) | Upgrading structure and construction method for road at top of active embankment dam | |
CN207813015U (en) | Floor slab preformed hole tool-typed formwork support construction | |
CN105951987A (en) | Sub-frame post-cast joint with external permanent aluminum plate outer mold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181211 |