CN209723059U - A kind of cast-in-place concrete pile loading test device - Google Patents

A kind of cast-in-place concrete pile loading test device Download PDF

Info

Publication number
CN209723059U
CN209723059U CN201822149804.4U CN201822149804U CN209723059U CN 209723059 U CN209723059 U CN 209723059U CN 201822149804 U CN201822149804 U CN 201822149804U CN 209723059 U CN209723059 U CN 209723059U
Authority
CN
China
Prior art keywords
plate
reinforcement cage
sighting tube
steel reinforcement
side plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822149804.4U
Other languages
Chinese (zh)
Inventor
魏伟
宁顺才
张晓廷
刘沐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Mainstay Engineering Testing Co ltd
Original Assignee
Sinohydro Bureau 11 Co Ltd
PowerChina 11th Bureau Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 11 Co Ltd, PowerChina 11th Bureau Engineering Co Ltd filed Critical Sinohydro Bureau 11 Co Ltd
Priority to CN201822149804.4U priority Critical patent/CN209723059U/en
Application granted granted Critical
Publication of CN209723059U publication Critical patent/CN209723059U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of cast-in-place concrete pile loading test device, it includes: steel reinforcement cage, deformable cabinet, Grouting Pipe, grout outlet, sighting tube and observation bar, deformable cabinet is adapted to steel reinforcement cage, and it is arranged in steel reinforcement cage bottom, Grouting Pipe, grout outlet, sighting tube one end extend through be arranged in deformable top of the box, the other end of Grouting Pipe is pierced by steel reinforcement cage and is arranged on slip casting machine, the other end stretching at the top of steel reinforcement cage respectively of grout outlet, sighting tube, it is provided with restrictor ring in sighting tube, observation bar passes through that restrictor ring is movable to be plugged in sighting tube.The utility model is simple and practical, and measured value is accurate, does not need to pile crown secondary treatment, and detection time is short, high-efficient, and expense is low, use is extensive.Overall simplification bearing capacity of pile foundation measuring method and technique, reduce testing cost, it is ensured that pile integrity.

Description

A kind of cast-in-place concrete pile loading test device
Technical field
The utility model relates to loading test field, especially a kind of cast-in-place concrete pile loading test device.
Background technique
For current pouring pile bearing capacity detection device and method, bearing capacity of pile foundation detection is examined using single pile static load , all there is certain defect in survey, high strain monitoring, autobalanced detection, since Pile Diameter is big, bearing capacity of single pile is wanted in applicability It asks high, leads to that single pile dead-load detection load height, performance difficulty, low efficiency, costly, process is more, time-consuming.High strain monitoring needs Large scale equipment is wanted to be impacted, pile foundation end needs secondary treatment, and costly, process is more, measured value difference is big;Autobalanced detection meeting Cause pile foundation reinforcing bar to be broken, influences the integrality of concrete pipe base, influence concrete pipe base quality, need back-grouting.Therefore, How to make a kind of cast-in-place concrete pile loading test device for being able to solve prior art problem just become have it is to be solved Technical problem.
Utility model content
The utility model is based on above-mentioned technical problem, proposes a kind of cast-in-place concrete pile loading test device, Compared with prior art, the utility model is simple and practical, and measured value is accurate, does not need to pile crown secondary treatment, and detection time is short, imitates Rate is high, and expense is low, use is extensive.Overall simplification bearing capacity of pile foundation measuring method and technique, reduce testing cost, it is ensured that Pile integrity.
In view of this, the utility model proposes a kind of cast-in-place concrete pile loading test device, it includes: reinforcing bar Cage, deformable cabinet, Grouting Pipe, grout outlet, sighting tube and observation bar, the deformable cabinet and the steel reinforcement cage are suitable Match, and the steel reinforcement cage bottom is set, one end difference of the Grouting Pipe, the grout outlet, the sighting tube Through the deformable top of the box is arranged in, the other end of the Grouting Pipe is pierced by the top of the steel reinforcement cage, connection On slip casting machine, the other end stretching at the top of the steel reinforcement cage respectively of the grout outlet, the sighting tube is described It is provided with restrictor ring in sighting tube, the observation bar passes through that the restrictor ring is movable to be plugged in the sighting tube.
In the technical scheme, it is not take up space using the present apparatus, does not need counterweight, reaction frame, does not need impact device, Suitable for the pile foundation of the positions such as underwater, bottom of foundation ditch, hillside fields, narrow place, there is stronger applicability.
In the above-mentioned technical solutions, it is preferred that the deformable cabinet includes top plate and bottom plate, side plate and non-woven fabrics, institute The side plate stated includes the first side plate and the second side plate, and first side plate is arranged under the top plate, described second side Plate is arranged on the bottom plate, there are gap between second side plate and the top plate, first side plate with There are gap between the bottom plate, adhesive layer is provided on the non-woven fabrics, the non-woven wraps are arranged at interval The top plate and the sole periphery, and fixed, be integrally formed with the deformable of cavity by the adhesive layer Cabinet.
In the technical scheme, it is preferred that deformable cabinet overall structure is simple, it is cheap, be easy to make, convenient for making With being also equipped with the morphotropism of detection demand.And non-woven fabrics has certain thick liquid penetrating, can increase viscous between pile foundation and soil Knot property, increases the bearing capacity of pile foundation.
In the above-mentioned technical solutions, it is preferred that steel chain is provided in the cavity, one end setting of the steel chain exists On the top plate, the other end of the steel chain is arranged on the bottom plate, and the length of the steel chain is greater than described 3 to 5 centimetres of the height of cavity.
In the technical scheme, it is preferred that be provided with steel chain in deformable cabinet, limit is increased to deformable cabinet Protection, avoids damage caused by unexpected factors.
In the above-mentioned technical solutions, it is preferred that the material of the top plate and the bottom plate is steel plate, the note Starch pipe, the material of the grout outlet, the sighting tube is coating steel pipe, the non-woven fabrics is that thicken nonwoven geotechnological Cloth.
In the technical scheme, it is preferred that use steel plate, coating steel pipe in its structure and thicken non-woven geotextile, mention The high entire compression intensity of detection device, it is ensured that the stability of detection process.
The utility model proposes a kind of cast-in-place concrete pile loading test devices, and the utility model is in steel reinforcement cage bottom Provided with counterforce device, after concrete perfusion intensity meets condition, grouting and reinforcing pile foundation substrate is carried out while pressurization, both Calculate bearing capacity of pile foundation, and improve the compacted effect and bearing capacity of pile foundation part, pile body is not generated any destruction with It influencing, is suitable for end-bearing pile and friction pile, production is simple, and it is easy to operate, landform, topography and position are not required, are applicable in Property is strong.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the top view of the utility model;
In figure: 1 steel reinforcement cage, 2 deformable cabinets, 3 Grouting Pipes, 4 grout outlets, 5 sighting tubes, 6 cavitys, 7 observation bars, 8 top plates, 9 bottom plates, 10 non-woven fabrics, 11 steel chains, 12 restrictor rings, 13 side plates.
Specific embodiment
In order to be more clearly understood that the above objects, features, and advantages of the utility model, with reference to the accompanying drawing and have The utility model is further described in detail in body embodiment.
Many details are explained in the following description in order to fully understand the utility model, still, this is practical Novel to be implemented using other than the one described here other way, therefore, the protection scope of the utility model is simultaneously It is not limited by following public content.
The technical solution of the utility model is described further below in conjunction with Fig. 1 and Fig. 2.
First embodiment: as shown in Figure 1, a kind of cast-in-place concrete pile loading test device, it includes: steel reinforcement cage 1, can Cabinet 2, Grouting Pipe 3, grout outlet 4, sighting tube 5 and observation bar 7 are deformed, the deformable cabinet 2 and the steel reinforcement cage 1 are suitable Match, and 1 bottom of steel reinforcement cage, one end of the Grouting Pipe 3, the grout outlet 4, the sighting tube 5 are set It extends through and 2 top of deformable cabinet is set, and communicated with the cavity 6 in the deformable cabinet 2, it is described The other end of Grouting Pipe 3 is pierced by the steel reinforcement cage 1 and is arranged on slip casting machine, the grout outlet 4, the sighting tube 5 The other end stretches out at the top of the steel reinforcement cage 1 respectively, and restrictor ring 12, the observation bar 7 are provided in the sighting tube 5 It is plugged in the sighting tube 5 across the restrictor ring 12 is movable.
The deformable cabinet 2 includes top plate 8, bottom plate 9, side plate 13 and non-woven fabrics 10, and the side plate 13 includes the Side plate and the second side plate, first side plate are arranged under the top plate 8, and second side plate is arranged in described On bottom plate 9, there are gap between second side plate and the top plate 8, first side plate and the bottom plate 9 it Between there are gap, be provided with adhesive layer on the non-woven fabrics 10, the non-woven fabrics 10 is wrapped in spaced described Top plate 8 and 9 periphery of bottom plate, and fixed by the adhesive layer, the deformable cabinet 2 with cavity 6 is integrally formed. Steel chain 11 is provided in the cavity 6, one end of the steel chain 11 is arranged on the top plate 8, the steel chain 11 The other end be arranged on the bottom plate 9, the length of the steel chain 11 is greater than 3 to 5 centimetres of height of the cavity 6. The material of the top plate 8 and the bottom plate 9 is steel plate, the Grouting Pipe 3, the grout outlet 4, the observation The material of pipe 5 is coating steel pipe, and the non-woven fabrics 10 is to thicken non-woven geotextile.
The height of the deformable cabinet 2 is 25cm, and diameter is consistent with pile diameter;The thickness of the steel plate >= 8mm;The diameter of the Grouting Pipe 3 and the grout outlet 4 is 1 inch;The Grouting Pipe 3, the grout outlet 4, institute The height for the sighting tube 5 stated is higher than described 1 top 1m of steel reinforcement cage or so (depending on site contour situation, with easy to operate It is advisable);The diameter of the sighting tube 5 is 0.6 inch;The described observation bar 7 is >=round steel of 8mm diameter.
In use: after pouring pile hole, borehole cleaning to criterion of acceptability will test device and be placed in priming concrete pile hole It is interior, normal perfusion pile body concrete, after 7 day age of concrete perfusion (or after concrete strength is greater than the 60% of design) Carry out loading test.
When loading test, the cement paste slip casting machine being stirred is poured into deformable cabinet 2 by the pressurization of Grouting Pipe 3 Cavity 6 in, grouting pressure is recorded by pressure gauge on slip casting machine;
Gradually cavity 6 is filled up into the slurries in cavity 6, makes 6 deformation expansion of cavity, observation observation bar 7 and sighting tube 5 Between relative deformation situation, record deformation tendency and maximum deformation quantity;
After the spilling of grout outlet 4, slip casting terminates extra slurries after the completion of detection;
The relation curve between capability and deformation amount is drawn according to record information, calculating pile foundation is allowing deformation range Interior maximum load capacity value.
Above-described is only the preferred embodiment of the utility model, is not intended to limit the utility model, for For those skilled in the art, various modifications and changes may be made to the present invention.All spirit and original in the utility model Within then, any modification, equivalent replacement, improvement and so on be should be included within the scope of protection of this utility model.

Claims (4)

1. a kind of cast-in-place concrete pile loading test device, it is characterised in that: including steel reinforcement cage, deformable cabinet, Grouting Pipe, Grout outlet, sighting tube and observation bar, the deformable cabinet is adapted to the steel reinforcement cage, and the steel reinforcement cage is arranged in Bottom, the Grouting Pipe, the grout outlet, the sighting tube one end extend through the deformable case be set At the top of body, the other end of the Grouting Pipe is pierced by the top of the steel reinforcement cage, is connected on slip casting machine, the grout outlet, The other end of the sighting tube stretches out at the top of the steel reinforcement cage respectively, is provided with restrictor ring in the sighting tube, institute The observation bar stated passes through that the described restrictor ring is movable to be plugged in the sighting tube.
2. cast-in-place concrete pile loading test device according to claim 1, it is characterised in that: the deformable case Body includes top plate and bottom plate, side plate and non-woven fabrics, and the side plate includes the first side plate and the second side plate, first side plate It is arranged under the top plate, second side plate is arranged on the bottom plate, second side plate and the top There are gaps between plate, there are gap between first side plate and the bottom plate, are provided on the non-woven fabrics viscous Layer is tied, the non-woven wraps pass through the bonding in the spaced top plate and the sole periphery Layer is fixed, and the deformable cabinet with cavity is integrally formed.
3. cast-in-place concrete pile loading test device according to claim 2, it is characterised in that: set in the cavity It is equipped with steel chain, one end of the steel chain is arranged on the top plate, and the bottom is arranged in the other end of the steel chain On plate, the length of the steel chain is greater than 3 to 5 centimetres of height of the cavity.
4. cast-in-place concrete pile loading test device according to claim 2, it is characterised in that: the top plate and institute The material for the bottom plate stated is steel plate, the Grouting Pipe, the grout outlet, the sighting tube material be galvanized steel Pipe, the non-woven fabrics are to thicken non-woven geotextile.
CN201822149804.4U 2018-12-21 2018-12-21 A kind of cast-in-place concrete pile loading test device Expired - Fee Related CN209723059U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822149804.4U CN209723059U (en) 2018-12-21 2018-12-21 A kind of cast-in-place concrete pile loading test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822149804.4U CN209723059U (en) 2018-12-21 2018-12-21 A kind of cast-in-place concrete pile loading test device

Publications (1)

Publication Number Publication Date
CN209723059U true CN209723059U (en) 2019-12-03

Family

ID=68677495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822149804.4U Expired - Fee Related CN209723059U (en) 2018-12-21 2018-12-21 A kind of cast-in-place concrete pile loading test device

Country Status (1)

Country Link
CN (1) CN209723059U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372039A (en) * 2018-12-21 2019-02-22 中水电第十工程局(郑州)有限公司 A kind of cast-in-place concrete pile loading test device and detection method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372039A (en) * 2018-12-21 2019-02-22 中水电第十工程局(郑州)有限公司 A kind of cast-in-place concrete pile loading test device and detection method
CN109372039B (en) * 2018-12-21 2023-11-03 中电建十一局工程有限公司 Concrete cast-in-place pile bearing capacity detection device and detection method

Similar Documents

Publication Publication Date Title
CN105064372B (en) A kind of foundation ditch Cast-in-situ Piles in Sand-filling shakes densification process
CN106759547B (en) Integral Abutment, pile foundation and soil interaction pseudo-static experimental measuring device and its installation method
CN105350488B (en) A kind of assay device of sheet-pile wharf and preparation method thereof and test method
CN205662958U (en) Concrete spread foundation test device
CN110528596A (en) A kind of static loading experiment construction technology and detection method based on self-balancing technology
CN103759957A (en) Geogrid pull-out test device
CN209723059U (en) A kind of cast-in-place concrete pile loading test device
CN106337446A (en) Indoor test device for pulling resistance of pile foundation and test method of indoor test device
CN216446059U (en) Geotechnical engineering pile foundation indoor model experimental device
CN109372039A (en) A kind of cast-in-place concrete pile loading test device and detection method
CN103808570B (en) A kind of geotextile anti-pulling friction testing method for Rock And Soil
CN210376011U (en) Large-area on-site direct shear test equipment
CN106400857B (en) For the model equipment and method of the inaccessible degree of soil plug in in-site measurement opening pile
CN105862944B (en) A kind of spread foundation full scale test device
KR20100048134A (en) Loading tester with cylinders acuating synchronously and method for measuring a bearing capacity of cast in plase pile using the same
CN109972635A (en) Side slope pastes high roadbed quality in slope and controls construction method
CN106245689B (en) A kind of monitoring method of mixing material support stake axle power
CN105862943B (en) A kind of concrete spread foundation experimental rig and implementation method
CN105887926B (en) Weak soil shake, which falls into stratum, prevents the open trench tunnel structure of ground inhomogeneous deformation
CN209468793U (en) A kind of static test settlement observer for exempting from datum line beam
CN203758853U (en) Stack pull type field large direct shearing equipment
CN208009500U (en) A kind of simple flat board load test device based on native counter-force
CN205954722U (en) Spiral ground stake counterforce device
CN105841653A (en) Method of measuring dam body horizontal displacement
CN110195446A (en) A kind of unit for single-pile vertical anti-pulling static test equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200303

Address after: 450000 No.01, unit 1, building 85, No.1 Cuizhu street, high tech Zone, Zhengzhou City, Henan Province

Patentee after: Henan mainstay Engineering Testing Co.,Ltd.

Address before: 450000 No. 59 Lianhua Street, Zhengzhou High-tech District, Henan Province

Co-patentee before: SINOHYDRO BUREAU 11 Co.,Ltd.

Patentee before: China Power Construction Eleventh Bureau Engineering Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191203

CF01 Termination of patent right due to non-payment of annual fee