CN205662958U - Concrete spread foundation test device - Google Patents

Concrete spread foundation test device Download PDF

Info

Publication number
CN205662958U
CN205662958U CN201620552485.XU CN201620552485U CN205662958U CN 205662958 U CN205662958 U CN 205662958U CN 201620552485 U CN201620552485 U CN 201620552485U CN 205662958 U CN205662958 U CN 205662958U
Authority
CN
China
Prior art keywords
concrete
soil pressure
pressure cell
spread foundation
concrete spread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620552485.XU
Other languages
Chinese (zh)
Inventor
梁兴
李元齐
王贞明
顾朝阳
陈健飞
罗金辉
干华
秦小亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Become Capital Electricity Power Engineering Design Co Ltd
Tongji University
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Sichuan Electric Power Co Ltd
Original Assignee
Become Capital Electricity Power Engineering Design Co Ltd
Tongji University
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Become Capital Electricity Power Engineering Design Co Ltd, Tongji University, State Grid Corp of China SGCC, State Grid Sichuan Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Sichuan Electric Power Co Ltd filed Critical Become Capital Electricity Power Engineering Design Co Ltd
Priority to CN201620552485.XU priority Critical patent/CN205662958U/en
Application granted granted Critical
Publication of CN205662958U publication Critical patent/CN205662958U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model discloses a concrete spread foundation test device, including foundation ditch, soil pressure cell, concrete spread foundation test piece, foil gage, biography power short column, hydraulic pressure static pressure stake machine and the stake of biography power plain concrete four angles of concrete spread foundation test piece bottom surface respectively set up a soil pressure cell, and the soil pressure cell that lies in cornerwise two angles department respectively is provided with a soil pressure cell along the both sides rather than adjacent and diagonal, and the soil pressure cell of three soil pressure cell on rather than adjacent angle distribution is the square, the foil gage respectively is provided with two at a hypotenuse of concrete spread foundation test piece with the base that corresponds, and two foil gages that are close to the power that passes short column on hypotenuse and the base are located same vertical on -line, and the foil gage is about a perpendicular plane of symmetry symmetry of concrete spread foundation test piece. The utility model discloses use rationally to have set up the position of foil gage with soil pressure cell, improved the experimental degree of accuracy that is greater than 2.5 concrete spread foundation test piece to the ratio of width to height.

Description

A kind of concrete spread foundation assay device
Technical field
This utility model relates to a kind of concrete spread foundation full scale test field, is specifically related to a kind of concrete extension base Plinth assay device.
Background technology
At present, concrete spread foundation is one of principal mode of electric power line steel tower.During UHV transmission line is built, base Plinth cost accounts for the 16% ~ 20% of overall investment, and therefore the optimization design on basis plays an important role with cost for saving the duration.
Reduce the cutting depth of foundation soil, i.e. reduce the height of footing step, can be significantly for economic angle Reduce cost, and can accelerate the duration.But, concrete spread foundation strictly observes step width in existing national sector standard The requirement less than 2.5 of the high ratio, so reducing the height of footing step, the width height ratio of steps of concrete spread foundation will exceed Specification limit.And using concrete spread foundation when, owing to downforce is increasing, and part geological condition ground Base low bearing capacity, sole plate area generally requires increase.It practice, the limit that concrete spread foundation the ratio of width to height is less than 2.5 Value is that the demand supposed based on the distribution of foundation bottom stress plane section is set out, and breaks through at present concrete spread foundation step width High than the requirement limited, need the sub-grade reaction distribution to the width height ratio of steps aspect ratio concrete spread foundation more than 2.5 Situation research experiment, preferably to recognize mechanical characteristic and the sub-grade reaction distribution rule on this class basis.
For concrete spread foundation, outdoor full scale test more can reflect its true mechanical characteristic objectively, but It is that traditional concrete spread foundation full scale test device is trying more than the concrete spread foundation of 2.5 limit values for the ratio of width to height During part, concrete spread foundation test specimen pastes the position of foil gauge and bottom concrete spread foundation test specimen, lays soil pressure The arrangement of box can not reflect the ratio of width to height concrete spread foundation test specimen more than 2.5 well and be produced in loading procedure Raw deformation and the reaction distribution rule of substrate so that the experimental accuracy of full scale test reduces.
Utility model content
Technical problem to be solved in the utility model is the defect for conventional Extension basis full scale test method, it is provided that A kind of concrete spread foundation assay device, solves conventional Extension basis full scale test method and is more than 2.5 in test the ratio of width to height During concrete spread foundation test specimen, the position of patch foil gauge and laying soil pressure cell can not reflect concrete extension base well Plinth test specimen is the problem of the reaction distribution rule of produced deformation and substrate in loading procedure.
This utility model is achieved through the following technical solutions: a kind of concrete spread foundation assay device, including foundation ditch, institute Stating and be provided with the soil pressure cell being embedded in back fill course bottom foundation ditch, described soil pressure cell is provided above concrete spread foundation Test specimen, described concrete spread foundation test specimen is provided with foil gauge, and it is short that concrete spread foundation test specimen top is provided with power transmission Post, also includes that hydraulic static pile pressing machine, the jaw of described hydraulic static pile pressing machine accompany the power transmission element being positioned at above power transmission short column Concrete-pile, respectively arranges a soil pressure cell at four angles of described concrete spread foundation test specimen bottom surface, is located therein one Soil pressure cell at cornerwise two angles is each provided with a soil pressure cell along the both sides being adjacent and diagonal, arranges afterwards The angle that is adjacent of three soil pressure cells on the distribution of soil pressure cell square;Described foil gauge extends base at concrete One hypotenuse of plinth test specimen and corresponding base are each provided with two, wherein, near two of power transmission short column on hypotenuse and base Foil gauge is positioned on same vertical curve, and described four foil gauges are about faced by a vertical symmetry of concrete spread foundation test specimen Claim.In prior art, traditional concrete spread foundation full scale test device is testing the concrete spread foundation of aspect ratio, I.e. short than general concrete spread foundation, floor space is big, the ratio of width to height more than the concrete spread foundation of 2.5 limit values, concrete expands Paste on the test specimen of exhibition basis foil gauge and bottom concrete spread foundation test specimen, lay the position of soil pressure cell can not be very Reflect well concrete spread foundation test specimen produced deformation and reaction distribution rule of substrate in loading procedure, make The experimental accuracy obtaining full scale test reduces.In order to solve this problem, this utility model has reset the position of patch foil gauge Putting and concrete spread foundation bottom surface arranges the position of soil pressure cell, found by practice, this kind of paving mode can be effective Reflect the ratio of width to height more than the concrete spread foundation test specimen of 2.5 limit values produced deformation and substrate in loading procedure Reaction distribution rule.
Further, the length of side of described concrete spread foundation bottom surface is 2500mm, the soil pressure cell being positioned on diagonal It is 850mm with the distance between the soil pressure cell arranged along its adjacent both sides.Found by practice, lay soil according to this ratio Pressure cell can be effectively reflected the ratio of width to height more than the reaction distribution rule bottom the concrete spread foundation test specimen of 2.5 limit values.
Further, equivalently-sized groove, institute it are provided with bottom described power transmission short column top and power transmission plain concrete pile Being provided with pressure transducer in stating groove, described pressure transducer connects piezometry instrument.When power transmission short column top and biography Bottom power plain concrete pile during contact, the groove inner shell of formation arranges pressure transducer, and the size of pressure transducer is preferably with recessed Groove size matches, and the pressure transducer when loading can be avoided to be moved, after setting pressure transducer, by external pressure Force detector device can survey the size of every grade of load, it is simple in loading procedure, controlled loading speed makes load stable.It addition, Pressure transducer can also be arranged between the jaw of hydraulic static pile pressing machine and power transmission plain concrete pile, power transmission short column and extension Between the test specimen of basis, lie in a horizontal plane in inside power transmission plain concrete pile or power transmission short column.
The implementation method of a kind of concrete spread foundation test, comprises the following steps:
A preparation before (), full scale test, carries out load calibrating including utilizing testing machine, utilizes standard soil pressure cell Resistance instrument filter out can meet require gum base concrete strain sheet, get out pressure transducer and cleaning work scene need not The foreign material wanted;
B the building of device needed for (), full scale test, including excavation pit, buries soil pressure cell, laying concrete mats underground Layer, laying bar-mat reinforcement, casting concrete, concrete curing, patch foil gauge, placement force sensor and hydraulic static pile pressing machine In place;
C concrete spread foundation test specimen is loaded by (), use hydraulic static pile pressing machine;
(d), tested after to on-the-spot cleaning work.
This method is divided into four big steps, is first by the preparation before full scale test, and preparation includes utilizing examination Machine of testing soil pressure cell is carried out load calibrating, utilize measuring resistance instrument filter out can meet require gum base concrete strain sheet, Get out pressure transducer and the on-the-spot unnecessary foreign material of cleaning work, after preparation completes, start to build test relevant Device and equipment, building include excavation pit, bury underground soil pressure cell, lay concrete cushion, to lay bar-mat reinforcement, casting mixed Solidifying soil, concrete curing, patch foil gauge, placement force sensor and hydraulic static pile pressing machine are in place, use after having built Hydraulic static pile pressing machine loads, site clearing after loaded.By the data measured by test, it is possible to extension base The mechanical characteristic of plinth, strain regime are analyzed with sub-grade reaction distribution, to judge that the ratio of width to height of spread foundation step whether may be used With the limit value more than 2.5.This utility model uses more preferably method for arranging patch foil gauge and laying soil pressure cell, substantially increases For the ratio of width to height more than the experimental accuracy of the concrete spread foundation test specimen of 2.5 limit values, result of the test is made to connect with truth Closely, additionally for the concrete spread foundation of aspect ratio, traditional concrete spread foundation full scale test loading system then needs Want large-area and build reaction frame and jack, not only lose time, and increase experimentation cost, make the efficiency of full scale test Reduce.This utility model does not use jack reaction frame system to load, but carries out static(al) with hydraulic static pile pressing machine and add Carry.The axial pressure or the eccentricity pressure that act on spread foundation top in Practical Project can be with hydraulic static pile pressing machine generations Vertical static pressure is simulated, hydraulic static pile pressing machine relatively reaction frame have noiselessness when having conveniently moving, low cost, construction, Friction, free of contamination advantage, and eliminate and set up this loaded down with trivial details operating process of reaction frame, be greatly accelerated test into Journey.The time not only shortening full scale test also a saving experimentation cost.
Further, in described step (b), during excavation pit, cutting depth is until supporting course, and the soil body of foundation ditch periphery needs Carrying out supporting, in place, periphery arranges gutter.The soil body of foundation ditch periphery needs a certain degree of supporting, can use put slope or The methods such as person's inner support, the loosened soil on the foundation ditch top layer dug needs first to clean out, the most again the equating end, hole, arranges at place periphery Hydrops is not had in place when the purpose in gutter is to ensure that the rainy day.
Further, in described step (b), when burying soil pressure cell underground, first bury the position paving of pressure cell underground carefully in plan Sand is also compacted, and fine sand thickness is 1 to 3 centimetre, then makes soil pressure cell be placed horizontally at above fine sand and move back and forth soil pressure Box, connects soil pressure cell and vibrating wire frequency measurer afterwards, finally places fine sand above soil pressure cell and backfill soil, soil pressure The fine sand thickness laid above box is 5 to 7 centimetres, and back fill course than soil pressure cell is high 5 to 7 centimetres.Pressure is buried underground in plan The position paving fine sand of box compacting make soil pressure cell bottom surface uniform force, make soil pressure cell be placed horizontally at above fine sand and come Return dynamic soil pressure box is to reach soil pressure cell and fine sand layer tight and the purpose of close contact, soil pressure cell and vibratory string frequency Detector connects, and operator can be made to observe the sub-grade reaction distribution situation of spread foundation by vibrating wire frequency measurer. The fine sand thickness laid below soil pressure cell be 1 to 3 centimetre so that soil pressure cell bottom surface uniform force, above soil pressure cell The fine sand thickness laid is 5 to 7 centimetres, and stress can be avoided to concentrate, and spreads fine sand above back fill course height and soil pressure cell After height identical, convenient after lay concrete cushion above it.
Further, in described step (b), after foil gauge posts, connect foil gauge and strain case, strain case data measured After be transferred to computer, automatically recorded by DH3816 static strain measuring instrument software and analyzed.Use static strain measuring instrument Software automatically can record data in computer and be analyzed, thus reduces the workload of operator.Pass through static strain The data that measuring instrument software analysis obtains can make operator observe the situation of change of spread foundation test specimen upper stress.
Further, in described step (b), pressure transducer is positioned over that spread foundation top is reserved in advance to be set Groove is interior and fixes its position, is connected with computer outside the venue by pressure transducer.Pressure transducer is placed on and pre-sets Groove in pressure transducer will not be moved in loading procedure, pressure transducer is connected permissible after computer outside the venue The size of every grade of load is surveyed, it is simple to controlled loading speed makes load stable in loading procedure in loading procedure.
Further, in described step (b), use the lifting machine of hydraulic static pile pressing machine by prefabricated power transmission concrete Stake hangs in the piling case of pile press machine, clamps power transmission concrete-pile with the pile-clamp of hydraulic static pile pressing machine, slowly reduces biography Power concrete-pile so that it is align with pressure transducer, the bottom that pressure transducer is stuck in power transmission concrete-pile is reserved in groove. Groove bottom power transmission concrete-pile agrees with the groove at spread foundation top, is stuck in groove by pressure transducer, loaded In journey, pressure transducer will not be moved, and the mensuration making loading load is more accurate.
Further, described step (c) carried out prestrain before formally loading.Apply prestrain, treat prestrain Instrumentation the most formally loads after normally working and being consistent with anticipatory data.
This utility model compared with prior art, has such advantages as and beneficial effect:
1, the utility model proposes a kind of concrete spread foundation assay device, this device is by reasonably arranging soil pressure Power box is in the position of concrete spread foundation test specimen bottom surface and pastes the position of foil gauge on concrete spread foundation test specimen, Improve for the ratio of width to height more than the experimental accuracy of the concrete spread foundation test specimen of 2.5 limit values, make test and practical operation Situation be more nearly;
2, this utility model uses hydraulic static pile pressing machine to instead of reaction frame and jack system, is effectively improved pin Conventional efficient to the ratio of width to height concrete spread foundation test more than 2.5, provides cost savings and decreases the time;
3, this utility model show that by practice should be provided above thickness at steel chord type soil pressure cell is 5 to 7 centimetres Fine sand, makes stress be distributed very well, adds the precision of test.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing being further appreciated by this utility model embodiment, constitutes the one of the application Part, is not intended that the restriction to this utility model embodiment.In the accompanying drawings:
Fig. 1 is flow chart of the present utility model;
Fig. 2 is the schematic diagram of foil gauge position;
Fig. 3 is that soil pressure cell arranges schematic diagram.
Detailed description of the invention
For making the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with embodiment and accompanying drawing, The utility model is described in further detail, and exemplary embodiment of the present utility model and explanation thereof are only used for explaining this Utility model, is not intended as restriction of the present utility model.
Embodiment 1
As shown in Figures 2 and 3, the present embodiment is a kind of concrete spread foundation assay device, including foundation ditch, described foundation ditch Bottom is provided with the soil pressure cell being embedded in back fill course, and described soil pressure cell is provided above concrete spread foundation test specimen, Being provided with foil gauge on described concrete spread foundation test specimen, concrete spread foundation test specimen top is provided with power transmission short column, also Including hydraulic static pile pressing machine, the jaw of described hydraulic static pile pressing machine accompanies the power transmission plain concrete being positioned at above power transmission short column Stake, it is characterised in that one soil pressure cell is respectively set at four angles of described concrete spread foundation test specimen bottom surface, is located therein Article one, the soil pressure cell at cornerwise two angles is each provided with a soil pressure cell along the both sides being adjacent and diagonal, after The distribution of the soil pressure cell on angle that three soil pressure cells arranged are adjacent is square;Described foil gauge expands at concrete One hypotenuse and the corresponding base of exhibition basis test specimen are each provided with two, wherein, near power transmission short column on hypotenuse and base Two foil gauges are positioned on same vertical curve, and described four foil gauges are about a vertical symmetry of concrete spread foundation test specimen Face is symmetrical.Further, the length of side of described concrete spread foundation bottom surface is 2500mm, the soil pressure cell being positioned on diagonal with Distance between the soil pressure cell that its adjacent both sides are arranged is 850mm.Further, described power transmission short column top and power transmission element Being provided with equivalently-sized groove bottom concrete-pile, be provided with pressure transducer in described groove, described pressure transducer is even It is connected to piezometry instrument.During work, first dig foundation ditch, bottom foundation ditch, lay soil pressure cell according to position shown in Fig. 3, afterwards Above soil pressure cell, place concrete spread foundation test specimen, concrete spread foundation test specimen sets according to position shown in Fig. 2 Putting foil gauge, be connected with vibrating wire frequency measurer by soil pressure cell, foil gauge is connected with static strain measuring instrument, at concrete Power transmission short column is installed at spread foundation test specimen top, and power transmission short column top arranges groove, placement force sensor in groove, and pressure passes Sensor is connected with piezometry instrument, clamps power transmission plain concrete pile by controlling hydrostatic pile press machine jaw, and power transmission element mixes Solidifying soil stake bottom groove aligns with power transmission short column top groove, finally starts to load, and is examined by piezometry instrument, vibratory string frequency Survey the data measured by instrument and static strain measuring instrument and can analyze mechanical characteristic and the substrate of concrete spread foundation test specimen Reaction distribution rule.
Embodiment 2
As it is shown in figure 1, the implementation method of a kind of concrete spread foundation test, comprise the following steps:
A preparation before (), full scale test, carries out load calibrating including utilizing testing machine, utilizes standard soil pressure cell Resistance instrument filter out can meet require gum base concrete strain sheet, get out pressure transducer and cleaning work scene need not The foreign material wanted;
B the building of device needed for (), full scale test, including excavation pit, buries soil pressure cell, laying concrete mats underground Layer, laying bar-mat reinforcement, casting concrete, concrete curing, patch foil gauge, placement force sensor and hydraulic static pile pressing machine In place;
C concrete spread foundation test specimen is loaded by (), use hydraulic static pile pressing machine;
(d), tested after to on-the-spot cleaning work.
Further, in described step (b), during excavation pit, cutting depth is until supporting course, and the soil body of foundation ditch periphery needs Carrying out supporting, in place, periphery arranges gutter.Further, in described step (b), when burying soil pressure cell underground, first at meter Drawing and bury the position paving fine sand of pressure cell underground and be compacted, fine sand thickness is 1 to 3 centimetre, then makes soil pressure cell be placed horizontally at carefully Above sand and move back and forth soil pressure cell, connect soil pressure cell and vibrating wire frequency measurer afterwards, finally above soil pressure cell Placing fine sand and backfill soil, the fine sand thickness laid above soil pressure cell is 5 to 7 centimetres, and back fill course than soil pressure cell is high by 5 To 7 centimetres.Further, in described step (b), after foil gauge posts, connect foil gauge and strain case, strain case data measured After be transferred to computer, automatically recorded by DH3816 static strain measuring instrument software and analyzed.Further, described step In (b), pressure transducer it is positioned in the groove set is reserved in advance in spread foundation top and fixes its position, will pressure Force transducer is connected with computer outside the venue.Further, in described step (b), the lifting machine using hydraulic static pile pressing machine will be pre- The power transmission concrete-pile made hangs in the piling case of pile press machine, clamps power transmission coagulation with the pile-clamp of hydraulic static pile pressing machine Soil stake, slowly reduces power transmission concrete-pile so that it is align with pressure transducer, pressure transducer is stuck in power transmission concrete-pile Bottom is reserved in groove.Further, described step (c) carried out prestrain before formally loading.
When using this method, preparation before first carrying out full scale test: include utilizing testing machine that soil pressure cell is entered Row load calibrating, utilize measuring resistance instrument filter out can meet requirement gum base concrete strain sheet, get out pressure transducer And the on-the-spot unnecessary foreign material of cleaning work.Then, build the device and equipment used needed for full scale test, excavation pit, Cutting depth, until supporting course, carries out supporting to the soil body of foundation ditch periphery, is arranged around gutter in place, after having dug foundation ditch, Spreading a layer thickness bottom foundation ditch is the fine sand layer of 2cm, places soil pressure cell, lay above soil pressure cell above fine sand layer The fine sand layer that 5cm is thick, backfills soil afterwards, and back fill course height adds the height of 5cm fine sand layer equal to the height of soil pressure cell, will Soil pressure cell is connected with vibrating wire frequency measurer, lays concrete cushion afterwards, at concrete cushion above back fill course The framework of steel reinforcement on basis is laid in top, and according to the structural working drawing of spread foundation, the periphery at bar-mat reinforcement props up lifting plate, and pours The concrete of desired strength and its superstructure, afterwards according to national standard concrete curing condition maintenance basis 28 days, Early strength agent can also be added and accelerate maintenance, after maintenance completes, stick gum base concrete strain sheet in spread foundation test specimen side, strain Sheet directly utilizes p-wire and is connected with strain case, is transferred to computer, DH3816 static strain measures after strain case data measured Instrument software automatically records and analyzes, placement force sensor in the groove at spread foundation test specimen top, connects pressure and passes Sensor and computer outside the venue, last hydraulic static pile pressing machine admission, the lifting machine of hydraulic static pile pressing machine admission is by prefabricated biography Power concrete-pile hangs in the piling case of pile press machine, clamps power transmission concrete-pile with the pile-clamp of hydraulic static pile pressing machine, slow Slow reduction power transmission concrete-pile, and make it align with pressure transducer, just pressure transducer is stuck at the bottom of power transmission concrete-pile In the groove that portion and spread foundation test specimen top are reserved, build device and after equipment worked, carry out prestrain, prestrain institute Apply load is maximum load 3% ~ 10%, treat that prestrain instrumentation is working properly, with expection basically identical after the most formal Loading, formal loading uses single cycle to be incremented by step by step and loads.Start by 100kN load, after crack soon occurring to test specimen by 50kN is loaded into the width in test specimen crack and reaches 0.3mm, is loaded into spread foundation by 100kN the most again and can not hold lotus or reach To the loading upper limit of equipment, in loading procedure, every grade of loading carries out reading after stablizing 1 to 2 second.When after the bearing capacity that reaches capacity, Unload, and record corresponding data, tested rear place cleaning.
Above-described detailed description of the invention, is entered the purpose of this utility model, technical scheme and beneficial effect One step describes in detail, be it should be understood that and the foregoing is only detailed description of the invention of the present utility model, is not used to limit Fixed protection domain of the present utility model, all within spirit of the present utility model and principle, any amendment, the equivalent made are replaced Change, improvement etc., within should be included in protection domain of the present utility model.

Claims (3)

1. a concrete spread foundation assay device, including foundation ditch, is provided with bottom described foundation ditch and is embedded in back fill course Soil pressure cell, described soil pressure cell is provided above concrete spread foundation test specimen, described concrete spread foundation test specimen sets Being equipped with foil gauge, concrete spread foundation test specimen top is provided with power transmission short column, also includes hydraulic static pile pressing machine, described hydraulic pressure The jaw of static pile press accompanies the power transmission plain concrete pile being positioned at above power transmission short column, it is characterised in that at described concrete Four angles of spread foundation test specimen bottom surface respectively arrange a soil pressure cell, are located therein the soil pressure at cornerwise two angles Power box is each provided with a soil pressure cell along the both sides being adjacent and diagonal, and rear three soil pressure cells arranged are adjacent Angle on the distribution of soil pressure cell square;Described foil gauge is in a hypotenuse of concrete spread foundation test specimen and correspondence Base be each provided with two, wherein, hypotenuse and base are positioned on same vertical curve near two foil gauges of power transmission short column, Described four foil gauges are about a vertical symmetry plane symmetry of concrete spread foundation test specimen.
A kind of concrete spread foundation assay device the most according to claim 1, it is characterised in that described concrete extends The length of side of the bottom of foundation is 2500mm, the soil pressure cell on diagonal with between the soil pressure cell arranged along its adjacent both sides Distance be 850mm.
A kind of concrete spread foundation assay device the most according to claim 1, it is characterised in that described power transmission short column top It is provided with equivalently-sized groove bottom portion and power transmission plain concrete pile, in described groove, is provided with pressure transducer, described pressure Force transducer connects piezometry instrument.
CN201620552485.XU 2016-06-08 2016-06-08 Concrete spread foundation test device Expired - Fee Related CN205662958U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620552485.XU CN205662958U (en) 2016-06-08 2016-06-08 Concrete spread foundation test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620552485.XU CN205662958U (en) 2016-06-08 2016-06-08 Concrete spread foundation test device

Publications (1)

Publication Number Publication Date
CN205662958U true CN205662958U (en) 2016-10-26

Family

ID=57156959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620552485.XU Expired - Fee Related CN205662958U (en) 2016-06-08 2016-06-08 Concrete spread foundation test device

Country Status (1)

Country Link
CN (1) CN205662958U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862943A (en) * 2016-06-08 2016-08-17 国网四川省电力公司经济技术研究院 Concrete expansion foundation experiment device and realization method
CN106524959A (en) * 2016-11-17 2017-03-22 太原理工大学 System and method of monitoring stability of filling column body
CN107271281A (en) * 2017-07-18 2017-10-20 国网四川省电力公司经济技术研究院 Experimental rig and method for double-deck armored concrete spread foundation uplift test
CN107340383A (en) * 2017-07-18 2017-11-10 国网四川省电力公司经济技术研究院 Device and preparation method for the measurement of concrete spread foundation sub-grade reaction distribution
CN112195987A (en) * 2020-10-16 2021-01-08 东北大学 Structural slab extension foundation stress failure test device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862943A (en) * 2016-06-08 2016-08-17 国网四川省电力公司经济技术研究院 Concrete expansion foundation experiment device and realization method
CN105862943B (en) * 2016-06-08 2017-09-26 国家电网公司 A kind of concrete spread foundation experimental rig and implementation method
CN106524959A (en) * 2016-11-17 2017-03-22 太原理工大学 System and method of monitoring stability of filling column body
CN106524959B (en) * 2016-11-17 2018-11-30 太原理工大学 A kind of system and method for monitoring filling cylinder stability
CN107271281A (en) * 2017-07-18 2017-10-20 国网四川省电力公司经济技术研究院 Experimental rig and method for double-deck armored concrete spread foundation uplift test
CN107340383A (en) * 2017-07-18 2017-11-10 国网四川省电力公司经济技术研究院 Device and preparation method for the measurement of concrete spread foundation sub-grade reaction distribution
CN107271281B (en) * 2017-07-18 2019-10-18 国网四川省电力公司经济技术研究院 Experimental rig and method for the double-deck armored concrete spread foundation uplift test
CN112195987A (en) * 2020-10-16 2021-01-08 东北大学 Structural slab extension foundation stress failure test device

Similar Documents

Publication Publication Date Title
CN205662958U (en) Concrete spread foundation test device
CN107179396B (en) Multifunctional assembled geotechnical engineering physical similarity test system
CN108072570B (en) Device and method for testing soil pressure of anchor plate retaining wall under different displacement modes
CN206512764U (en) A kind of horizontally loading test system for applying vertical load in stake top
CN2851352Y (en) Quick detector for compaction degree of earth-filling subgrade
Forsman et al. Hertsby case: A column stabilised and geotextile reinforced road embankment on soft subsoil
CN202433536U (en) Physical model testing system for tunnel-penetrated ground crack zone
CN103645061B (en) A kind of Framed Anchor Technique large-scale physical model test method
CN108797660A (en) The experimental rig and test method of Collapsible Loess District Long-short Pile Group model
CN204575465U (en) Portable soft layer in-situ direct shear tester
CN106018123A (en) Anchoring-type rock-soil-mass in-situ direct-shearing test device
Su Laboratory pull-out testing study on soil nails in compacted completely decomposed granite fill
CN210376011U (en) Large-area on-site direct shear test equipment
CN114544347A (en) Counterfort retaining wall back soil pressure and displacement simulation system and measurement method
CN105862943B (en) A kind of concrete spread foundation experimental rig and implementation method
CN112664212B (en) Three-dimensional model loading method of shield tunneling machine
CN105862944B (en) A kind of spread foundation full scale test device
CN206512763U (en) A kind of bored concrete pile vertically pulling-resistant pilot system
CN218524504U (en) Indoor large-scale direct shear test device of geogrid reinforced earth-stone mixture
McAffee et al. Performance of an induced trench installation
Elsamny et al. Experimental evaluation of bearing capacity and behaviour of single pile and pile group in cohesionless soil
CN115931602A (en) On-site test method and test device for pipe soil shearing property of rectangular pipe jacking construction in anhydrous sand layer
CN206607613U (en) A kind of bored concrete pile displacement acquisition device
CN114518292A (en) Model test device and test method for high-speed railway roadbed of inclined crossing karez
CN111501862B (en) Method for simulating bearing capacity test of vertical support column in reverse construction method construction environment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161026

Termination date: 20190608

CF01 Termination of patent right due to non-payment of annual fee