CN209703486U - A kind of multifunctional well bracket of pile foundation steel bar cage construction positioning - Google Patents

A kind of multifunctional well bracket of pile foundation steel bar cage construction positioning Download PDF

Info

Publication number
CN209703486U
CN209703486U CN201920112831.6U CN201920112831U CN209703486U CN 209703486 U CN209703486 U CN 209703486U CN 201920112831 U CN201920112831 U CN 201920112831U CN 209703486 U CN209703486 U CN 209703486U
Authority
CN
China
Prior art keywords
cabinet frame
steel
reinforcement cage
steel reinforcement
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920112831.6U
Other languages
Chinese (zh)
Inventor
罗长维
翁方文
张延河
彭强
杜俊
胡伟
李东辉
刘福星
夏欢
徐文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201920112831.6U priority Critical patent/CN209703486U/en
Application granted granted Critical
Publication of CN209703486U publication Critical patent/CN209703486U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to steel reinforcement cages to transfer constructing structure technical field, in particular to a kind of multifunctional well bracket of pile foundation steel bar cage construction positioning.Well cabinet frame including being centered around drilling surrounding;The well cabinet frame includes four end to end crossbeams, the support plate that vertical crossbeams are disposed on every crossbeam and are extended to well cabinet frame center, it is characterised in that: further include the horizontal steel tube being fixed on well cabinet frame;The horizontal steel tube lower end is provided with the vertically arranged rigid connection structure for positioning support steel reinforcement cage.The support plate of the utility model plays the role of temporary support in steel reinforcement cage decentralization process;Support plate guarantees that steel reinforcement cage does not sink by all wt that hangs muscle supports steel reinforcement cage;Vertical steel pipe and horizontal steel tube play the role of to steel reinforcement cage horizontal location and anti-floating;The utility model simple structure, function is more, easy to operate, reusable multiple.

Description

A kind of multifunctional well bracket of pile foundation steel bar cage construction positioning
Technical field
The utility model relates to steel reinforcement cages to transfer constructing structure technical field, and it is fixed to construct in particular to a kind of pile foundation steel bar cage The multifunctional well bracket of position.
Background technique
Using extremely wide in building foundation engineering with bridge, cast-in-situ bored pile needs first to use machine cast-in-situ bored pile Tool pore-forming installs subaqueous concreting after steel reinforcement cage section by section.With the continuous development of bored concrete pile, stake diameter is increasing, stake is long It is increasingly longer, cause steel reinforcement cage to become very long and again, while steel reinforcement cage needs to guarantee under water to design posture, concrete perfusion When, influences the disturbance of steel reinforcement cage and lifting on the posture of steel reinforcement cage and elevation very big, and many bored pile constructions is caused to be completed Reinforcing bar cage location and elevation deviation afterwards is serious, and mass of foundation difference even threatens engineering safety, and steel reinforcement cage is in the construction process Positioning problem be badly in need of obtaining effective solution.
Summary of the invention
The purpose of this utility model seeks to solve the deficiency of above-mentioned background technique, and it is fixed to provide a kind of pile foundation steel bar cage construction The multifunctional well bracket of position.
The technical solution of the utility model are as follows: a kind of multifunctional well bracket of pile foundation steel bar cage construction positioning, including surround In the well cabinet frame of drilling surrounding;The well cabinet frame includes four end to end crossbeams, is disposed with vertical cross on every crossbeam The support plate that the well cabinet frame center Liang Bingxiang extends, it is characterised in that: further include the horizontal steel tube being fixed on well cabinet frame;Described Horizontal steel tube lower end is provided with the vertically arranged rigid connection structure for positioning support steel reinforcement cage.
The further connection structure includes vertical steel pipe;The vertical steel pipe is that lower end is sleeved and fixed in reinforcing bar In cage main reinforcement, upper end the vertical rigid member on horizontal steel tube is fixed on by connector.
At least two are provided on the well cabinet frame along longitudinal direction or the horizontal steel tube that is arranged laterally at a spacing, And at least two horizontal steel tubes are arranged symmetrically centered on the central point of well cabinet frame.
It is offered on the further crossbeam multiple along the spaced apart through-hole of crossbeam length direction;The level Steel pipe passes through through-hole and connect with crossbeam.
It further further include that lower end is fixed on steel reinforcement cage upper end, the hangs muscle of upper end hook on the supporting plate.
The convex of restricted hangs muscle abjection support plate is arranged in the one end at further support plate towards the well cabinet frame center Platform.
The support plate of the utility model plays the role of temporary support in steel reinforcement cage decentralization process, docks convenient for steel reinforcement cage; After steel reinforcement cage decentralization in place, support plate supports all wt of steel reinforcement cage by hangs muscle, guarantees that steel reinforcement cage does not sink;Steel reinforcement cage After decentralization in place, vertical steel pipe and horizontal steel tube play the role of to steel reinforcement cage horizontal location and anti-floating;Meanwhile well cabinet frame can Steel reinforcement cage suitable for a variety of diameters, which is constructed, to be positioned, and has very strong applicability;The utility model simple structure, function is more, behaviour Make simply, it is reusable multiple.
Detailed description of the invention
Fig. 1: the top view of the utility model;
Fig. 2: the beam structure schematic diagram of the utility model;
Fig. 3: the steel reinforcement cage docking structure schematic diagram of the utility model;
Fig. 4: the steel reinforcement cage of the utility model transfers structural schematic diagram;
Wherein: 1-crossbeam;2-support plates;3-horizontal steel tubes;4-steel reinforcement cages;5-vertical steel pipes;6-steel reinforcement cage masters Muscle;7-connectors;8-through-holes;9-hangs muscles;10-boss.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments.
Such as Fig. 1~4, a kind of multifunctional well bracket of pile foundation steel bar cage construction positioning, the well including being centered around drilling surrounding Cabinet frame, the well cabinet frame of the present embodiment are fixed on the ground around drilling or platform, and well cabinet frame includes four end to end Crossbeam 1, the support plate 2 that vertical crossbeams 1 are disposed on every crossbeam 1 and are extended to well cabinet frame center, as shown in Fig. 2, on crossbeam 1 The through hole that support plate 2 passes through is offered, support plate 2 can be arranged on crossbeam 1 along the direction of vertical crossbeams 1, play supporting steel The effect of muscle cage.In decentralization process, the length that hole can be threaded through by adjusting support plate 2 is played to steel reinforcement cage steel reinforcement cage Temporary support effect.In the decentralization process of steel reinforcement cage, hangs muscle 9 is provided in the present embodiment support plate 2, as shown in figure 4, hanging 9 upper end of muscle is hooked on 2 upper and lower end of support plate and is connected and fixed 4 upper end of steel reinforcement cage, and the one end at support plate 2 towards well cabinet frame center is set It is equipped with the boss 10 that limitation hangs muscle 9 deviates from support plate 2.
Rear non-rising in place below steel reinforcement cage in order to guarantee, the present embodiment is equipped with horizontal steel tube 3 on well cabinet frame, horizontal 3 lower end of steel pipe is provided with the vertically arranged rigid connection structure for positioning support steel reinforcement cage 4.It is provided at least on well cabinet frame Two along longitudinal direction or the horizontal steel tube 3 that is arranged laterally at a spacing, and at least two horizontal steel tubes 3 are with the central point of well cabinet frame It is centrosymmetrically arranged.Offer multiple along the spaced apart through-hole 8 of 1 length direction of crossbeam on crossbeam 1, horizontal steel tube 3 passes through logical Hole 8 is connect with crossbeam 1.
As shown in figure 4, connection structure includes vertical steel pipe 5, vertical steel pipe 5 is that lower end is sleeved and fixed in steel reinforcement cage main reinforcement 6 Upper, upper end is fixed on the vertical rigid member on horizontal steel tube 3 by connector 7.
When use: 1, reserving hole location: according to the demand of piles with different diameter, in advance by the corresponding horizontal steel tube of piles with different diameter 3 It sets and decides, opening up for 2 through hole of plate and through-hole 8 is then supported when well cabinet frame is processed, for different pile foundations, level Steel pipe 3 uses different through-holes 8.
2, it places in place: after Completion of Drilling Hole, clearing up hole location surrounding ground or platform, place well cabinet frame and support plate 2, and Centering is adjusted, support plate 2 does not enter in 4 range of steel reinforcement cage, if necessary, cushion block can be arranged under well cabinet frame.
3, steel reinforcement cage docks: after the decentralization to Near Ground of coxopodite steel reinforcement cage 4, releasing support plate 2, it is made to be stuck in steel reinforcement cage hoop Under muscle, four support plates 2 should be supported on same root reinforcing cage stirrup, guaranteed that coxopodite steel reinforcement cage 4 is steady, then put section steel down Muscle cage 4 can dock two section steel reinforcement cages up and down.
4, vertical steel pipe is installed: when the decentralization of steel reinforcement cage 4 is to 6 top of steel reinforcement cage main reinforcement close to ground, by 4 vertical steel pipes 5 are inserted in corresponding steel reinforcement cage main reinforcement 6, and transfer together in place with steel reinforcement cage.
5, steel reinforcement cage positions: after the decentralization in place of steel reinforcement cage 4, support plate 2 is released, by 4 hangs muscles 9 in steel reinforcement cage main reinforcement 6 It hangs in support plate 2, steel reinforcement cage 4 stops decentralization;Then horizontal steel tube 3 and connector 5 are successively installed, prevent steel reinforcement cage horizontal partially Position, meanwhile, in casting concrete, the anti-floating of steel reinforcement cage 4 can be played the role of.
Basic principles, main features, and advantages of the present invention has been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, the utility model can also on the premise of not departing from the spirit and scope of the utility model There are various changes and modifications, these various changes and improvements fall within the scope of the claimed invention.The utility model is wanted Protection scope is asked to be defined by appended claims and its equivalent.

Claims (6)

1. a kind of multifunctional well bracket of pile foundation steel bar cage construction positioning, the well cabinet frame including being centered around drilling surrounding;Described Well cabinet frame includes four end to end crossbeams (1), vertical crossbeams (1) is disposed on every crossbeam (1) and to well cabinet frame center The support plate (2) of extension, it is characterised in that: further include the horizontal steel tube (3) being fixed on well cabinet frame;The horizontal steel tube (3) lower end is provided with the vertically arranged rigid connection structure for positioning support steel reinforcement cage (4).
2. a kind of multifunctional well bracket of pile foundation steel bar cage construction positioning as described in claim 1, it is characterised in that: described Connection structure includes vertical steel pipe (5);The vertical steel pipe (5) be lower end be sleeved and fixed on steel reinforcement cage main reinforcement (6), upper end The vertical rigid member on horizontal steel tube (3) is fixed on by connector (7).
3. a kind of multifunctional well bracket of pile foundation steel bar cage construction positioning as claimed in claim 1 or 2, it is characterised in that: institute At least two are provided on the well cabinet frame stated along longitudinal direction or the horizontal steel tube (3) that is arranged laterally at a spacing, and at least two water Flat steel pipe (3) is arranged symmetrically centered on the central point of well cabinet frame.
4. a kind of multifunctional well bracket of pile foundation steel bar cage construction positioning as described in claim 1, it is characterised in that: described It is offered on crossbeam (1) multiple along the spaced apart through-hole of crossbeam (1) length direction (8);The horizontal steel tube (3) passes through logical Hole (8) is connect with crossbeam (1).
5. a kind of multifunctional well bracket of pile foundation steel bar cage construction positioning as described in claim 1, it is characterised in that: further include Lower end is fixed on steel reinforcement cage (4) upper end, upper end is hooked on the hangs muscle (9) on support plate (2).
6. a kind of multifunctional well bracket of pile foundation steel bar cage construction positioning as claimed in claim 5, it is characterised in that: described The boss (10) of restricted hangs muscle (9) abjection support plate (2) is arranged in the one end at support plate (2) towards well cabinet frame center.
CN201920112831.6U 2019-01-23 2019-01-23 A kind of multifunctional well bracket of pile foundation steel bar cage construction positioning Active CN209703486U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920112831.6U CN209703486U (en) 2019-01-23 2019-01-23 A kind of multifunctional well bracket of pile foundation steel bar cage construction positioning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920112831.6U CN209703486U (en) 2019-01-23 2019-01-23 A kind of multifunctional well bracket of pile foundation steel bar cage construction positioning

Publications (1)

Publication Number Publication Date
CN209703486U true CN209703486U (en) 2019-11-29

Family

ID=68641219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920112831.6U Active CN209703486U (en) 2019-01-23 2019-01-23 A kind of multifunctional well bracket of pile foundation steel bar cage construction positioning

Country Status (1)

Country Link
CN (1) CN209703486U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110894722A (en) * 2019-12-03 2020-03-20 湖北省路桥集团有限公司 Construction method of cast-in-situ bored pile
CN112982412A (en) * 2021-01-30 2021-06-18 中交第一航务工程局有限公司 Pile foundation reinforcement cage construction positioning method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110894722A (en) * 2019-12-03 2020-03-20 湖北省路桥集团有限公司 Construction method of cast-in-situ bored pile
CN110894722B (en) * 2019-12-03 2021-09-28 湖北省路桥集团有限公司 Construction method of cast-in-situ bored pile
CN112982412A (en) * 2021-01-30 2021-06-18 中交第一航务工程局有限公司 Pile foundation reinforcement cage construction positioning method

Similar Documents

Publication Publication Date Title
WO2021142941A1 (en) Recyclable rebar cage centralizing system and construction method therefor
CN105672678A (en) Method for mounting overall steel protective shed cantilever frame
CN108643192A (en) Brace in Deep Footing Groove supporting ultralong steel tube column pile construction method
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN101302760A (en) Ultralong overweight concrete filling pile reinforcement type reinforcing steel bar caging
CN110409477B (en) Steel suspension box anti-surge internal support system and construction method thereof
CN209703486U (en) A kind of multifunctional well bracket of pile foundation steel bar cage construction positioning
CN106759350A (en) A kind of Extra-Deep Foundation Pit vertical lattice column positioning steering control system and application method
CN211472509U (en) A prevent empting formula underground structure supporting device for old city district
CN113756320B (en) Method for hoisting low-clearance and ultra-long reinforcement cage section by section into holes under high-voltage line
CN202658590U (en) Integral assembled drilling platform
CN107227741B (en) Basement supporting construction
CN112982412A (en) Pile foundation reinforcement cage construction positioning method
CN111021343A (en) Construction method of upright post pile
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN112302028A (en) A guider that is used for double-walled steel cofferdam to transfer location
CN208563658U (en) A kind of prefabricated lattice compound shear wall assembly monomer
CN115492403A (en) Combined type precise positioning construction device for tower footing steel latticed column
CN212956136U (en) Cast-in-place bridge bearing structure on abrupt slope
CN210658215U (en) Weighing type ship-leaning component mounting device
CN211849438U (en) Device for pile connection and perpendicularity adjustment
CN110171766B (en) Steel bar transportation lifting appliance
CN108867548B (en) Construction platform and construction platform erection method for on-site watering high pile wharf
CN218060310U (en) Pile foundation steel reinforcement cage positioning hanging bracket
CN201212146Y (en) Reinforcement reinforced bar caging of ultralong and overweight concrete filling pile