CN209669902U - 基础集水坑渗水排水系统 - Google Patents
基础集水坑渗水排水系统 Download PDFInfo
- Publication number
- CN209669902U CN209669902U CN201821822648.7U CN201821822648U CN209669902U CN 209669902 U CN209669902 U CN 209669902U CN 201821822648 U CN201821822648 U CN 201821822648U CN 209669902 U CN209669902 U CN 209669902U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- catch pit
- water
- basic
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本实用新型涉及一种基础集水坑渗水排水系统,包括开挖于基础集水坑底部的抽水坑,抽水坑内埋入钢管,所述的钢管下部管壁开有渗水孔,钢管顶部管口设有翼环,翼环中部开排水孔;抽水坑内的钢管周围敷设石子作为滤水层,基础集水坑外侧设置自吸泵,自吸泵连接排水管一端,排水管另一端插入钢管内。基础集水坑范围内有少量地表水渗出时,通过钢管上的渗水孔进入钢管内部,启动自吸泵将水抽至基础集水坑外部,能够有效排水,确保了后序工序的正常施工。自吸泵连接时控开关可实现自动排水,无需专人看管,节省了人工成本。自吸泵设置于基础集水坑外部,垫层、防水层及保护层能够一次性施工,保证了防水的施工质量。
Description
技术领域
本实用新型涉及一种排水系统,具体而言,是一种用于排出建筑物集水坑渗水的排水系统。
背景技术
大多数高层建筑均设有地下室,集水坑是地下室中不可缺少的一项构造,且基本是整个结构标高最低的一项构造。在结构施工时,有些时候地下水水位高于集水坑坑底标高,在集水坑挖完土后往往会出现整个基槽表面基本无地表水,但在集水坑内不断有水渗出,需及时将水排出,否则无法正常施工。
发明内容
本实用新型要解决的技术问题是提供一种基础集水坑渗水排水系统,以达到即使排出基础集水坑内渗水的目的。
为解决以上技术问题,本实用新型采用的技术方案是:
一种基础集水坑渗水排水系统,包括开挖于基础集水坑底部的抽水坑,抽水坑内埋入钢管,所述的钢管下部管壁开有渗水孔,钢管顶部管口设有翼环,翼环中部开排水孔;抽水坑内的钢管周围敷设石子作为滤水层,基础集水坑外侧设置自吸泵,自吸泵连接排水管一端,排水管另一端插入钢管内。
进一步地,钢管顶部管口处还设有止水环。
进一步地,所述自吸泵连接电源和自动时控开关。
进一步地,基础集水坑底部由上至下依次施工构造筏板、防水层及保护层、垫层,钢管按基础集水坑垫层顶标高降低20-30mm的标高埋入抽水坑内。
基础集水坑范围内有少量地表水渗出时,通过钢管上的渗水孔进入钢管内部,启动自吸泵将水抽至基础集水坑外部,能够有效排水,确保了后序工序的正常施工。自吸泵连接时控开关可实现自动排水,无需专人看管,节省了人工成本。自吸泵设置于基础集水坑外部,垫层、防水层及保护层能够一次性施工,保证了防水的施工质量。
附图说明
图1是本实用新型的排水系统的结构示意图。
图2是本实用新型钢管的结构示意图。
图中,1-基础集水坑,2-抽水坑,3-钢管,4-渗水孔,5-翼环,6-排水孔,7-滤水层,8-自吸泵,9-排水管,10-止水环,11-构造筏板,12-防水层及保护层,13-垫层,14-砖胎模,15-素土。
具体实施方式
本实用新型一种典型的实施方式提供的一种基础集水坑渗水排水系统,包括开挖于基础集水坑1底部的抽水坑2,抽水坑2内埋入钢管3,所述的钢管3下部管壁开有渗水孔4,钢管3顶部管口设有翼环5,翼环5中部开排水孔6;抽水坑2内的钢管3周围敷设石子作为滤水层7,基础集水坑1外侧设置自吸泵8,自吸泵8连接排水管9一端,排水管9另一端插入钢管3内。
根据以上实施方式,基础集水坑范围内有少量地表水渗出时,通过钢管上的渗水孔进入钢管内部,启动自吸泵将水抽至基础集水坑外部,能够有效排水。
参考图1,基础集水坑1底部由上至下依次施工构造筏板11、防水层及保护层12、C20素混凝土垫层13,基础集水坑1内侧构筑砖胎模14。基础集水坑1的周边用素土15填实。抽水坑内敷设粒径为10-30mm石子作为滤水层。
考虑到如果采用抽水泵直接从抽水坑向外抽水,抽水泵处垫层、防水层不能与周围垫层、防水层一次性施工,且垫层和防水层施工完后需要在很短时间内完成底板砼浇筑,防水质量不易保证。其次,抽水泵在坑底钢筋安装完毕后取出,增加取泵难度,往往有时候只能将泵舍弃。以上实施方式中,将自吸泵设置于基础集水坑1外部,垫层、防水层能够一次性施工,保证了防水的施工质量,避免了以往取泵难的问题,降低了施工风险。
钢管3顶部管口处还设有止水环10,以防止钢管内的水向基础集水坑底部的垫层13、防水层及保护层12渗透。
作为优选的实施方式,所述自吸泵连接电源和自动时控开关。所述自动时控开关设置在连接电源处的配电箱内,根据根据现场渗水情况设置好自吸泵抽水、停水时间,接通电源后自动将水抽至基础排水坑外侧,不仅能够自动有效的排水,而且不影响别的施工工序,还能够保证防水的施工质量。
实施例1
将A160钢管切割成500mm长,然后将止水环10、翼环5按照设计要求焊接于钢管3上。要求焊缝饱满,钢管3管壁采用电焊穿孔或气割冲孔,预留5-10mm渗水孔4,保证地下水能够渗流入钢管3内。
基础集水坑1土方施工完毕后,在其底部单独开挖一个500mm直径的小水坑作为抽水坑2,抽水坑2底部铺设一层300mm厚石子(粒径10~30mm),将加工制作好的A160钢管按基础集水坑垫层顶标高降低20-30mm的标高埋入抽水坑2内,固定好位置,周边再用石子将抽水坑2填塞密实作为滤水层7。
钢管3放置完毕,待自吸泵8排水系统完善后,将自吸泵8的一端排水管9伸入钢管3中,为防止泥浆堵塞,端头要用细目网包裹。自吸泵8出水口连接自吸泵8,自吸泵8型号1AWZB550,绝缘等级B级,220V,最高吸程为9m。自吸泵应将其垫高,并采取保护措施,以免损坏。
集水坑渗水自动排水系统要在构造筏板11砼浇筑前一直进行,待集水坑构造筏板钢筋绑扎完成后进行350mm构造筏板砼施工时,方可停止抽水,此时先将钢管3中水抽完后,立即将排水管9取出,用微膨胀水泥灌实塞满钢管,封堵严实后,截取300×300mm的SBS改性沥青防水卷材将钢管出水孔部分进行加强处理,加强层热熔封边(卷材搭接处用喷枪加热,趁热使二者粘贴牢固,以边缘挤出沥青为度,末端收头处用密封缝膏嵌填严密)符合规范要求,经检查验收合格后再进行坑底筏板11砼浇筑。
Claims (2)
1.一种基础集水坑渗水排水系统,其特征在于:包括开挖于基础集水坑底部的抽水坑,抽水坑内埋入钢管,所述的钢管下部管壁开有渗水孔,钢管顶部管口设有翼环,翼环中部开排水孔;抽水坑内的钢管周围敷设石子作为滤水层,基础集水坑外侧设置自吸泵,自吸泵连接排水管一端,排水管另一端插入钢管内;钢管顶部管口处还设有防止钢管内的水向基础集水坑底部的垫层、防水层及保护层渗透的止水环;基础集水坑底部由上至下依次施工构造筏板、防水层及保护层、垫层,钢管按基础集水坑垫层顶标高降低20-30mm的标高埋入抽水坑内;基础集水坑的周边用素土填实。
2.根据权利要求1所述的基础集水坑渗水排水系统,其特征在于:所述自吸泵连接电源和自动时控开关。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821822648.7U CN209669902U (zh) | 2018-11-07 | 2018-11-07 | 基础集水坑渗水排水系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821822648.7U CN209669902U (zh) | 2018-11-07 | 2018-11-07 | 基础集水坑渗水排水系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209669902U true CN209669902U (zh) | 2019-11-22 |
Family
ID=68561183
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821822648.7U Active CN209669902U (zh) | 2018-11-07 | 2018-11-07 | 基础集水坑渗水排水系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209669902U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111236283A (zh) * | 2020-01-06 | 2020-06-05 | 南通八建集团有限公司 | 深基坑集水坑局部连续式降水方法 |
CN112196076A (zh) * | 2020-09-23 | 2021-01-08 | 贵州建工集团第一建筑工程有限责任公司 | 一种透水箱浅埋式施工现场排水装置 |
CN112281858A (zh) * | 2020-10-20 | 2021-01-29 | 中建八局发展建设有限公司 | 泥岩天然地基裂隙水疏排施工方法 |
CN112609723A (zh) * | 2020-12-18 | 2021-04-06 | 中国二冶集团有限公司 | 基坑施工水位降低结构及其方法 |
CN112962646A (zh) * | 2021-03-02 | 2021-06-15 | 江苏省建筑工程集团有限公司 | 一种集水坑及其施工方法 |
-
2018
- 2018-11-07 CN CN201821822648.7U patent/CN209669902U/zh active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111236283A (zh) * | 2020-01-06 | 2020-06-05 | 南通八建集团有限公司 | 深基坑集水坑局部连续式降水方法 |
CN112196076A (zh) * | 2020-09-23 | 2021-01-08 | 贵州建工集团第一建筑工程有限责任公司 | 一种透水箱浅埋式施工现场排水装置 |
CN112281858A (zh) * | 2020-10-20 | 2021-01-29 | 中建八局发展建设有限公司 | 泥岩天然地基裂隙水疏排施工方法 |
CN112609723A (zh) * | 2020-12-18 | 2021-04-06 | 中国二冶集团有限公司 | 基坑施工水位降低结构及其方法 |
CN112962646A (zh) * | 2021-03-02 | 2021-06-15 | 江苏省建筑工程集团有限公司 | 一种集水坑及其施工方法 |
CN112962646B (zh) * | 2021-03-02 | 2022-06-24 | 江苏省建筑工程集团有限公司 | 一种集水坑及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209669902U (zh) | 基础集水坑渗水排水系统 | |
CN103046565B (zh) | 超深岩基深基坑降排水方法 | |
CN103821181A (zh) | 地下室底板疏水层施工工法 | |
CN103184747B (zh) | 用于深层地下工程两墙合一结构的防渗漏施工方法及结构 | |
CN109488371B (zh) | 一种全包防水车站防水系统及动态设置限量排水方法 | |
CN109736340B (zh) | 一种基础底板预留降水井保证垫层完整性的降水装置与方法 | |
CN109340453A (zh) | 一种供热管道施工方法 | |
CN104179189A (zh) | 一种基坑落深区域的疏排水结构及其施工方法 | |
CN109372016A (zh) | 高承压水下地下室底板后浇带结构及施工方法 | |
CN109208651A (zh) | 地下工程超长结构体变形缝防排水结构施工方法及结构 | |
CN103572808A (zh) | 建筑物卫生间沉箱防水器及施工方法 | |
CN210768766U (zh) | 治理暗挖竖井层间滞水的引排系统 | |
CN107012893A (zh) | 一种地下室底壁板后浇带防水结构及其施工方法 | |
CN110374125A (zh) | 地铁深基坑侧壁夹层水处理方法 | |
CN104234089B (zh) | 一种地下室防排水结合的施工方法 | |
CN103410318B (zh) | 卫生间管井防漏水施工方法 | |
CN107100206A (zh) | 一种地下室渗漏的防治方法 | |
CN110295630A (zh) | 多层约束防渗漏的后浇带结构 | |
CN105672335A (zh) | 用于集水坑降水的施工方法 | |
CN210712963U (zh) | 地下室底板后浇带的排水结构 | |
CN107724405B (zh) | 一种地埋管施工中地基降水施工方法 | |
CN110359495A (zh) | 综合管廊结构缝构造及其施工方法 | |
CN109930780A (zh) | 一种下沉式卫生间的施工工艺 | |
CN202519628U (zh) | 密实坝体内的临时埋管进口封堵装置 | |
CN205954632U (zh) | 富水砂层中管线横穿基坑处支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |