CN209636738U - A kind of Internet of Things intelligence water channel assembled gool - Google Patents
A kind of Internet of Things intelligence water channel assembled gool Download PDFInfo
- Publication number
- CN209636738U CN209636738U CN201920282688.5U CN201920282688U CN209636738U CN 209636738 U CN209636738 U CN 209636738U CN 201920282688 U CN201920282688 U CN 201920282688U CN 209636738 U CN209636738 U CN 209636738U
- Authority
- CN
- China
- Prior art keywords
- gool
- link
- plate
- bottom plate
- assembled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
A kind of Internet of Things intelligence water channel assembled gool, folded plate including bottom plate and two sides, backing plate is equipped at two side position of bottom plate lower part, folded plate is installed on the upside of backing plate, link block there are two being set side by side at two side position of bottom plate top, first sleeve is embedded in each link block, the bottom end of folded plate is equipped with convex block, the convex block is located between two link blocks, the second casing is embedded with inside convex block, inserted link with matching is equipped in first sleeve and the second casing, bottom plate and folded plate are connected as one by inserted link, waterproof material is smeared in gap at bottom plate and folded plate link position, the middle position of the inserted link is equipped with locating piece, the locating slot matched with locating piece is equipped on the outside of link block, one end of inserted link is protruded into the first sleeve and the second casing of same assembled gool, the other end of inserted link protrudes into another In the first sleeve and the second casing of a adjacent assembled gool, so that each assembled gool is sequentially connected.
Description
Technical field
The utility model relates to water channel construction technique field, specifically a kind of Internet of Things intelligence water channel assembled canal
Slot.
Background technique
Water channel is the water channel manually dug, and is widely used in crop irrigation or draining flood control.The construction of water channel usually exists
After excavating out channel shape, artificial stone or cement are poured, but such method of construction expends a large amount of artificial and times, effect
Rate is low, and another method of construction is using prefabricated board, and in order to be bonded the shape of water channel, existing prefabricated board is mostly U-shaped, In
It is easy to that the damaged conditions such as cracking occur during transporting, and for the problem of Cracking for solving plate in transport, prefabricated board is made into
Fabricated construction, but the gool of common prefabricated plate is after building and completing, due to the soil erosion of the side Qu Bi or plant
Situations such as growth, it is easy to relatively move the structure of assembly connection, so that the waterproof material smeared at link position
Cracking loses waterproof performance, so that water channel seeps water, the normal use of influence power water channel.
With the rapid development of technology of Internet of things, installing flowmeter and other detection devices in water channel can be realized to this
The data of water channel monitor in real time, but the conducting wire of existing detection device equipment is mostly directly anchored on gool wall, with water flow
Wash away or water in sundries collision, conducting wire be easy to generate failure, cannot achieve detection device and the data of the water channel supervised in real time
Control.
Summary of the invention
To solve the above problems, the purpose of this utility model is to provide a kind of Internet of Things intelligence water channel assembled gool,
It is formed using fabricated prefabricated panel and folded plate, bottom plate and two sides folded plate constitute an assembly unit body, each assembly unit body
It is sequentially connected composition gool wall, fabricated preformed material can be reduced construction-time, each fractionation part of assembly unit body
It individually transports, is connected between each assembly unit body by inserted link, the relative position between bottom plate and side plate can be further fixed, guarantee
The integral strength of water channel maintains its normal use.Cabling channel on gool wall can also protect conducting wire by the impact of water flow, not guarantee
The normal work of detection device in water channel.
The technical scheme adopted by the utility model to solve the technical problem is as follows: a kind of Internet of Things described in the utility model
Intelligent water channel assembled gool, the folded plate including bottom plate and two sides are equipped with backing plate, backing plate at two side position of bottom plate lower part
Folded plate is installed in upside, sets side by side at two side position of bottom plate top there are two link block, is embedded in each link block
First sleeve, the bottom end of folded plate are equipped with convex block, and the convex block is located between two link blocks, and second set is embedded with inside convex block
Pipe is equipped with inserted link with matching in first sleeve and the second casing, and bottom plate and folded plate are connected as one by inserted link, bottom plate
With smear waterproof material in the gap at folded plate link position, the middle position of the inserted link is equipped with locating piece, link block
Outside be equipped with the locating slot matched with locating piece, the first sleeve and of same assembled gool is protruded into one end of inserted link
In two casings, the other end of inserted link is protruded into the first sleeve and the second casing of another adjacent assembled gool, thus by each
A assembled gool is sequentially connected.Further, the rear and front end of the folded plate offers mutually matched with adjacent folded plate
Buckle slot.Further, the middle position of the bottom plate is equipped with Doppler Ultrasonic Flowmeter, the folded plate of bottom plate and two sides
Cabling channel is offered on inner wall.
The utility model has the following positive effects: a kind of Internet of Things intelligence water channel assembled canal described in the utility model
Slot avoids traditional barnacle or cement and pours equal mode of construction, reduce the labor intensity of construction personnel, improves work effect
Rate.Each assembly unit physical efficiency of assembled gool is independently split, and can individually be transported, and is solved existing U-shaped integral prefabricated
The inconvenient problem of board-like gool transport.It is sequentially connected between each assembly unit body by inserted link, easy to operate, fixing intensity is installed
Height can be further ensured that the relative position of bottom plate and side plate is not moved, guarantee the integral strength of water channel, it be maintained normally to make
With.Cabling channel on gool wall can also protect conducting wire by the impact of water flow, not guarantee the normal work of detection device in water channel.
Detailed description of the invention
Fig. 1 is the three-dimensional structure schematic diagram of the utility model;
Fig. 2 is the main view of the utility model;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is the partial enlarged view of sectional view along A-A in Fig. 2;
Fig. 5 is the partial enlarged view of I in Fig. 3.
1 bottom plate, 2 folded plate, 3 backing plate, 4 link block, 5 first sleeve, 67 second casing of convex block, 8 inserted link, 9 locating piece in figure
10 locating slot, 11 buckle slot, 12 Doppler Ultrasonic Flowmeter, 13 cabling channel.
Specific embodiment
A kind of Internet of Things intelligence water channel assembled gool described in the utility model, as shown in Figure 1, including bottom plate 1 and two
The folded plate 2 of side is equipped with backing plate 3 at 1 lower part of bottom plate, two side position, installs folded plate 2,1 top two sides of bottom plate on the upside of backing plate 3
Link block 4 there are two being set side by side at position, as shown in figure 5, being embedded with first sleeve 5, folded plate in each link block 4
2 bottom end is equipped with convex block 6, and the convex block 6 is located between two link blocks 4, and the second casing 7 is embedded with inside convex block 6.
As shown in figure 5, the first sleeve 5 is identical with the internal diameter of the second casing 7, in first sleeve 5 and the second casing 7
Equipped with inserted link 8 with matching, bottom plate 1 and folded plate 2 are connected as one by inserted link 8, at 2 link position of bottom plate 1 and folded plate
Waterproof material is smeared in gap.The middle position of the inserted link 8 is equipped with locating piece 9, and the outside of link block 4 is equipped with and determines
The locating slot 10 that position block 9 matches.As shown in figure 3, the first sleeve 5 and of same assembled gool is protruded into one end of inserted link 8
In two casings 7, the other end of inserted link 8 is protruded into the first sleeve 5 and the second casing 7 of another adjacent assembled gool, thus
Each assembled gool is sequentially connected.
When carrying out assembled gool installation exercise, inserted link 8 is inserted into the locating slot 10 on link block 4 first, makes to insert
Bar 8 sequentially enters in first sleeve 5 and the second casing 7, to bottom plate 1 is connected with folded plate 2, due to 6 backing plate at bottom 3 of convex block
In the presence of the folded plate 2 of two sides can keep opposing stationary with bottom plate 1 at an angle, to be bonded the shape of water channel.Assembly unit body exists
Fixation can be sequentially connected after being installed by inserted link 8, forms irrigation canals and ditches wall, each component part of assembly unit body can be transported individually
It is defeated, solve the problems, such as that existing U-shaped integral prefabricated board-like gool transport is inconvenient, the assembly unit body being sequentially connected is determined by inserted link 8
Position is fixed, and the positioning during being easily installed finds accurately, only needs staff's successively grafting, that is, alleviate labor intensity, again
It ensure that positioning accuracy, and under the collective effect of inserted link 8 and backing plate 3, lateral separation or perpendicular will not occur for bottom plate 1 and folded plate 2
To separation, the waterproof material at assembly connection position can sufficiently play the role of waterproof leakproof, even if soil erosion etc. occurs
It is also ensured that the integral strength of water channel, can avoid the generation of infiltration to a certain extent in the case that other soil change, with
Maintain its normal use.
Preferably, in order to further reinforce adjacent assembly unit body, as shown in Figure 1 and Figure 4, the front and back of the folded plate 2
Both ends are offered can be such that adjacent assembly unit body mutually props up with the mutually matched buckle slot 11 of adjacent folded plate 2, buckle slot 11
Support, improves the integral strength of gool, moreover it is possible to which positioning datum when as installation guarantees the installation essence between assembly unit body
Degree.
Preferably, in order to more intelligently be managed and use to water channel, pacify in the middle position of the bottom plate 1
Equipped with Doppler Ultrasonic Flowmeter 12, cabling channel 13 is offered on 2 inner wall of folded plate of bottom plate 1 and two sides, in cabling channel 13
Mountable watertight conduit protects conducting wire not in order to which Doppler Ultrasonic Flowmeter 12 is by the control equipment etc. outside conducting wire access
By the impact of water flow, guarantee the normal use of Doppler Ultrasonic Flowmeter 12.It can be with by Doppler Ultrasonic Flowmeter 12
Collect statistics are realized to the real-time traffic in water channel, Internet of Things management are realized, to meet heavy rain emergency advance warning control system, city
The requirement of the advanced managing and control system based on Internet of Things big data such as plumbing Optimal Scheduling.
The technical solution of the utility model is not restricted in the range of embodiment described in the utility model.This is practical new
The technology contents of the not detailed description of type are well-known technique.
Claims (3)
1. a kind of Internet of Things intelligence water channel assembled gool, it is characterised in that: the folded plate (2) including bottom plate (1) and two sides, it is described
It is equipped with backing plate (3) at two side position of bottom plate (1) lower part, folded plate (2) is installed on the upside of backing plate (3), two side position of bottom plate (1) top
Place is set side by side there are two link block (4), and each link block (4) is interior to be embedded with first sleeve (5), the bottom of folded plate (2)
End is equipped with convex block (6), and the convex block (6) is located between two link blocks (4), is embedded with the second casing (7) inside convex block (6),
Inserted link with matching (8) are equipped in first sleeve (5) and the second casing (7), inserted link (8) is by bottom plate (1) and folded plate (2)
It is connected as one, waterproof material, the centre of the inserted link (8) is smeared in the gap at bottom plate (1) and folded plate (2) link position
Locating piece (9) are equipped at position, are equipped with the locating slot (10) matched with locating piece (9), inserted link on the outside of link block (4)
(8) one end is protruded into first sleeve (5) and the second casing (7) of same assembled gool, and the other end of inserted link (8) protrudes into separately
In the first sleeve (5) and the second casing (7) of one adjacent assembled gool, so that each assembled gool is sequentially connected.
2. a kind of Internet of Things intelligence water channel assembled gool according to claim 1, it is characterised in that: the folded plate (2)
Rear and front end offer and adjacent folded plate (2) mutually matched buckle slot (11).
3. a kind of Internet of Things intelligence water channel assembled gool according to claim 1, it is characterised in that: the bottom plate (1)
Middle position be equipped with Doppler Ultrasonic Flowmeter (12), offered on folded plate (2) inner wall of bottom plate (1) and two sides
Cabling channel (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920282688.5U CN209636738U (en) | 2019-03-06 | 2019-03-06 | A kind of Internet of Things intelligence water channel assembled gool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920282688.5U CN209636738U (en) | 2019-03-06 | 2019-03-06 | A kind of Internet of Things intelligence water channel assembled gool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209636738U true CN209636738U (en) | 2019-11-15 |
Family
ID=68495347
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920282688.5U Expired - Fee Related CN209636738U (en) | 2019-03-06 | 2019-03-06 | A kind of Internet of Things intelligence water channel assembled gool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209636738U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111691366A (en) * | 2020-06-29 | 2020-09-22 | 张磊 | Farmland hydraulic engineering's rapid Assembly formula ditch |
-
2019
- 2019-03-06 CN CN201920282688.5U patent/CN209636738U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111691366A (en) * | 2020-06-29 | 2020-09-22 | 张磊 | Farmland hydraulic engineering's rapid Assembly formula ditch |
CN111691366B (en) * | 2020-06-29 | 2022-08-19 | 萧县威辰机电工程设备有限公司 | Farmland hydraulic engineering's rapid Assembly formula ditch |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106480902A (en) | There is water-retention and the underground pipe gallery of preliminary filtering function | |
CN205839797U (en) | There is the underground pipe gallery of water storage function | |
CN108277783A (en) | Fish pass moisturizing attracting structure and its moisturizing attracting method | |
CN209636738U (en) | A kind of Internet of Things intelligence water channel assembled gool | |
CN206070586U (en) | Inspection well structure for sewage access comprehensive pipe rack | |
CN208594459U (en) | A kind of novel town road discharge structure | |
CN210917244U (en) | Water conservancy construction stone foundation waterproof construction | |
CN111443183A (en) | Portable slope runoff water and sand collecting groove | |
CN212956887U (en) | Civil engineering road drainage device | |
CN110130980A (en) | A kind of tunnel drainage device, system and its construction method | |
CN212130548U (en) | Tunnel drainage system capable of preventing and treating karst water crystallization | |
CN210238709U (en) | Reduce drainage structure of utility tunnel sump pit quantity | |
CN109689986A (en) | Equipment for the sewerage system including trench drain pipe | |
CN210917454U (en) | Assembly type comprehensive pipe rack assembly capable of being turned on construction site | |
CN209686551U (en) | A kind of engineering drainage pipe underground mounting structure | |
CN103866815B (en) | Seawater taking facility for liquefied natural gas receiving station | |
CN208533490U (en) | A kind of automatic pollution discharge diversion system | |
CN205935155U (en) | Prefabricated inspection shaft | |
CN217870545U (en) | Be used for highway side slope photovoltaic grillage drainage structures | |
CN105735202B (en) | Dragon stealth high speed water route | |
CN205501939U (en) | High -speed water route of dragon stealth | |
CN219033094U (en) | Ecological bank protection component of water conservancy river course | |
CN214497408U (en) | Urban and rural planning construction combines earth's surface ecological remediation to use dam | |
CN210597534U (en) | Canal lower pipe compound rain and sewage diversion system | |
CN212129240U (en) | Drainage well lid for building engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191115 Termination date: 20210306 |
|
CF01 | Termination of patent right due to non-payment of annual fee |