CN209633287U - A kind of prefabricated piping lane rapid molding device - Google Patents
A kind of prefabricated piping lane rapid molding device Download PDFInfo
- Publication number
- CN209633287U CN209633287U CN201822095797.4U CN201822095797U CN209633287U CN 209633287 U CN209633287 U CN 209633287U CN 201822095797 U CN201822095797 U CN 201822095797U CN 209633287 U CN209633287 U CN 209633287U
- Authority
- CN
- China
- Prior art keywords
- piping lane
- internal model
- support
- pedestal
- external mold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
A kind of prefabricated piping lane rapid molding device, it is mobile trolley used including template system, internal model, the template system includes end socket template, external mold panel, external mold support, the support of internal model panel, internal model, external mold support first hydraulic cylinder of connection, internal model support second hydraulic cylinder of connection.The mobile trolley used internal model includes track foundation, trolley steel structure, and the track foundation is equipped with walking track, and trolley steel structure leads to bottom and is equipped with traveling wheel, and traveling wheel is located on walking track.The device further includes piping lane pedestal, and piping lane pedestal is located on track foundation, and piping lane pedestal is concrete pedestal, and channel steel is arranged above piping lane pedestal side, plastic flexible pipe is installed in channel steel.The utility model can complete the bottom plate of piping lane, side wall and top plate one-time-concreting, accelerate construction progress, and guarantee piping lane construction quality.
Description
Technical field
A kind of prefabricated piping lane rapid molding device of the utility model is suitable for the concrete construction of municipal works pipe gallery and leads
Domain.
Background technique
City integrated piping lane construction is divided into cast-in-place and prefabricated.The cast-in-place construction activity duration is long, situ wet operation heavy workload,
Need longer concrete curing Enhanced time.It is limited by building-site condition, long period, and concrete is easy locally to occur
Easily there is construction crack, culvert body sidewall entire crack etc. in leakage, culvert pipe.When prefabricated piping lane concrete construction, traditional construction method is
The reinforcing that support carries out piping lane template is set up in piping lane.The method heavy workload, investment material, equipment and artificial more, work
Phase is long, at high cost, and due to piping lane narrow space, template is not easy to reinforce, and be easy to cause and runs mould phenomenon.
Summary of the invention
The technical problem to be solved by the utility model is to provide a kind of prefabricated piping lane rapid molding devices, can be by piping lane
Bottom plate, side wall and top plate one-time-concreting are completed, and are accelerated construction progress, and guarantee piping lane construction quality.
The technical solution that the utility model is taken are as follows:
A kind of prefabricated piping lane rapid molding device, including template system, internal model are mobile trolley used, and the template system includes envelope
Head template, external mold panel, external mold support, the support of internal model panel, internal model, external mold support first hydraulic cylinder of connection are described
Internal model support the second hydraulic cylinder of connection.The mobile trolley used internal model includes track foundation, trolley steel structure, on the track foundation
Equipped with walking track, trolley steel structure leads to bottom and is equipped with traveling wheel, and traveling wheel is located on walking track.
The device further includes piping lane pedestal, and piping lane pedestal is located on track foundation, and piping lane pedestal is concrete pedestal, described
Channel steel is set above piping lane pedestal side, plastic flexible pipe is installed in channel steel.
The trolley steel structure includes crossbeam, linking beam, cable-stayed support, brace steel post, front leg strut hand jack;Crossbeam and company
It is welded and fixed between binder, between linking beam and cable-stayed support, between cable-stayed support and brace steel post;The side of the brace steel post
It is welded with internal model nose girder, the end of front leg strut hand jack support internal mould nose girder.
Second hydraulic cylinder be it is multiple, shifting is reinforced or torn open to top plate, side plate and chamfering for internal die face plate.
The external mold panel includes left plate, right side plate, the length and the piping lane than needing to pour of left plate and right side plate
A distance is respectively stretched out at length both ends, and upper/lower terminal is connected by the first hydraulic cylinder between left plate and right side plate, the first liquid
Compressing cylinder is for reinforcing and removing external mold panel and end socket template.
The traveling wheel connects movable motor, and walking track is equipped with limiting device, limiting device be used for traveling wheel into
Row limit.
The end socket template uses set shaped steel formwork.
The piping lane external mold panel, piping lane internal model panel are steel plate.
The piping lane external mold support, the support of piping lane internal model are channel steel.
A kind of prefabricated piping lane rapid molding device of the utility model, advantage are:
1: by using utility model device, construction quality, speed of application may make to greatly improve, and then improve whole
The economic benefit of body.
2: the common fault that the quality of utility model device effective solution piping lane concrete construction is difficult to ensure can be accelerated
Construction speed saves construction cost, strong operability.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawings and examples:
Fig. 1 is the schematic cross-sectional view of the utility model.
Fig. 2 is the B-B cross section view of Fig. 1.
Fig. 3 is the front elevation of trolley in piping lane in the utility model.
Fig. 4 is that template tears shifting schematic diagram open in the utility model.
Fig. 5 is piping lane pedestal front elevation in the utility model.
Fig. 6 is piping lane pedestal elevation (face A-A) in the utility model.
Specific embodiment
As shown in Fig. 1 ~ Fig. 6, a kind of prefabricated piping lane rapid molding device, including template system, internal model are mobile trolley used, described
Template system includes end socket template 3, external mold panel 5, external mold support 4, internal model panel 5 ', internal model support 4 ', internal model branch hinge 9 '.
4 first hydraulic cylinder 6 of connection of external mold support, the first hydraulic cylinder 6 connects the first hydraulic oil pump 7, described interior
4 ' the second hydraulic cylinder 6 ' of connection of mould support, the second hydraulic cylinder 6 ' connect the second hydraulic oil pump 7 '.First hydraulic oil pump 7
In on track foundation 1, the second hydraulic oil pump 7 ' is located on crossbeam 15.
The mobile trolley used internal model includes track foundation 1, trolley steel structure, and trolley steel structure is connected to become whole with internal model panel 5 '
Body.
The track foundation 1 is equipped with walking track 11, and trolley steel structure leads to bottom and is equipped with traveling wheel 13, and traveling wheel 13 is located at
It walks on track 11.
The device further includes piping lane pedestal 2, and piping lane pedestal 2 is located on track foundation 1, and piping lane pedestal 2 is concrete pedestal,
Channel steel 2-1 is set above 2 side of piping lane pedestal, plastic flexible pipe 2-2 is installed in channel steel 2-1, prevents piping lane bottom spillage.
The trolley steel structure includes crossbeam 15, linking beam 16, cable-stayed support 17, brace steel post 18, front leg strut hand jack
10;It is welded between crossbeam 15 and linking beam 16, between linking beam 16 and cable-stayed support 17, between cable-stayed support 17 and brace steel post 18
It is fixed;The side of the brace steel post 18 is welded with internal model nose girder 8 ', 10 support internal mould nose girder of front leg strut hand jack
8 ' end.
Second hydraulic cylinder 6 ' be it is multiple, for internal die face plate 5 ' top plate, side plate and chamfering carry out reinforce or
Tear shifting open.
The external mold panel 5 includes left plate 5-1, right side plate 5-2, the length of left plate 5-1 and right side plate 5-2 with than needing
30cm or so is respectively stretched out at the piping lane length both ends to be poured, and upper/lower terminal passes through first between left plate 5-1 and right side plate 5-2
Hydraulic cylinder 6 connects, and the first hydraulic cylinder 6 is for reinforcing and removing external mold panel 5 and end socket template 3.
The traveling wheel 13 connects movable motor 14, and walking track 11 is equipped with limiting device 12, and limiting device 12 is used for
Traveling wheel 13 is limited.
The end socket template 3 uses set shaped steel formwork.
The piping lane external mold panel 5, piping lane internal model panel 5 ' are steel plate.
The piping lane external mold support 4, piping lane internal model support 4 ' are channel steel.
By the way that trolley steel structure is arranged, trolley steel structure and internal model panel 5 ' are connected to become entirety, and utilize internal model support 4 '
The reinforcing of internal model panel 5 ' is completed in connection;
External mold panel 5 is affixed by the first hydraulic cylinder 6 and external mold support 4, and the first hydraulic cylinder 6 is for reinforcing and removing
External mold panel 5 and end socket template 3.
Pass through flexible, the achievable reinforcing to template of HYDRAULIC CONTROL SYSTEM the first hydraulic cylinder 6, the second hydraulic cylinder 6 '
And tear shifting open.After a piping lane is completed in construction, when concrete strength reaches demoulding condition, hydraulic cylinder is under hydraulic action, by face
Plate carries out micro-shifting, completes demoulding work.
It is connected by trolley steel structure with corresponding traveling wheel 13, and drives traveling wheel 13 in walking rail using movable motor 14
It walks on road 11, the reusable device carries out next prefabricated piping lane concrete construction.By using the device, may make
Construction quality, speed of application greatly improve, and then improve whole economic benefit.
A kind of prefabricated piping lane quick molding method, comprising the following steps:
Step 1): the concreting of progress piping lane internal model mobile trolley used track foundation 1 and piping lane pedestal 2 first, In
Channel steel 2-1 is arranged above 2 sides in piping lane pedestal, and plastic flexible pipe 2-2 is installed in channel steel 2-1;
Step 2: carrying out installation mobile trolley used in piping lane, the installation walking track 11 on track foundation 1, by trolley steel
It is welded and fixed between crossbeam 15, linking beam 16, cable-stayed support 17 and brace steel post 18 in structure, is welded in the side of brace steel post 18
Fixed overhanging internal model nose girder 8 ';
Step 3): the internal model support 4 ' of internal model panel 5 ' passes through the second hydraulic cylinder 6 ' with internal model nose girder 8 ' and connect, by the
Two hydraulic oil pumps 7 ' are connect with the second hydraulic cylinder 6 ', and make the internal die face plate 5 ' of the second hydraulic cylinder 6 ' uniformly force.
Step 4): the reinforcing bar binding of piping lane is carried out.
Step 5): external mold panel 5, end socket template 3, the external mold branch of left plate 5-1, right side plate 5-2 are installed on the outside of piping lane
It supports 4 upper/lower terminals to be attached by the first hydraulic cylinder 6, before concreting, external mold panel 5 passes through the first hydraulic cylinder 6
Contraction reinforce.
Step 6): before concreting, internal model panel 5 ' is reinforced by the extension of the second hydraulic cylinder 6 ', front leg strut hand
Dynamic 10 support internal mould nose girder of jack, 8 ' end.
Step 7): pouring and complete a piping lane concrete, and concrete reaches demoulding condition, shrinks the second hydraulic cylinder 6 ',
The first hydraulic cylinder 6 is upheld, the dismounting of piping lane template is completed;
Step 8): after a piping lane is completed in construction, internal model is mobile trolley used to be moved under the driving of movable motor 14, will be prefabricated
Piping lane is transferred from piping lane pedestal 2, reuses the device and carries out next prefabricated piping lane construction.
Claims (9)
1. a kind of prefabricated piping lane rapid molding device, including template system, internal model are mobile trolley used, it is characterised in that: the template
System includes end socket template (3), external mold panel (5), external mold support (4), internal model panel (5 '), internal model support (4 '), described outer
Mould supports (4) connection the first hydraulic cylinder (6), and the internal model support (4 ') connects the second hydraulic cylinder (6 ');The internal model is moved
Dynamic trolley includes track foundation (1), trolley steel structure, and the track foundation (1) is equipped with walking track (11), and trolley steel structure leads to bottom
Portion is equipped with traveling wheel (13), and traveling wheel (13) is located in walking track (11).
2. a kind of prefabricated piping lane rapid molding device according to claim 1, it is characterised in that: the device further includes piping lane platform
Seat (2), piping lane pedestal (2) are located on track foundation (1), and piping lane pedestal (2) is concrete pedestal, piping lane pedestal (2) side
Channel steel (2-1) is set above face, plastic flexible pipe (2-2) is installed in channel steel (2-1).
3. a kind of prefabricated piping lane rapid molding device according to claim 1, it is characterised in that: the trolley steel structure includes cross
Beam (15), linking beam (16), cable-stayed support (17), brace steel post (18), front leg strut hand jack (10);Crossbeam (15) with link
It is welded and fixed between beam (16), between linking beam (16) and cable-stayed support (17), between cable-stayed support (17) and brace steel post (18);
The side of the brace steel post (18) is welded with internal model nose girder (8 '), front leg strut hand jack (10) support internal mould nose girder
The end of (8 ').
4. a kind of prefabricated piping lane rapid molding device according to claim 1, it is characterised in that: second hydraulic cylinder
(6 ') to be multiple, shifting is reinforced or torn open to top plate, side plate and chamfering for internal die face plate (5 ').
5. a kind of prefabricated piping lane rapid molding device according to claim 1, it is characterised in that: external mold panel (5) packet
Left plate (5-1), right side plate (5-2) are included, the length and the piping lane than needing to pour of left plate (5-1) and right side plate (5-2) are long
A distance is respectively stretched out at degree both ends, and upper/lower terminal passes through the first hydraulic cylinder (6) between left plate (5-1) and right side plate (5-2)
Connection, the first hydraulic cylinder (6) is for reinforcing and removing external mold panel (5) and end socket template (3).
6. a kind of prefabricated piping lane rapid molding device according to claim 1, it is characterised in that: traveling wheel (13) connection
Movable motor (14), walking track (11) are equipped with limiting device (12), and limiting device (12) is used to carry out traveling wheel (13)
Limit.
7. a kind of prefabricated piping lane rapid molding device according to claim 1, it is characterised in that: the end socket template (3) is adopted
Use set shaped steel formwork.
8. a kind of prefabricated piping lane rapid molding device according to claim 1, it is characterised in that: the external mold panel (5), interior
Die face plate (5 ') is steel plate.
9. a kind of prefabricated piping lane rapid molding device according to claim 1, it is characterised in that: external mold support (4), interior
It is channel steel that mould, which supports (4 '),.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822095797.4U CN209633287U (en) | 2018-12-13 | 2018-12-13 | A kind of prefabricated piping lane rapid molding device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822095797.4U CN209633287U (en) | 2018-12-13 | 2018-12-13 | A kind of prefabricated piping lane rapid molding device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209633287U true CN209633287U (en) | 2019-11-15 |
Family
ID=68474647
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822095797.4U Active CN209633287U (en) | 2018-12-13 | 2018-12-13 | A kind of prefabricated piping lane rapid molding device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209633287U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109605547A (en) * | 2018-12-13 | 2019-04-12 | 中国葛洲坝集团第六工程有限公司 | A kind of prefabricated piping lane rapid molding device and method |
-
2018
- 2018-12-13 CN CN201822095797.4U patent/CN209633287U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109605547A (en) * | 2018-12-13 | 2019-04-12 | 中国葛洲坝集团第六工程有限公司 | A kind of prefabricated piping lane rapid molding device and method |
CN109605547B (en) * | 2018-12-13 | 2024-09-06 | 中国葛洲坝集团建设工程有限公司 | Rapid forming device and method for prefabricated pipe gallery |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105386778B (en) | Tunnel excavation lining construction chassis and tunnel excavation lining construction method | |
CN109505630B (en) | Full-hydraulic crawler-type self-propelled trestle and construction method | |
CN108867419A (en) | A kind of cast-in-place box culvert rapid molding device and construction method | |
CN107882064A (en) | A kind of formwork jumbo and slding form operation method for pipe gallery cast-in-place concrete slding form operation | |
CN104594918B (en) | Split integrated underground passage steel mold plate trolley and construction method thereof | |
CN113235472B (en) | Concrete placement platform truck is contained to apron | |
CN101302739B (en) | Prestress concrete box girder hydraulic internal mold vehicle as well as hydraulic internal mold system | |
CN111941637A (en) | Sectional prefabricating method for immersed tube joint | |
CN104763446B (en) | The multi-functional chassis of metro station construction | |
CN109605547A (en) | A kind of prefabricated piping lane rapid molding device and method | |
CN208717763U (en) | A kind of cast-in-place box culvert rapid molding device | |
CN110905554B (en) | Tunnel inverted arch and filled concrete paver and construction process | |
CN110331675B (en) | Construction method for rebuilding and expanding bridge | |
CN209162667U (en) | All-hydraulic automatically walk culvert abutment body trolley | |
CN110714785A (en) | Pipe gallery top plate construction trolley, trolley set and construction method | |
CN108867420A (en) | All-hydraulic automatically walk culvert abutment body trolley and construction technology process | |
CN106351180A (en) | Full hydraulic opening self-propelled template system for aqueduct | |
CN207567810U (en) | A kind of formwork jumbo for pipe gallery cast-in-place concrete slding form operation | |
CN205223976U (en) | Irrigation gallery concrete slipform device | |
CN211314235U (en) | Tunnel inverted arch and filling concrete paver | |
CN201244857Y (en) | Prestress concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system | |
CN111501570A (en) | Automatic adjusting and supporting die frame for small-span arch bridge | |
CN209633287U (en) | A kind of prefabricated piping lane rapid molding device | |
CN110924323A (en) | Culvert template trolley | |
CN214993219U (en) | Concrete placement platform truck is contained to apron |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 650217 Building 2, class E industrial building, International Jewelry City (No. 31, Shuntong Avenue), Kunming Export Processing Zone, Kunming Economic and Technological Development Zone, Yunnan Province Patentee after: China Gezhouba Group Construction Engineering Co.,Ltd. Address before: 650217 Building 2, class E industrial building, International Jewelry City (No. 31, Shuntong Avenue), Kunming Export Processing Zone, Kunming Economic and Technological Development Zone, Yunnan Province Patentee before: CHINA GEZHOUBA GROUP NO.6 ENGINEERING Co.,Ltd. |
|