CN209602906U - The waterproof floor tile reconstruction structure in sponge city - Google Patents

The waterproof floor tile reconstruction structure in sponge city Download PDF

Info

Publication number
CN209602906U
CN209602906U CN201821951775.7U CN201821951775U CN209602906U CN 209602906 U CN209602906 U CN 209602906U CN 201821951775 U CN201821951775 U CN 201821951775U CN 209602906 U CN209602906 U CN 209602906U
Authority
CN
China
Prior art keywords
floor tile
square
long recess
permeable brick
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821951775.7U
Other languages
Chinese (zh)
Inventor
侯剑锋
郁虎
张永栋
侯俊
郭仕军
郑玥
施晨卉
尤丹
陈培培
侯沁鋆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jingjiang Afforestation Engineering Co Ltd
Original Assignee
Jingjiang Afforestation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jingjiang Afforestation Engineering Co Ltd filed Critical Jingjiang Afforestation Engineering Co Ltd
Priority to CN201821951775.7U priority Critical patent/CN209602906U/en
Application granted granted Critical
Publication of CN209602906U publication Critical patent/CN209602906U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)
  • Floor Finish (AREA)

Abstract

The utility model relates to municipal drainage technical fields, more particularly, to a kind of waterproof floor tile reconstruction structure in sponge city, including square floor tile, long recess is offered on the diagonal line of side's floor tile upper surface, cooperation is equipped with rectangle water-permeable brick in long recess, and the upper surface of rectangle water-permeable brick is flushed with the upper surface of square floor tile;Two sharp corners on square floor tile corresponding to long recess both ends cut out notch, and four notches on the square floor tile of adjacent four pieces of laying surround square hole, and the side length of square hole is equal to the width of long recess.The utility model solve the problems, such as by it is not permeable mat formation on ponding permeate the ground.The square hole that square tile surface ponding is guided into edge by slotting, solve the problems, such as by it is not permeable mat formation on ponding permeate the ground;By opening up diversion trench in square floor tile upper surface, the ponding at the hollow of square floor tile upper surface is guided in long recess or square hole using diversion trench, the wet shoes of ponding on the side's of avoiding floor tile.

Description

The waterproof floor tile reconstruction structure in sponge city
Technical field
The utility model relates to municipal drainage technical fields, more particularly, to a kind of waterproof floor tile transformation knot in sponge city Structure.
Background technique
" sponge city " is new generation of city storm water man- agement concept, refers to that city is adapting to environmental change and reply rainwater band Natural calamity come etc. has good " elasticity ", also referred to as " water elasticity city ", water suction, water storage, infiltration when raining Water, water purification by the water stored " release " and are used when needing.
Six word policies of sponge urban construction are as follows: " seep, is stagnant, storing, net, use, row ".The lead-in of six word policies is to allow to the greatest extent may be used Ground more than energy " can seep ", it is sufficient to seem its importance, only first seep, can just there is subsequent construction means.But have very much The case where, for example the city square that stone material is paved needs to guarantee certain earth's surface knot since city square belongs to sports safety area Structure intensity, therefore be not suitable for building up permeable seeping and mat formation, " sponge " of infiltration so that these regions can not become can to absorb water.
Such case reduces area permeable in city, so that water percolating capacity is reduced, so that sponge " infiltration " word in six word policies of urban construction can not be realized preferably, so that the construction means in subsequent sponge city can not reach To expected effect.
Authorization Notice No. is that the utility model patent of CN207062685U discloses a kind of sponge city, is solved in city Some places need to guarantee certain surface infrastructure intensity, such as the city square that stone material is paved, be not suitable for building up it is permeable can Infiltration is mated formation, so that these regions can not become can to absorb water the problem of " sponge " of infiltration, its key points of the technical solution are that: it is seeped with leading Pipe by rainwater transverse direction water conservancy diversion to it is impermeable mat formation lower section.Above-mentioned solution although part water can be guided to it is impermeable mat formation under Side is utilized the impermeable permeable layer for mating formation lower section, but this only improves infiltration and mats formation the osmotic efficiency of upper precipitation, Without solve the problems, such as it is not permeable mat formation on ponding, i.e. water percolating capacity is not improved, unless make it is not permeable mat formation on Precipitation permeate the ground.
Utility model content
The purpose of the utility model is to provide a kind of waterproof floor tile reconstruction structure in sponge city, solving will be not permeable The problem of ponding on mating formation permeates the ground.
The above-mentioned purpose of utility model of the utility model has the technical scheme that a kind of sponge city Waterproof floor tile reconstruction structure, including square floor tile, offer long recess on the diagonal line of side's floor tile upper surface, in long recess Cooperation is equipped with rectangle water-permeable brick, and the upper surface of rectangle water-permeable brick is flushed with the upper surface of square floor tile;Correspond on square floor tile Two sharp corners at long recess both ends cut out notch, and four notches on the square floor tile of adjacent four pieces of laying surround square hole, The side length of square hole is equal to the width of long recess, cooperates in square hole and is equipped with square water-permeable brick, on square water-permeable brick Surface is flushed with square floor tile upper surface.
By using above-mentioned technical proposal, by being embedded in rectangle water-permeable brick, In on the upper surface diagonal line of square floor tile Square water-permeable brick is embedded at the joint angle of adjacent four pieces square floor tiles, wherein permeable below the straight-through square floor tile of square water-permeable brick Soil.Rainwater flows into pervious soil via rectangle water-permeable brick and square water-permeable brick when rainy, or directly by square saturating Water brick flow into pervious soil, therefore solve the problems, such as by it is not permeable mat formation on ponding permeate the ground.
Preferably, long recess is offered on two diagonal lines of every piece of side's floor tile, cooperation is equipped with ten in long recess Font water-permeable brick.
By using above-mentioned technical proposal, long recess is opened up on two diagonal lines of square floor tile, forms cross type groove, The efficiency that rainwater flows into square hole and permeates the ground on the side's of improving floor tile.
Preferably, the slot bottom center of the long recess is high and both ends are low.
By using above-mentioned technical proposal, the rate that rainwater flow to square hole from long recess can be accelerated, on the side's of making floor tile Ponding quickly drain.
Preferably, if the upper surface of side's floor tile is equipped with arterial highway diversion trench, diversion trench and long recess or square hole phase It is logical.
By using above-mentioned technical proposal, diversion trench the ponding at the hollow of square floor tile upper surface can be guided to long recess or In square hole, the wet shoes of ponding on the side's of avoiding floor tile.
Preferably, the slot bottom of the diversion trench is oblique, and the diversion trench the close apart from long recess or square hole, leads Chute is deeper.
By using above-mentioned technical proposal, skewed slot bottom makes to be not easy to be formed hydrops in diversion trench, and rainwater can be quickly suitable Diversion trench flow into long recess or square hole.
Preferably, the square water-permeable brick bottom is fixed with cross template, and phase is inserted into four sides of cross template In the connecting sewing of adjacent two pieces of square floor tiles.
By using above-mentioned technical proposal, four sides of cross template are inserted into the connecting sewing of adjacent two pieces of floor tiles, can It realizes being fixedly secured for cross template, square water-permeable brick is made to be not easy square hole;Cross template can also will square thoroughly Water brick is aerial, and the rainwater into square hole is made directly to permeate the ground after relatively thin square water-permeable brick.
Preferably, the two sides of the rectangle water-permeable brick are equipped with several first discharge orifices, the bottom of rectangle water-permeable brick Face is equipped with several second discharge orifices, and the second discharge orifice is communicated with the first discharge orifice.
By using above-mentioned technical proposal, flowing into rectangle water-permeable brick can be successively suitable with the rainwater in long recess side clearance The second discharge orifice and the first discharge orifice flow to the slot bottom of long recess, so that accelerating ponding drains efficiency.
Preferably, the cross board bottom portion is fixed with plate, is equipped with several through-holes on plate and cross template.
By using above-mentioned technical proposal, when directly being contacted with cross template due to soil, the two contact area is smaller, foot The pressure that soil is subject to when stepping on square water-permeable brick is larger, and square water-permeable brick is easy to cause to sink, therefore is increased using plate The contact area of cross template and soil reduces the pressure that soil is subject to.
In conclusion the advantageous effects of the utility model are as follows:
1. square tile surface ponding to be guided into the square hole of edge by slotting, solve by it is not permeable mat formation on Ponding the problem of permeating the ground;
2. the ponding at the hollow of square floor tile upper surface is led using diversion trench by opening up diversion trench in square floor tile upper surface It flow in long recess or square hole, the wet shoes of ponding on the side's of avoiding floor tile.
Detailed description of the invention
Fig. 1 is the waterproof floor tile reconstruction structure schematic diagram in sponge city in embodiment 1;
Fig. 2 is the structural schematic diagram of rectangle water-permeable brick in embodiment 1;
Fig. 3 is that Fig. 1 hides the structural schematic diagram after one piece of rectangle water-permeable brick;
Fig. 4 is that Fig. 1 hides the structural schematic diagram after one piece of square floor tile;
Fig. 5 is the top view of Fig. 4;
Fig. 6 is the waterproof floor tile reconstruction structure schematic diagram in sponge city in embodiment 2.
In figure, 1, square floor tile;2, long recess;3, notch;4, square hole;5, square water-permeable brick;6, rectangle is permeable Brick;7, cross water-permeable brick;8, diversion trench;9, cross template;10, the first discharge orifice;11, the second discharge orifice;12, plate;13, Through-hole.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment 1: Fig. 1 is a kind of waterproof floor tile reconstruction structure in sponge city disclosed by the utility model, including several Block side's floor tile 1, the side of adjacent side's floor tile 1, which is bonded, to be laid with.It is recessed that length is offered on one diagonal line of every piece of 1 upper surface of square floor tile Slot 2, is ordinatedly laid with rectangle water-permeable brick 6 in long recess 2, and 6 upper surface of rectangle water-permeable brick being laid with and side's floor tile 1 is upper Surface flushes, and foot is stepped in no concave-convex sense on rectangle water-permeable brick 6.
As shown in Fig. 2, the two sides of rectangle water-permeable brick 6 are equipped with several first discharge orifices 10, rectangle water-permeable brick 6 Bottom surface is equipped with several second discharge orifices 11, and the second discharge orifice 11 is communicated with the first discharge orifice 10, flows into rectangle water-permeable brick 6 and length Rainwater in 2 side clearance of groove can successively flow to the slot bottom of long recess 2 along the second discharge orifice 11 and the first discharge orifice 10, from And accelerates ponding and drain efficiency.
As shown in Figure 1, the cornerwise both ends wedge angle for opening up long recess 2 on square floor tile 1 is removed, lacking for triangle is formed Mouth 3, and long recess 2 is cut into rectangle, two notches 3 are communicated with long recess 2.Four on the square floor tile 1 of adjacent four pieces be laid with A notch 3 surrounds square hole 4, and the side length of square hole 4 is equal to the width of long recess 2.Shape is equipped in square hole 4 to match The square water-permeable brick 5 of conjunction, square 5 upper surface of water-permeable brick are flushed with 1 upper surface of square floor tile, and foot is stepped in square water-permeable brick 5 Upper no concave-convex sense.
As shown in figure 3, the slot bottom center of long recess 2 is high, both ends bottom, is conducive to quickening rainwater from long recess 2 and flow to pros The rate in shape hole 4, the ponding on the side's of making floor tile 1 quickly drain.If the upper surface of square floor tile 1 opens up arterial highway diversion trench 8, diversion trench 8 communicate with long recess 2 or directly communicate with square hole 4, and diversion trench 8 can be by the ponding water conservancy diversion at square 1 upper surface hollow of floor tile To long recess 2 or square hole, the wet shoes of ponding on the side's of avoiding floor tile 1.The slot bottom of diversion trench 8 is oblique, and diversion trench 8 away from Then diversion trench 8 more close from long recess 2 or square hole 4 is deeper, and skewed slot bottom makes to be not easy to form hydrops, rain in diversion trench 8 Water quickly can flow into long recess 2 or square hole 4 along diversion trench 8.
As shown in Figure 4, Figure 5, the height of square water-permeable brick 5 is less than the depth of square hole 4, square 5 bottom of water-permeable brick Portion is fixed with cross template 9, and four sides of cross template 9 are inserted into the connecting sewing of adjacent two pieces square floor tiles 1, it can be achieved that cross Template 9 is fixedly secured, and square water-permeable brick 5 is made to be not easy square hole 4.Cross template 9 can be by square 5 frame of water-permeable brick Sky makes the rainwater into square hole 4 directly permeate the ground after relatively thin square water-permeable brick 5.Due to 9 bottom of cross template The contact area of portion and soil is smaller, therefore the pressure that soil is subject to when foot steps on square water-permeable brick 5 is larger, square water-permeable brick 5 are easy to sink, therefore 9 bottom of cross template is fixed with plate 12, plate 12 and soil contact product are big, therefore soil is subject to Pressure is small, so plate 12 is not easy to fall into soil.Several through-holes 13 are opened up on plate 12 and cross template 9, for permeable.
The implementation principle of the present embodiment are as follows: when on the rainwater side of falling on floor tile 1, flow to rectangle water-permeable brick 6 along diversion trench 8 Or on square water-permeable brick 5, slot bottom of the water through rectangle water-permeable brick 6 along long recess 2 is flowed into square hole 4, Huo Zheshui It is flowed directly into square hole 4 through square water-permeable brick 5, the rainwater in square hole 4 permeates the ground.
Embodiment 2: as shown in fig. 6, unlike the first embodiment, on two diagonal lines of every piece of 1 upper surface of square floor tile Long recess 2 is offered, two long recess 2 constitute cross type groove, and cooperation is equipped with cross water-permeable brick 7 in cross type groove, improve The efficiency that rainwater flows into square hole 4 and permeates the ground on square floor tile 1.
The embodiment of present embodiment is the preferred embodiment of the utility model, and not limitation is originally practical new according to this The protection scope of type, therefore: the equivalence changes that all structures, shape, principle according to the utility model are done should all be covered by practical Within novel protection scope.

Claims (8)

1. a kind of waterproof floor tile reconstruction structure in sponge city, including square floor tile (1), it is characterised in that: on side's floor tile (1) It is offered on the diagonal line on surface long recess (2), cooperation is equipped with rectangle water-permeable brick (6) in long recess (2), rectangle water-permeable brick (6) upper surface is flushed with the upper surface of square floor tile (1);Correspond to two sharp corners at long recess (2) both ends on square floor tile (1) It cuts out notch (3), four notches (3) on the square floor tile (1) of adjacent four pieces of laying surround square hole (4), square hole (4) Side length be equal to the width of long recess (2), cooperation is equipped with square water-permeable brick (5), square water-permeable brick in square hole (4) (5) upper surface is flushed with square floor tile (1) upper surface.
2. the waterproof floor tile reconstruction structure in sponge city according to claim 1, it is characterised in that: every piece of side's floor tile (1) it is offered long recess (2) on two diagonal lines, cooperation is equipped with cross water-permeable brick (7) in long recess (2).
3. the waterproof floor tile reconstruction structure in sponge city according to claim 1, it is characterised in that: the long recess (2) Slot bottom center it is high and both ends are low.
4. the waterproof floor tile reconstruction structure in sponge city according to claim 1, it is characterised in that: side's floor tile (1) Upper surface be equipped with arterial highway diversion trench if (8), diversion trench (8) communicates with long recess (2) or square hole (4).
5. the waterproof floor tile reconstruction structure in sponge city according to claim 4, it is characterised in that: the diversion trench (8) Slot bottom it is oblique, and diversion trench (8) is deeper apart from long recess (2) or the more close then diversion trench (8) of square hole (4).
6. the waterproof floor tile reconstruction structure in sponge city according to claim 1, it is characterised in that: the square is permeable Brick (5) bottom is fixed with cross template (9), and the connection of adjacent two pieces square floor tiles (1) is inserted into four sides of cross template (9) In seam.
7. the waterproof floor tile reconstruction structure in sponge city according to claim 1, it is characterised in that: the rectangle is permeable The two sides of brick (6) are equipped with several first discharge orifices (10), and the bottom surface of rectangle water-permeable brick (6) is equipped with several second discharge orifices (11), the second discharge orifice (11) are communicated with the first discharge orifice (10).
8. the waterproof floor tile reconstruction structure in sponge city according to claim 6, it is characterised in that: the cross template (9) bottom is fixed with plate (12), is equipped with several through-holes (13) on plate (12) and cross template (9).
CN201821951775.7U 2018-11-23 2018-11-23 The waterproof floor tile reconstruction structure in sponge city Active CN209602906U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821951775.7U CN209602906U (en) 2018-11-23 2018-11-23 The waterproof floor tile reconstruction structure in sponge city

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821951775.7U CN209602906U (en) 2018-11-23 2018-11-23 The waterproof floor tile reconstruction structure in sponge city

Publications (1)

Publication Number Publication Date
CN209602906U true CN209602906U (en) 2019-11-08

Family

ID=68396162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821951775.7U Active CN209602906U (en) 2018-11-23 2018-11-23 The waterproof floor tile reconstruction structure in sponge city

Country Status (1)

Country Link
CN (1) CN209602906U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982074A (en) * 2021-03-09 2021-06-18 江阴城建集团有限公司 Energy-concerving and environment-protective urban road surface device that permeates water

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112982074A (en) * 2021-03-09 2021-06-18 江阴城建集团有限公司 Energy-concerving and environment-protective urban road surface device that permeates water

Similar Documents

Publication Publication Date Title
CN108301280A (en) A kind of permeable pavement structure
CN213476523U (en) Infiltration road surface is used in gardens
CN109457566A (en) A kind of assembled gap porous pavement
CN110016886A (en) River near-nature forest eco-embankment
CN208293343U (en) A kind of gardens porous pavement
CN208104940U (en) A kind of sponge urban road drainage structure
CN209958165U (en) Assembled gap permeable pavement
CN209602906U (en) The waterproof floor tile reconstruction structure in sponge city
CN109403181A (en) A kind of porous pavement
CN207700330U (en) A kind of concave herbaceous field grass-planting ecological ditch
CN205223783U (en) But hole regenerative permeable ground surface structure
CN205529778U (en) Road brick that permeates water
CN104594155A (en) Permeable pavement laying method
CN109024131A (en) Pervious environment protection type road
CN205662795U (en) Urban main road road structure of permeating water
CN206174103U (en) District garage top road surface structure
CN213417454U (en) Permeable pavement
CN212895759U (en) Subside support type square structure of mating formation of permeating water
CN208250846U (en) Surface drainage
CN209323289U (en) A kind of assembled greening band structure
CN205954437U (en) Permeable pavement system that combines sponge city theory
CN206512554U (en) A kind of efficient permeable road kerb
CN210975421U (en) Modular permeable pavement structure
CN208577902U (en) It is a kind of based on concrete prefabricated greening environment-protective road
CN213476510U (en) Municipal administration road that permeates water

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant