CN209586441U - A kind of tunnel drainage device - Google Patents
A kind of tunnel drainage device Download PDFInfo
- Publication number
- CN209586441U CN209586441U CN201822217076.6U CN201822217076U CN209586441U CN 209586441 U CN209586441 U CN 209586441U CN 201822217076 U CN201822217076 U CN 201822217076U CN 209586441 U CN209586441 U CN 209586441U
- Authority
- CN
- China
- Prior art keywords
- sump
- tunnel
- drainage device
- scupper
- rectangle ditch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a kind of tunnel drainage devices, several including being arranged at tunnel internal Karst water bursting mouth are interconnected and are used for the sump and rectangle ditch of charge for remittance, rectangle ditch one end is connected to the borehole wall of one of sump, the other end is connected to tunnel Central drain, the bottom of the sump drills equipped with several diversions, the lower section of sump is equipped with scupper, and the diversion drilling is connected to scupper;The bottom of the sump is lower than the height of water burst mouth;The top of water burst mouth is arranged in the rectangle ditch.The utility model is discharged the water inside sump using the pattern that rectangle ditch, diversion drill by setting sump charge for remittance, is able to satisfy the permanent requirement for administering karst water.
Description
Technical field
The utility model relates to Tunnel Karst water harnessing technical fields, and in particular to a kind of tunnel drainage device.
Background technique
Currently, applying tunnel in karst region often encounters karst water, usually administered based on row, but
The mode of draining be often difficult to it is perfect, it is short-term within karst water smooth can be discharged, after the time has been grown, drainage channel holds
It is easily blocked, gushes out so as to cause karst water from tunnel weak link, influence traffic safety.Existing tunnel drainage device is seldom
Can apply to karst region, how effectively, persistently, safely administer karst water, these are the problems for being badly in need of researching and solving at present.
Utility model content
The technical problems to be solved in the utility model is to overcome the deficiencies of the prior art and provide a kind of tunnel drainage device,
It is discharged the water inside sump using the pattern that rectangle ditch, diversion drill by setting sump charge for remittance, and it is permanent to be able to satisfy
Administer the requirement of karst water.
In order to solve the above technical problems, the utility model proposes technical solution are as follows: a kind of tunnel drainage device is included in
Several being arranged at tunnel internal Karst water bursting mouth are interconnected and are used for the sump and rectangle ditch of charge for remittance, the rectangle ditch
One end is connected to the borehole wall of one of sump, and the other end is connected to tunnel Central drain, and the bottom of the sump is equipped with
The lower section of several diversions drilling, sump is equipped with scupper, and the diversion drilling is connected to scupper;The bottom of the sump
Portion is lower than the height of water burst mouth;The top of water burst mouth is arranged in the rectangle ditch.
As a further improvement of the above technical scheme: the well lid absolute altitude of the sump is flushed with tunnel road surface, is catchmented
Well is poured using armored concrete.
Further, the underface in the region of several sumps formation is arranged in the scupper.
Further, the quantity of the sump is four, and four sumps form rectangular configuration or square structure, sump
Quantity be mainly arranged according to issue, being set as four mouthfuls of The Small Wells mainly can be laid with two cover plates, the lid bigger than one piece
Plate is more advantageous to traffic safety.
Further, the quantity that diversion drills in each sump is 3-6.
Further, the quantity of the rectangle ditch is identical as the quantity of sump, or less than the quantity of sump, one is catchmented
Well is used with a rectangle ditch is unified.
The water discharge method of above-mentioned tunnel drainage device are as follows:
S1: digging several sumps at the Karst water bursting mouth in tunnel, the shaft bottom of sump is lower than water burst mouth;
S2: the aperture on the wherein borehole wall of one or several sumps opens up rectangle ditch, the end of rectangle ditch along this aperture
It is connected to tunnel Central drain;
S3: scupper is opened up at the following distance of sump;
S4: it is drilled with several diversions drilling in the bottom of each sump, the end of diversion drilling is connected to scupper.
As a further improvement of the above technical scheme: in the step S1 each sump be all made of armored concrete into
Row pours.
Further, diversion drilling is connected to scupper straight down in the step S4.
Compared with the prior art, the advantages of the utility model are:
1, the sump of the utility model can concentrate karst water and converge, and concentrate discharge;
2, the rectangle ditch of the utility model is connected to tunnel Central drain, makes full use of the Central drain row that tunnel is existing
Water;
3, scupper is arranged in the utility model below sump, and drills in bottom setting diversion of catchmenting, with draining
Hole communicates, and strengthens the discharge of karst water, and the quantity and size of diversion drilling can be depending on the size of water yield;
4, it is provided with well lid on the sump of the utility model, and is flushed with tunnel road surface, do not influence to run and facilitates inspection
It repairs.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the A-A cross-sectional view in Fig. 1.
Marginal data:
1, water burst mouth;2, sump;21, diversion drills;22, well lid;3, rectangle ditch;4, tunnel Central drain;5, it drains
Hole.
Specific embodiment
For the ease of understanding the utility model, below in conjunction with Figure of description and preferred embodiment to the utility model
Work more comprehensively, meticulously describes, but the protection scope of the utility model is not limited to embodiment in detail below.
As depicted in figs. 1 and 2, a kind of tunnel drainage device, it is several including what is be arranged at tunnel internal Karst water bursting mouth 1
The borehole wall of a sump 2 and rectangle ditch 3 being interconnected and be used for charge for remittance, 3 one end of rectangle ditch and one of sump 2 connects
Logical, the other end is connected to tunnel Central drain 4, and the bottom of sump 2 is equipped with several diversions drilling 21, the lower section of sump 2
Equipped with scupper 5, diversion drilling 21 is connected to scupper 5;The bottom of sump 2 is lower than the height of water burst mouth 1;Rectangle ditch 3 is set
It sets in the top of water burst mouth 1.
In the present embodiment, 22 absolute altitude of well lid of sump 2 is flushed with tunnel road surface, sump 2 using armored concrete into
Row pours.
In the present embodiment, the underface in the region of several sumps 2 formation, the size of scupper 5 is arranged in scupper 5
For 2.7 × 3.4m (wide × high).
In the present embodiment, the quantity of sump 2 is four, and four sumps 2 form rectangular configuration, each sump 2
Size is 1.0 × 0.85 × 1.6m (long × wide × deep).
In the present embodiment, the quantity of diversion drilling 21 is four in each sump 2, and the diameter of diversion drilling 21 is
24cm。
In the present embodiment, the quantity of rectangle ditch 3 is two, and a sump 2 is used with a rectangle ditch 3 is unified, rectangle ditch 3
Size be 0.8 × 0.7m.
The water discharge method of above-mentioned tunnel drainage device are as follows:
S1: digging several sumps 2 at the Karst water bursting mouth 1 in tunnel, the shaft bottom of sump 2 is lower than water burst mouth 1;
S2: the aperture on the wherein borehole wall of one or several sumps 2 opens up rectangle ditch 3 along this aperture, rectangle ditch 3
End is connected to tunnel Central drain 4;
S3: opening up scupper 5 at the following distance of sump 2, and scupper 5 is using common New Austrian Tunneling Method excavation
It can;
S4: several diversions drilling 21, the end of diversion drilling 21 and scupper 5 are drilled in the bottom of each sump 2
Connection.
In the present embodiment, each sump 2 is all made of armored concrete and is poured in step S1.
In the present embodiment, diversion drilling 21 is connected to scupper 5 straight down in step S4.
Claims (6)
1. a kind of tunnel drainage device, it is characterised in that: be included in several phases being arranged at tunnel internal Karst water bursting mouth (1)
Sump (2) and rectangle ditch (3) intercommunicated and that be used for charge for remittance, described rectangle ditch (3) one end and one of sump (2)
Borehole wall connection, the other end are connected to tunnel Central drain (4), and the bottom of the sump (2) drills equipped with several diversions
(21), the lower section of sump (2) is equipped with scupper (5), and the diversion drilling (21) is connected to scupper (5);The sump
(2) bottom is lower than the height of water burst mouth (1);Top of rectangle ditch (3) setting in water burst mouth (1).
2. tunnel drainage device according to claim 1, it is characterised in that: well lid (22) absolute altitude of the sump (2)
It is flushed with tunnel road surface, sump (2) is poured using armored concrete.
3. tunnel drainage device according to claim 1, it is characterised in that: scupper (5) setting is in several collection
The underface in the region that well (2) is formed.
4. tunnel drainage device according to any one of claim 1-3, it is characterised in that: the number of the sump (2)
Amount is four, and four sumps (2) form rectangular configuration or square structure.
5. tunnel drainage device according to any one of claim 1-3, it is characterised in that: each sump (2)
The quantity of middle diversion drilling (21) is 3-6.
6. tunnel drainage device according to any one of claim 1-3, it is characterised in that: the number of the rectangle ditch (3)
Quantity identical as the quantity of sump (2), or being less than sump (2) is measured, a sump (2) is with a unification rectangle ditch (3)
It uses.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822217076.6U CN209586441U (en) | 2018-12-27 | 2018-12-27 | A kind of tunnel drainage device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822217076.6U CN209586441U (en) | 2018-12-27 | 2018-12-27 | A kind of tunnel drainage device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209586441U true CN209586441U (en) | 2019-11-05 |
Family
ID=68379363
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822217076.6U Active CN209586441U (en) | 2018-12-27 | 2018-12-27 | A kind of tunnel drainage device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209586441U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109488372A (en) * | 2018-12-27 | 2019-03-19 | 湖南省交通规划勘察设计院有限公司 | A kind of tunnel drainage device and its water discharge method |
-
2018
- 2018-12-27 CN CN201822217076.6U patent/CN209586441U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109488372A (en) * | 2018-12-27 | 2019-03-19 | 湖南省交通规划勘察设计院有限公司 | A kind of tunnel drainage device and its water discharge method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104912065B (en) | Dowel pile construction method under water | |
CN105155562B (en) | For the construction method of deep basal pit spring sealing | |
CN204000909U (en) | A kind of immersed tube Precipitation Structure | |
CN209586441U (en) | A kind of tunnel drainage device | |
CN205857173U (en) | A kind of Novel steel casing sheath applying bored concrete pile on the water | |
CN204551510U (en) | A kind of filled-up ground catchments pressure reduction well drop and drainage structure | |
CN105672370B (en) | A kind of underground engineering water pressure control system | |
CN105155472B (en) | Dam foundation anti-seepage structure of deep overlying layer earth-rock dam and construction method of dam foundation anti-seepage structure | |
CN103114576A (en) | Post grouting construction method for cast-in-place concrete pile | |
CN109488372A (en) | A kind of tunnel drainage device and its water discharge method | |
CN105951977A (en) | Silt settling tank cleaning equipment and silt cleaning system | |
CN207159993U (en) | A kind of civil engineering built pile used temporarily | |
CN204326110U (en) | A kind of inspection well cover of not easily ponding | |
CN205975587U (en) | Fetch earth and press construction equipment who irritates | |
CN205636527U (en) | Device is advanced on box culvert top | |
CN210238709U (en) | Reduce drainage structure of utility tunnel sump pit quantity | |
CN205000346U (en) | Slope frame for slope reinforcement and water drainage | |
CN104790380B (en) | Underground diaphragm wall framework | |
CN107974890A (en) | A kind of permeable Route for pedestrians brick of convenient-laying | |
CN208949889U (en) | Deep basal pit karst base lime rock stratum groundwater treatment system | |
CN206090596U (en) | Directional well of control environment influence | |
CN209669901U (en) | Foundation pit and Tunnel Base spring pump drainage plugging device | |
CN202706038U (en) | Guide pipe reinsertion protector for underwater concreting of pile foundation | |
CN208009458U (en) | A kind of artificial digging pile minor diameter dewatering well corollary apparatus | |
CN206736965U (en) | A kind of electric power well construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |