CN209568450U - A kind of connection structure for foundation pit assembled inner bracing member and crown beam - Google Patents

A kind of connection structure for foundation pit assembled inner bracing member and crown beam Download PDF

Info

Publication number
CN209568450U
CN209568450U CN201920185350.8U CN201920185350U CN209568450U CN 209568450 U CN209568450 U CN 209568450U CN 201920185350 U CN201920185350 U CN 201920185350U CN 209568450 U CN209568450 U CN 209568450U
Authority
CN
China
Prior art keywords
bracing member
crown beam
inner bracing
foundation pit
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920185350.8U
Other languages
Chinese (zh)
Inventor
戚玉亮
陈帅光
董晓斌
黄荣超
谢合舜
李鹏
王光谱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Construction Industry Research Institute Co Ltd
Original Assignee
Guangzhou Construction Industry Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Construction Industry Research Institute Co Ltd filed Critical Guangzhou Construction Industry Research Institute Co Ltd
Priority to CN201920185350.8U priority Critical patent/CN209568450U/en
Application granted granted Critical
Publication of CN209568450U publication Critical patent/CN209568450U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of connection structures for foundation pit assembled inner bracing member and crown beam, including crown beam and inner bracing member;Crown beam is equipped with the post-cast strip being adapted with inner bracing member, and the main reinforcement of perforation post-cast strip is embedded in crown beam;Several dowels are stretched out on the end face of inner bracing member, and dowel is inserted into post-cast strip and is fixedly connected with main reinforcement, crown beam and inner bracing member is connected and fixed through casting concrete in post-cast strip.It effectively raises the globality that assembled inner bracing member is connect with crown beam, is connected firmly, construction is simple, can save the duration, can effectively guarantee construction quality, is adapted for promoting and applying.

Description

A kind of connection structure for foundation pit assembled inner bracing member and crown beam
Technical field
The utility model belongs to precast concrete technical field, and in particular to one kind is used for foundation pit assembled inner support The connection structure of component and crown beam.
Background technique
Inner support supporting construction is a kind of common support form of pattern foundation pit supporting structure, in the theory of low-carbon environment-friendly, green energy conservation Under guidance, favor of the prefabricated construction by architectural engineering.
As ultra-deep, super foundation engineering increase, supporting member is connect with crown beam in foundation pit supporting project entirety The requirement of property steps up.Formwork pours to form foundation pit supporting system foundation pit inner support on site with crown beam at present, and construction is existing Field pours inner support, is limited by the limitation of field condition, the construction period is longer, and construction quality is difficult to ensure, seriously affects sometimes The safety of foundation pit supporting system.
Therefore, it is necessary to a kind of new technology is longer to solve the construction period in the prior art, construction quality is difficult to ensure, shadow The problem of ringing the safety of foundation pit supporting system.
Utility model content
Longer to solve the construction period in the prior art, construction quality is difficult to ensure, influences the safety of foundation pit supporting system Property the problem of, the utility model provides a kind of connection structure for foundation pit assembled inner bracing member and crown beam, effectively The globality for improving assembled inner bracing member and being connect with crown beam, be connected firmly, construction is simple can save the duration, can Effectively to guarantee construction quality, it is adapted for promoting and applying.
The utility model uses following technical scheme:
A kind of connection structure for foundation pit assembled inner bracing member and crown beam, including crown beam and inner bracing member;
The crown beam is equipped with the post-cast strip being adapted with the inner bracing member, is embedded with described in perforation in the crown beam The main reinforcement of post-cast strip;
Stretch out several dowels on the end face of the inner bracing member, the dowel be inserted into the post-cast strip and with Main ribs are fixedly connected, and are connected and fixed the crown beam with inner bracing member through casting concrete in the post-cast strip.
It is further used as the improvement of technical solutions of the utility model, the seam of the post-cast strip is straight seam.
It is further used as the improvement of technical solutions of the utility model, the dowel includes HRB400 reinforcing bar, and the company Connect protective layer of the muscle on the inner bracing member with a thickness of 50mm or more.
It is further used as the improvement of technical solutions of the utility model, main ribs include HRB400 reinforcing bar, and main ribs Protective layer in the crown beam with a thickness of 60mm or more.
It is further used as the improvement of technical solutions of the utility model, main ribs are welded and fixed with the dowel, and institute It states main reinforcement and is cased with several stirrups on one section of the post-cast strip, the stirrup is welded and fixed with main ribs.
It is further used as the improvement of technical solutions of the utility model, the spacing of two adjacent stirrups is 100mm.
It is further used as the improvement of technical solutions of the utility model, the concrete poured in the post-cast strip is early strong coagulation Soil.
It is further used as the improvement of technical solutions of the utility model, the grade label of the early strength concrete is than the crown beam And/or more than the high 2 grade labels of grade label of the concrete of inner bracing member.
It is further used as the improvement of technical solutions of the utility model, the crown beam is site concrete.
It is further used as the improvement of technical solutions of the utility model, the inner bracing member is prefabricated components.
Compared with prior art, the utility model has the following beneficial effects: the inner bracing member in the utility model is prefabricated Component, pre-production is transported to construction site fortunately and is assembled before construction, there is the time for shortening site operation, saves work Phase;Crown beam and inner bracing member carry out pouring fixed connection type by post-cast strip, effectively raise inner bracing member with The globality of crown beam connection, is connected firmly, construction is simple can effectively guarantee construction quality, be adapted for promoting and applying.
Detailed description of the invention
The technology of the utility model is described in further detail with reference to the accompanying drawings and detailed description:
Fig. 1 is overall structure diagram;
Fig. 2 is whole top view;
Fig. 3 is whole front view;
Fig. 4 is whole side view.
Appended drawing reference:
1- crown beam;2- inner bracing member;The post-cast strip 11-;12- main reinforcement;13- stirrup;21- dowel.
Specific embodiment
It is carried out below with reference to technical effect of the embodiment and attached drawing to the design of the utility model, specific structure and generation Clear, complete description, to be completely understood by the purpose of this utility model, scheme and effect.It should be noted that not conflicting In the case where, the features in the embodiments and the embodiments of the present application can be combined with each other.What is used everywhere in attached drawing is identical Appended drawing reference indicates the same or similar part.
It should be noted that unless otherwise specified, when a certain feature referred to as " fixation ", " connection " are in another feature, It can directly fix, be connected to another feature, and can also fix, be connected to another feature indirectly.In addition, this The descriptions such as upper and lower, left and right used in utility model are only the phase relative to each component part of the utility model in attached drawing For mutual positional relationship.
Referring to figs. 1 to Fig. 4, a kind of structure being connect for foundation pit assembled inner bracing member with crown beam, including 1 He of crown beam Inner bracing member 2.Wherein, the crown beam 1 is site concrete, and cast in situs forms on construction ground;The inner bracing member 2 is Prefabricated components, are transported to the construction place of production again after Workshop Production molding and crown beam 1 is assembled.
Specifically, the crown beam 1 reserves the post-cast strip 11 being adapted with the inner bracing member 2 in pouring molding, Post-cast strip 11 uses straight seam, is embedded with the main reinforcement 12 for penetrating through the post-cast strip 11 in the crown beam 1;
Several dowels 21 are stretched out on the end face of the inner bracing member 2, the dowel 21 is inserted into the post-cast strip It is fixedly connected in 11 and with main ribs 12, through casting concrete by the crown beam 1 and inner bracing member 2 in the post-cast strip 11 It is connected and fixed.If main reinforcement 12 influences protruding into for dowel 21 in crown beam 1, dowel 21 can be bent, guarantee to be not less than The anchorage length of 35d.
It should be noted that the concrete poured in the post-cast strip 11 is early strength concrete, to accelerate the speed of solidification Degree;And the grade label of the early strength concrete is higher by 2 than the grade label of the crown beam 1 and/or the concrete of inner bracing member 2 More than a grade label, guarantee the bonding strength of crown beam 1 and inner bracing member 2 at post-cast strip 11.
Wherein, the dowel 21 uses HRB400 reinforcing bar, guarantees bonding strength, and the dowel 21 is in the interior branch Support the protective layer on component 2 with a thickness of 50mm or more, protect reinforcing bar to be not rusted, be also convenient for 21 stress of dowel.
Main ribs 12 include HRB400 reinforcing bar, and protective layer of the main ribs 12 in the crown beam 1 with a thickness of 60mm or more.
Preferably, main ribs 12 are welded and fixed with the dowel 21, and main ribs 12 are in the post-cast strip 11 Several stirrups 13 are cased on one section, the stirrup 13 is welded and fixed with main ribs 12, the dense distribution in main reinforcement 12 of stirrup 13, Encryption 13rd area of stirrup is formed, each 13 equidistantly distributed of stirrup, the spacing of the stirrup 13 of adjacent two is 100mm, with enhancing The bonding strength of crown beam 1 and inner bracing member 2.
Inner bracing member 2 in the utility model is prefabricated components, and pre-production is transported to construction field fortunately before construction Ground is assembled, and has the time for shortening site operation, saves the duration;Crown beam 1 and inner bracing member 2 are carried out by post-cast strip 11 Fixed connection type is poured, the globality that inner bracing member is connect with crown beam 1 is effectively raised, is connected firmly, construction letter It is single, it can effectively guarantee construction quality, be adapted for promoting and applying.
It is described in the utility model to join for other contents of foundation pit assembled inner bracing member and the connection structure of crown beam See the prior art, details are not described herein.
The above descriptions are merely preferred embodiments of the present invention, not makees in any form to the utility model Limitation, therefore it is all without departing from the content of the technical scheme of the utility model, implement according to the technical essence of the utility model to above Any modification, equivalent variations and modification, are still within the scope of the technical solutions of the present invention made by example.

Claims (10)

1. a kind of connection structure for foundation pit assembled inner bracing member and crown beam, including crown beam and inner bracing member, special Sign is: the crown beam is equipped with the post-cast strip being adapted with the inner bracing member, is embedded with described in perforation in the crown beam The main reinforcement of post-cast strip;
Stretch out several dowels on the end face of the inner bracing member, the dowel be inserted into the post-cast strip and with it is described Main reinforcement is fixedly connected, and is connected and fixed the crown beam with inner bracing member through casting concrete in the post-cast strip.
2. the connection structure according to claim 1 for foundation pit assembled inner bracing member and crown beam, it is characterised in that: The seam of the post-cast strip is straight seam.
3. the connection structure according to claim 1 for foundation pit assembled inner bracing member and crown beam, it is characterised in that: The dowel includes HRB400 reinforcing bar, and protective layer of the dowel on the inner bracing member with a thickness of 50mm with On.
4. the connection structure according to claim 1 for foundation pit assembled inner bracing member and crown beam, it is characterised in that: Main ribs include HRB400 reinforcing bar, and protective layer of the main ribs in the crown beam with a thickness of 60mm or more.
5. the connection structure according to claim 1 for foundation pit assembled inner bracing member and crown beam, it is characterised in that: Main ribs are welded and fixed with the dowel, and main ribs are cased with several stirrups on one section of the post-cast strip, described Stirrup is welded and fixed with main ribs.
6. the connection structure according to claim 5 for foundation pit assembled inner bracing member and crown beam, it is characterised in that: The spacing of two adjacent stirrups is 100mm.
7. the connection structure according to claim 1 for foundation pit assembled inner bracing member and crown beam, it is characterised in that: The concrete poured in the post-cast strip is early strength concrete.
8. the connection structure according to claim 7 for foundation pit assembled inner bracing member and crown beam, it is characterised in that: The grade label of the early strength concrete 2 grades higher than the grade label of the crown beam and/or the concrete of inner bracing member It is more than label.
9. the connection structure according to any one of claim 1 to 8 for foundation pit assembled inner bracing member and crown beam, It is characterized by: the crown beam is site concrete.
10. the connection knot according to any one of claim 1 to 8 for foundation pit assembled inner bracing member and crown beam Structure, it is characterised in that: the inner bracing member is prefabricated components.
CN201920185350.8U 2019-02-01 2019-02-01 A kind of connection structure for foundation pit assembled inner bracing member and crown beam Active CN209568450U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920185350.8U CN209568450U (en) 2019-02-01 2019-02-01 A kind of connection structure for foundation pit assembled inner bracing member and crown beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920185350.8U CN209568450U (en) 2019-02-01 2019-02-01 A kind of connection structure for foundation pit assembled inner bracing member and crown beam

Publications (1)

Publication Number Publication Date
CN209568450U true CN209568450U (en) 2019-11-01

Family

ID=68335189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920185350.8U Active CN209568450U (en) 2019-02-01 2019-02-01 A kind of connection structure for foundation pit assembled inner bracing member and crown beam

Country Status (1)

Country Link
CN (1) CN209568450U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114718087A (en) * 2022-05-09 2022-07-08 深圳市综合交通与市政工程设计研究总院有限公司 Construction method for post-connection assembly of foundation pit concrete inner support
CN115012423A (en) * 2022-06-07 2022-09-06 广州地铁设计研究院股份有限公司 Waist beam pouring construction method for foundation pit support and waist beam structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114718087A (en) * 2022-05-09 2022-07-08 深圳市综合交通与市政工程设计研究总院有限公司 Construction method for post-connection assembly of foundation pit concrete inner support
CN115012423A (en) * 2022-06-07 2022-09-06 广州地铁设计研究院股份有限公司 Waist beam pouring construction method for foundation pit support and waist beam structure
CN115012423B (en) * 2022-06-07 2023-10-10 广州地铁设计研究院股份有限公司 Waist beam pouring construction method and waist beam structure for foundation pit support

Similar Documents

Publication Publication Date Title
CN106869321A (en) The prefabricated regeneration concrete bean column node and its construction method of a kind of reinforcement
CN106481023B (en) Assembled steel-concrete composite beam structure and its implementation method
CN105569224A (en) Concrete-filled steel tube edge restraint overlapping integrated shear wall and preparing and installation methods thereof
CN206737118U (en) A kind of prefabricated regeneration concrete bean column node of reinforcement
CN110387826A (en) A kind of precast segment assembly bridge pier steel member and construction method and application
CN209568450U (en) A kind of connection structure for foundation pit assembled inner bracing member and crown beam
CN105275097A (en) A post-cast strip water-stop steel plate and demolition-free template net installing method
CN106012851A (en) Synchronous construction method of steel box girder and concrete pier studs
CN103410101B (en) Tower crane conversion method for construction of parabola-shaped ultrahigh pier
CN109707052A (en) Assembled beam and plate connecting node
CN209669688U (en) A kind of half assembled thin-wall piers
CN109578011A (en) Supporting construction and its construction method in a kind of municipal tunnel
CN107724540A (en) Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates
CN110468998A (en) A kind of assembled RC shear wall structure connected horizontally and its construction method
CN110344844A (en) A kind of track engineering section of track well construction method
CN102767378B (en) Double-column type tunnel portal method for bent frame construction tunnel
CN107558351A (en) Abdomen bag bottom is trapezoidal(Waveform)Steel plate combination box beam and its construction method
CN204551219U (en) The stage transverse prestress structure of oblique hinged precast hollow slab beam bridge
CN103216085B (en) A kind of removable lining self-bearing type reinforcement bar truss mould plate
CN104746434B (en) Closure segment formwork system without dismantling outer formwork
CN106337530A (en) Construction method for plugging construction joint of frame beam
CN206722094U (en) A kind of rectangular steel-tube concrete column and beam and slab type superstructure attachment means
CN207348280U (en) A kind of novel precast floor slab
CN207079809U (en) A kind of assembled steel reinforced Concrete U Vierendeel girder and making mould and connection steelframe
CN102776955B (en) Connecting node for connecting newly added reinforced concrete earthquake resistant wall and sleeve reinforced beam