CN209556333U - A kind of construction hanging basket mechanism - Google Patents
A kind of construction hanging basket mechanism Download PDFInfo
- Publication number
- CN209556333U CN209556333U CN201822235266.0U CN201822235266U CN209556333U CN 209556333 U CN209556333 U CN 209556333U CN 201822235266 U CN201822235266 U CN 201822235266U CN 209556333 U CN209556333 U CN 209556333U
- Authority
- CN
- China
- Prior art keywords
- outer framework
- pulley
- fixed link
- hanging basket
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of construction hanging basket mechanisms, it is related to Architectural Equipment field, technical solution is, four side walls of the hanging basket including basket type structure, including cuboid outer framework, outer framework are provided with a grid, fixed link is symmetrical arranged on outer framework two side frames vertical with building body, pulley is arranged towards the one side on the inside of outer framework in fixed link, and the upper end of fixed link is fixedly connected with one end of wirerope, and wirerope connect around pulley with hoist engine after the coaster on track.The beneficial effects of the utility model are: design is reasonable, it is easy to use, pass through the present apparatus, rear carrier plate and collateral plate can be used as effective support of wallboard when GRC wallboard is installed, and transfer roller thereon facilitates construction personnel to move position of wallboards, holding wallboard that can be more stable, wallboard is removed from loop wheel machine, then the safe building body side that is moved to is installed.
Description
Technical field
The utility model relates to Architectural Equipment field, in particular to a kind of construction hanging basket mechanism.
Background technique
Clear-water concrete, clear water mould are a kind of modernistic technique of expression of building, because its great decorative effect also referred to as fills
Adorn concrete.Basic idea is poured in concrete to be postponed, and there is no the materials such as any coating, tiling, patch stone material, shows coagulation
A kind of gimmick of plain face of soil.
In dry concrete construction project, uses a large amount of prefabricated GRC plate to install as exterior wall, needed using loop wheel machine
It is lifted to construction location and is installed, it is therefore desirable to use the lifting tool for being adapted to GRC plate.And as building building body
For GRC plate for, usual form of construction work be layer-by-layer laying construction, that is to say, that along building, body moves horizontally carry out Side fascia
Installation exercise.And clear-water concrete needs to avoid knocking to the installation exactissima diligentia of GRC plate because not having extraneous adornment
It touches.In current construction equipment, lack the suspender for facilitating and carrying out this movement.
Utility model content
In order to realize above-mentioned purpose of utility model, in view of the above technical problems, the utility model provides a kind of construction
With hanging basket mechanism.
Its technical solution is that the bracket at building body edge is fixed on including array, and bracket is fixed towards the external side lower section in building
Track is set, hanging basket is arranged by wirerope suspention below track, is provided with the hoist engine connecting with the wirerope in hanging basket, and with
The corresponding control panel of hoist engine;The hanging basket is basket type structure, including cuboid outer framework, four side walls of the outer framework
A grid are provided with, are symmetrical arranged fixed link, the fixed link direction on the outer framework two side frames vertical with building body
Pulley is arranged in one side on the inside of the outer framework, and the upper end of the fixed link is fixedly connected with one end of the wirerope, and wirerope passes through
It is connect around the pulley with hoist engine after coaster on the track;
The lower edge of the hinged collateral plate of the outer framework two frame outer lower portions vertical with building body, outer framework is far from building
It is provided with knob on the upper side frame of the lower edge of the side lower hinge rear carrier plate of body, the collateral plate and rear carrier plate, is shaken hands
One end of upper winding rope, the rope other end extend to inside outer framework.
Preferably, the fixed link is fixedly connected with pulley yoke towards the outer framework inner opposite end, and institute's pulley yoke includes two
Root is parallel and the upright bar that is vertically arranged, pulley spindle is arranged between two upright bars, pulley is arranged on the pulley spindle;
The lower end surface of the upright bar is fixedly connected with the frame of the outer framework, and the pulley radial edges are close to described solid
The body of rod of fixed pole;
The fixed link is cylindrical rod body;The pulley includes the center pillar for being located at middle part, and the wheel positioned on both sides of the middle
Side, center pillar are cylindrical body, and wheel side is disc, and the pulley axial length is less than or equal to the diameter of the fixed link, pulley
Face is overlapped with face in the axial direction of fixed link in radial direction, there are gap between wheel side and the body of rod of the fixed link of the pulley,
The width in gap is less than the diameter of the wirerope.
Preferably, bottom plate is fixedly installed in the base of frame of the hanging basket, and bottom plate is closing plate body, the collateral plate, rear branch
The top edge of plate and the bottom plate is hinged.
Preferably, the equal array setting transfer roller in middle part of the rear carrier plate, collateral plate, the axis of the rear carrier plate transfer roller and institute
The lateral surface for stating building body is vertical, and the axis of the collateral plate transfer roller is parallel with the lateral surface of the building body.
Preferably, corner of the collateral plate far from the building body is arc chord angle, and the collateral plate and the outer framework are cut with scissors
The side that the length of edge fit is equal to the outer framework adds the width of the rear carrier plate.
Technical solution provided by the embodiment of the utility model has the benefit that design rationally, easy to use, passes through
The present apparatus can use rear carrier plate and collateral plate as effective support of wallboard when GRC wallboard is installed, and transfer roller side thereon
Just construction personnel moves position of wallboards, holding wallboard that can be more stable, wallboard is removed from loop wheel machine, then safe shifting
It is installed the building Dong Zhi body side.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model embodiment.
Fig. 2 is the A partial enlarged view of Fig. 1.
Fig. 3 is the C partial enlarged view of Fig. 2.
Wherein, appended drawing reference are as follows: 1, bracket;2, track;3, hanging basket;31, outer framework;32, grid;33, fixed link;34,
Pulley;35, collateral plate;36, rear carrier plate;37, it shakes hands;38, pulley yoke.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation
Example, the present invention will be further described in detail.Certainly, specific embodiment described herein is only practical to explain
It is novel, it is not used to limit the utility model.
It should be noted that in the absence of conflict, the spy in embodiment and embodiment in the utility model creation
Sign can be combined with each other.
The utility model create description in, it is to be understood that term " center ", " longitudinal direction ", " transverse direction ", "upper",
The orientation or position of the instructions such as "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside"
Relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description the utility model and creates and simplify description,
Rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, because
This should not be understood as the limitation created to the utility model.In addition, term " first ", " second " etc. are used for description purposes only, and
It cannot be understood as indicating or implying relative importance or implicitly indicate the quantity of indicated technical characteristic.It defines as a result,
The feature of " first ", " second " etc. can explicitly or implicitly include one or more of the features.In the utility model
In the description of creation, unless otherwise indicated, the meaning of " plurality " is two or more.
In the description that the utility model is created, it should be noted that unless otherwise clearly defined and limited, term
" installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one
Connect to body;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be indirect by intermediary
It is connected, can be the connection inside two elements.For the ordinary skill in the art, it can be managed by concrete condition
Solve concrete meaning of the above-mentioned term in the utility model creation.
Embodiment 1
Referring to Fig. 1 to Fig. 3, the utility model provides a kind of construction hanging basket mechanism, including array is fixed on building body
The bracket 1 at edge, bracket 1 are fixedly installed track 2 towards the external side lower section in building, are hung below track 2 by wirerope suspention setting
Basket 3 is provided with the hoist engine connecting with wirerope, and control panel corresponding with hoist engine in hanging basket 3;Hanging basket 3 is basket type structure,
Including cuboid outer framework 31, four side walls of outer framework 31 are provided with a grid, two sides vertical with building body of outer framework 31
Be symmetrical arranged fixed link 33 on frame, the one side of fixed link 33 towards the inside of outer framework 31 is arranged pulley 34, fixed link 33 it is upper
End is fixedly connected with one end of wirerope, and wirerope connect around pulley 34 with hoist engine after the coaster on track;
The lower edge of the hinged collateral plate 35 of the two frame outer lower portions vertical with building body of outer framework 31, outer framework 31 are separate
Knob is provided on the lower edge of the side lower hinge rear carrier plate 36 of building body, collateral plate 35 and the upper side frame of rear carrier plate 36
37, one end of rope is wound on knob 37, the rope other end extends to inside outer framework 31.
Fixed link 33 is fixedly connected with pulley yoke 38 towards 31 inner opposite end of outer framework, institute's pulley yoke 38 include two it is parallel and
The upright bar being vertically arranged, pulley spindle is arranged between two upright bars, and pulley 34 is arranged on pulley spindle;
The lower end surface of upright bar is fixedly connected with the frame of outer framework 31, bar of 34 radial edges of pulley close to fixed link 33
Body;
Fixed link 33 is cylindrical rod body;Pulley 34 includes the center pillar positioned at middle part, and positioned at the wheel side of on both sides of the middle, in
Column is cylindrical body, and wheel side is disc, and 34 axial length of pulley is less than or equal to the diameter of fixed link 33, face in the radial direction of pulley 34
It is overlapped with face in the axial direction of fixed link 33, there are gap, the width in gap between wheel side and the body of rod of fixed link 33 of pulley 34
Less than the diameter of wirerope.
Bottom plate is fixedly installed in the base of frame of hanging basket 3, and bottom plate is closing plate body, collateral plate 35, rear carrier plate 36 and bottom plate
Top edge is hinged.
The equal array setting transfer roller in middle part of rear carrier plate 36, collateral plate 35, the axis of 36 transfer roller of rear carrier plate and the outside of building body
Face is vertical, and the axis of collateral 35 transfer roller of plate is parallel with the lateral surface of building body.
Corner of the collateral plate 35 far from building body is arc chord angle, and collateral plate 35 and the length of 31 hinge side of outer framework are equal to outline border
The side of frame 31 adds the width of rear carrier plate 36.
When the utility model is used, rear carrier plate 36 and collateral plate 35 are opened, is lifted to GRC plate to be installed with loop wheel machine
On hanging basket side, construction personnel can place GRC plate, and turn of rear carrier plate 36 by rear carrier plate 36 and collateral plate 35 as support
Roller direction, which facilitates, is moved to GRC plate on collateral plate 35, and the transfer roller direction of collateral plate 35 facilitates that GRC plate is moved to building is external
Side.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this
Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model
Within the scope of shield.
Claims (5)
1. a kind of construction hanging basket mechanism, it is fixed on the bracket (1) at building body edge including array, bracket (1) is towards building body
Track (2) are fixedly installed below outboard end, setting hanging basket (3) is suspended in midair by wirerope below track (2), is provided in hanging basket (3)
The hoist engine being connect with the wirerope, and control panel corresponding with hoist engine;It is characterized in that, the hanging basket (3) is basket formula
Structure, including cuboid outer framework (31), four side walls of the outer framework (31) are provided with a grid, the outer framework (31)
Fixed link (33) are symmetrical arranged on two side frames vertical with building body, the fixed link (33) is interior towards the outer framework (31)
Pulley (34) are arranged in the one side of side, and the upper end of the fixed link (33) is fixedly connected with one end of the wirerope, described in wirerope passes through
It is connect around the pulley (34) with hoist engine after coaster on track;
The lower edge of the hinged collateral plate (35) of the outer framework (31) the two frame outer lower portions vertical with building body, outer framework
(31) lower edge of the side lower hinge rear carrier plate (36) far from building body, the top of the collateral plate (35) and rear carrier plate (36)
It is provided on frame knob (37), one end of rope is wound on knob (37), it is internal that the rope other end extends to outer framework (31).
2. construction according to claim 1 hanging basket mechanism, which is characterized in that the fixed link (33) is described in
Outer framework (31) inner opposite end is fixedly connected pulley yoke (38), and the pulley yoke (38) includes that two parallel and what is be vertically arranged stands
Bar, pulley spindle is arranged between two upright bars, and pulley (34) is arranged on the pulley spindle;
The lower end surface of the upright bar is fixedly connected with the frame of the outer framework (31), and pulley (34) radial edges are close to institute
State the body of rod of fixed link (33);
The fixed link (33) is cylindrical rod body;The pulley (34) includes the center pillar positioned at middle part, and is located on both sides of the middle
Wheel side, center pillar is cylindrical body, and wheel side is disc, and pulley (34) axial length is less than or equal to the fixed link (33)
Diameter, there are gap between the wheel side of the pulley (34) and the body of rod of the fixed link (33), the width in gap is less than described
The diameter of wirerope.
3. construction according to claim 1 hanging basket mechanism, which is characterized in that the base of frame of the hanging basket (3)
Bottom plate is fixedly installed, bottom plate is closing plate body, and the collateral plate (35), rear carrier plate (36) and the top edge of the bottom plate are hinged.
4. construction according to claim 3 hanging basket mechanism, which is characterized in that the rear carrier plate (36), collateral plate
(35) transfer roller is arranged in the equal array in middle part, and the axis of rear carrier plate (36) transfer roller is vertical with the lateral surface of the building body, described
The axis of collateral plate (35) transfer roller is parallel with the lateral surface of the building body.
5. construction according to claim 3 hanging basket mechanism, which is characterized in that the collateral plate (35) is far from described
The corner of building body is arc chord angle, and the collateral plate (35) and the length of the outer framework (31) hinge side are equal to the outer framework
(31) side adds the width of the rear carrier plate (36).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822235266.0U CN209556333U (en) | 2018-12-28 | 2018-12-28 | A kind of construction hanging basket mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822235266.0U CN209556333U (en) | 2018-12-28 | 2018-12-28 | A kind of construction hanging basket mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209556333U true CN209556333U (en) | 2019-10-29 |
Family
ID=68304121
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822235266.0U Active CN209556333U (en) | 2018-12-28 | 2018-12-28 | A kind of construction hanging basket mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209556333U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113882278A (en) * | 2021-07-28 | 2022-01-04 | 北京市机械施工集团有限公司 | Movable operating frame for construction of large-span steel structure cantilever |
CN114482484A (en) * | 2020-10-26 | 2022-05-13 | 广东博智林机器人有限公司 | External wall tile paving robot and working method thereof |
-
2018
- 2018-12-28 CN CN201822235266.0U patent/CN209556333U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482484A (en) * | 2020-10-26 | 2022-05-13 | 广东博智林机器人有限公司 | External wall tile paving robot and working method thereof |
CN113882278A (en) * | 2021-07-28 | 2022-01-04 | 北京市机械施工集团有限公司 | Movable operating frame for construction of large-span steel structure cantilever |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209556333U (en) | A kind of construction hanging basket mechanism | |
CN209583387U (en) | One kind lifting adjustable lifting for assembled stair | |
CN106013434B (en) | Bean column node fixed structure and installation method among a kind of prefabricated construction | |
CN107201719A (en) | Overpass anti-collision wall formwork hoisting conveyance and anti-collision wall construction method | |
CN209635769U (en) | A kind of manual hanging basket mechanism | |
CN206784172U (en) | Overpass anti-collision wall formwork hoisting conveyance | |
CN214167097U (en) | Lifting appliance for integral steel reinforcement framework of railway box girder | |
CN104343342B (en) | A kind of universal window of replaceable sash and its building method | |
CN207436503U (en) | Efficient construction of precast floorslab hangs membrane module | |
CN112065076B (en) | Combined building outer wall | |
CN212609232U (en) | Tool for assisting installation of light partition board | |
CN108726358A (en) | A kind of towering concrete structure main reinforcement batch hanging apparatus and method | |
CN212953836U (en) | GRC environmental protection box hoisting structure | |
CN210684485U (en) | Steel arch frame dismantling device for deck box type arch bridge construction | |
CN210885083U (en) | Cable trench cover carrying device | |
CN206189284U (en) | End bay construction support, rigid frame bridge end bay and rigid frame bridge | |
CN205346759U (en) | Construction of integrated hanger rail formula outer wall, washing, maintenance machine | |
CN209635721U (en) | A kind of clear-water concrete GRC plate lifting balancing device | |
CN218841435U (en) | Gypsum board hoist convenient to operation | |
CN212755050U (en) | Building new material show board | |
CN109850774A (en) | A kind of manual hanging basket mechanism | |
CN209457361U (en) | Scalable hanging basket | |
CN208413720U (en) | A kind of construction apparatus for automatically lifting | |
CN220412609U (en) | Steel box girder heightening block lifting device | |
CN210685325U (en) | Scaffold for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |