CN209538013U - A kind of end template for the construction of Thin-wall Hollow Pier pier top solid-section - Google Patents

A kind of end template for the construction of Thin-wall Hollow Pier pier top solid-section Download PDF

Info

Publication number
CN209538013U
CN209538013U CN201920075212.4U CN201920075212U CN209538013U CN 209538013 U CN209538013 U CN 209538013U CN 201920075212 U CN201920075212 U CN 201920075212U CN 209538013 U CN209538013 U CN 209538013U
Authority
CN
China
Prior art keywords
section
pier
reinforcement
solid
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920075212.4U
Other languages
Chinese (zh)
Inventor
党彦锋
孟祥源
杨德月
刘帅帅
孙凯
杨浩
朱备
张志龙
武彦杰
刘佳
胡茳
刘恒宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co Ltd
Original Assignee
Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co Ltd filed Critical Sixth Engineering Co Ltd Of Cccc Fourth Highway Engineering Co Ltd
Priority to CN201920075212.4U priority Critical patent/CN209538013U/en
Application granted granted Critical
Publication of CN209538013U publication Critical patent/CN209538013U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a kind of end templates for the construction of Thin-wall Hollow Pier pier top solid-section, precast slab including a rectangle, it is provided in precast slab and is intersected the framework of steel reinforcement connected by longitudinal reinforcement and transverse steel, vertical reinforcement is also connected in each intersection of longitudinal reinforcement and transverse steel, the end of longitudinal reinforcement and transverse steel protrudes from precast slab periphery certain length, and the upper end of vertical reinforcement protrudes from precast concrete plate top surface certain altitude.The utility model directly overlays at the hollow section of pier top hollow section top, is linked together completely with solid section concrete, without individually setting up and dismantling end template.

Description

A kind of end template for the construction of Thin-wall Hollow Pier pier top solid-section
Technical field
The utility model relates to bridge Wall Voided Pier construction fields, and in particular to one kind is used for Thin-wall Hollow Pier pier top The end template of solid-section construction.
Background technique
Major part Main Pier of Bridges is both designed as thin-walled hollow structure at present, this bridge pier have the rigidity of structure and intensity it is good, From heavy and light, the feature that section modulus is big and area of section is small.As shown in Figure 1, the main body of Thin-wall Hollow Pier 1 is hollow section 2, pier Top is solid-section 3, and the difficult point in construction is that the end template of pier top solid-section 3 is constructed.Most of pier top hollow section is to become to cut Face setting, construct pier top solid-section when, if simply hollow section top cover a cover board, not can guarantee cover board with it is solid Section concrete connection is integrated, and can be seriously affected solid-section quality, be caused major safety risks;Therefore usually construction method be The good built-in fitting of hollow section inner wall variable cross-section apical position pre-plugged, then when constructing pier top solid-section process, utilization is pre-buried Part sets up solid-section end template by way of welding shape steel bracket.When constructing hollow section, it is arranged to go out on Dun Bi in advance Enter the constructor hole inside hollow section, after the completion of solid-section pours, construction personnel enters constructor hole will be inside hollow section Shape steel bracket and end template take out.But constructor hole, which is arranged, can have an impact to the overall structure of hollow thin-walled high pier, and enter construction There is certain security risk when the removal bracket of people hole;If being not provided with constructor hole, the built-in fitting in hollow section can not be taken out, only It can for good and all be retained in inside pier stud, not only cause waste of material, also cause hidden danger of quality to pier stud internal structure.
Summary of the invention
The purpose of the utility model is to provide a kind of end templates for the construction of Thin-wall Hollow Pier pier top solid-section, do not have to Built-in fitting and welding shape steel bracket is arranged in pier stud hollow section top inner wall, and no matter whether hollow thin-walled high pier considers that constructor is arranged Construction cost is saved in the case where not influencing main structure in hole, guarantees pier stud construction quality.
Technical scheme is as follows:
A kind of end template for the construction of Thin-wall Hollow Pier pier top solid-section, the end template include the prefabricated mixed of a rectangle Concrete board is provided in precast slab and is intersected the framework of steel reinforcement connected by longitudinal reinforcement and transverse steel, special Sign is: being also connected with vertical reinforcement, the longitudinal reinforcement and transverse direction in each intersection of longitudinal reinforcement and transverse steel The end of reinforcing bar protrudes from precast slab periphery certain length, and the upper end of the vertical reinforcement protrudes from precast slab Top surface certain altitude.
The utility model, which is used, is directly placed at pier stud hollow section top with the concrete slab of label with pier top solid-section, The end template that entire solid-section pours is served as, horizontal Vertical bar connection is then carried out, solid section concrete is poured, after the completion of construction End template is integrally formed with solid section concrete, it is no longer necessary to remove end template, solid-section is without again by setting up fashioned iron branch The mode of frame support end template is constructed, and additional influence is not caused to pier stud, reduces construction cost, accelerates construction Progress also avoids the security risk of later period disassembly end template.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of Thin-wall Hollow Pier;
Fig. 2 is that the reinforcing bar of the utility model lays plan view;
Fig. 3 is that the reinforcing bar of the utility model lays elevation;
Fig. 4 is the status diagram that the utility model is used for the construction of Thin-wall Hollow Pier solid-section.
Specific embodiment
As shown in Figure 2 and Figure 3, the utility model includes the precast slab 4 of a rectangle, setting in precast slab 4 Have and intersected the framework of steel reinforcement connected by longitudinal reinforcement 5 and transverse steel 6, in each of longitudinal reinforcement 5 and transverse steel 6 Intersection is also connected with vertical reinforcement 7, and the end of the longitudinal reinforcement 5 and transverse steel 6 protrudes from precast slab 4 weeks Side certain length, the upper end of the vertical reinforcement 7 protrude from 4 top surface certain altitude of precast slab.
When the utility model is constructed for Thin-wall Hollow Pier pier top solid-section, the laying spacing of longitudinal reinforcement, transverse steel, Completely the same with the longitudinal and transverse rebar design spacing of pier top solid-section, the length for protruding from concrete slab periphery will be able to satisfy It is connect with the longitudinal and transverse reinforcing bar of solid-section;The height of vertical reinforcement is consistent with pier top solid-section vertical bar height;Precast slab mixes Solidifying soil label is identical with the concrete grade of solid-section, is one so that end template can link completely with solid section concrete Body.
The size of precast slab, generally will be by its vertically and horizontally size setting depending on hollow section top cross-section size It is advisable to be respectively greater than the vertically and horizontally size 0.2m of hollow section at the top of hollow section.Such as in one specific embodiment of the utility model In, the hollow section at the top of bridge pier hollow section is having a size of 2.4 × 2.4m, then the concrete slab of the utility model is designed and sized to 2.6×2.6m。
As shown in figure 4, being poured when the utility model is constructed for Thin-wall Hollow Pier pier top solid-section in bridge pier hollow section 2 After the completion, 4 surrounding of the precast slab of the utility model and top surface dabbing are handled, is then lifted into hollow section 2 with loop wheel machine Hollow section section is completely covered at top.Then lay pier top solid-section reinforcing bar, and by the vertically and horizontally reinforcing bar of solid-section respectively with The vertical, horizontal reinforcement welding on the utility model periphery connects.The concrete for starting to pour solid-section 3 pours sequence using first four Mid way after week after concrete surface integrally covers prefabricated bed die plate top surface, then carries out center concreting.Entirely After the completion of solid-section concreting, the utility model and solid section concrete go completely into one.

Claims (1)

1. a kind of end template for the construction of Thin-wall Hollow Pier pier top solid-section, the end template includes the concrete of a rectangle Native plate is provided in precast slab and is intersected the framework of steel reinforcement connected by longitudinal reinforcement and transverse steel, feature It is: is also connected with vertical reinforcement, the longitudinal reinforcement and lateral steel in each intersection of longitudinal reinforcement and transverse steel The end of muscle protrudes from precast slab periphery certain length, and the upper end of the vertical reinforcement protrudes from precast slab top Face certain altitude.
CN201920075212.4U 2019-01-16 2019-01-16 A kind of end template for the construction of Thin-wall Hollow Pier pier top solid-section Expired - Fee Related CN209538013U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920075212.4U CN209538013U (en) 2019-01-16 2019-01-16 A kind of end template for the construction of Thin-wall Hollow Pier pier top solid-section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920075212.4U CN209538013U (en) 2019-01-16 2019-01-16 A kind of end template for the construction of Thin-wall Hollow Pier pier top solid-section

Publications (1)

Publication Number Publication Date
CN209538013U true CN209538013U (en) 2019-10-25

Family

ID=68270099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920075212.4U Expired - Fee Related CN209538013U (en) 2019-01-16 2019-01-16 A kind of end template for the construction of Thin-wall Hollow Pier pier top solid-section

Country Status (1)

Country Link
CN (1) CN209538013U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113756195A (en) * 2021-08-31 2021-12-07 中铁七局集团有限公司 Hollow pier top solid section construction device and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113756195A (en) * 2021-08-31 2021-12-07 中铁七局集团有限公司 Hollow pier top solid section construction device and method

Similar Documents

Publication Publication Date Title
CN109403458A (en) Novel pre-fabricated one
CN104963289B (en) A kind of abnormity pier stud mass concrete overall time pouring construction method
CN109610341A (en) A kind of solid section constructing method of Thin-wall Hollow Pier pier top
CN104594500B (en) Integrated slab column formwork structure system and construction method
CN208072950U (en) A kind of combination set shaped steel formwork
CN108755984A (en) Late poured band support construction method based on concrete square column
CN110273359A (en) A kind of prefabricated bent cap and construction method of packaged type bridges
CN105128131A (en) Method for manufacturing prestressed hollow slab beam through polystyrene foam
CN107237270A (en) A kind of construction method of girder construction
CN209538013U (en) A kind of end template for the construction of Thin-wall Hollow Pier pier top solid-section
CN111730738A (en) Prefabricated box girder diaphragm plate connecting structure and construction method thereof
CN107419904A (en) The skewed slot mounting structure and its application method poured for concrete column
CN104153573A (en) Pouring formwork and construction method for V-shaped cylindrical concrete
CN109555017A (en) A kind of separate type bridge guardian column formwork for placing and construction method
CN208071101U (en) A kind of piping lane precast segment overturning and hoisting device
CN105201204B (en) A kind of method and structure of rotten when preventing pouring reinforcement concrete column suspension column
CN106320373A (en) Supporting system at position of post-pouring belt of underground garage roof and construction method
CN209538025U (en) A kind of separate type bridge guardian column formwork for placing
CN107762001A (en) A kind of assembly concrete variable cross-section newel post type shearing wall member and its construction method
CN205444614U (en) Net piece forms hollow dark contignation with spacer bar cast in situ concrete
CN109184193A (en) A kind of early-dismantling formwork system and its construction method
CN204001714U (en) The concrete mould of building of V-type cylinder
CN209397710U (en) Novel pre-fabricated one
CN204001713U (en) V-type cylinder oblique line section concrete is built mould
CN208763209U (en) The assembled integral concrete frame structure of beam-ends connection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191025

Termination date: 20220116