CN209495067U - Construction Pipe leakage stopper - Google Patents

Construction Pipe leakage stopper Download PDF

Info

Publication number
CN209495067U
CN209495067U CN201920020994.1U CN201920020994U CN209495067U CN 209495067 U CN209495067 U CN 209495067U CN 201920020994 U CN201920020994 U CN 201920020994U CN 209495067 U CN209495067 U CN 209495067U
Authority
CN
China
Prior art keywords
horizontal location
arc clip
location plate
pipeline
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920020994.1U
Other languages
Chinese (zh)
Inventor
徐仁贵
吉达华
陈春红
王塞
丁国东
余中旺
张桢
姚照光
许可
徐刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG DAXIN ENINEERING CO Ltd
Nantong Daxin Engineering Co Ltd
Original Assignee
NANTONG DAXIN ENINEERING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG DAXIN ENINEERING CO Ltd filed Critical NANTONG DAXIN ENINEERING CO Ltd
Priority to CN201920020994.1U priority Critical patent/CN209495067U/en
Application granted granted Critical
Publication of CN209495067U publication Critical patent/CN209495067U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to technical architecture construction pipe mould technical fields, it is a kind of construction Pipe leakage stopper, it includes floor, pipeline, fixture, left horizontal location plate and right horizontal location plate, reserving hole is equipped on floor, pipeline is equipped in reserving hole, there is spacing between pipeline and reserving hole, fixture includes front arc clip and rear arc clip.The utility model reasonable and compact in structure, it is easy to use, when operation, left horizontal location plate and right horizontal location plate are withstood on to the bottom of floor, then front arc clip and rear arc clip are withstood on into left horizontal location plate and right horizontal location board bottom portion, then clamping screw is withstood on pipeline, thus left horizontal location plate and right horizontal location plate are held out against in the bottom of floor, front arc clip and rear arc clip are fixed again, it finally can be carried out concrete perfusion operation, in this way, just reduce that concrete bottom is sagging to cause the out-of-flatness of board bottom face, uncompacted phenomenon, improve pouring quality.

Description

Construction Pipe leakage stopper
Technical field
The utility model relates to technical architecture construction pipe mould technical fields, are a kind of construction pipe plugging dresses It sets.
Background technique
In building construction process, the reserving hole of various construction pipelines is required pre- in advance before civil construction in floor It stays, after waiting pipeline constructions, it is necessary to the gap between pipeline and reserving hole be handled, concrete is usually used It carries out filling stifled, but in formwork, generally by the way of hanging mould, but steel wire hangs mould to be easy to appear concrete bottom sagging, causes The out-of-flatness of board bottom face, uncompacted phenomenon not only reduce construction quality, also lead to occur seeping water or leakage accident occurs Cause later period maintenance difficult.
Summary of the invention
The utility model provides a kind of construction Pipe leakage stopper, overcomes the defects of the prior art, It can effectively solve that be easy to appear concrete bottom sagging because steel wire hangs mould, cause the out-of-flatness of plate ground, uncompacted phenomenon, thus Appearance is seeped water or leakage accident occurs, and is not only reduced construction quality, is also resulted in the problem of later period maintenance difficulty.
The technical solution of the utility model is realized by following measures: a kind of construction Pipe leakage stopper, Including floor, pipeline, fixture, left horizontal location plate and right horizontal location plate, reserving hole is equipped on floor, in reserving hole It is interior to be equipped with pipeline, there is spacing between pipeline and reserving hole, fixture includes front arc clip and rear arc clip, front arc clip It is hingedly mounted on together with one end of rear arc clip, the other end of front arc clip and rear arc clip is fixedly mounted on one Rise, front arc clip and rear arc hoop sleeve on the outside of pipeline, be respectively equipped on front arc clip and rear arc clip to A few threaded hole, is threadably secured in threaded hole and is equipped with the clamping screw that inner end is withstood on pipeline, left horizontal location The right part of plate is equipped with left semicircle slot, and the left part of right horizontal location plate is equipped with right semi-circle slot, and left semicircle slot and right semi-circle slot are to one Rise and correspond to and be sleeved on pipeline, left horizontal location plate and right horizontal location panel seat on front arc clip and rear arc clip simultaneously It holds out against in the bottom of floor.
Here is the further optimization and/or improvements to above-mentioned utility model technical solution:
The outer end of above-mentioned left horizontal location plate and right horizontal location plate is equipped with handle vertically downward.
The right part of the left semicircle slot of above-mentioned left horizontal location plate extends to form left elongated slot, and the left part of right horizontal location plate extends Right elongated slot is formed, left horizontal location plate and right horizontal location plate are fixed together from top to bottom.
The inner end of above-mentioned clamping screw is equipped with groove, and arc rubber corresponding with pipeline radian is equipped in groove Plate.
The outside of above-mentioned rear arc clip is equipped with groove, and the horizontal guiding ruler that can stretch out groove is hingedly equipped in groove.
The other end of above-mentioned front arc clip and rear arc clip is equipped with lug, and two lugs are fixed by fastening bolt It is installed together.
The utility model reasonable and compact in structure, it is easy to use, when operation, by left horizontal location plate and right horizontal location plate The bottom of floor is withstood on, front arc clip and rear arc clip are then withstood on into left horizontal location plate and right horizontal location board bottom Then portion withstands on clamping screw on pipeline, thus hold out against left horizontal location plate and right horizontal location plate at the bottom of floor Portion, then front arc clip and rear arc clip are fixed, it finally can be carried out concrete perfusion operation, in this way, just reducing Concrete bottom is sagging to cause the out-of-flatness of board bottom face, uncompacted phenomenon, improves pouring quality.Pass through left water setting up and down Flat positioning plate and right horizontal location plate more convenient can operate, be improved work efficiency.By the way that arc rubber slab is arranged It withstands on pipeline, the damage to pipeline can be reduced.By the way that horizontal guiding ruler is arranged, levelness can be adjusted in operation, to mention The high quality of concrete perfusion.
Detailed description of the invention
Attached drawing 1 is the schematic view of the front view of the utility model.
Attached drawing 2 is the overlooking structure diagram of left horizontal location plate in the utility model.
Attached drawing 3 is the connection schematic diagram of clamping screw and arc rubber slab in the utility model.
Coding in attached drawing is respectively as follows: 1 for floor, and 2 be pipeline, and 3 be left horizontal location plate, and 4 be right horizontal location plate, and 5 It is front arc clip for reserving hole, 6,7 be clamping screw, and 8 be left semicircle slot, and 9 be handle, and 10 be left elongated slot, and 11 be arc Rubber slab, 12 be lug, and 13 be clamping screw.
Specific embodiment
The utility model is not limited by following embodiments, can technical solution according to the present utility model and actual conditions Determine specific embodiment.
In the present invention, for ease of description, the description of the relative positional relationship of each component is according to specification The Butut mode of attached drawing 1 is described, such as: the positional relationship of upper and lower, left and right is the Butut according to Figure of description 1 Direction determines.
The utility model is further described below with reference to examples and drawings:
As shown in attached drawing 1,2,3, which includes floor 1, pipeline 2, fixture, left horizontal location Plate 3 and right horizontal location plate 4 are equipped with reserving hole 5 on floor 1, are equipped with pipeline 2 in reserving hole 5, pipeline 2 and reserved There is spacing between hole 1, fixture includes front arc clip 6 and rear arc clip, one end of front arc clip 6 and rear arc clip It is hingedly mounted on together, the other end of front arc clip 6 and rear arc clip is fixedly installed togather, and front arc clip 6 is with after Arc-shaped clamp is sleeved on 2 outside of pipeline, is respectively equipped at least one threaded hole on front arc clip 6 and rear arc clip, It is threadably secured in threaded hole and the clamping screw 7 that inner end is withstood on pipeline 2 is installed, the right part of left horizontal location plate 3 is equipped with Left semicircle slot 8, the left part of right horizontal location plate 4 are equipped with right semi-circle slot, and left semicircle slot 8 to together with and corresponds to set with right semi-circle slot On pipeline 2, left horizontal location plate 3 and right horizontal location plate 4 are on front arc clip 6 and rear arc clip and hold out against The bottom of floor 1.When operation, left horizontal location plate 3 and right horizontal location plate 4 are withstood on to the bottom of floor 1, then by front arc Clip 6 and rear arc clip withstand on left horizontal location plate 3 and right 4 bottom of horizontal location plate, and clamping screw 7 is then withstood on pipeline On 2, thus left horizontal location plate 3 and right horizontal location plate 4 are held out against in the bottom of floor 1, then by front arc clip 6 with after Arc-shaped clamp fixes, and finally can be carried out concrete perfusion operation, in this way, just reducing, concrete bottom is sagging to cause plate Bottom surface out-of-flatness, uncompacted phenomenon, improve pouring quality.
Above-mentioned construction Pipe leakage stopper can be made further optimization and/or improvements according to actual needs:
As shown in Fig. 1, the outer end of left horizontal location plate 3 and right horizontal location plate 4 is equipped with handle 9 vertically downward. In this way convenient for operation.
As shown in attached drawing 1,2, the right part of the left semicircle slot 8 of left horizontal location plate 3 extends to form left elongated slot 10, right horizontal fixed The left part of position plate 4 extends to form right elongated slot, and left horizontal location plate 3 and right horizontal location plate 4 are fixed together from top to bottom.Pass through Left horizontal location plate 3 setting up and down and right horizontal location plate 4 more convenient can operate, be improved work efficiency.
As shown in Fig. 3, the inner end of clamping screw 7 is equipped with groove, is equipped in groove corresponding with 2 radian of pipeline Arc rubber slab 11.It is withstood on pipeline 2 by the way that arc rubber slab 11 is arranged, the damage to pipeline 2 can be reduced.
As needed, the outside of rear arc clip is equipped with groove, and the level that can stretch out groove is hingedly equipped in groove Guiding ruler.By the way that horizontal guiding ruler is arranged, levelness can be adjusted in operation, to improve the quality of concrete perfusion.
As shown in Fig. 1, in order to facilitate the installation of, the other end of front arc clip 6 and rear arc clip is equipped with lug 12, Two lugs 12 are fixedly installed togather by fastening bolt 13.
The above technical characteristic constitutes the most preferred embodiment of the utility model, with stronger adaptability and best implementation Effect can increase and decrease non-essential technical characteristic, according to actual needs to meet the needs of different situations.

Claims (10)

1. a kind of construction Pipe leakage stopper, it is characterised in that including floor, pipeline, fixture, left horizontal location plate and the right side Horizontal location plate is equipped with reserving hole on floor, pipeline is equipped in reserving hole, between having between pipeline and reserving hole It include front arc clip and rear arc clip away from, fixture, one end of front arc clip and rear arc clip is hingedly mounted on together, The other end of front arc clip and rear arc clip is fixedly installed togather, and front arc clip and rear arc hoop sleeve are mounted in pipeline Outside is respectively equipped at least one threaded hole on front arc clip and rear arc clip, is threadably secured in threaded hole The clamping screw that inner end is withstood on pipeline is installed, the right part of left horizontal location plate is equipped with left semicircle slot, right horizontal location plate Left part is equipped with right semi-circle slot, and left semicircle slot and right semi-circle slot are to together with and correspondence is sleeved on pipeline, left horizontal location plate and Right horizontal location panel seat is on front arc clip and rear arc clip and holds out against in the bottom of floor.
2. construction Pipe leakage stopper according to claim 1, it is characterised in that left horizontal location plate and right level The outer end of positioning plate is equipped with handle vertically downward.
3. construction Pipe leakage stopper according to claim 1 or 2, it is characterised in that left the half of left horizontal location plate The right part of circular groove extends to form left elongated slot, and the left part of right horizontal location plate extends to form right elongated slot, left horizontal location plate and You Shui Flat positioning plate is fixed together from top to bottom.
4. construction Pipe leakage stopper according to claim 1 or 2, it is characterised in that the inner end of clamping screw is equipped with Groove is equipped with arc rubber slab corresponding with pipeline radian in groove.
5. construction Pipe leakage stopper according to claim 3, it is characterised in that the inner end of clamping screw is equipped with recessed Slot is equipped with arc rubber slab corresponding with pipeline radian in groove.
6. construction Pipe leakage stopper described according to claim 1 or 2 or 5, it is characterised in that outside rear arc clip Side is equipped with groove, and the horizontal guiding ruler that can stretch out groove is hingedly equipped in groove.
7. construction Pipe leakage stopper according to claim 3, it is characterised in that the outside of rear arc clip is equipped with Groove is hingedly equipped with the horizontal guiding ruler that can stretch out groove in groove.
8. construction Pipe leakage stopper according to claim 4, it is characterised in that the outside of rear arc clip is equipped with Groove is hingedly equipped with the horizontal guiding ruler that can stretch out groove in groove.
9. construction Pipe leakage stopper described according to claim 1 or 2 or 5 or 7 or 8, it is characterised in that front arc card The other end of hoop and rear arc clip is equipped with lug, and two lugs are fixedly installed togather by fastening bolt.
10. construction Pipe leakage stopper according to claim 6, it is characterised in that front arc clip and rear arc card The other end of hoop is equipped with lug, and two lugs are fixedly installed togather by fastening bolt.
CN201920020994.1U 2019-01-07 2019-01-07 Construction Pipe leakage stopper Expired - Fee Related CN209495067U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920020994.1U CN209495067U (en) 2019-01-07 2019-01-07 Construction Pipe leakage stopper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920020994.1U CN209495067U (en) 2019-01-07 2019-01-07 Construction Pipe leakage stopper

Publications (1)

Publication Number Publication Date
CN209495067U true CN209495067U (en) 2019-10-15

Family

ID=68155042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920020994.1U Expired - Fee Related CN209495067U (en) 2019-01-07 2019-01-07 Construction Pipe leakage stopper

Country Status (1)

Country Link
CN (1) CN209495067U (en)

Similar Documents

Publication Publication Date Title
CN204510556U (en) A kind of dry-hang ceramic plate curtain wall pendant system
CN204418673U (en) A kind of adjustable form reinforcement tools suitable for reading
CN215631660U (en) Mould hanging tool of aluminum alloy template supporting system
CN209495067U (en) Construction Pipe leakage stopper
CN201610978U (en) Pipe rack convenient for installing and repairing multilayer pipeline
CN205857693U (en) A kind of canalization template being applied to movement joint both sides shear wall synchronous construction
CN203701597U (en) Outer wall formwork supporting and bearing device
CN210289136U (en) Required mould sealing device of assembled frame column root slip casting
CN204112729U (en) Pipe well inner sleeve reserves fixed support
CN206844653U (en) A kind of pipeline through-flooring steel sleeve is accurately positioned component
CN206245741U (en) New hole embedded tool
CN211369548U (en) Waterproof anti-bank hangs mould mounting fixture
CN203846655U (en) Short-cantilever dry-hanging device of stone curtain wall
CN204418670U (en) The sealing concrete pad used in a kind of building operations
CN206034709U (en) Energy -saving curtain based on steel aluminium cover core and orientation angle sign indicating number
CN209874074U (en) Porous inclined plane slip casting embedded pipe
CN209723610U (en) A kind of pipeline that adjustable recycles hangs mould
CN209637214U (en) A kind of tooling for hanging hole template for installing plumbing standpipe
CN202577975U (en) Clamping apparatus for right-angled die plate
CN212480374U (en) Water stop pipe joint
CN205476452U (en) Connection structure of shear force wall and floor
CN216553048U (en) Scalable fast branch quick detach hangs hole support frame for building
CN204826220U (en) Location built -in fitting with U type groove
CN102720288A (en) Method for connecting solderless curtain wall dry pendant
CN212613727U (en) Be applied to mould shell of close rib structure superstructure building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191015

Termination date: 20210107

CF01 Termination of patent right due to non-payment of annual fee