It accurately connects convergent belt device and scoops out and prepare convergent belt device and bonding machine
Technical field
The utility model relates to solar cell module preparation equipment technical fields, more particularly to one kind accurately to connect confluence
It band device and scoops out and prepares convergent belt device and bonding machine.
Background technique
With the extensive application of the efficient component of MBB, the three outlet version types confluence tape welding machine of half component becomes market
Product just is needed, and the automatic technology of the equipment also develops rapidly, 2016, we had developed double outlet component version types
Convergent belt and battery strings automatic welding device, in the device, we have proposed " scoop out device and EPE film supply preparation facilities
And convergent belt preparation facilities and bonding machine " patented technology, Patent No.: 201721514749.3.
In the art, it is arranged by the way that device will be scooped out to the lower end for the placement work base station for putting EPE film, convergent belt,
In EPE film hand, drawstring hand when placing EPE film, convergent belt, EPE film, convergent belt are scooped out by sucker, later, accurately put
On the workbench or base station for setting EPE film, convergent belt, during being stated using the skill, for scooping out EPE film and accurately placing
It is what there is no problem.
But when scooping out placement convergent belt, because convergent belt is longer and light, convergent belt is easy to offset and influence with limited post
Positioning accuracy brings adverse effect to the subsequent operation of component to influence welding quality.
Summary of the invention
It is necessary to propose that one kind accurately connects convergent belt device.
It there is a need to propose that one kind scoops out to prepare convergent belt device.
It there is a need to propose a kind of bonding machine.
A kind of accurately to connect convergent belt device, including tape splicing component, pressure zone component, the setting of tape splicing component scoops out the logical of convergent belt
Road, pressure zone component are set to the end of tape splicing component, and pressure zone component includes pressure zone driving mechanism and rotation press belt mechanism, and pressure zone drives
The telescopic end connection rotation press belt mechanism of motivation structure, to drive rotation press belt mechanism rotation, rotation press belt mechanism setting, which compresses, to converge
The compact heap of band is flowed, to compress to convergent belt.
One kind, which scoops out, prepares convergent belt device, and described scoop out prepares convergent belt device according to outlet version type spy in half component
Point, middle outlet include three groups of outlets altogether, and three groups of outlets are respectively the short convergent belt L-type outlet in both ends and intermediate convergent belt U two groups long
Type outlet, described scoop out prepare convergent belt device including accurately connecing convergent belt device and two groups of long confluences of storings preparation described in two groups
Band device, two groups of storings prepare long convergent belt device and are arranged along the length direction of the convergent belt of placement, and two groups accurately connect confluence
Be respectively arranged to put with device and prepare the both ends of long convergent belt device, accurately connect convergent belt device for place on the left of short confluence
Band, the short convergent belt in right side, storing prepare long convergent belt device for placing left long convergent belt, right long convergent belt, every group of storing system
Standby long convergent belt device includes the two pressure zone components and a tape splicing component for accurately connecing convergent belt device, two pressures
The both ends of a tape splicing component are set to component, wherein the convergent belt device that accurately connects is described accurately to connect remittance
Stream band device.
A kind of bonding machine including rack, the convergent belt feedway being installed in rack, arrangement convergent belt device and scoops out
Convergent belt device is prepared, convergent belt feedway connects for supplying convergent belt, arrangement convergent belt device for arranging that confluence is taken to
It should prepare on convergent belt device, scooping out and preparing convergent belt device is that described scooping out prepares convergent belt device.
The utility model, can be to pre-placing by centering tape splicing component and pressure zone component in the accurate convergent belt dress that connects
Convergent belt accurately scooped out and compressed, for subsequent convergent belt preparation be ready, very well satisfy determining for convergent belt
Position preparation requires, and improves the degree of automation of convergent belt and battery strings interconnection welding equipment.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the three outlet component version type convergent belt of half before preparation.
Fig. 2 is the axis side structure schematic diagram for accurately connecing state before convergent belt device works.
Fig. 3 is the left view for accurately connecing convergent belt device.
Fig. 4 is the axis side structure schematic diagram for accurately connecing state when convergent belt device scoops out short convergent belt.S1 is tape splicing
The moving direction of component, S2 are the moving direction of pressure zone component.
Fig. 5 is the axis side structure schematic diagram for accurately connecing convergent belt device and scooping out the state after short convergent belt.
Fig. 6 is accurately to connect convergent belt device to scoop out the axis side structure schematic diagram for returning to position after short convergent belt.
Fig. 7 is accurately to connect convergent belt device and be set to scoop out the position axis side structure schematic diagram for preparing convergent belt device.
Fig. 8 is after hiding rack section structure, and the convergent belt feedway arranges convergent belt device and scoops out preparation and converges
Flow the location diagram with device in bonding machine.
In figure: accurately connect convergent belt device 10, tape splicing component 11, tape splicing seat 111, tape splicing base station 112, limited post 1121,
Fixed plate 113, the first cylinder 114, drive rod 115, guide rail 116, sliding block 117, pressure zone component 12, the second cylinder 121, motion bar
122, attachment base 123, connection shaft seat 124, fork plate 125, first rotating shaft 126, compact heap 127, the second shaft 128, storing preparation
Long convergent belt device 21 scoops out that prepare convergent belt device 30, convergent belt feedway 40, arrangement convergent belt device 50, left side short
Convergent belt 601, the short convergent belt 602 in right side, left long convergent belt 603, right long convergent belt 604, bonding machine 100.
Specific embodiment
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment
Attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is some embodiments of the utility model, for this
For the those of ordinary skill of field, without creative efforts, it can also be obtained according to these attached drawings others
Attached drawing.
Referring to Fig. 1 to Fig. 6, the utility model embodiment provides one kind and accurately connects convergent belt device 10, including tape splicing group
The channel for scooping out convergent belt is arranged in part 11, pressure zone component 12, tape splicing component 11, and pressure zone component 12 is set to the end of tape splicing component 11
Portion, pressure zone component 12 include pressure zone driving mechanism and rotation press belt mechanism, the telescopic end connection rotation pressure zone of pressure zone driving mechanism
Mechanism, to drive rotation press belt mechanism rotation, rotation press belt mechanism setting compresses the compact heap 127 of convergent belt, to convergent belt
It compresses.
Further, tape splicing component 11 includes tape splicing seat 111, tape splicing base station 112, fixed plate 113, the first cylinder 114, driving
Bar 115, guide rail 116, sliding block 117, tape splicing base station 112 are fixedly installed on tape splicing seat 111, and setting is used on tape splicing base station 112
The channel of convergent belt is scooped out, for fixed plate 113 for connecting with external rack, the first cylinder 114 and guide rail 116 are all set in fixation
On plate 113, the lower end of drive rod 115 and the telescopic end of cylinder are connected, and upper end is fixedly connected with the lower surface of tape splicing base station 112,
Sliding block 117 is slidably connected with guide rail 116, to control 112 edge of tape splicing base station by the first cylinder 114, drive rod 115, sliding block 117
Guide rail 116 slide up and down movement, the pressure zone driving mechanism of the pressure zone component 12 is fixedly connected with tape splicing seat 111.
Cylinder drives drive rod 115 to move up and down, with drive tape splicing base station 112 and pressure zone component 12 synchronize move up and down,
Tape splicing base station 112 moves up, and for scooping out convergent belt, convergent belt is placed on the channel of tape splicing base station 112, and adsorbent equipment will
Then convergent belt absorption positioning rotates press belt mechanism driving compact heap 127 and rotates, the compact heap 127 of rotating down pressing is to convergent belt
Compressed, exhaust hood drive tape splicing base station 112 and rotation press belt mechanism move down, set back.
Further, several limited posts 1121 are also set on tape splicing base station 112, and the formation of limited post 1121 being oppositely arranged is set
Put the channel of convergent belt.
Further, the pressure zone driving mechanism of the pressure zone component 12 includes the second cylinder 121, motion bar 122, attachment base
123, connection shaft seat 124, the lower end of motion bar 122 are connect with the telescopic end of the second cylinder 121, and upper end and rotation press belt mechanism connect
Connect, the second cylinder 121 is fixedly connected with attachment base 123, connection shaft seat 124 be connected to attachment base 123 and tape splicing base station 112 it
Between, it is moved up and down with realizing that pressure zone driving mechanism is synchronous with tape splicing base station 112;The rotation press belt mechanism of the pressure zone component 12
Including fork plate 125, first rotating shaft 126, compact heap 127, the second shaft 128, the lower end of fork plate 125 and the work of pressure zone driving mechanism
Lever 122 connects, and first rotating shaft 126 is set to the upper end of fork plate 125, and the second shaft 128 is connect with tape splicing base station 112, described
The lower end of compact heap 127 and first rotating shaft 126 are rotatablely connected, and upper end and the second shaft 128 are rotatablely connected, to pass through the second cylinder
121 drive compact heap 127 to rotate around the second shaft 128, realize the compression to convergent belt.
Further, the end setting of the compact heap 127 compresses the lower surface of convergent belt.
Further, one layer of flexible cover sheet is arranged in the lower surface that the compact heap 127 is used to compress convergent belt, avoids compressing
Confluence belt surface is scratched when 127 compression of block acts.
Referring to Fig. 7, the utility model also proposes that one kind scoops out and prepares convergent belt device 30, and described scoop out prepares convergent belt dress
30 are set according to outlet version type feature in half component, middle outlet includes three groups of outlets altogether, and three groups of outlets are respectively the short confluence in both ends
Band L-type outlet and the U-shaped outlet of intermediate two groups long convergent belt, described scoop out prepare convergent belt device 30 including accurately connecing described in two groups
Convergent belt device 10 and two groups of storings prepare long convergent belt device 21, and two groups of storings prepare long convergent belt device 21 along placement
The length direction of convergent belt is arranged, and two groups accurately connect convergent belt device 10 and are respectively arranged at storing and prepare long convergent belt device 21
Both ends, accurately connect convergent belt device 10 for place the short convergent belt 601 in left side, the short convergent belt 602 in right side, put that preparation is long to converge
For band device 21 for placing left long convergent belt 603, right long convergent belt 604, it includes institute that every group of storing, which prepares long convergent belt device 21,
The two pressure zone components 12 and a tape splicing component 11 for accurately connecing convergent belt device 10 are stated, two pressure zone components 12 are set to
The both ends of one tape splicing component 11, wherein the convergent belt device 10 that accurately connects is described accurately to connect convergent belt device
10。
Referring to Fig. 8, the utility model also proposes a kind of bonding machine 100, supplies including rack, the convergent belt being installed in rack
It to device 40, arrangement convergent belt device 50 and scoops out and prepares convergent belt device 30, convergent belt feedway 40 is for supplying confluence
Band, arrangement convergent belt device 50 prepare convergent belt device 30 for arranging that confluence is taken to scoop out, scoop out and prepare convergent belt device
30 prepare convergent belt device 30 for above-mentioned scooping out.
The utility model also proposes a kind of method for accurately connecing convergent belt, and subject of implementation accurately connects convergent belt for described
Device 10, comprising the following steps:
Step 1: convergent belt being placed on the tape splicing base station 112 of tape splicing component 11, the first cylinder 114 of tape splicing component 11
Movement drives tape splicing base station 112 to rise, convergent belt is caught and is placed in the channel of tape splicing base station 112;
Step 2: the second cylinder 121 movement of pressure zone component 12, driving compact heap 127 are revolved to the direction of tape splicing base station 112
Turn, be pressed to compact heap 127 convergent belt on tape splicing base station 112;
Step 3: the movement of the first cylinder 114 of tape splicing component 11, by pressure zone component 12, tape splicing base station 112 and its on
Convergent belt decline, restore to system band workbench height.
Module or unit in the utility model embodiment device can be merged according to actual needs, divide and be deleted
Subtract.
Above disclosures are merely preferred embodiments of the utility model, the utility model cannot be limited with this certainly