CN209486945U - A kind of real training concrete prefabricated element mounting platform - Google Patents
A kind of real training concrete prefabricated element mounting platform Download PDFInfo
- Publication number
- CN209486945U CN209486945U CN201820424684.1U CN201820424684U CN209486945U CN 209486945 U CN209486945 U CN 209486945U CN 201820424684 U CN201820424684 U CN 201820424684U CN 209486945 U CN209486945 U CN 209486945U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- connecting plate
- strip groove
- real training
- connection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Toys (AREA)
Abstract
The utility model relates to build real training field, especially a kind of real training concrete prefabricated element mounting platform, including bottom plate, connecting plate and prefabricated components, the strip groove of more than two parallel interval arrangements is offered on the bottom plate, the cross section of the strip groove is inverted T-type structure, the connecting plate is connect by connecting bolt with bottom plate, the bolt head is fastened in strip groove to be slidably matched with strip groove composition, the upper surface of the connecting plate is vertically provided with more reinforcing bar plugs, the lower end surface of the prefabricated components is equipped with jack corresponding with reinforcing bar plug, the utility model can be at enterprise scene and school development training base towards students, enterprise staff, the teaching, training of the progress assembled architecture such as lifting operation administrative staff.
Description
Technical field
The utility model relates to build real training field, specific field is that a kind of installation of real training concrete prefabricated element is flat
Platform.
Background technique
Country pushes occupation constitution transition and upgrade, wherein being by the building industrialization of main contents of assembled architecture
Some or all of building component has exactly been prefabricated in the factory by one of prior development direction of future architecture, assembled architecture
At, it then transports to construction site, component is assembled into the building built up by reliable connection type, and precast concrete structure
Part (PC component) is in factory or the live building of pre-production or the concrete component of structures, using assembly concrete
Structure has many advantages, such as to save labour, overcomes seasonal effect, energy-saving and emission-reduction, promotes prefabricated concrete structure, is to realize to build
Build one of industrialized important channel.
Assembled architecture is also in primary developing stage in China, and specialized technology construction team also quite lacks, phase
School is closed also not dedicated for the facilities and equipment of training, the exploitation of real training mounting platform is conducive to change and this situation, fills out
The blank of assembled architecture teaching, training model construction is mended, real training mounting platform takes up an area less, and investment is small, can be existing in enterprise
, specialization can also be carried out towards students, enterprise staff, lifting operation administrative staff etc. with school development training base
Training, contribute for the development of assembled architecture.
Utility model content
The purpose of this utility model is to provide a kind of real training concrete prefabricated element mounting platforms, can be existing in enterprise
Field and school development training base are towards the progress assembled architecture such as students, enterprise staff, lifting operation administrative staff
Teaching, training.
To achieve the above object, the utility model provides the following technical solutions: a kind of real training is pacified with concrete prefabricated element
Assembling platform, it is characterised in that: including bottom plate, connecting plate and prefabricated components, more than two parallel intervals are offered on the bottom plate
The strip groove of arrangement, the cross section of the strip groove are inverted T-type structure, and the connecting plate is connect by connecting bolt with bottom plate,
The bolt head of the bolt is fastened in strip groove to be slidably matched with strip groove composition, and the upper surface of the connecting plate is vertically arranged
There are more reinforcing bar plugs, the lower end surface of the prefabricated components is equipped with jack corresponding with reinforcing bar plug.
Preferably, the bolt head of the connection bolt is rectangle.
Preferably, the connecting plate includes the connecting plate ontology of rectangle and the company for being distributed in four corners of connecting plate ontology
Auxiliary plate is connect, connecting hole is offered on the auxiliary plate of connection, connection bolt is fixed after passing through the connecting hole with nut cooperation.
Preferably, the connecting plate includes the connecting plate ontology of rectangle and is symmetrically distributed in four of connecting plate ontology two sides
Auxiliary plate is connected, connecting hole is offered on the auxiliary plate of connection, connection bolt is fixed after passing through the connecting hole with nut cooperation.
Preferably, the connecting plate ontology passes through welding manner connection with auxiliary plate is connect.
Preferably, the prefabricated components include four prefabricated posts and a precast shear wall, four prefabricated posts installation
In four corners of platform, the precast shear wall is parallel with strip groove and is mounted between two prefabricated posts.
It preferably, further include four prefabricated crossbeams and one piece of installation template, four prefabricated crossbeams are erected at four in advance
The top of column processed simultaneously surrounds a rectangle, and the installation template is arranged in the square that four prefabricated crossbeams surround by support frame
Among shape.
Compared with prior art, the utility model has the beneficial effects that a kind of real training coagulation provided by the utility model
Native prefabricated components mounting platform has filled up the blank of assembled architecture teaching, training model construction, which takes up an area
Few, investment is small, can also be made with school development training base towards students, enterprise staff, lifting at enterprise scene
Industry administrative staff etc. carry out the training of specialization, contribute for the development of assembled architecture.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the utility model partial structure diagram;
Fig. 3 is the utility model partial structure diagram;
Fig. 4 is the structural schematic diagram of connecting plate in the utility model;
Fig. 5 is the bottom view of prefabricated post in the utility model.
In figure: 1 bottom plate, 11 strip grooves, 2 connecting plates, 21 reinforcing bar plugs, the auxiliary plate of 22 connections, 23 connecting holes, 3 prefabricated structures
Part, 31 prefabricated posts, 311 jacks, 32 precast shear walls, 4 connection bolts, 5 prefabricated crossbeams, 6 installation templates, 7 support frames.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Please refer to Fig. 1-5, the utility model provides a kind of technical solution: a kind of real training concrete prefabricated element installation is flat
Platform, including bottom plate 1, connecting plate 2 and prefabricated components 3 offer the strip groove 11 of more than two parallel intervals arrangements on bottom plate 1,
The cross section of strip groove 11 is inverted T-type structure, and connecting plate 2 is connect by connecting bolt 4 with bottom plate 1, the bolt head card of bolt 4
System is slidably matched in strip groove 11 with the composition of strip groove 11, and the upper surface of connecting plate 2 is vertically provided with more reinforcing bar plugs 21,
The lower end surface of prefabricated components 3 is equipped with jack 311 corresponding with reinforcing bar plug 21, and in the present embodiment, prefabricated components 3 are four
Prefabricated post 31 and a precast shear wall 32, each prefabricated post 31 and 32 bottom of precast shear wall are designed with jack 311, are needing
At the position for installing prefabricated post 31 and precast shear wall 32, upper junction plate 2, a prefabricated post 31 and a connecting plate 2 are installed
Corresponding, a precast shear wall 32 can be corresponding with two to three connecting plates 2, to guarantee the stabilization and peace of precast shear wall 32
Entirely, then prefabricated post 31 and precast shear wall 32 are vertically inserted on corresponding connecting plate 2, four prefabricated posts 31 are mounted on flat
Four corners of platform, precast shear wall 32 is parallel with strip groove and is mounted between two prefabricated posts 31, in four prefabricated posts
31 and precast shear wall 32 side be provided with oblique pull support, can prevent prefabricated post 31 and precast shear wall 32 from collapsing.
Further, a kind of real training concrete prefabricated element mounting platform provided in this embodiment further includes four prefabricated
Crossbeam 5 and one piece of installation template 6, four prefabricated crossbeams 5 are erected at the top of four prefabricated posts 31 and surround a rectangle, installation
Template 6 is arranged among the rectangle that four prefabricated crossbeams 5 surround by support frame 7.
In the present invention, the bolt head for connecting bolt 4 is rectangle, and connection bolt 4 is upside down in strip groove 11, puts
It when setting connection bolt 4, keeps bolt head parallel with strip groove 11, can be convenient and quickly inject bolt head in strip groove 11,
Then connection bolt 4 is rotated by 90 °, bolt head is vertical with strip groove 11, and bolt head can be fastened on inside strip groove 11.
Further, the connecting plate ontology of connecting plate 2 including rectangle and the connection welded together with connecting plate ontology are auxiliary
Plate 22 connects and offers connecting hole 23 on auxiliary plate 22, and connection bolt 4 is fixed after passing through connecting hole 23 with nut cooperation.
Wherein, when the equivalent width of spacing and 2 ontology of connecting plate between two adjacent strip grooves 11, auxiliary plate is connected
22 are welded on four corners of 2 ontology of connecting plate, corresponding with strip groove 11 to keep connecting the connecting hole 23 on auxiliary plate 22, square
It will pass through connection bolt 4 to connect;When the spacing between two adjacent strip grooves 11 is greater than the width of 2 ontology of connecting plate, even
Auxiliary 22 transverse weld of plate is connect in the two sides of 2 ontology of connecting plate, for lengthening the entire length of connecting plate 2, to facilitate the auxiliary plate of connection
Connecting hole 23 on 22 can be corresponding with strip groove 11, for example, the spacing between two adjacent strip grooves 11 is 50cm, even
The width of 2 ontology of fishplate bar is 40cm, connects that auxiliary plate 22 is square and side length is 10cm, and the setting of connecting hole 23 is connecting auxiliary plate
22 center connects the two sides that auxiliary plate 22 is symmetrically welded at 2 ontology of connecting plate, two connecting holes 23 being located on the same line
Between spacing be just 50cm, can be with 11 Matching installation of strip groove;When the spacing between two adjacent strip grooves 11 is small
When the equivalent width of 2 ontology of connecting plate, connects auxiliary plate 22 and be vertically welded on the two sides of 2 ontology of connecting plate, and keep the same side
Two auxiliary plates 22 of connection 23 spacing of connecting hole it is consistent with 11 spacing of strip groove, so that connecting hole 23 is matched peace with strip groove 11
Dress.
Specific installation process: bottom plate 1 uses Steel-concrete Composite, band steel frame, and frame uses Q235 steel type,
Platform arrangement of reinforcement presses Deepen Design, platform setting demoulding, lifting built-in fitting, and quantity presses Deepen Design, reserved bar shaped when irrigation platform
Slot 11 selects sizeable connector according to prefabricated components 3, by connector according to build require by connect bolt 4 install
In the strip groove 11 of platform, wherein the connector can the two-way flexible movement in strip groove 11, can fit and meet various build
Size requirement, then prefabricated post 31 and precast shear wall 32 are inserted on connecting plate 2, then, four prefabricated posts 31 with
And the side setting oblique pull appropriate support of precast shear wall 32, it prevents from collapsing, when actually building, precast shear wall 32 and pre-
Between column 31 processed it is subsequent also can placing concrete, then four prefabricated crossbeams 5 are set up to the top for arriving prefabricated post 31, make prefabricated cross
The reinforcing bar of 5 end of beam is interspersed between the reinforcing bar reserved at the top of prefabricated post 31, is then set up support frame 7 in platform central, is being propped up
Installation template 6 is placed in the top of support 7, then ties the reinforcing bar of 5 end of prefabricated crossbeam and the reinforcing bar at 31 top of prefabricated post
It pricks, then is laid with one layer of reinforcing bar on 6 top of installation template, and by the reinforcing bar of 5 top of the reinforcing bar at the top of installation template 6 and prefabricated crossbeam
It is tied up, carries out concrete casting recently, installation template 6 under dropping back to concrete dry realizes entire installation and builds
Process.
A kind of real training provided by the utility model concrete prefabricated element mounting platform uses fabricated connection, installation
Process is simple and convenient, can fill up the blank of assembled architecture teaching, training model construction, and the real training is accounted for mounting platform
Ground lacks, and investment is small, can be at enterprise scene, can also be with school development training base, towards students, enterprise staff, lifting
Job management personnel etc. carry out the training of specialization, contribute for the development of assembled architecture.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (7)
1. a kind of real training concrete prefabricated element mounting platform, it is characterised in that: including bottom plate (1), connecting plate (2) and prefabricated
Component (3) offers the strip groove (11) of more than two parallel intervals arrangements on the bottom plate (1), the strip groove (11)
Cross section is inverted T-type structure, and the connecting plate (2) is connect by connecting bolt (4) with bottom plate (1), the bolt of the bolt (4)
Head is fastened on to constitute in strip groove (11) with strip groove (11) and be slidably matched, and the upper surface of the connecting plate (2) is vertically provided with
The lower end surface of more reinforcing bar plugs (21), the prefabricated components (3) is equipped with jack (311) corresponding with reinforcing bar plug (21).
2. a kind of real training concrete prefabricated element mounting platform according to claim 1, it is characterised in that: the connection
The bolt head of bolt (4) is rectangle.
3. a kind of real training concrete prefabricated element mounting platform according to claim 1, it is characterised in that: the connection
Plate (2) includes the connecting plate ontology of rectangle and the auxiliary plate of connection (22) for being distributed in four corners of connecting plate ontology, the connection
It is offered connecting hole (23) on auxiliary plate (22), connection bolt (4) passes through the connecting hole (23) and cooperates fixation with nut afterwards.
4. a kind of real training concrete prefabricated element mounting platform according to claim 1, it is characterised in that: the connection
Plate (2) includes the connecting plate ontology of rectangle and four auxiliary plates (22) of connection for being symmetrically distributed in connecting plate ontology two sides, the company
It connects and offers connecting hole (23) on auxiliary plate (22), connection bolt (4) passes through the connecting hole (23) and cooperates fixation with nut afterwards.
5. according to a kind of any real training concrete prefabricated element mounting platform of claim 3 or 4, it is characterised in that:
The connecting plate ontology passes through welding manner connection with auxiliary plate (22) is connect.
6. a kind of real training concrete prefabricated element mounting platform according to claim 1, it is characterised in that: described prefabricated
Component (3) includes four prefabricated posts (31) and a precast shear wall (32), and four prefabricated posts (31) are mounted on platform
Four corners, the precast shear wall (32) is parallel with strip groove and is mounted between two prefabricated posts (31).
7. a kind of real training concrete prefabricated element mounting platform according to claim 6, it is characterised in that: further include four
Root prefabricated crossbeam (5) and one piece of installation template (6), four prefabricated crossbeams (5) are erected at the top of four prefabricated posts (31)
And a rectangle is surrounded, the installation template (6) is arranged in the square that four prefabricated crossbeams (5) surround by support frame (7)
Among shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820424684.1U CN209486945U (en) | 2018-03-28 | 2018-03-28 | A kind of real training concrete prefabricated element mounting platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820424684.1U CN209486945U (en) | 2018-03-28 | 2018-03-28 | A kind of real training concrete prefabricated element mounting platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209486945U true CN209486945U (en) | 2019-10-11 |
Family
ID=68109774
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820424684.1U Active CN209486945U (en) | 2018-03-28 | 2018-03-28 | A kind of real training concrete prefabricated element mounting platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209486945U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108335558A (en) * | 2018-03-28 | 2018-07-27 | 江苏城乡建设职业学院 | A kind of real training concrete prefabricated element mounting platform |
-
2018
- 2018-03-28 CN CN201820424684.1U patent/CN209486945U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108335558A (en) * | 2018-03-28 | 2018-07-27 | 江苏城乡建设职业学院 | A kind of real training concrete prefabricated element mounting platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108335558A (en) | A kind of real training concrete prefabricated element mounting platform | |
CN110056092B (en) | Connecting structure of bolting-inserting type upper and lower prefabricated shear walls and superimposed sheet and construction method | |
CN206053131U (en) | Precast floor slab steel reinforcement cage component and floor | |
CN201953070U (en) | Repeatedly usable assembly type processing shed on building construction sites | |
CN103572834A (en) | Large-span arch structure and construction method thereof | |
CN110067383B (en) | Closely knit type composite form of construction beam column concrete placement | |
CN209486945U (en) | A kind of real training concrete prefabricated element mounting platform | |
CN105401960B (en) | A kind of mould bases and its construction method for the construction of railway tunnel inverted arch | |
CN203759976U (en) | Detachable teaching model for overhead formwork construction | |
CN205063965U (en) | A die carrier for construction of railway tunnel inverted arch | |
CN208845309U (en) | The support platform and wind power generating set of tower | |
CN205077686U (en) | Close girt strip board construction structures based on -in -place mould | |
CN207244961U (en) | A kind of Prefabricated stacking floor with side flanging for being used to drop plate region | |
CN210827109U (en) | Arc-shaped stepped cable tower cross beam side template | |
CN209907886U (en) | Adjustable assembled stair construction platform | |
CN203175134U (en) | Truss used for lifting electric transmission line tower connecting legs | |
CN207244957U (en) | A kind of modularization Prefabricated stacking floor for being used to drop plate region | |
CN207189930U (en) | A kind of mould for being used to make prefabricated components | |
CN207244960U (en) | A kind of Prefabricated stacking floor with tool-typed formwork for being used to drop plate region | |
CN204110668U (en) | A kind of modularization can assemble spherical tank associating ladder landing platform | |
CN203795461U (en) | Profile steel platform of tool type tower crane | |
CN216892502U (en) | Iron tower basis built-in fitting installation positioner | |
CN219754107U (en) | Reinforced beam concrete pouring shaping device | |
CN208501685U (en) | A kind of reverse construction steel pipe column positioning device | |
CN220908719U (en) | Steel construction frame pre-buried formula base |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210608 Address after: Room 1601, No.94, Heping North Street, Heping District, Shenyang, Liaoning 110000 Patentee after: Source teaching assistant (Shenyang) Technology Co.,Ltd. Address before: 213147 No.1 Heyu Road, Yincun Vocational Education Park, Zhonglou District, Changzhou City, Jiangsu Province Patentee before: JIANGSU URBAN AND RURAL CONSTRUCTION College |
|