CN209482675U - A kind of construction hoisting operation framing scaffold - Google Patents
A kind of construction hoisting operation framing scaffold Download PDFInfo
- Publication number
- CN209482675U CN209482675U CN201920181863.1U CN201920181863U CN209482675U CN 209482675 U CN209482675 U CN 209482675U CN 201920181863 U CN201920181863 U CN 201920181863U CN 209482675 U CN209482675 U CN 209482675U
- Authority
- CN
- China
- Prior art keywords
- fixed
- support plates
- group
- hole
- same group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a kind of construction hoisting operation framing scaffolds, including eight support plates, four support plates of same level are one group, two the second installing taches are respectively and fixedly provided on one end side wall of four support plates in same group, the first installing tache is respectively and fixedly provided on the other end side wall of four support plates in same group, brace is rotatably connected between the opposing sidewalls of two of them support plate in same group, and two braces are arranged in a crossed manner, two fixed blocks are respectively and fixedly provided in the opposing sidewalls of same group of other two support plate, opening is equipped on four fixed blocks, two openings of the same end are one group, through equipped with limited block in two openings in same group.The utility model solves the problems, such as that present scaffold builds that process is tedious, simplifies and builds step by the improvement to construction scaffolding, time saving and energy saving, improves and builds efficiency, reduce labor intensity, improve stability, reduce cost of labor, is easy to use.
Description
Technical field
The utility model relates to technical field of building construction more particularly to a kind of construction hoisting operation framing scaffolds.
Background technique
Scaffold is to guarantee each work progress is gone on smoothly and is set up workbench.It is divided by the position set up outer
Scaffold, internal scaffolding;Timber scaffolding, bamboo scaffolding, steel pipe scaffold can be divided by material difference;It is divided by structural form vertical
Rod-type scaffold, door-type scaffold, swinging scaffold, suspended scaffold, chooses formula scaffold, climbs formula foot hand bridge scaffold
Frame.
But existing scaffold builds that process is tedious, and it is slow to build speed, and it is time-consuming and laborious, and stability is poor, leads to work
Make inefficiency, improve labor intensity, increase cost of labor, for this purpose, it is proposed that a kind of construction lifting construction
Scaffold solves the above problems.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and a kind of construction proposed is used
Hoisting operation framing scaffold.
To achieve the goals above, the utility model adopts the technical scheme that
Four support plates of a kind of construction hoisting operation framing scaffold, including eight support plates, same level are
Two the second installing taches, four branch in same group are respectively and fixedly provided on one end side wall of four support plates in one group, same group
It is respectively and fixedly provided with the first installing tache on the other end side wall of fagging, turns between the opposing sidewalls of the two of them support plate in same group
It is dynamic to be connected with brace, and two braces are arranged in a crossed manner, are respectively and fixedly provided with two in the opposing sidewalls of same group of other two support plate
A fixed block, is equipped with opening on four fixed blocks, two openings of the same end in two openings in one group, same group
Through limited block is equipped with, the upper end of two limited blocks in same group is fixed with connecting plate, the one end of the fixed block jointly
It being all provided on wall there are four the second tapped through hole, the limited block is equipped with third tapped through hole corresponding with the second tapped through hole,
Through the first screw is equipped in second tapped through hole, one end of first screw is extended in third tapped through hole.
Preferably, the lower end of two support plates of the same side is fixed with fixed plate jointly, runs through in two fixed plates and sets
There is a screw thread ground pile, it is jointly fixed there are two placement plate between the opposing sidewalls of two support plates of the same side, two placement plates
Side is fixed with ladder jointly, and the lower end of one of placement plate is fixed, and there are two support rod, one end difference of two support rods
It is fixed in the opposing sidewalls of two support plates.
Preferably, wherein the upper end of four support plates in one group is equipped with groove, and one of four support plates in the group
Side is all provided with there are three the first tapped through hole, through being equipped with the second screw in first tapped through hole, four in another set
The lower end of support plate is fixed with gag lever post, and gag lever post is located in groove, and the gag lever post is equipped with corresponding with the second screw
One end of tapped blind hole, second screw extends in tapped blind hole.
Preferably, the first bolt there are two setting is run through on first installing tache, runs through on second installing tache and is equipped with
Two the second bolts.
Preferably, two braces are fixedly connected by third bolt.
Preferably, one end of the ladder is welded on the side of one of support plate.
Compared with prior art, the utility model has the beneficial effects that
1, by support plate, the cooperation of brace, connecting plate, limited block, fixed block and the first screw, using support plate and tiltedly
Bar, which facilitates, to be rotated, and solves the problems, such as that present scaffold builds that process is tedious, realizing can be with fast construction scaffold
Purpose simplifies and builds step, time saving and energy saving, reduces cost of labor;
2, by screw thread ground pile, the first installing tache, the second installing tache, the cooperation of groove, gag lever post and bolt uses screw thread
Ground pile and two installing taches are fixedly connected, and solve the problems, such as that present scaffold stability is poor, are realized and are improved safety
Purpose reduces labor intensity, improves stability, is easy to use;
In conclusion the utility model solves the problems, such as that present scaffold builds that process is tedious, simplifies and builds step,
It is time saving and energy saving, it improves and builds efficiency, reduce labor intensity, improve stability, reduce cost of labor, be easy to use.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of construction hoisting operation framing scaffold structural schematic diagram;
Fig. 2 be the utility model proposes a kind of construction hoisting operation framing scaffold side view;
Fig. 3 be the utility model proposes a kind of construction hoisting operation framing scaffold A at enlarged drawing;
Fig. 4 be the utility model proposes a kind of construction hoisting operation framing scaffold connecting plate structural schematic diagram.
In figure: 1 fixed plate, 2 support plates, 3 fixed blocks, 4 first installing taches, 5 second installing taches, 6 limited blocks, 7 braces, 8
Connecting plate, 9 second bolts, 10 first tapped through holes, 11 first bolts, 12 third bolts, 13 gag lever posts, 14 second screw threads are logical
Hole, 15 screw thread ground piles, 16 ladders, 17 support rods, 18 grooves, 19 first screws, 20 second screws, 21 placement plates.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
Referring to Fig.1-4, a kind of construction hoisting operation framing scaffold, including eight support plates 2, the four of same level
A support plate 2 is respectively and fixedly provided with two the second installing taches 5 on one end side wall for four support plates 2 in one group, same group, uses
Second installing tache 5 and the scaffold of the left and right sides are fixedly connected, on the other end side wall of four in same group support plate 2
It is respectively and fixedly provided with the first installing tache 4, is fixedly connected using the first installing tache 4 and the scaffold of front and rear sides, the first installing tache 4
It is upper through setting there are two the first bolt 11, through setting there are two the second bolt 9 on the second installing tache 5, in same group wherein two
It is rotatably connected to brace 7 between the opposing sidewalls of a support plate 2, and two braces 7 are arranged in a crossed manner, two will be rotatably connected on tiltedly
Support plate 2 on bar 7, which is turned to, to be fixedly connected with 7 plumbness of brace, two braces 7 by third bolt 12, and support is passed through
Plate 2 is rotatably connected on the side of brace 7, has achieved the effect that fold, has improved and build efficiency;
Two fixed blocks 3 are respectively and fixedly provided in the opposing sidewalls of same group of other two support plate 2, on four fixed blocks 3
It is equipped with opening, two openings of the same end are equipped with limited block 6 to run through in two openings in one group, same group, same
The upper end of two limited blocks 6 in group is fixed with connecting plate 8 jointly, is inserted into using two limited blocks 6 being fixed on connecting plate 8
It is fixed in the fixed block 3 in two support plates 2, and uses the second tapped through hole 14, third tapped through hole and the first screw 19
It is fixed, facilitates and limited, improve stability, be all provided on one end side wall of fixed block 3 there are four the second tapped through hole
14, limited block 6 is equipped with third tapped through hole corresponding with the second tapped through hole 14, through being equipped with the in the second tapped through hole 14
One end of one screw 19, the first screw 19 extends in third tapped through hole, by the first screw 19 to fixed block 3 and limited block
6 are fixed, and improve safety.
In the utility model, the lower end of two support plates 2 of the same side is fixed with fixed plate 1 jointly, in two fixed plates 1
Through screw thread ground pile 15 is equipped with, conveniently the lower end of scaffold is fixed, the opposing sidewalls of two support plates 2 of the same side
Between it is jointly fixed there are two placement plates 21, the side of two placement plates 21 is fixed with ladder 16 jointly, worker is facilitated to take
It builds and works, one end of ladder 16 is welded on the side of one of support plate 2, and the lower end of one of placement plate 21 is fixed with
Two support rods 17, one end of two support rods 17 are separately fixed in the opposing sidewalls of two support plates 2, pass through screw thread ground pile
15 can be improved the fastness of scaffold.
In the utility model, wherein the upper end of four support plates 2 in one group is equipped with groove 18, and four branch in the group
The side of fagging 2 is all provided with there are three the first tapped through hole 10, through the second screw 20 is equipped in the first tapped through hole 10, in addition one
The lower end of four support plates 2 in group is fixed with gag lever post 13, and gag lever post 13 is located in groove 18, facilitates and is built, limit
Position bar 13 is equipped with tapped blind hole corresponding with the second screw 20, and one end of the second screw 20 extends in tapped blind hole, uses
Gag lever post 13 on another scaffold is inserted into groove 18 and is fixed using the second screw 20, and the fast of scaffold is realized
Speed is built, and support plate 2 is rotatably connected on two braces 7, is facilitated and is folded, so that convenient transportation, passes through groove 18
It with the cooperation of gag lever post 13, simplifies and builds step, reduce working strength.
In the utility model, when in use, the support plate 2 being rotatably connected on two braces 7 is turned to and is hung down with brace 7
Straight state is inserted into the fixed block 3 being fixed in two support plates 2 using two limited blocks 6 being fixed on connecting plate 8, and
It is fixed using the second tapped through hole 14, third tapped through hole and the first screw 19, is fixedly connected with two using third bolt 12
Scaffold is fixed on suitable position using screw thread ground pile 15 and fixed plate 1 by a brace 7, uses the second installing tache 5 and left and right two
The scaffold of side is fixedly connected, and is fixedly connected using the first installing tache 4 and the scaffold of front and rear sides, use is another
Gag lever post 13 on a scaffold is inserted into groove 18 and is fixed using the second screw 20, and quickly taking for scaffold is realized
It builds, and support plate 2 is rotatably connected on two braces 7, is facilitated and is folded, thus convenient transportation.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not
It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (6)
1. a kind of construction hoisting operation framing scaffold, including eight support plates (2), it is characterised in that: same level
Four support plates (2) are respectively and fixedly provided with two the second installing taches on one end side wall for four support plates (2) in one group, same group
(5), it is respectively and fixedly provided with the first installing tache (4) on the other end side wall of four support plates (2) in same group, in same group wherein
It is rotatably connected between the opposing sidewalls of two support plates (2) brace (7), and two braces (7) are arranged in a crossed manner, same group another
It is respectively and fixedly provided with two fixed blocks (3) in the opposing sidewalls of outer two support plates (2), is equipped with opening on four fixed blocks (3), together
Two openings of one end are equipped with limited block (6) to run through in two openings in one group, same group, two limits in same group
The upper end of position block (6) is fixed with connecting plate (8) jointly, is all provided on one end side wall of the fixed block (3) there are four the second screw thread
Through-hole (14), the limited block (6) are equipped with third tapped through hole corresponding with the second tapped through hole (14), second screw thread
Through the first screw (19) are equipped in through-hole (14), one end of first screw (19) is extended in third tapped through hole.
2. a kind of construction hoisting operation framing scaffold according to claim 1, which is characterized in that two of the same side
The lower end of support plate (2) is fixed with fixed plate (1) jointly, is run through on two fixed plates (1) and is equipped with screw thread ground pile (15), same
It is jointly fixed between the opposing sidewalls of two support plates (2) of side that there are two placement plate (21), the sides of two placement plates (21)
It is fixed with jointly ladder (16), the lower end of one of placement plate (21) is fixed, and there are two support rod (17), two support rods
(17) one end is separately fixed in the opposing sidewalls of two support plates (2).
3. a kind of construction hoisting operation framing scaffold according to claim 1, which is characterized in that wherein in one group
The upper end of four support plates (2) is equipped with groove (18), and the side of four support plates (2) in the group is all provided with there are three the first spiral shell
Line through-hole (10), through being equipped with the second screw (20) in first tapped through hole (10), four support plates in another set
(2) lower end is fixed with gag lever post (13), and gag lever post (13) is located in groove (18), and the gag lever post (13) is equipped with and the
One end of the corresponding tapped blind hole of two screws (20), second screw (20) extends in tapped blind hole.
4. a kind of construction hoisting operation framing scaffold according to claim 2, which is characterized in that first installation
Run through there are two setting the first bolt (11) on button (4), through setting, there are two the second bolt (9) on second installing tache (5).
5. a kind of construction hoisting operation framing scaffold according to claim 1, which is characterized in that two braces (7)
It is fixedly connected by third bolt (12).
6. a kind of construction hoisting operation framing scaffold according to claim 2, which is characterized in that the ladder (16)
One end be welded on the sides of one of support plate (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920181863.1U CN209482675U (en) | 2019-02-01 | 2019-02-01 | A kind of construction hoisting operation framing scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920181863.1U CN209482675U (en) | 2019-02-01 | 2019-02-01 | A kind of construction hoisting operation framing scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209482675U true CN209482675U (en) | 2019-10-11 |
Family
ID=68133572
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920181863.1U Expired - Fee Related CN209482675U (en) | 2019-02-01 | 2019-02-01 | A kind of construction hoisting operation framing scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209482675U (en) |
-
2019
- 2019-02-01 CN CN201920181863.1U patent/CN209482675U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208869129U (en) | Telescopic building hoist day beam is set in elevator traction | |
CN103422663B (en) | Attached lift scaffold | |
CN214462437U (en) | Hanging basket wall-riding adjustable suspension bracket | |
CN209482675U (en) | A kind of construction hoisting operation framing scaffold | |
CN207079899U (en) | A kind of construction coherent-wall scaffolding suspending apparatus | |
CN207863448U (en) | A kind of Simple building construction scaffold plate | |
CN214885306U (en) | Multifunctional carrying frame for residential buildings | |
CN205857709U (en) | Air-conditioning template length governor motion and air-conditioning formwork support structure | |
CN212957617U (en) | Ratchet type template sliding device | |
CN208039785U (en) | A kind of Multifunctional scaffolding shelf | |
CN209620774U (en) | Assembled courtyard wall | |
CN207228603U (en) | One kind is used for interior decoration scaffold | |
CN102767280A (en) | Quick-dismounting system and installation method for top plate | |
CN208330165U (en) | A kind of folding type aluminum alloy double ladder | |
CN208456101U (en) | A kind of housing construction scaffold | |
CN214739699U (en) | Anti-skidding scaffold is used in house construction | |
CN203878952U (en) | Simple telescopic scaffold | |
CN221277199U (en) | Folding scaffold for building construction | |
CN215626033U (en) | Liftable support for construction engineering construction | |
CN217205263U (en) | Construction pipeline erects coalignment | |
CN215564293U (en) | Scaffold for interior decoration | |
CN211818543U (en) | Safety enclosure for building construction | |
CN220768706U (en) | Frame assembly type wall purline convenient to hoist | |
CN214091338U (en) | Combined building safety enclosure | |
CN211775969U (en) | Construction guardrail is built in room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191011 Termination date: 20210201 |
|
CF01 | Termination of patent right due to non-payment of annual fee |