CN217205263U - Construction pipeline erects coalignment - Google Patents
Construction pipeline erects coalignment Download PDFInfo
- Publication number
- CN217205263U CN217205263U CN202220281425.4U CN202220281425U CN217205263U CN 217205263 U CN217205263 U CN 217205263U CN 202220281425 U CN202220281425 U CN 202220281425U CN 217205263 U CN217205263 U CN 217205263U
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- welded
- straightening
- alignment
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 238000003466 welding Methods 0.000 claims description 6
- 239000003381 stabilizer Substances 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 description 13
- 239000010959 steel Substances 0.000 description 13
- 238000009434 installation Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a construction pipeline erection straightening device, which comprises a bottom plate, wherein a rectangular slot is formed in the front side of the bottom plate, vertical rods are welded at two ends of the rectangular slot at the upper end of the bottom plate, slide rails are fixed at one side, opposite to the two vertical rods, of the two vertical rods through bolts, two straightening drums are arranged between the two slide rails, sliding parts are welded at two ends of each straightening drum through connecting rods II, the sliding parts are installed inside the corresponding slide rails, a connecting plate is welded at one side of each sliding drum, an operating pull rod is movably hinged on each connecting plate through an articulated shaft, a balancing weight is welded at the rear side of the upper end of the bottom plate, a horizontal bubbler is fixed at the middle part of the upper end of the bottom plate, and adjustable support legs are arranged at four corners of the lower end of the bottom plate; the utility model has the advantages of reasonable design, this construction pipeline erects coalignment can be more convenient carry out the alignment to the construction pipeline when erectting, and the alignment is more accurate, the effectual efficiency of construction that has improved, the practicality is strong.
Description
Technical Field
The utility model relates to a construction technical field specifically is a construction pipeline erects coalignment.
Background
The scaffold is a general term of a construction field, and refers to various supports which are erected for workers to operate and solve vertical and horizontal transportation, and the general term of a building boundary refers to a place which is used on an outer wall, interior decoration or high floor height and cannot be directly constructed on a building site, when the scaffold vertical steel pipe is erected, the vertical steel pipe of the lowest layer needs to be straightened to ensure the verticality of the upper vertical steel pipe, but the traditional vertical steel pipe straightening device generally has the defects of troublesome use and low straightening efficiency, and the construction progress is influenced; therefore, a straightening device for construction pipeline erection is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction pipeline erects coalignment to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a construction pipeline erection straightening device comprises a bottom plate, wherein a rectangular groove is formed in the front side of the bottom plate, vertical rods are welded at two ends, located at the rectangular groove, of the upper end of the bottom plate, slide rails are fixed on one side, opposite to the vertical rods, of the bottom plate through bolts, two straightening cylinders are arranged between the two slide rails, sliding parts are welded at two ends of each straightening cylinder through connecting rods II, the sliding parts are installed inside the corresponding slide rails, auxiliary slide rods are welded and fixed at the upper end of the bottom plate, limit blocks are welded at the upper ends of the auxiliary slide rods, two sliding cylinders are movably sleeved on the auxiliary slide rods, the positions of the two sliding cylinders correspond to the positions of the two straightening cylinders respectively, the sliding cylinders and the straightening cylinders which correspond to each other are connected through connecting rods I in a welded mode, connecting plates are welded on one sides of the sliding cylinders, and operation pull rods are hinged to the connecting plates through movable hinges, the utility model discloses a bottom plate, including bottom plate, horizontal bubbler, adjustable stabilizer blade, horizontal bubbler is fixed with in the upper end middle part of bottom plate, the lower extreme four corners department of bottom plate all is provided with the balancing weight in the upper end rear side of bottom plate.
Preferably, adjustable stabilizer blade all includes the external screw thread pole of welding in bottom plate lower extreme four corners department, the lower extreme of external screw thread pole has all been twisted through screw-thread fit has the internal thread sleeve, the telescopic lower extreme of internal thread has all welded the gasket, the telescopic outside of internal thread all is provided with anti-skidding line.
Preferably, the height of the auxiliary slide bar is equal to that of the slide rail.
Preferably, the straightening cylinder, the sliding cylinder and the bottom plate are all vertically arranged.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model has the advantages of reasonable design, this construction pipeline erects coalignment can be more convenient carry out the alignment to the construction pipeline when erectting, and the alignment is more accurate, the effectual efficiency of construction that has improved, the practicality is strong.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A in FIG. 1 according to the present invention;
FIG. 3 is an enlarged schematic view of the structure at B in FIG. 1 according to the present invention;
fig. 4 is a front view of the structural soil 1 of the present invention.
In the figure: the device comprises a bottom plate 1, a vertical rod 2, a sliding rail 3, a straightening cylinder 4, an auxiliary sliding rod 5, a limiting block 6, an operating pull rod 7, a sliding piece 8, an adjustable supporting leg 9, a rectangular groove 10, a horizontal bubble device 11, a balancing weight 12, a sliding cylinder 13, a connecting plate 14, a hinge shaft 15, a connecting rod I16, a scaffold vertical steel pipe 17 and a connecting rod II 18.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a construction pipeline erection straightening device comprises a bottom plate 1, a rectangular slot 10 is formed in the front side of the bottom plate 1, vertical rods 2 are welded to two ends, located at the rectangular slot 10, of the upper end of the bottom plate 1, slide rails 3 are fixed to one opposite sides of the two vertical rods 2 through bolts, two straightening cylinders 4 are arranged between the two slide rails 3, sliders 8 are welded to two ends of each straightening cylinder 4 through connecting rods II18, the sliders 8 are mounted inside the corresponding slide rails 3, auxiliary slide bars 5 are welded to the upper end of the bottom plate 1, the heights of the auxiliary slide bars 5 and the heights of the slide rails 3 are equal, limiting blocks 6 are welded to the upper ends of the auxiliary slide bars 5, two sliding cylinders 13 are movably sleeved on the auxiliary slide bars 5, the straightening cylinders 4 and the sliding cylinders 13 and the bottom plate 1 are vertically arranged, the positions of the two sliding cylinders 13 correspond to the positions of the two straightening cylinders 4 respectively, and the sliding cylinders 13 and the straightening cylinders 4 which correspond to each other are connected through connecting rods I16 in a welded mode, a connecting plate 14 is welded on one side of each sliding cylinder 13, an operating pull rod 7 is movably hinged on each connecting plate 14 through a hinge shaft 15, a balancing weight 12 is welded on the rear side of the upper end of the bottom plate 1, a horizontal bubbler 11 is fixed in the middle of the upper end of the bottom plate 1, adjustable support legs 9 are arranged at four corners of the lower end of the bottom plate 1, each adjustable support leg 9 comprises an external threaded rod welded at four corners of the lower end of the bottom plate 1, an internal threaded sleeve is screwed on the lower end of each external threaded rod in a threaded fit mode, a round gasket is welded on the lower end of each internal threaded sleeve, and anti-skid threads are arranged on the outer side of each internal threaded sleeve; the construction pipeline erection straightening device is placed on the ground through a bottom plate 1, the bottom plate 1 is adjusted to be in a horizontal state through an adjustable support leg 9, then a scaffold vertical steel pipe 17 penetrates through two straightening cylinders 4 from top to bottom, the straightening cylinder 4 positioned above is moved to the top position of the scaffold vertical steel pipe 17 through an operation pull rod 7, the straightening cylinder 4 positioned below is moved to the lower end position of the scaffold vertical steel pipe 17, straightening of the scaffold vertical steel pipe 17 can be completed, then conventional installation is performed on the bottom of the scaffold vertical steel pipe 17 at a rectangular notch 10, after the installation of the bottom of the scaffold vertical steel pipe 17 is completed, the two straightening cylinders 4 can be moved to the topmost end through the operation pull rod 7, the scaffold vertical steel pipe 17 is separated, and then the whole device is moved to the position of the next scaffold vertical steel pipe 17 for operation; the utility model discloses can be more convenient carry out the alignment to the construction pipeline when erectting, and the alignment is more accurate, the effectual efficiency of construction that has improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (4)
1. The utility model provides a construction pipeline erects coalignment, includes bottom plate (1), its characterized in that: the utility model discloses a straightening machine, including bottom plate (1), connecting rod II (18) welding has slider (8) in the both ends that the upper end of bottom plate (1) is located rectangle fluting (10), and slide rail (3) all have through bolt fastening in one side that two montants (2) are relative, are provided with two alignment drums (4) between two slide rails (3), the both ends of alignment drum (4) all have slider (8) through connecting rod II (18) welding, slider (8) are all installed inside slide rail (3) that correspond, the upper end welded fastening of bottom plate (1) has supplementary slide bar (5), the upper end welding of supplementary slide bar (5) has stopper (6), the movable sleeve is equipped with two slip drums (13) on supplementary slide bar (5), and the position of two slip drums (13) corresponds with the position of two alignment drums (4) respectively, and all welds through connecting rod I (16) between slip drum (13) and the alignment drum (4) that correspond each other Connect, connecting plate (14) have all been welded to one side of slip drum (13), it has operating rod (7) all to articulate through articulated shaft (15) activity on connecting plate (14), the upper end rear side welding of bottom plate (1) has balancing weight (12), the upper end middle part of bottom plate (1) is fixed with horizontal bubbler (11), the lower extreme four corners department of bottom plate (1) all is provided with adjustable stabilizer blade (9).
2. The straightening device for construction pipe erection according to claim 1, wherein: adjustable stabilizer blade (9) all include the external screw thread pole of welding in bottom plate (1) lower extreme four corners department, the lower extreme of external screw thread pole has all been twisted through screw-thread fit has the internal thread sleeve, the round gasket has all been welded to the telescopic lower extreme of internal thread, the telescopic outside of internal thread all is provided with anti-skidding line.
3. The straightening device for construction pipe erection according to claim 1, wherein: the auxiliary sliding rod (5) and the sliding rail (3) are equal in height.
4. The straightening device for construction pipe erection according to claim 1, wherein: the straightening cylinder (4), the sliding cylinder (13) and the bottom plate (1) are all vertically arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220281425.4U CN217205263U (en) | 2022-02-11 | 2022-02-11 | Construction pipeline erects coalignment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220281425.4U CN217205263U (en) | 2022-02-11 | 2022-02-11 | Construction pipeline erects coalignment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217205263U true CN217205263U (en) | 2022-08-16 |
Family
ID=82796750
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220281425.4U Expired - Fee Related CN217205263U (en) | 2022-02-11 | 2022-02-11 | Construction pipeline erects coalignment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217205263U (en) |
-
2022
- 2022-02-11 CN CN202220281425.4U patent/CN217205263U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212534174U (en) | Raft foundation steel bar supporting tool | |
CN108678365B (en) | Self-angle-changing hydraulic climbing formwork system | |
CN217205263U (en) | Construction pipeline erects coalignment | |
CN212078601U (en) | Scaffold with safety device | |
CN212927107U (en) | Diagonal brace for prefabricated wall panel construction | |
CN206016841U (en) | Development machine temporary support device | |
CN207862973U (en) | A kind of simple trolley formwork system of concrete pipe gallery | |
CN206888490U (en) | A kind of construction scaffold | |
CN206768836U (en) | A kind of I-steel gabion assembles counterfort supporting construction | |
CN206530077U (en) | A kind of support frame | |
CN215801134U (en) | Culvert template trolley with adjustable span and height | |
CN212000638U (en) | Overhead cover beam type steel supporting structure | |
CN211895796U (en) | Core cylinder movable arm type tower crane installation climbing structure | |
CN211597633U (en) | Scaffold for building engineering that can install fast | |
CN219909867U (en) | Good scaffold frame for construction of stability | |
CN211897854U (en) | Special lifting beam device for prefabricated track groove beam | |
CN221277199U (en) | Folding scaffold for building construction | |
CN219972936U (en) | Platform for bridge engineering bent cap construction | |
CN218522336U (en) | Telescopic beam support | |
CN220058310U (en) | Assembled steel structure frame | |
CN215760467U (en) | Assembled stair template for cast-in-place stair | |
CN103758334A (en) | Scaffold structure for constructing exterior wall of building | |
CN218205924U (en) | Engineering formwork support frame | |
CN203640245U (en) | Scaffold structure for building exterior wall construction | |
CN220352843U (en) | Box slot supporting construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220816 |