CN209408891U - A kind of structure of the combined steel moald-cavity pedestal of assembled - Google Patents

A kind of structure of the combined steel moald-cavity pedestal of assembled Download PDF

Info

Publication number
CN209408891U
CN209408891U CN201821707488.1U CN201821707488U CN209408891U CN 209408891 U CN209408891 U CN 209408891U CN 201821707488 U CN201821707488 U CN 201821707488U CN 209408891 U CN209408891 U CN 209408891U
Authority
CN
China
Prior art keywords
steel
pedestal
profile steel
profile
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821707488.1U
Other languages
Chinese (zh)
Inventor
彭官友
李昆
黄卓新
杨春会
陈量
彭辉
王飞
曾伟
张剑铃
肖阳历
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Hunan Construction Engineering Co Ltd
Hunan Road and Bridge Construction Group Co Ltd
Original Assignee
Hunan Hunan Construction Engineering Co Ltd
Hunan Road and Bridge Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Hunan Construction Engineering Co Ltd, Hunan Road and Bridge Construction Group Co Ltd filed Critical Hunan Hunan Construction Engineering Co Ltd
Priority to CN201821707488.1U priority Critical patent/CN209408891U/en
Application granted granted Critical
Publication of CN209408891U publication Critical patent/CN209408891U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of structure of assembled combined steel moald-cavity pedestal installation, it is greater than the Extended chemotherapy on pedestal basis including the pedestal basis that is poured according to the maximum length of T beam and the maximum width of box beam and in the width that pours of end position of every kind of length T beam and box beam;In the length direction pre-buried several parallel steel plates of the top along pedestal basis on pedestal basis and across the bolt of steel plate;Pedestal basis and H profile steel are connected as an entirety by pre-embedded bolt by several billets being placed above in each steel plate and the H profile steel installed on billet;Several parallel channel steel distribution beams installed along its length at the top of H profile steel and the stainless steel faceplate being laid on channel steel distribution beam.The utility model it is economical it is good, construction it is convenient, strong applicability, can be used in turn, the advantage that maintenance is convenient.

Description

A kind of structure of the combined steel moald-cavity pedestal of assembled
Technical field
The utility model belongs to precast beam pedestal technology, and in particular to a kind of knot of the combined steel moald-cavity pedestal of assembled Structure.
Background technique
Currently, precast beam pedestal mostly uses armored concrete pedestal, i.e., according to beam body ruler in the construction of China's precast beam It is very little require according to assembling reinforcement, it is die-filling, pour concrete, health, demoulding process construct.As scientific and technical is constantly progressive, Although the construction quality of armored concrete pedestal is gradually improved, but still following insufficient existing: first is that reinforcing bar, concrete are used Amount is big, can not be used in turn, at high cost, lacks economy;Second is that anti-camber, variation pedestal size can not be adjusted at any time, one Kind of pedestal is only suitable for a kind of the prefabricated of size beam body, faces to build and takes up a large area;Third is that outer web mould Screw arbor with nut at both-ends duct is pre-buried Position is fixed, and operating space is limited, can not adjust specific location according to the actual situation;Fourth is that can not solve to generate because expanding with heat and contract with cold The variation of steel plate internal stress, and influence the flatness of precast beam bottom plate;Fifth is that maintenance is cumbersome, can not adjust at any time because of ground unevenness It is even sedimentation and generate poor flatness and amount of deflection it is poor;Sixth is that full-automatic spray shower pipe laying space is small.
Utility model content
The purpose of the utility model is to provide a kind of good economy performance, convenient, strong applicability the assembleds of construction to combine fashioned iron The structure of modularization pedestal.
Realizing the technical solution of the utility model aim is:
The structure of the combined steel moald-cavity pedestal of assembled provided by the utility model, comprising:
The pedestal basis that is poured according to the maximum length of T beam and the maximum width of box beam and in every kind of length T beam and The width that the end position of box beam pours is greater than the Extended chemotherapy on pedestal basis;
In the length direction pre-buried several parallel steel plates of the top along pedestal basis on pedestal basis and across steel plate Bolt;
Several billets being placed above in each steel plate and the H profile steel installed on billet, by pre-embedded bolt by platform Seat basis is connected as an entirety with H profile steel;
It several parallel channel steel distribution beams for being installed along its length at the top of H profile steel and is laid on channel steel distribution beam Stainless steel faceplate.
Further technical solution is:
The H profile steel is made of two parts, and the adjacent end portion of two parts H profile steel is welded with junction steel plate, is connected by H profile steel Bolt connects two parts H profile steel;Adjacent channel steel distribution beam is bolted by channel steel connection above two parts H profile steel.
The utility model has the beneficial effects that
The utility model is characterized in that: peace is torn open convenient, can be used in turn, economy is good, easy to maintenance;It can be according to reality It needs to improve spelling, realizes that pedestal shares, save floor occupying area;It can solve to become because of the steel plate internal stress for generation of expanding with heat and contract with cold Change, it is ensured that the flatness of precast beam bottom plate;The poor flatness generated by uneven settlement of foundation can be adjusted at any time and amount of deflection is poor; It can solve the problems, such as that fully-automatic sprinkling pipeline is laid, is small to pull rod pipeline laying space;Billet is conveniently increased and decreased, and can be adjusted at any time Whole anti-camber, meets design requirement.
The technical solution of the utility model is further illustrated with reference to the accompanying drawing.
Detailed description of the invention
Fig. 1 is the top view of the combined steel moald-cavity pedestal of the utility model assembled.
Fig. 2 is the partial perspective view of the combined steel moald-cavity pedestal of the utility model assembled.
Specific embodiment
See Fig. 1-Fig. 2, the structure of the combined steel moald-cavity pedestal of assembled provided by the utility model, comprising:
The pedestal basis 7 and in every kind of length T poured according to the maximum length L1 of T beam and the maximum width L2 of box beam The width that beam and the end position of box beam pour is greater than the Extended chemotherapy 11 on pedestal basis 7;
In the pre-buried several parallel steel plates 6 of the length direction of the top along pedestal basis 7 on pedestal basis 7 and pass through steel plate Bolt 5;
Several billets 4 being placed above in each steel plate 6 and the H profile steel 3 installed on billet 4, pass through pre-embedded bolt 5 Pedestal basis 7 is connected as an entirety with H profile steel 3;
Several parallel channel steel distribution beams 2 for being installed along its length at the top of H profile steel 3 and on channel steel distribution beam 2 The stainless steel faceplate 1 of laying;
The H profile steel 3 is made of two parts, and the adjacent end portion of two parts H profile steel 3 is welded with junction steel plate 8, passes through H profile steel Connection bolt 10 connects two parts H profile steel 3;Adjacent channel steel distribution beam 2 connects spiral shell by channel steel above two parts H profile steel 3 Bolt 9 connects.
See Fig. 1-Fig. 2, the method for the combined steel moald-cavity pedestal installation of the assembled of the utility model, according to the following steps It carries out:
1, it pours pedestal basis 7 and Extended chemotherapy 11, pedestal basis 7 is maximum according to the maximum length L1 of T beam and box beam Width L2 is poured, and pours the Extended chemotherapy 11 that width is greater than pedestal basis 7 in the end position of every kind of length T beam and box beam Stretching bed seat as each beam.
2, before pedestal basis 7 pours, length direction of the top along pedestal basis 7 on pedestal basis 7 is pre-buried several parallel Steel plate 6 and fixed using spacer bar, pre-embedded bolt 5 is passed through to the bolt hole of steel plate 6.
3, pedestal basis 7 and after Extended chemotherapy 11 pours, require according to precast beam camber, inverse steel plate 6 everywhere Highly, several billets 4 are placed in the upper surface of each steel plate 6, by the top surface absolute altitude of level strict control billet 4, then H profile steel 3 is installed on billet 4, pre-embedded bolt 5 is aligned to and is passed through the prepared screw-bolt hole of H profile steel 3, nut is tightened, makes pedestal Basis 7 is connected as an entirety with H profile steel 3.
4, several parallel channel steel distribution beams 2 are installed along L1 length direction at 3 top of H profile steel, on channel steel distribution beam 2 It is laid with stainless steel faceplate 1, completes the installation of a pedestal A.
If 5, precast beam baseplate width is greater than the pedestal A that step 4 is installed, before step 4 is laid with stainless steel faceplate 1, Step 3,4 installed base B are repeated according to increased pedestal width on the basis 7 of the side pedestal A;When H profile steel 3 is installed, need It is welded with junction steel plate 8 in adjacent 3 end of H profile steel pedestal A and pedestal B, bolt 10 is connected for the H of two pedestal A, B by H profile steel Fashioned iron 3 connects;When channel steel distribution beam 2 is installed, then the adjacent channel steel distribution beam 2 of two pedestal A, B is connected using channel steel connection bolt 9 It connects, pedestal installation is widened in last whole laying stainless steel faceplate 1, completion.

Claims (2)

1. a kind of structure of the combined steel moald-cavity pedestal of assembled, it is characterized in that including:
The pedestal poured according to the maximum length of T beam and the maximum width of box beam is basic and in every kind of length T beam and box beam The width that pours of end position be greater than the Extended chemotherapy on pedestal basis;
In the length direction pre-buried several parallel steel plates of the top along pedestal basis on pedestal basis and across the bolt of steel plate;
Several billets being placed above in each steel plate and the H profile steel installed on billet, by pre-embedded bolt by pedestal base Plinth and H profile steel are connected as an entirety;
It several parallel channel steel distribution beams for being installed along its length at the top of H profile steel and is laid with not on channel steel distribution beam Become rusty steel facing.
2. the structure of the combined steel moald-cavity pedestal of assembled according to claim 1, it is characterized in that the H profile steel is by two Part is constituted, and the adjacent end portion of two parts H profile steel is welded with junction steel plate, is connected bolt by H profile steel and is connected two parts H profile steel It connects;Adjacent channel steel distribution beam is bolted by channel steel connection above two parts H profile steel.
CN201821707488.1U 2018-10-22 2018-10-22 A kind of structure of the combined steel moald-cavity pedestal of assembled Active CN209408891U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821707488.1U CN209408891U (en) 2018-10-22 2018-10-22 A kind of structure of the combined steel moald-cavity pedestal of assembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821707488.1U CN209408891U (en) 2018-10-22 2018-10-22 A kind of structure of the combined steel moald-cavity pedestal of assembled

Publications (1)

Publication Number Publication Date
CN209408891U true CN209408891U (en) 2019-09-20

Family

ID=67931670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821707488.1U Active CN209408891U (en) 2018-10-22 2018-10-22 A kind of structure of the combined steel moald-cavity pedestal of assembled

Country Status (1)

Country Link
CN (1) CN209408891U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109109155A (en) * 2018-10-22 2019-01-01 湖南路桥建设集团有限责任公司 A kind of installation method and structure of the combined steel moald-cavity pedestal of assembled

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109109155A (en) * 2018-10-22 2019-01-01 湖南路桥建设集团有限责任公司 A kind of installation method and structure of the combined steel moald-cavity pedestal of assembled

Similar Documents

Publication Publication Date Title
CN104264899B (en) Embedded outsourcing U-shaped steel-concrete composite beam
CN109667377A (en) The construction method and prestressed concrete overlapped slab of prestressed concrete overlapped slab
CN211517947U (en) Bridge case roof beam is prefabricated with shaped steel pedestal
CN207177102U (en) Prefabricated conversion layer reserves sleeve joint bar accurate-location device
CN201962804U (en) Embedded part embedding structure for ultralong device foundation platform
CN209408891U (en) A kind of structure of the combined steel moald-cavity pedestal of assembled
CN106437184A (en) Pouring support frame for concrete laminates and mounting and using method of pouring support frame
CN109056535A (en) Based on adjustable regularization template variable curvature construction of cast-in-situ box-beam method
CN109109155A (en) A kind of installation method and structure of the combined steel moald-cavity pedestal of assembled
CN104480858A (en) Construction method for sealing anchorage of pre-stress concrete box girder and cross girder anchored troughs
KR101396434B1 (en) Movable mold device
CN205474895U (en) A space drainage structures that is arranged in low circuit double -line location of putting of low -speed maglev
CN203282598U (en) Movable steel pedestal with adjustable jacking
CN110847676A (en) Reinforcing apparatus of single-pipe tower
CN206052565U (en) A kind of beam-column type bracket
CN105887922B (en) A kind of method that inwall construction is carried out using truss support device
CN209816657U (en) Efficient steel-concrete combined bridge deck formwork structure
WO2020181716A1 (en) Precast-slab frame and precast slab
CN207392744U (en) Prefabricated concrete structure primary-secondary beam connecting integration support system
CN209584870U (en) Pedestal structure for the prefabricated a variety of line style free cantilever erections segment of long line method
CN208280644U (en) Open caisson and inverse device is installed as internal model
CN208201892U (en) A kind of white-out tubular pole and soil nail wall composite supporting construction
CN202017289U (en) Steel frame prestressed reinforcement light shock-proof plate
CN102392417A (en) Dual-cantilever bearing support structure for large steel pipe and installation method
CN202492787U (en) Template device for slant prestress cement concrete pavement construction