CN207177102U - Prefabricated conversion layer reserves sleeve joint bar accurate-location device - Google Patents

Prefabricated conversion layer reserves sleeve joint bar accurate-location device Download PDF

Info

Publication number
CN207177102U
CN207177102U CN201721188107.9U CN201721188107U CN207177102U CN 207177102 U CN207177102 U CN 207177102U CN 201721188107 U CN201721188107 U CN 201721188107U CN 207177102 U CN207177102 U CN 207177102U
Authority
CN
China
Prior art keywords
joint bar
crossbeam
longeron
steel pipe
mounting bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721188107.9U
Other languages
Chinese (zh)
Inventor
张晓峰
李晓亮
迟毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201721188107.9U priority Critical patent/CN207177102U/en
Application granted granted Critical
Publication of CN207177102U publication Critical patent/CN207177102U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a kind of prefabricated conversion layer and reserves sleeve joint bar accurate-location device, including mounting bracket, it is fixed with the mounting bracket some to crossbeam, it is some to longeron, a pair of beams and a pair of longerons coordinate one steel pipe of clamping, the position distribution of steel pipe is identical with the sleeve position distribution of precast concrete wall bottom to be installed, the diameter of steel tube is adapted with in-situ layer wall pre-embedded joint bar, mounting bracket possesses four supporting legs, height of landing leg is more than the height of interlayer wall piece, present apparatus in-situ layer is set to pour link without interference with it in casting concrete, fixed crossbeam on mounting bracket, the position of longeron is adapted with steel pipe distributing position.Crossbeam, the quantity of longeron and steel pipe quantity are adapted, and the crossbeam and longeron are angle steel, and the utility model can be accurately positioned the position of the pre- doweling of in-situ layer, are made in-situ layer joint bar consistent with preformed layer sleeve position sheet, are facilitated shear wall to install.

Description

Prefabricated conversion layer reserves sleeve joint bar accurate-location device
Technical field
The utility model belongs to concrete construction technical field, and specifically one kind helps to install precast concrete The device that wall index bed is connected with basal layer.
Background technology
During fabricated shear wall installation, the longitudinal reinforcement connection of node and seam crossing is more to be in the milk using sleeve Connection.Index bed and top layer are installed using reserved sleeve, the structure of joint bar, because the shear wall of index bed and top layer is all Prefabricated, the position of sleeve joint bar is fixed well, so during installation, accurately can be reserved by upper strata shear wall Sleeve, lower floor's shear wall reserved joint bar is installed, and basal layer is cast in situs, the reinforcing bar in concreting process The situation of deformation or connection end movement is also easy to produce, causes index bed not install smoothly, is reserved on the conversion layer of preformed layer Technical requirements are high in the work progress of joint bar, and difficulty of construction is big.
Utility model content
The utility model is in order to solve the above technical problems, provide a kind of in-situ layer pre- doweling position of can accurately fixing Device.
The concrete structure of the present apparatus is:
A kind of prefabricated conversion layer reserves sleeve joint bar accurate-location device, including mounting bracket, is fixed with the mounting bracket It is some to crossbeam, it is some to longeron, a pair of beams and a pair of longerons coordinate one steel pipes of clamping, the position distribution of steel pipe with it is to be installed The sleeve position distribution of precast concrete wall bottom is identical, and the diameter of steel tube is adapted with in-situ layer wall pre-embedded joint bar.
Mounting bracket possesses four supporting legs, and height of landing leg is more than the height of interlayer wall piece, is pouring present apparatus in-situ layer When building concrete link is poured without interference with it.
Fixed crossbeam, the position of longeron and steel pipe distributing position are adapted on mounting bracket.Crossbeam, the quantity of longeron and steel Pipe quantity is adapted.
The crossbeam and longeron are angle steel.
The utility model can be accurately positioned the position of the pre- doweling of in-situ layer, make in-situ layer joint bar and preformed layer sleeve position This is consistent, facilitates shear wall to install.
Brief description of the drawings
Fig. 1 is the utility model front view;
Fig. 2 is the utility model top view;
Fig. 3 is the utility model lateral plan.
In figure:Mounting bracket 1, longeron 2, crossbeam 3, steel pipe 4, supporting leg 5.
Embodiment
The utility model is illustrated below in conjunction with the accompanying drawings, a kind of prefabricated conversion layer as Figure 1-3 reserves sleeve Joint bar accurate-location device, mounting bracket 1, longeron 2, crossbeam 3, steel pipe 4, supporting leg 5.It is fixed with the mounting bracket 1 some to horizontal stroke Beam 3, some to longeron 2, a pair of beams 3 and a pair of longerons 2 coordinate one steel pipes 4 of clamping, the position distribution of steel pipe 4 with it is to be installed pre- The sleeve position distribution of concrete wall bottom processed is identical, and the diameter of steel pipe 4 is adapted with in-situ layer wall pre-embedded joint bar.
The crossbeam 3 and longeron 2 are angle steel.Make the contact surface of clamping beam and steel pipe bigger using angle steel, the fixation of steel pipe It is more firm.
The utility model paints the quantity for the crossbeam 3 that accompanying drawing is showed, position, and the quantity of longeron 2, position are with steel pipe 4 Position is not intended as the limitation of this programme, and only embodies one embodiment of the present utility model.
In this positioner before use, mounting bracket 1 first contrasts under precast wall body, set accordingly according to the position of sleeve The position of good steel pipe 4, then with this position go position cast-in-situ wall reinforcing bar position.
Because the embedded bar distributing position of each cast-in-situ wall is different, setting and the sleeve of steel pipe 4 correspond, crossbeam 3rd, the setting that the quantity of longeron 2, position are adapted with steel pipe 4.
The application method of the present apparatus:
A) mounting bracket 1 is compared with precast wall body bottom, the position of steel pipe 4 is fixed according to the position of sleeve;
B) split bolt hole is reserved at the top of cast-in-situ wall;
C) this positioner is fixed by split bolt;
D) the pre- doweling of cast-in-situ wall is each passed through steel pipe 4 on mounting bracket and fixed;
E) carry out removing and installing the entirety of frame 1 after wall pours, obtain location specification articulamentum installation joint bar.
Mounting bracket possesses four supporting legs 5, and the height of supporting leg 5 is more than the height of interlayer wall piece, makes the present apparatus in in-situ layer In casting concrete link is poured without interference with it.
The utility model transverse direction angle steel clamps the joint bar of cast-in-place concrete with sole bar angle, makes joint bar in concreting Shi Buhui displacements, the pre- doweling position of in-situ layer is accurately positioned, shear wall is smoothly installed.

Claims (4)

1. a kind of prefabricated conversion layer reserves sleeve joint bar accurate-location device, it is characterized in that:Including mounting bracket, on the mounting bracket Be fixed with it is some to crossbeam, it is some to longeron, a pair of beams and a pair of longerons coordinate one steel pipes of clamping, the position distribution of steel pipe with The sleeve position of precast concrete wall bottom to be installed is distributed identical, the diameter of steel tube and in-situ layer wall pre-embedded joint bar phase Adaptation.
2. prefabricated conversion layer as claimed in claim 1 reserves sleeve joint bar accurate-location device, it is characterized in that:Mounting bracket possesses four Individual supporting leg, height of landing leg are more than the height of interlayer wall piece.
3. prefabricated conversion layer as claimed in claim 1 or 2 reserves sleeve joint bar accurate-location device, it is characterized in that:Crossbeam, longeron Position be adapted with steel pipe distributing position;Crossbeam, the quantity of longeron and steel pipe quantity are adapted.
4. prefabricated conversion layer as claimed in claim 1 reserves sleeve joint bar accurate-location device, it is characterized in that:The crossbeam and vertical Beam is angle steel.
CN201721188107.9U 2017-09-16 2017-09-16 Prefabricated conversion layer reserves sleeve joint bar accurate-location device Active CN207177102U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721188107.9U CN207177102U (en) 2017-09-16 2017-09-16 Prefabricated conversion layer reserves sleeve joint bar accurate-location device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721188107.9U CN207177102U (en) 2017-09-16 2017-09-16 Prefabricated conversion layer reserves sleeve joint bar accurate-location device

Publications (1)

Publication Number Publication Date
CN207177102U true CN207177102U (en) 2018-04-03

Family

ID=61747580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721188107.9U Active CN207177102U (en) 2017-09-16 2017-09-16 Prefabricated conversion layer reserves sleeve joint bar accurate-location device

Country Status (1)

Country Link
CN (1) CN207177102U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109707110A (en) * 2019-03-01 2019-05-03 中建二局第二建筑工程有限公司 A kind of precast shear wall conversion layer embedded bar locating rack and construction method
CN109736575A (en) * 2018-12-09 2019-05-10 山东泰安建筑工程集团有限公司 A kind of building cast-in-situ layer and preformed layer grouting connection reserved steel bar Exact Location Method
CN110424636A (en) * 2019-07-29 2019-11-08 中国十七冶集团有限公司 Assembled architecture conversion layer reserves casing joint bar positioning device and construction method
CN110805291A (en) * 2019-11-29 2020-02-18 湖南五新模板有限公司 PC building wallboard reserves sleeve pipe joint bar positioner
CN112127637A (en) * 2020-09-22 2020-12-25 中国五冶集团有限公司 Construction method for pre-buried vertical component steel bars of foundation layer of fabricated building

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736575A (en) * 2018-12-09 2019-05-10 山东泰安建筑工程集团有限公司 A kind of building cast-in-situ layer and preformed layer grouting connection reserved steel bar Exact Location Method
CN109707110A (en) * 2019-03-01 2019-05-03 中建二局第二建筑工程有限公司 A kind of precast shear wall conversion layer embedded bar locating rack and construction method
CN110424636A (en) * 2019-07-29 2019-11-08 中国十七冶集团有限公司 Assembled architecture conversion layer reserves casing joint bar positioning device and construction method
CN110805291A (en) * 2019-11-29 2020-02-18 湖南五新模板有限公司 PC building wallboard reserves sleeve pipe joint bar positioner
CN112127637A (en) * 2020-09-22 2020-12-25 中国五冶集团有限公司 Construction method for pre-buried vertical component steel bars of foundation layer of fabricated building

Similar Documents

Publication Publication Date Title
CN207177102U (en) Prefabricated conversion layer reserves sleeve joint bar accurate-location device
CN105220874B (en) The construction method of basement superelevation exterior wall self-supporting single side formwork system
CN203247603U (en) High-order rag bolt positioner
CN103243649B (en) The system and method for a kind of cable saddle Fast Installation, location
CN108589465A (en) Cast-in-place concrete gutter rail gliding style formwork system and construction method
CN108708394A (en) A kind of tunneling boring exempts from the overlapping assembled comprehensive pipe gallery structure and construction method of support
CN112049413B (en) Precast concrete sill table and construction method thereof
CN105649248B (en) Prefabricated PC concrete core slab and Cast-in-situ Beam integral construction method
CN105780922B (en) Large span steel reinforced concrete transfer truss segmental hoisting formwork system construction method
CN113738023B (en) Semi-prefabricated semi-cast-in-situ constructional column, and assembly structure and construction method thereof
CN108457190A (en) Anchor ceiling board construction method before anchorage
CN208072181U (en) A kind of spherical bearing positioning device
CN207878262U (en) A kind of high pier shaft binder concrete construction strutting system
CN107142834B (en) A kind of Through Steel pipe concrete tie-rod arch bridge abutment steel pipe location structure and its construction method
CN106381810B (en) With the cast-in-place outstanding method for filling beam of beam-column type bracket
CN107675838A (en) Assembled architecture sidewalk brick precast beam embedded sleeve barrel joint bar construction method
CN204510813U (en) L-type cladding panel structure under a kind of novel frame Liang Liang
CN108755395B (en) A kind of spherical bearing installation method
CN207620184U (en) A kind of superimposed sheet construction system
CN107130521A (en) Method for constructing large-section beam bailey bracket hoisting mold of pit cliff wall section
CN208267362U (en) A kind of constructing device of deformation joint concrete wall formwork
CN203603462U (en) Post-cast strip beam plate formwork supporting structure
CN206052565U (en) A kind of beam-column type bracket
CN206319632U (en) A kind of assembled architecture foundation pole rib precise positioning instrument
CN207392744U (en) Prefabricated concrete structure primary-secondary beam connecting integration support system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant