CN209403261U - Leakage dropping-board installs matching operation equipment - Google Patents
Leakage dropping-board installs matching operation equipment Download PDFInfo
- Publication number
- CN209403261U CN209403261U CN201822216154.0U CN201822216154U CN209403261U CN 209403261 U CN209403261 U CN 209403261U CN 201822216154 U CN201822216154 U CN 201822216154U CN 209403261 U CN209403261 U CN 209403261U
- Authority
- CN
- China
- Prior art keywords
- frame body
- ladder
- type
- leakage dropping
- board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model is that a kind of leakage dropping-board installs matching operation equipment, including lifting lever bracket, scale mark post and horizon bar;Lifting lever bracket includes gate frame body and ladder-type frame body, gate frame body bottom is equipped with rubber roll, ladder-type frame body is mutually perpendicular to fix after passing through gate frame body with gate frame body, and scale mark post uses aluminium alloy straight-bar using the T-type or L-type strip band steel for being provided with scale value, horizon bar.The utility model design science, structure are simple, operation is easy, low in cost, practicability is extremely strong, and lifting lever therein compensates for " the construction blind area " of crane lifting leakage dropping-board, reduce construction cost investment, improve lifting efficiency;Scale mark post and horizon bar correct the deviation of leakage dropping-board installation dimension, improve the installation quality of leakage dropping-board.The use of the utility model equipment, improves speed of application, reduces construction period, saves artificial and input cost, improves the installation quality of leakage dropping-board, has very high application and popularization value.
Description
Technical field
The utility model relates to technical field of building construction, specifically a kind of leakage dropping-board installs matching operation equipment.
Background technique
In recent years, in livestock breed aquatics, the application of cement leakage dropping-board so that production efficiency is greatly improved, and
And leakage dropping-board is smooth, easy to clean, durable, creates comfortable lie down and cleaning ambient to livestock.But due to general
The leakage dropping-board laying area of farm is wider, and lifting narrow space, topography are uneven, is unable to satisfy primary lifting and forms, Er Qieshui
The installation quality of mud leakage dropping-board is more demanding.So in leakage dropping-board process of deployment, how to solve lifting blind area laying and
How control panel surface evenness and the straight degree of plate face lines, just become work progress in have to the problem captured.
Summary of the invention
Purpose of the utility model is to solve above-mentioned problems of the prior art, and provide a kind of leakage dropping-board peace
Assembly set construction equipment.
The utility model is achieved by the following technical solution:
A kind of leakage dropping-board installation matching operation equipment, including lifting lever bracket, scale mark post and horizon bar;
The lifting lever bracket includes gate frame body and ladder-type frame body, two free ends difference of gate frame body bottom
Rubber roll is installed by rolling cage bearing, ladder-type frame body is mutually perpendicular to fix after passing through gate frame body with gate frame body, door
Oblique pull reinforcing rib is respectively fixed between the top of type frame body and the ladder-type breast piece of its two sides;
The scale mark post uses T-type or L-type strip band steel, and is provided with scale on T-type or L-type strip band steel
Value;
The horizon bar uses aluminium alloy straight-bar.
In the utility model equipment, lifting lever compensates for " blind area " problem of crane lifting leakage dropping-board construction, reduces
Construction cost investment, improves lifting efficiency.The gate frame body and ladder-type frame body lifted in lever forms lever mechanism, rubber
Idler wheel moves the lever mechanism, and when specifically used, construction personnel controls one end of ladder-type frame body, leakage to be laid
Dropping-board is lifted on the other end of ladder-type frame body, and such construction personnel can be sling separately by pushing ladder-type frame body one end
One end leakage dropping-board to be laid, then leakage dropping-board to be laid is moved to by construction " blind area " by rubber roll, it can carry out just
Normal laying construction.Scale mark post, can be suitable as adjustment crevice board using the T-type or L-type strip band steel for indicating scale value
The rod piece of straight degree dimensional discrepancy, and crevice board axial dimension deviation can also be verified in conjunction with steel ruler.Horizon bar is straight using aluminium alloy
Bar, can be used as the tool of adjustment leakage dropping-board block flatness deviation, and error is can be controlled in 3mm.
The complete process of leakage dropping-board laying is carried out using the utility model equipment are as follows: first with cad technique to leakage dropping-board
Integral installation carry out rationalization arrangement, secondly formulate reasonable lifting route according to field condition, finally utilize lifting lever
Crane lifting " blind area " is made up, while scale mark post and horizon bar being cooperated to be adjusted.
It is fixed between two vertical beams of gate frame body and is arranged in parallel with gate frame body top beam as a preferred technical solution,
Web beam, ladder-type frame body is placed on web beam and is fixedly connected with web beam.
It is 1.5:1 that ladder-type frame body, which is located at the length ratio of gate frame body two sides, as a preferred technical solution,.
Hoisting rope, the free end of hoisting rope are provided on the ladder-type frame body of shorter side as a preferred technical solution,
It is connected with hook.
Downward folding and unfolding is fixed on the ladder-type frame body of shorter side as a preferred technical solution, and with self-locking function
Telescopic supporting rod.
The utility model equipment design science, structure are simple, operation is easy, low in cost, practicability is extremely strong, therein to hang
Dress lever compensates for " the construction blind area " of crane lifting leakage dropping-board, reduces construction cost investment, improves lifting efficiency;Scale
Mark post and horizon bar correct the deviation of leakage dropping-board installation dimension, improve the installation quality of leakage dropping-board.In short, this is practical
The use of novel equipment, improves speed of application, reduces construction period, saves artificial and input cost, improves leakage excrement
The installation quality of plate has very high application and popularization value.
Detailed description of the invention
Attached drawing herein is used to provide the further explanation to the utility model, constitutes part of this application, this is practical
Novel illustrative embodiments and their description are used to explain the utility model, not constitute improper limits to the present invention.
Fig. 1 is the structural schematic diagram that lever is lifted in the utility model.
In figure: 1- gate frame body, 2- ladder-type frame body, 3- rubber roll, 4- oblique pull reinforcing rib, 5- hoisting rope, 6- hook,
7- telescopic supporting rod.
Specific embodiment
In order to make those skilled in the art better understand the utility model, below in conjunction with reference attached drawing and in conjunction with the embodiments
Further clear, complete explanation is made to the utility model.It should be noted that in the absence of conflict, in the application
Feature in embodiment and embodiment can be combined with each other.
A kind of leakage dropping-board installation matching operation equipment, including lifting lever bracket, scale mark post and horizon bar;
As shown in Figure 1, the lifting lever bracket includes gate frame body 1 and ladder-type frame body 2;Gate frame body 1 includes top
Beam and the vertical beam for being fixed on top beam both ends are further fixed on web beam, the bottom terminal ends of two vertical beams between two vertical beams
Respectively by roll cage bearing rubber roll 3 is installed, wherein top beam, vertical beam and web beam by 40m*80mm stainless steel
Square tube is made, and rolling cage bearing is made by the horizontal solid bar member that diameter is 40mm, and the diameter of rubber roll 3 is
500mm*500mm;Ladder-type frame body 2 includes two crossbeams disposed in parallel, is arranged at intervals with several companies between two crossbeams
Connect beam;Ladder-type frame body 2 passes through gate frame body and is placed on the web beam of gate frame body 1 and is fixedly connected with web beam,
2 place plane of ladder-type frame body is arranged in a mutually vertical manner with plane where gate frame body, wherein two crossbeams are 50mm by diameter
, wall thickness 5mm, length be 4000mm stainless steel tube be made, attachment beam by diameter is 40mm, wall thickness 5mm, length
Degree is that the stainless steel tube of 800mm is made, and the spacing distance between attachment beam is 500-1000mm;Ladder-type frame body 2 is located at
The length ratio of 1 two sides of gate frame body is 1.5:1, and 2 sections of ladder-type frame body of longer side are conveying people control terminal, the ladder of shorter side
2 sections of frame body of formula of grade are hanging leakage dropping-board end, and such design is to be convenient to conveying people slinging and transporting to leakage dropping-board, is saved
When, laborsaving, easy manipulation;Hoisting rope 5 is provided on the ladder-type frame body 2 of shorter side, the free end of hoisting rope 5 is connected with hook
6, hoisting rope 5 and hook 6 are used for hook and tie up leakage dropping-board;Downward folding and unfolding and band are fixed on the ladder-type frame body 2 of shorter side simultaneously
The telescopic supporting rod 7 of self-locking function, telescopic supporting rod 7 are risen to the bait when ladder-type frame body 2 and are tied up for the support to ladder-type frame body 2
Leakage dropping-board but when needing to suspend handling, so that it may telescopic supporting rod 7 is stretched out and self-locking, can thus not unload leakage
Support column lifts lever in the case where dropping-board;It is solid respectively between the top of gate frame body 1 and 2 part of ladder-type frame body of its two sides
Surely there is oblique pull reinforcing rib 4, oblique pull reinforcing rib 4 is used to reinforce the bonding strength between door type frame body 1 and ladder-type frame body 2;
The scale mark post uses the T-type or L-type strip band steel of 4mm thickness, and on T-type or L-type strip band steel
It is provided with scale value;
The horizon bar uses aluminium alloy straight-bar, and the size of aluminium alloy straight-bar is 6m*0.1m*0.04m.
The above is clearly and completely described to the technical scheme in the embodiment of the utility model, described reality
Applying example is only the utility model a part of the embodiment, instead of all the embodiments.Based on the embodiments of the present invention,
All other embodiment obtained by those of ordinary skill in the art without making creative efforts, belongs to this reality
With novel protected range.
Claims (6)
1. a kind of leakage dropping-board installs matching operation equipment, it is characterised in that: including lifting lever bracket, scale mark post and horizon bar;
The lifting lever bracket includes gate frame body and ladder-type frame body, and two free ends of gate frame body bottom pass through respectively
Rolling cage bearing is equipped with rubber roll, and ladder-type frame body is mutually perpendicular to fix after passing through gate frame body with gate frame body, door type frame
Oblique pull reinforcing rib is respectively fixed between the top of body and the ladder-type breast piece of its two sides;
The scale mark post uses T-type or L-type strip band steel, and is provided with scale value on T-type or L-type strip band steel;
The horizon bar uses aluminium alloy straight-bar.
2. leakage dropping-board according to claim 1 installs matching operation equipment, it is characterised in that: two vertical beams of gate frame body
Between be fixed with gate frame body top beam web beam disposed in parallel, ladder-type frame body be placed on web beam and with reinforce it is horizontal
Beam is fixedly connected.
3. leakage dropping-board according to claim 1 or 2 installs matching operation equipment, it is characterised in that: ladder-type frame body is located at
The length ratio of gate frame body two sides is 1.5:1.
4. leakage dropping-board according to claim 3 installs matching operation equipment, it is characterised in that: in the ladder-type frame of shorter side
Hoisting rope is provided on body, the free end of hoisting rope is connected with hook.
5. leakage dropping-board according to claim 3 installs matching operation equipment, it is characterised in that: in the ladder-type frame of shorter side
Downward folding and unfolding and the telescopic supporting rod with self-locking function are fixed on body.
6. leakage dropping-board according to claim 4 installs matching operation equipment, it is characterised in that: in the ladder-type frame of shorter side
Downward folding and unfolding and the telescopic supporting rod with self-locking function are fixed on body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822216154.0U CN209403261U (en) | 2018-12-27 | 2018-12-27 | Leakage dropping-board installs matching operation equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822216154.0U CN209403261U (en) | 2018-12-27 | 2018-12-27 | Leakage dropping-board installs matching operation equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209403261U true CN209403261U (en) | 2019-09-20 |
Family
ID=67940908
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822216154.0U Active CN209403261U (en) | 2018-12-27 | 2018-12-27 | Leakage dropping-board installs matching operation equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209403261U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113455410A (en) * | 2021-08-12 | 2021-10-01 | 山东昊冰建筑工程有限公司 | Excrement leaking plate mounting equipment |
-
2018
- 2018-12-27 CN CN201822216154.0U patent/CN209403261U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113455410A (en) * | 2021-08-12 | 2021-10-01 | 山东昊冰建筑工程有限公司 | Excrement leaking plate mounting equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212079327U (en) | Hydraulic pressure regulation formula side wall template platform truck | |
KR101305913B1 (en) | Rebar jig for psm box girder mould | |
CN209403261U (en) | Leakage dropping-board installs matching operation equipment | |
CN104674992A (en) | Supporting method and structure of suspended steel bar truss deck | |
CN207538483U (en) | A kind of steel box-girder suspender | |
CN210635627U (en) | Large-scale lifting machine for outer wall decoration | |
CN205077842U (en) | Multi -use architecture support | |
CN204899108U (en) | Node structure is hung futilely to marble | |
CN110282579A (en) | The Lift-on/Lift-off System and hanging method of prefabricated pipe trench in height-limited small space | |
CN216690350U (en) | Concrete circular silo slip form construction equipment | |
CN106698242B (en) | Support frame for pipeline installation | |
CN205976397U (en) | Portable handling frame | |
CN209505764U (en) | A kind of construction material trolley for being able to carry out lifting and using | |
CN205444889U (en) | Support arrangement for horizontal prefabricated component | |
CN109230155A (en) | A kind of prefabricated panel piling bin | |
CN211691525U (en) | Construction device for overhanging type inclined curtain wall | |
CN201128882Y (en) | Lifting and supporting brackets integrated construction device for bridge arch rib | |
CN208883352U (en) | A kind of dismountable hanging device | |
CN208932780U (en) | A kind of scalable bracket | |
CN106285000A (en) | Whole spelling template transporter and conveyer method thereof | |
CN203394008U (en) | Suspension type hanging bracket used on plane truss | |
CN107700854B (en) | Steel plate wall sliding installation device and installation method for super high-rise core tube | |
CN205224579U (en) | Steel framework template and self -supporting truss board combination concrete quick detach system | |
CN220769489U (en) | Support mounting auxiliary device for tunnel synchronous lining conveyor belt | |
CN208918320U (en) | One kind is built a wall frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |