CN209385146U - Tunnel double-lining concrete construction is without door frame formwork jumbo - Google Patents

Tunnel double-lining concrete construction is without door frame formwork jumbo Download PDF

Info

Publication number
CN209385146U
CN209385146U CN201821364124.8U CN201821364124U CN209385146U CN 209385146 U CN209385146 U CN 209385146U CN 201821364124 U CN201821364124 U CN 201821364124U CN 209385146 U CN209385146 U CN 209385146U
Authority
CN
China
Prior art keywords
arc template
sliding slot
fixed
lifting
oil cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201821364124.8U
Other languages
Chinese (zh)
Inventor
马小利
冯建军
庄乾理
李光军
周普华
魏存兰
冯钰�
王飞刚
刘维号
周诗坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN201821364124.8U priority Critical patent/CN209385146U/en
Application granted granted Critical
Publication of CN209385146U publication Critical patent/CN209385146U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Tunnel double-lining concrete construction is without door frame formwork jumbo, it is placement traveling wheel in orbit and fixed lifting traveller, lifting cylinder is fixed in the upper end, lifting cylinder is fixed on bottom beam, sliding slot in side is set between bottom beam, oil cylinder in tune is inlayed in side sliding slot, its telescopic end affixed side sliding column is simultaneously sleeved in side sliding slot, setting driving platform and step of getting on the bus on bottom beam, upper arc template and side arc template are hinged, upper arc template sets transverse beam below, vertical columns between transverse beam and upper arc template, cantilever mounted beam and operation platform in the arc template of side, side arc oil cylinder is fixed in transverse beam, arc oil cylinder 7 telescopic end in side is hinged on a cantilever beam.The utility model is structurally reasonable, stable mechanical performance, easy to operate, fast and accurate for positioning, stability is good, and integral mold plate rigid is high, and deflection is small, and channel available space is big, Construction traffic operation is smooth, and ventilation strip can pass through, and improve the construction environment in tunnel.

Description

Tunnel double-lining concrete construction is without door frame formwork jumbo
Technical field
The utility model relates to a kind of tunnel double-lining concrete blinding trolley, specifically a kind of tunnel double-lining concrete construction Without door frame formwork jumbo, belong to road and bridge construction field.
Background technique
With the fast development that national basis is built, more strict requirements are proposed to construction quality and safety. Especially the construction quality of Railway Tunnel concrete is required more to standardize, tunnel double-lining concreting generally uses 12 Rice formwork jumbo segmentation successively pours, and inevitably there are construction joints between every section, by every section of construction joint of job specfication requirement It should be smooth smooth.And code requirement is extremely difficult in practice of construction, especially ground face upward 2 meters or so seam crossing most It is easy to appear concrete height faulting of slab ends, and faulting of slab ends degree is larger, generally taken to eliminate faulting of slab ends in faulting of slab ends position erection construction The concrete being higher by is polished flat on platform with sanding machine suitable by platform, construction personnel;There are also be exactly small abutment wall and lower arc template Lower part lap-joint is also easy to appear faulting of slab ends, and main cause is that the bottom of formwork jumbo lower part camber template is added with screw rod and ground Gu the angle of two fulcrums is generally acute angle, the pressure of concrete casting and the impact force of concrete vibrating are easy template Now float shrink or tension and relaxation and there is faulting of slab ends, if screw rod to reinforce it is not firm, it is possible that spillage and run mould, go out concrete It now sheds tears line, voids and pits, serious influence concrete solid quality;Due to the particularity of constructing tunnel, two lining concrete moulds Pallet vehicle must assure that Construction traffic is passed through from trolley door frame, so the door frame bottom of formwork jumbo cannot achieve rigidity branch Support, the pressure when being poured concrete can make two sides door frame to central reduction, also be easy that concrete seam is made faulting of slab ends occur.Separately The reinforcing screw rod of outer this formwork jumbo is especially more, has lower arc template to the reinforcing screw rod of door frame, has lower arc template to ground Screw rod is reinforced, screw rod is exactly to require construction personnel to reinforce rotation to hold out against reinforcings, more than recruitment and large labor intensity, simultaneously because area Face, which is excavated, mostly uses big machinery to carry out excavation construction, so flue dust is larger in tunnel, since two lining formwork jumbos are there are door frame, Oil smoke is not easy that tunnel is discharged, and seriously affects construction.There is presently no a kind of rigidity, and strong, environmentally friendly and structurally reasonable tunnel double-lining mixes Solidifying soil construction formwork trolley.
Utility model content
The utility model aim is the current tunnel double-lining concrete blinding trolley defect present in construction of solution, thus A kind of tunnel double-lining concrete construction is disclosed without door frame formwork jumbo.
The technical solution of the utility model is as follows:
Two tracks are placed on the ground of tunnel longitudinal direction, two traveling wheels are placed on every track, on each traveling wheel Fixed lifting traveller respectively, in lifting sliding slot, lifting sliding slot perforation is embedded on bottom beam lifting slide rod sleeve, is gone up and down on traveller End is fixed on lifting cylinder telescopic end, and lifting cylinder fixing end is fixed on bottom beam, is set a side between three foundation beams respectively and is pushed away Sliding slot is connected with each other between bottom beam and side sliding slot by attachment beam, and oil in a tune is respectively inlayed in each side sliding slot both ends Cylinder, oil cylinder telescopic end fixes a side sliding column respectively in tune, and sliding column sleeve in side is in side sliding slot, fixer on attachment beam Case is pressed, step of getting on the bus is respectively set in setting driving platform on bottom beam, driving platform both ends, and guardrail is arranged in driving platform two sides, even Beam side installation elevating screw is connect, lead screw is reinforced in installation between bottom beam and side arc template, and upper arc template and side arc template pass through hinge Even pin is hinged, and upper arc template sets several transverse beams below, and instrument in adjusting, every transverse beam and upper arc are installed in the middle part of the transverse beam of front end A plurality of uprights are fixed between template, and a cantilever beam and two operation platforms, side arc oil cylinder are fixed in every piece of side arc template Fixing end is fixed in transverse beam, and arc oil cylinder 7 telescopic end in side is hinged on a cantilever beam.
The utility model design structure is reasonable, and stable mechanical performance is easy to operate, and centering uses infrared ray adjustment dress It sets, fast and accurate for positioning, whole trolley surrounding and bottom form closed structure, and stability is good, and integral mold plate rigid is high, Deflection is small, and channel available space is big, and Construction traffic operation is smooth, and ventilation strip can pass through, the more advantageous tunnel of channel large space The flue dust of road front end face is discharged, and improves the construction environment in tunnel, so reaching one meets quality safety requirement Tunnel double-lining concrete construction is without door frame formwork jumbo.
Detailed description of the invention
Attached drawing 1 is the schematic view of the front view of the utility model.
Attached drawing 2 be the utility model attached drawing 1 along A-A to left view the schematic diagram of the section structure.
The reference numerals are as follows: upper arc template 1, side arc template 2, hinge pin 3, column 4, transverse beam 5, cantilever beam 6, side Arc oil cylinder 7, operation platform 8, track 9, traveling wheel 10, lifting cylinder 11 go up and down traveller 12, go up and down sliding slot 13, bottom beam 14, in tune Oil cylinder 15 reinforces lead screw 16, attachment beam 17, side sliding column 18, side sliding slot 19, instrument 20 in tune, hydraulic fluid tank 21, step of getting on the bus 22, platform 23 of driving a vehicle, guardrail 24, elevating screw 25.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing:
Two tracks 9 are placed on the ground of tunnel longitudinal direction, two traveling wheels 10 are placed on every track 9, in each walking Fixed lifting traveller 12, lifting traveller 12 are sleeved in lifting sliding slot 13 respectively on wheel 10, and the lifting perforation of sliding slot 13 is embedded in bottom On beam 14, lifting 12 upper end of traveller is fixed on 11 telescopic end of lifting cylinder, and 11 fixing end of lifting cylinder is fixed on bottom beam 14, and three A side sliding slot 19 is set between foundation beam 14 respectively, is connected with each other between bottom beam 14 and side sliding slot 19 by attachment beam 17, Oil cylinder 15 in a tune is respectively inlayed in each 19 both ends of side sliding slot, 15 telescopic end of oil cylinder fixes a side sliding column respectively in tune 18, side sliding column 18 is sleeved in side sliding slot 19, fixed hydraulic case 21 on attachment beam 17, setting driving platform on bottom beam 14 23, step 22 of getting on the bus is respectively set in driving 23 both ends of platform, and guardrail 24, the installation of 17 side of attachment beam is arranged in driving 23 two sides of platform Elevating screw 25, lead screw 16 is reinforced in installation between bottom beam 14 and side arc template 2, and upper arc template 1 passes through the pin that is hinged with side arc template 2 3 are hinged, and upper arc template 1 sets five transverse beams 5 below, in the middle part of front end transverse beam 5 installation adjust in instrument 20, every transverse beam 5 with it is upper Three root posts 4 are fixed between arc template 1, fix a cantilever beam 6 and two operation platforms 8, side arc in every piece of side arc template 2 7 fixing end of oil cylinder is fixed in transverse beam 5, and arc oil cylinder 7 telescopic end in side is hinged on cantilever beam 6.
When the utility model is used, two tracks are laid in tunnel ground level first, trolley is placed in orbit, is led to It crosses traveling wheel and pushes to the position that need to be poured concrete, open hydraulic fluid tank, oil cylinder in tune is adjusted by instrument in adjusting and is stretched, really It is consistent with tunnel middle line to determine trolley middle line, lifting cylinder extends to jack trolley to specified altitude assignment and stop, rotation and lifting lead screw, silk Thick stick extends top to ground, and oil cylinder, which extends, in tune drives sliding capital in side to stretch lower arc template to designated position stopping, rotating reinforcing wire Thick stick is reinforced lead screw extension opposite side arc template and is reinforced, is laid with step of getting on the bus, starts casting concrete, after concrete setting, Remove step of getting on the bus, close hydraulic fluid tank, come loose and reinforce lead screw and elevating screw, trolley resets, and so on enter next section to apply Work.

Claims (2)

1. tunnel double-lining concrete construction is without door frame formwork jumbo, it is characterised in that: place two rails on the ground of tunnel longitudinal direction Two traveling wheels (10) are placed in road (9) on every track (9), fixed lifting traveller (12) respectively on each traveling wheel (10), Lifting traveller (12) is sleeved in lifting sliding slot (13), and lifting sliding slot (13) perforation is embedded on bottom beam (14), goes up and down traveller (12) upper end is fixed on lifting cylinder (11) telescopic end, and lifting cylinder (11) fixing end is fixed on bottom beam (14), three foundation beams (14) a side sliding slot (19) is set between respectively, is mutually interconnected between bottom beam (14) and side sliding slot (19) by attachment beam (17) It connects, oil cylinder (15) in a tune is respectively inlayed in each side sliding slot (19) both ends, oil cylinder (15) telescopic end fixes one respectively in tune A side sliding column (18), side sliding column (18) are sleeved in side sliding slot (19), fixed hydraulic case (21), bottom on attachment beam (17) Setting driving platform (23) on beam (14), driving platform (23) both ends are respectively set step of getting on the bus (22), platform (23) two of driving a vehicle Guardrail (24) are arranged in side, and elevating screw (25) are installed in attachment beam (17) side, and installation adds between bottom beam (14) and side arc template (2) Gu lead screw (16), upper arc template (1) and side arc template (2) are hinged by the pin (3) that is hinged, upper arc template (1) sets several below Transverse beam (5), instrument (20) in tune is installed at front end transverse beam (5) middle part, fixed between every transverse beam (5) and upper arc template (1) A plurality of uprights (4) fix a cantilever beam (6) and two operation platforms (8), side arc oil cylinder on every piece of side arc template (2) (7) fixing end is fixed on transverse beam (5), and side arc oil cylinder (7) telescopic end is hinged on cantilever beam (6).
2. tunnel double-lining concrete construction according to claim 1 is without door frame formwork jumbo, it is characterised in that: upper arc template (1) five transverse beams (5) are set below, fixes three root posts (4) between every transverse beam (5) and upper arc template (1).
CN201821364124.8U 2018-08-23 2018-08-23 Tunnel double-lining concrete construction is without door frame formwork jumbo Withdrawn - After Issue CN209385146U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821364124.8U CN209385146U (en) 2018-08-23 2018-08-23 Tunnel double-lining concrete construction is without door frame formwork jumbo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821364124.8U CN209385146U (en) 2018-08-23 2018-08-23 Tunnel double-lining concrete construction is without door frame formwork jumbo

Publications (1)

Publication Number Publication Date
CN209385146U true CN209385146U (en) 2019-09-13

Family

ID=67869298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821364124.8U Withdrawn - After Issue CN209385146U (en) 2018-08-23 2018-08-23 Tunnel double-lining concrete construction is without door frame formwork jumbo

Country Status (1)

Country Link
CN (1) CN209385146U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868832A (en) * 2018-08-23 2018-11-23 中铁二十局集团第三工程有限公司 Tunnel double-lining concrete construction is without door frame formwork jumbo

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868832A (en) * 2018-08-23 2018-11-23 中铁二十局集团第三工程有限公司 Tunnel double-lining concrete construction is without door frame formwork jumbo
CN108868832B (en) * 2018-08-23 2024-03-19 中铁二十一局集团第三工程有限公司 Portal-free template trolley for tunnel secondary lining concrete construction

Similar Documents

Publication Publication Date Title
CN101230785B (en) Construction method for large section and multiple sections tunnel lining
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN103967050A (en) Construction system of subway station
CN101302739B (en) Prestress concrete box girder hydraulic internal mold vehicle as well as hydraulic internal mold system
CN106089253A (en) A kind of all-hydraulic template system poured for culvert
CN107387122A (en) A kind of formwork jumbo and its construction method for the construction of piping lane tunneling boring
CN108103945B (en) A kind of whole landing mould bases of cast-in-situ box girder
CN104499434A (en) Movable formwork for casting of wide-body box girder and construction method
CN106812541A (en) A kind of adjustable bore tunnel construction platform car and adjusting method
CN108868832A (en) Tunnel double-lining concrete construction is without door frame formwork jumbo
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN209385146U (en) Tunnel double-lining concrete construction is without door frame formwork jumbo
CN202412422U (en) Template system for prefabricating simply-supported box girder
CN109629439B (en) Construction method of single-tower cable-stayed bridge
CN103388305A (en) Railway T-beam cast-in-site bridge deck forming machine
CN203248170U (en) Lining trolley for secondary lining construction of pedestrian crosswalk
CN104110002A (en) Method for replacing bridge deck slabs of steel truss girder bridge
CN102268858A (en) Cradle for suspension pouring of arch-type bridge
KR20050108867A (en) A method for changing plate-girder bridge of railway bridge into slab bridge by using temporary construction bents.
CN211762304U (en) Self-propelled hydraulic integral T-beam template device
CN102528910A (en) Template system of prefabricated simply support box beam
CN205243529U (en) Tunnel secretly digs lining construction platform truck
CN108098978A (en) A kind of assembled underground pipe gallery epimere producing device and production method
CN212335790U (en) Large cantilever bent cap construction trolley
CN105178197B (en) Support frame for bearing formworks of initial blocks of bridge box girder and initial block construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20190913

Effective date of abandoning: 20240319

AV01 Patent right actively abandoned

Granted publication date: 20190913

Effective date of abandoning: 20240319

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned