CN108868832A - Tunnel double-lining concrete construction is without door frame formwork jumbo - Google Patents

Tunnel double-lining concrete construction is without door frame formwork jumbo Download PDF

Info

Publication number
CN108868832A
CN108868832A CN201810967590.3A CN201810967590A CN108868832A CN 108868832 A CN108868832 A CN 108868832A CN 201810967590 A CN201810967590 A CN 201810967590A CN 108868832 A CN108868832 A CN 108868832A
Authority
CN
China
Prior art keywords
arc template
sliding slot
fixed
oil cylinder
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810967590.3A
Other languages
Chinese (zh)
Other versions
CN108868832B (en
Inventor
马小利
冯建军
庄乾理
李光军
周普华
魏存兰
冯钰�
王飞刚
刘维号
周诗坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN201810967590.3A priority Critical patent/CN108868832B/en
Publication of CN108868832A publication Critical patent/CN108868832A/en
Application granted granted Critical
Publication of CN108868832B publication Critical patent/CN108868832B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Tunnel double-lining concrete construction is without door frame formwork jumbo, it is placement traveling wheel in orbit and fixed lifting traveller, lifting cylinder is fixed in the upper end, lifting cylinder is fixed on bottom beam, sliding slot in side is set between bottom beam, oil cylinder in tune is inlayed in side sliding slot, its telescopic end affixed side sliding column is simultaneously sleeved in side sliding slot, setting driving platform and step of getting on the bus on bottom beam, upper arc template and side arc template are hinged, upper arc template sets transverse beam below, vertical columns between transverse beam and upper arc template, cantilever mounted beam and operation platform in the arc template of side, side arc oil cylinder is fixed in transverse beam, arc oil cylinder 7 telescopic end in side is hinged on a cantilever beam.Structure of the invention is reasonable, stable mechanical performance, easy to operate, fast and accurate for positioning, and stability is good, and integral mold plate rigid is high, and deflection is small, and channel available space is big, and Construction traffic operation is smooth, and ventilation strip can pass through, and improve the construction environment in tunnel.

Description

Tunnel double-lining concrete construction is without door frame formwork jumbo
Technical field
The present invention relates to a kind of tunnel double-lining concrete blinding trolley, specifically a kind of tunnel double-lining concrete construction is without door Frame formwork jumbo belongs to road and bridge construction field.
Background technique
With the fast development that national basis is built, more strict requirements are proposed to construction quality and safety. Especially the construction quality of Railway Tunnel concrete is required more to standardize, tunnel double-lining concreting generally uses 12 Rice formwork jumbo segmentation successively pours, and inevitably there are construction joints between every section, by every section of construction joint of job specfication requirement It should be smooth smooth.And code requirement is extremely difficult in practice of construction, especially ground face upward 2 meters or so seam crossing most It is easy to appear concrete height faulting of slab ends, and faulting of slab ends degree is larger, generally taken to eliminate faulting of slab ends in faulting of slab ends position erection construction The concrete being higher by is polished flat on platform with sanding machine suitable by platform, construction personnel;There are also be exactly small abutment wall and lower arc template Lower part lap-joint is also easy to appear faulting of slab ends, and main cause is that the bottom of formwork jumbo lower part camber template is added with screw rod and ground Gu the angle of two fulcrums is generally acute angle, the pressure of concrete casting and the impact force of concrete vibrating are easy template Now float shrink or tension and relaxation and there is faulting of slab ends, if screw rod to reinforce it is not firm, it is possible that spillage and run mould, go out concrete It now sheds tears line, voids and pits, serious influence concrete solid quality;Due to the particularity of constructing tunnel, two lining concrete moulds Pallet vehicle must assure that Construction traffic is passed through from trolley door frame, so the door frame bottom of formwork jumbo cannot achieve rigidity branch Support, the pressure when being poured concrete can make two sides door frame to central reduction, also be easy that concrete seam is made faulting of slab ends occur.Separately The reinforcing screw rod of outer this formwork jumbo is especially more, has lower arc template to the reinforcing screw rod of door frame, has lower arc template to ground Screw rod is reinforced, screw rod is exactly to require construction personnel to reinforce rotation to hold out against reinforcings, more than recruitment and large labor intensity, simultaneously because area Face, which is excavated, mostly uses big machinery to carry out excavation construction, so flue dust is larger in tunnel, since two lining formwork jumbos are there are door frame, Oil smoke is not easy that tunnel is discharged, and seriously affects construction.There is presently no a kind of rigidity, and strong, environmentally friendly and structurally reasonable tunnel double-lining mixes Solidifying soil construction formwork trolley.
Summary of the invention
Object of the present invention is to solve current tunnel double-lining concrete blinding trolley defect present in construction, thus open A kind of tunnel double-lining concrete construction is without door frame formwork jumbo.
Technical scheme is as follows:
Two tracks are placed on the ground of tunnel longitudinal direction, place two traveling wheels on every track, on each traveling wheel respectively Fixed lifting traveller, lifting slide rod sleeve is in lifting sliding slot, and lifting sliding slot perforation is embedded on bottom beam, and lifting traveller upper end is solid It is scheduled on lifting cylinder telescopic end, lifting cylinder fixing end is fixed on bottom beam, a side sliding slot is set between three foundation beams respectively, It is connected with each other between bottom beam and side sliding slot by attachment beam, oil cylinder in a tune is respectively inlayed in each side sliding slot both ends, is adjusted Middle oil cylinder telescopic end fixes a side sliding column respectively, and sliding column sleeve in side is in side sliding slot, fixed hydraulic case on attachment beam, Step of getting on the bus is respectively set in setting driving platform on bottom beam, driving platform both ends, and guardrail, attachment beam side is arranged in driving platform two sides Elevating screw is installed in portion, and lead screw is reinforced in installation between bottom beam and side arc template, and upper arc template and side arc template pass through the pin hinge that is hinged Even, upper arc template sets several transverse beams below, in the middle part of the transverse beam of front end installation adjust in instrument, every transverse beam and upper arc template it Between fix a plurality of uprights, a cantilever beam and two operation platforms, side arc oil cylinder fixing end are fixed in every piece of side arc template It is fixed in transverse beam, arc oil cylinder 7 telescopic end in side is hinged on a cantilever beam.
Design structure of the present invention is reasonable, and stable mechanical performance is easy to operate, and centering uses infrared line adjusting device, fixed Quick and precisely, whole trolley surrounding and bottom form closed structure, and stability is good for position, and integral mold plate rigid is high, deformation Measure small, channel available space is big, and Construction traffic operation is smooth, and ventilation strip can pass through, before the more advantageous tunnel of channel large space The flue dust discharge for holding face, improves the construction environment in tunnel, so reaching the tunnel for meeting quality safety requirement Two lining concrete constructions are without door frame formwork jumbo.
Detailed description of the invention
Attached drawing 1 is schematic view of the front view of the invention.
Attached drawing 2 be attached drawing 1 of the present invention along A-A to left view the schematic diagram of the section structure.
The reference numerals are as follows:Upper arc template 1, side arc template 2, hinge pin 3, column 4, transverse beam 5, cantilever beam 6, side Arc oil cylinder 7, operation platform 8, track 9, traveling wheel 10, lifting cylinder 11 go up and down traveller 12, go up and down sliding slot 13, bottom beam 14, in tune Oil cylinder 15 reinforces lead screw 16, attachment beam 17, side sliding column 18, side sliding slot 19, instrument 20 in tune, hydraulic fluid tank 21, step of getting on the bus 22, platform 23 of driving a vehicle, guardrail 24, elevating screw 25.
Specific embodiment
The present invention is described in further detail below in conjunction with attached drawing:
Two tracks 9 are placed on the ground of tunnel longitudinal direction, two traveling wheels 10 are placed on every track 9, in each traveling wheel 10 Upper lifting traveller 12 fixed respectively, lifting traveller 12 are sleeved in lifting sliding slot 13, and the lifting perforation of sliding slot 13 is embedded in bottom beam 14 On, lifting 12 upper end of traveller is fixed on 11 telescopic end of lifting cylinder, and 11 fixing end of lifting cylinder is fixed on bottom beam 14, three foundation A side sliding slot 19 is set between beam 14 respectively, is connected with each other between bottom beam 14 and side sliding slot 19 by attachment beam 17, each Oil cylinder 15 in a tune is respectively inlayed in 19 both ends of side sliding slot, 15 telescopic end of oil cylinder fixes a side sliding column 18 respectively in tune, Side sliding column 18 is sleeved in side sliding slot 19, fixed hydraulic case 21 on attachment beam 17, setting driving platform 23, row on bottom beam 14 Step 22 of getting on the bus is respectively set in 23 both ends of vehicle platform, and guardrail 24, the installation lifting of 17 side of attachment beam is arranged in driving 23 two sides of platform Lead screw 25, lead screw 16 is reinforced in installation between bottom beam 14 and side arc template 2, and upper arc template 1 is cut with scissors with side arc template 2 by hinge pin 3 Even, upper arc template 1 sets five transverse beams 5 below, and instrument 20 in adjusting, every transverse beam 5 and upper arc mould are installed in the middle part of front end transverse beam 5 Three root posts 4 are fixed between plate 1, and a cantilever beam 6 and two operation platforms 8, side arc oil cylinder are fixed in every piece of side arc template 2 7 fixing ends are fixed in transverse beam 5, and arc oil cylinder 7 telescopic end in side is hinged on cantilever beam 6.
Trolley is placed in orbit in use, first in tunnel ground level two tracks of laying, passes through row by the present invention It walks wheel and pushes to the position that need to be poured concrete, open hydraulic fluid tank, oil cylinder in tune is adjusted by instrument in adjusting and is stretched, determining table Vehicle middle line is consistent with tunnel middle line, and lifting cylinder extends to jack trolley to specified altitude assignment and stop, and rotation and lifting lead screw, lead screw prolongs Top to ground is stretched, oil cylinder, which extends, in tune drives sliding capital in side to stretch lower arc template to designated position stopping, and rotation is reinforced lead screw, added It is reinforced Gu lead screw extends opposite side arc template, is laid with step of getting on the bus, started casting concrete and remove after concrete setting Get on the bus step, close hydraulic fluid tank, come loose and reinforce lead screw and elevating screw, trolley resets, and so on next section of construction of entering.

Claims (2)

1. tunnel double-lining concrete construction is without door frame formwork jumbo, it is characterised in that:Two rails are placed on the ground of tunnel longitudinal direction Road(9), every track(9)Two traveling wheels of upper placement(10), in each traveling wheel(10)Upper lifting traveller fixed respectively(12), Go up and down traveller(12)It is sleeved on lifting sliding slot(13)In, go up and down sliding slot(13)Perforation is embedded in bottom beam(14)On, go up and down traveller (12)Upper end is fixed on lifting cylinder(11)Telescopic end, lifting cylinder(11)Fixing end is fixed on bottom beam(14)On, three foundation beams (14)Between set a side sliding slot respectively(19), bottom beam(14)With side sliding slot(19)Between pass through attachment beam(17)Mutually interconnect It connects, each side sliding slot(19)Oil cylinder in a tune is respectively inlayed in both ends(15), oil cylinder in tune(15)Telescopic end fixes one respectively A side sliding column(18), side sliding column(18)It is sleeved on side sliding slot(19)It is interior, attachment beam(17)Upper fixed hydraulic case(21), bottom Beam(14)Upper setting driving platform(23), platform of driving a vehicle(23)Step of getting on the bus is respectively set in both ends(22), platform of driving a vehicle(23)Two Guardrail is arranged in side(24), attachment beam(17)Side is installed by elevating screw(25), bottom beam(14)With side arc template(2)Between installation plus Gu lead screw(16), upper arc template(1)With side arc template(2)It is sold by being hinged(3)It is hinged, upper arc template(1)Several are set below Transverse beam(5), front end transverse beam(5)Instrument in middle part installation tune(20), every transverse beam(5)With upper arc template(1)Between it is fixed A plurality of uprights(4), every piece of side arc template(2)It is above each to fix a cantilever beam(6)With two operation platforms(8), side arc oil cylinder (7)Fixing end is fixed on transverse beam(5)On, side arc oil cylinder(7)Telescopic end is hinged at cantilever beam(6)On.
2. tunnel double-lining concrete construction according to claim 1 is without door frame formwork jumbo, it is characterised in that:Upper arc template (1)Five transverse beams are set below(5), every transverse beam(5)With upper arc template(1)Between fix three root posts(4).
CN201810967590.3A 2018-08-23 2018-08-23 Portal-free template trolley for tunnel secondary lining concrete construction Active CN108868832B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810967590.3A CN108868832B (en) 2018-08-23 2018-08-23 Portal-free template trolley for tunnel secondary lining concrete construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810967590.3A CN108868832B (en) 2018-08-23 2018-08-23 Portal-free template trolley for tunnel secondary lining concrete construction

Publications (2)

Publication Number Publication Date
CN108868832A true CN108868832A (en) 2018-11-23
CN108868832B CN108868832B (en) 2024-03-19

Family

ID=64321583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810967590.3A Active CN108868832B (en) 2018-08-23 2018-08-23 Portal-free template trolley for tunnel secondary lining concrete construction

Country Status (1)

Country Link
CN (1) CN108868832B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111379570A (en) * 2018-12-27 2020-07-07 山河智能装备股份有限公司 Lining cutting platform truck and formwork device thereof
CN111379569A (en) * 2018-12-27 2020-07-07 山河智能装备股份有限公司 Lining trolley without portal

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1096105A2 (en) * 1999-10-28 2001-05-02 Ed. Züblin Ag Method for shuttering the walls of a tunnel and shutter for use in the method
CN1851233A (en) * 2006-05-24 2006-10-25 杨秋利 Tunnel lining trolley
ES1144986U (en) * 2015-09-30 2015-10-21 Amorim Obras Publicas, S.L. Self-supporting formwork trolley for tunnel lining (Machine-translation by Google Translate, not legally binding)
CN107905819A (en) * 2017-12-21 2018-04-13 湖南五新隧道智能装备股份有限公司 A kind of template bearing-type lining trolley
CN107965337A (en) * 2017-12-21 2018-04-27 湖南五新隧道智能装备股份有限公司 A kind of lining construction method and its lining trolley of use
CN209385146U (en) * 2018-08-23 2019-09-13 中铁二十一局集团第三工程有限公司 Tunnel double-lining concrete construction is without door frame formwork jumbo

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1096105A2 (en) * 1999-10-28 2001-05-02 Ed. Züblin Ag Method for shuttering the walls of a tunnel and shutter for use in the method
CN1851233A (en) * 2006-05-24 2006-10-25 杨秋利 Tunnel lining trolley
ES1144986U (en) * 2015-09-30 2015-10-21 Amorim Obras Publicas, S.L. Self-supporting formwork trolley for tunnel lining (Machine-translation by Google Translate, not legally binding)
CN107905819A (en) * 2017-12-21 2018-04-13 湖南五新隧道智能装备股份有限公司 A kind of template bearing-type lining trolley
CN107965337A (en) * 2017-12-21 2018-04-27 湖南五新隧道智能装备股份有限公司 A kind of lining construction method and its lining trolley of use
CN209385146U (en) * 2018-08-23 2019-09-13 中铁二十一局集团第三工程有限公司 Tunnel double-lining concrete construction is without door frame formwork jumbo

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李忠忱;: "霞浦隧道可变断面衬砌台车设计", 铁道建筑技术, no. 06, pages 61 - 63 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111379570A (en) * 2018-12-27 2020-07-07 山河智能装备股份有限公司 Lining cutting platform truck and formwork device thereof
CN111379569A (en) * 2018-12-27 2020-07-07 山河智能装备股份有限公司 Lining trolley without portal
CN111379570B (en) * 2018-12-27 2022-03-18 山河智能装备股份有限公司 Lining cutting platform truck and formwork device thereof

Also Published As

Publication number Publication date
CN108868832B (en) 2024-03-19

Similar Documents

Publication Publication Date Title
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN101302739B (en) Prestress concrete box girder hydraulic internal mold vehicle as well as hydraulic internal mold system
CN103967050A (en) Construction system of subway station
CN106089253A (en) A kind of all-hydraulic template system poured for culvert
CN107387122A (en) A kind of formwork jumbo and its construction method for the construction of piping lane tunneling boring
CN110513126A (en) A kind of tunnel double-lining trolley that section-variable can be recycled
CN104499434A (en) Movable formwork for casting of wide-body box girder and construction method
CN113235472A (en) Concrete placement platform truck is contained to apron
CN212336714U (en) Self-propelled truss supporting template
CN110468748B (en) Culvert trolley
CN108868832A (en) Tunnel double-lining concrete construction is without door frame formwork jumbo
KR100692952B1 (en) Railroad crane and method for carrying out replacement of an upper structure of a railway bridge utilizing the same
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN111809660A (en) Comprehensive pipe gallery rectangular trolley and construction method
CN210712594U (en) Culvert platform truck
CN209385146U (en) Tunnel double-lining concrete construction is without door frame formwork jumbo
KR20050108867A (en) A method for changing plate-girder bridge of railway bridge into slab bridge by using temporary construction bents.
CN104110002A (en) Method for replacing bridge deck slabs of steel truss girder bridge
CN211762304U (en) Self-propelled hydraulic integral T-beam template device
CN102808375B (en) Hinge structure of steel pier column of portal frame platform bridge and bearing platform and construction method thereof
CN219240333U (en) Trolley for construction of cover culvert
CN209066302U (en) Cast-in-place side template assembly with walking system
KR101044340B1 (en) Traveling way construction method of automated guideway transit type light weight railway and thereof construction machine
CN212335790U (en) Large cantilever bent cap construction trolley
CN116378711A (en) Shallow-buried underground excavation tunnel separated trolley device and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant