CN209308156U - A kind of prefabricated buildings that can be recycled - Google Patents

A kind of prefabricated buildings that can be recycled Download PDF

Info

Publication number
CN209308156U
CN209308156U CN201821721780.9U CN201821721780U CN209308156U CN 209308156 U CN209308156 U CN 209308156U CN 201821721780 U CN201821721780 U CN 201821721780U CN 209308156 U CN209308156 U CN 209308156U
Authority
CN
China
Prior art keywords
fixedly connected
gable
roof boarding
wallboard
recycled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821721780.9U
Other languages
Chinese (zh)
Inventor
侯和涛
王承磊
陈城
曲冰
赵星楠
牟银林
陈骁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201821721780.9U priority Critical patent/CN209308156U/en
Application granted granted Critical
Publication of CN209308156U publication Critical patent/CN209308156U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to technical field of buildings, more particularly to a kind of prefabricated buildings that can be recycled, including three-hinged arch roof boarding, the three-hinged arch roof boarding includes the room plate that multiple groups are arranged at an angle, every block plate includes two pieces of roof boardings, one end of two pieces of roof boardings is hinged, and the other end of every piece of roof boarding is arranged diagonally downward and is fixedly connected respectively with wallboard;The wallboard is used to support three-hinged arch roof boarding, and the lower section of wallboard is fixedly connected with prefabricated foundation, and the lower end of the prefabricated foundation is installed in ground, and upper end is fixedly connected with wallboard;The opposite side of two pieces of roof boardings is fixedly connected by horizontally disposed two round tubes, and the roof boarding place of being hinged forms ridge.The present invention also provides a kind of installation method of prefabricated buildings that can be recycled, the utility model can substitute traditional color steel plate room, and node installation is convenient, easy to disassemble, can be recycled;House stability after assembly is good, and securely and reliably, comfort level is high.

Description

A kind of prefabricated buildings that can be recycled
Technical field
The invention belongs to technical field of buildings, and in particular to a kind of prefabricated buildings that can be recycled.
Background technique
Currently, construction board house be one kind using lightgage steel joist as skeleton, using chromatic steel sandwich plate as maintenance materials, with standard module Spatial Coupling is carried out, component is connected by screw bolts and the movable plank house that is formed, can conveniently and efficiently carry out assembly and disassembly, but its Insulation, sound insulation, fire resistance are poor, and comfort level is low, and building waste is easy to produce after disassembly.
Container activity house is a kind of novel temporary building, and convenient disassembly is quick, and does not have to build ground, environmental protection Effect is good, long service life, recoverable, but its transportation cost is high, and use space is limited.
It is all skeletons and the support that house is constituted with lightweight steel that lightgage steel joist, which assembles house, such as light gauge cold-formed steel shape room Room, can be easy for installation with assembled in situ, but process is more, and its higher cost, is suitable for low layer villa or high-grade house.
Summary of the invention
The present invention provides a kind of prefabricated buildings that can be recycled, can be instead of traditional color steel plate room, node It is easy for installation, it is easy to disassemble, it can be recycled;House stability after assembly is good, and securely and reliably, comfort level is high.
The present invention adopts the following technical solutions: a kind of prefabricated buildings that can be recycled, including three-hinged arch roof boarding, institute Stating three-hinged arch roof boarding includes the room plate that multiple groups are arranged at an angle, and every block plate includes two pieces of roof boardings, and the one of two pieces of roof boardings End is hinged, and the other end of every piece of roof boarding is arranged diagonally downward and is fixedly connected respectively with wallboard;
The wallboard is used to support three-hinged arch roof boarding, and the lower section of wallboard is fixedly connected with prefabricated foundation, the prefabricated base The lower end of plinth is installed in ground, and upper end is fixedly connected with wallboard;The opposite side of two pieces of roof boardings passes through horizontally disposed two A round tube is fixedly connected, and the roof boarding place of being hinged forms ridge.
Further, the one end of the roof boarding diagonally downward is fixedly connected by bolt with one end of T-type connector, T-type The other end of connector is fixedly connected by bolt with round tube, is connected between two be oppositely arranged round tube by flower basket bolt. Be fixedly installed with soundproof plate below the roof boarding, the soundproof plate is horizontally disposed, the both ends of soundproof plate respectively with roof boarding Medial surface be fixedly connected.
Further, the wallboard includes Side fascia and internal partition wall;The Side fascia is insulated wall, and the Side fascia includes mountain Wall and vertical wall are provided with steel column, beams of concrete or girder steel in the Side fascia.
Further, being horizontally disposed between multiple wallboards has at least one layer of floor component, and floor component makes described be recycled Prefabricated buildings are separated into multilayered structure;
Floor component includes multiple floors, is fixedly connected between adjacent floor deck by bowl-shape connector, under the floor End is respectively equipped with steel guide groove.
Further, the vertical wall is an integral structure in vertical direction, and the gable is layered in vertical direction to be arranged, described Gable is vertically arranged about the hinge axes of three-hinged arch roof boarding, and the two sides of three-hinged arch roof boarding are respectively equipped with the gable, often Side gable includes multiple rectangle gable boards and a triangle gable board, and every layer of structure in the multilayered structure passes through two squares Shape gable board is supported, and multiple rectangle gable boards are respectively fixedly connected with, rectangle gable board and triangle mountain positioned at top layer Wallboard is fixedly connected, and the triangle gable board is fixedly connected with roof boarding;The girder steel of the gable below floor is logical It crosses fastener to connect with steel guide groove, the gable is fixedly connected with floor by L shape connector.
Further, it is fixedly connected between the roof boarding and gable by bolt assembly, the roof boarding, which is equipped with, to be fixed Sleeve, the fixes sleeve is interior to be equipped with screw thread, and the fixes sleeve is fixedly connected by bolt with one end of wall board connector, wall The other end of plate connector is connect by bolt with vertical wall.
Further, it is fixedly connected between the vertical wall and gable by concordant end plate, passes through T-steel plate between adjacent vertical wall It is fixedly connected, the internal partition wall passes through concordant end plate connection with vertical wall.
Further, inner space is formed between the Side fascia and three-hinged arch roof boarding, the internal partition wall and floor will be interior House between portion space is separated into mostly.
Further, it is provided with door and window on wallboard, is provided with exterior stair outside wallboard.
A kind of installation method for the prefabricated buildings that can be recycled, comprising the following steps:
Step 1, the installation of prefabricated foundation:
The positioning of place unwrapping wire, carries out leveling and the basement process of substrate, to meet foundation bearing capacity and settlement request, then It is placed according to the lifting that the prefabricated foundation layout drawing of design drawing carries out prefabricated foundation.
Step 2, the installation of wallboard:
According to the number of wallboard, lifted to positioning on corresponding prefabricated foundation, prefabricated foundation by high-strength bolt with The column root-plate of steel column is connected, while wallboard lateral support is arranged, and guarantees the stability of component;
Step 3, the installation of floor:
According to the number of floor, is lifted to positioning on corresponding girder steel, connect by steel guide groove with gable, recycled The limit of L-type connector;Adjacent floor deck is connected by bowl-shape connector.
Step 4, the installation of roof boarding:
Triangle gable board is lifted to positioning on corresponding wallboard, is fixed by L-type connector, short branch is set on soundproof plate The installation of gable is convenient in support, installs rear support and no longer removes;Finally by roof boarding integral hoisting to wall top, pass through not similar shape The L-type connector of formula connects roof boarding wallboard.
Step 5, the connection at node:
Beams of concrete and steel column are attached by T-steel plate between adjacent vertical wall, led between adjacent vertical wall and gable It crosses concordant end plate to be attached, different layers gable carries out concordant end plate connection by the steel column in wallboard, and internal partition wall and vertical wall are logical Cross concordant end plate connection;
Step 6, plate stitch processing and waterproof:
Waterproof material, central filler PE rubber bar are filled out in plate stitch between each wallboard, outermost selects weatherability preferable One-component silicone sealant is blocked.
Step 7, later stage work:
Door and window, exterior stair, corridor railing are installed, the easy application work in later period is carried out.
Compared with prior art, the beneficial effects of the present invention are:
1, building systems provided by the invention use prefabricated steel-concrete component, instead of the brick of brick masonry structure building Watt material and cast-in-place concrete structure reduce building site template consumption, greatly reduce scaffold workload.
2, node is to be bolted, quick for installation, and convenient disassembly can be recycled, greatly reduce house use at This.
3, steel-concrete frame system of the invention is embedded in Side fascia, and wallboard is integrated with beam column, makes entire room Room globality is stronger.
4, the plate-type component that the present invention uses is insulated compound trabs, and being self-possessed, small, thermal and insulating performance is good, and wallboard both may be used It using as maintenance component, and can be used as supporting member, and can be prefabricated according to larger size panel or be customized according to standard width of a room in an old-style house size, with Traditional ALC prefabricated panel and other wallboards are few compared to plate stitch, and hidden leakage defect is few.
5, stability of the present invention is good, and securely and reliably, comfort level is high, is particularly suitable for temporary building, such as construction room, army With room etc..
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present application, and the application's shows Meaning property embodiment and its explanation are not constituted an undue limitation on the present application for explaining the application.
Fig. 1 is overall structure diagram main view of the invention;
Fig. 2 is the structural schematic diagram of the part-structures such as roof boarding and stringer board in the present invention;
Fig. 3 is the plan view of deadlight of the present invention;
Fig. 4 is the structural schematic diagram of prefabricated foundation in the present invention;
Fig. 5 is the structural schematic diagram of column root-plate in the present invention;
Fig. 6 is the structural schematic diagram of gable in the present invention;
Fig. 7 is the structural schematic diagram that wall is indulged in the present invention;
Fig. 8 is the structural schematic diagram of floor in the present invention;
Fig. 9 is the structural schematic diagram of three-hinged arch roof boarding in the present invention;
Figure 10 is the connection schematic diagram of adjacent vertical wall in the present invention;
Figure 11 is the connection schematic diagram that wall and gable are indulged in the present invention
Figure 12 is the connection schematic diagram of roof boarding and gable in the present invention;
Figure 13 is the connection schematic diagram of roof boarding and vertical wall in the present invention;
Figure 14 is the structural schematic diagram of T-type connector in the present invention;
Figure 15 is the structural schematic diagram of round tube and flower basket bolt in the present invention;
Figure 16 is the connection schematic diagram of roof boarding and T-type connector in the present invention;
Figure 17 is in the present invention for connecting the bowl-shape connector schematic diagram of adjacent floor deck.
In figure: 1, prefabricated foundation;2, wallboard;3, floor;4, roof boarding;5, soundproof plate;6, room bottom plate;7, stair;8, column Sole;9, steel guide groove;2A, vertical wall;2B, gable;2C, internal partition wall;
2-1, the first vertical wall;2-2, the second vertical wall;2-3, third indulge wall;2-6, the 4th vertical wall;2-7, the 5th vertical wall;2-8, 6th vertical wall;
2-4, the first gable;2-5, the second gable;2-9, the first internal partition wall;2-10, the second internal partition wall;
2-11, third internal partition wall;2-12, the 4th internal partition wall;2-13, the 5th internal partition wall;2-14.
41, fixes sleeve;42, bolt;43, T-type connector;44, round tube;45, flower basket bolt.
Specific embodiment
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
The word of the indicating positions such as middle left and right of the present invention, forward and backward is to be based on the orientation or positional relationship shown in the drawings, only It is rather than to indicate or imply that signified device or component must have specific side to describe the present invention and simplify description Position, is constructed and operated in a specific orientation, is not considered as limiting the invention.
A kind of exemplary embodiment of the application, as shown in Fig. 1-17, a kind of prefabricated buildings that can be recycled, including Three-hinged arch roof boarding 4, the three-hinged arch roof boarding 4 include the room plate that multiple groups are arranged at an angle, and every block plate includes two pieces of roofings One end of plate 4, two pieces of roof boardings 4 is hinged, and the other end of every piece of roof boarding 4 is arranged diagonally downward and consolidated respectively with wallboard 2 Fixed connection;
The wallboard 2 is used to support three-hinged arch roof boarding 4, and the lower section of wallboard 2 is fixedly connected with prefabricated foundation 1, described pre- The lower end on system basis 1 is installed in ground, and upper end is fixedly connected with wallboard 2;Two pieces of opposite sides of roof boarding 4 are set by level Two round tubes 44 set are fixedly connected, and 4 place of being hinged of roof boarding forms ridge.
Preferably, the one end of the roof boarding 4 diagonally downward connects by the way that one end of bolt 42 and T-type connector 43 is fixed It connects, the other end of T-type connector is fixedly connected by bolt 42 with round tube 44, passes through flower between two be oppositely arranged round tube 44 Basket bolt 45 connects.Soundproof plate 5 is fixedly installed with below the roof boarding, the soundproof plate is horizontally disposed, and the two of soundproof plate End is fixedly connected with the medial surface of roof boarding respectively.
Preferably, the wallboard 2 includes Side fascia 2 and internal partition wall 2C;The Side fascia 2 is that insulated wall (protect by sandwich style One of warm composite plate or steel wire truss concrete slab, profiling steel plate-bamboo offset plate compoboard, lightgage steel joist wallboard).
The Side fascia 2 includes gable 2A and vertical wall 2B, is provided with steel column, beams of concrete or girder steel in the Side fascia 2, The lower end of the steel column is equipped with column root-plate 8, constitutes the steel-concrete frame system in entire house;By dark between plate and plate Beam is connected with sleeper, and wallboard 2 is reserved convenient for manually installed hole in junction.Vertical wall is the vertical big plate for crossing over two layers, plate Interior includes in secret beams of concrete and H profile steel column, wherein the first vertical wall 2-1, third indulge wall 2-3, the 4th vertical wall 2-6, the 6th vertical The left and right ends of wall 2-8 are all provided with steel column, and the second vertical wall 2-2, the 5th vertical wall 2-7 do not set steel column;First gable 2-4, the second gable 2-5) the big plate for being one layer one piece, plate are interior containing only H profile steel beam;
Internal partition wall does not set insulating layer, and thickness is less than exterior wall, and to mitigate 2 weight of wallboard, the lightweights materials such as PE stick are clogged in plate Material.Beam containing H profile steel at the top of first kind partition wall 2-9, the second internal partition wall 2-10, third internal partition wall 2-11, the 5th internal partition wall 2-13 are left Right both ends are all provided with steel column, and the 4th internal partition wall 2-12 does not have steel column.
Preferably, being horizontally disposed between multiple wallboards 2 has at least one layer of 3 component of floor, and 3 component of floor will be described recyclable The prefabricated buildings used are separated into multilayered structure;
3 component of floor includes multiple floors 3, is fixedly connected between adjacent floor deck 3 by bowl-shape connector, the floor 3 Lower end be respectively equipped with steel guide groove 9.Upper layer and lower layer steel fabric sheet is equipped with inside each floor 3.The floor 3 can bear it is larger across Degree, and can be recycled.
Preferably, the vertical wall is an integral structure in vertical direction, and the gable is layered in vertical direction to be arranged, and is located at The upper end girder steel of the gable below floor is connect by fastener with steel guide groove, and the gable is connect with floor 3 by L shape Part is fixedly connected.
Gable 2B is vertically arranged about the hinge axes of three-hinged arch roof boarding, and the two sides of three-hinged arch roof boarding are respectively equipped with institute State gable, every side gable includes multiple rectangle gable boards and a triangle gable board 2-14, and every layer in the multilayered structure Structure is supported by two rectangle gable boards, and multiple rectangle gable boards are respectively fixedly connected with, positioned at the rectangle mountain of top layer Wallboard is fixedly connected with triangle gable board 2-14, and the triangle gable board 2-14 is fixedly connected with roof boarding 6;Positioned at floor The girder steel of the gable of lower section is connect by fastener with steel guide groove 9,
Preferably, it is fixedly connected between the roof boarding 4 and gable by 42 component of bolt, the roof boarding 4 is equipped with Fixes sleeve 41, the fixes sleeve 41 is interior to be equipped with screw thread, and the fixes sleeve 41 passes through bolt 42 and the one of 2 connector of wallboard End is fixedly connected, and the other end of 2 connector of wallboard is connect by bolt 42 with vertical wall.
Preferably, it is fixedly connected between the vertical wall and gable by concordant end plate, passes through T-steel plate between adjacent vertical wall It is fixedly connected, the internal partition wall passes through concordant end plate connection with vertical wall.
Preferably, inner space is formed between the Side fascia 2 and three-hinged arch roof boarding 4, the internal partition wall and floor 3 will House between inner space is separated into mostly.
Preferably, it is provided with door and window on wallboard 2, exterior stair 7 is provided with outside wallboard 2.
A kind of installation method for the prefabricated buildings that can be recycled, comprising the following steps:
Step 1, the installation of prefabricated foundation 1:
The positioning of place unwrapping wire, carries out leveling and the basement process of substrate, to meet foundation bearing capacity and settlement request, then It is placed according to the lifting that 1 layout drawing of prefabricated foundation of design drawing carries out prefabricated foundation 1.
Step 2, the installation of wallboard 2:
According to the number of wallboard 2, lifted to positioning on corresponding prefabricated foundation 1, prefabricated foundation passes through high-strength bolt It is connected with the column root-plate of steel column, while 2 lateral support of wallboard is set, guarantees the stability of component;
Step 3, the installation of floor 3:
According to the number of floor 3, is lifted to positioning on corresponding girder steel, connect by steel guide groove 9 with gable, then benefit It is limited with L-type connector;Adjacent floor deck 3 is connected by bowl-shape connector.
Step 4, the installation of roof boarding 4:
Triangle gable board is lifted to positioning on corresponding wallboard 2, is fixed, is set on soundproof plate short by L-type connector The installation of gable is convenient in support, installs rear support and no longer removes;Finally by 4 integral hoisting of roof boarding to wall top, by not L-type connector with form connects 4 wallboard 2 of roof boarding.
Step 5, the connection at node:
Beams of concrete and steel column are attached by T-steel plate between adjacent vertical wall, led between adjacent vertical wall and gable It crosses concordant end plate to be attached (such as wallboard 2-1 and 2-4), different layers gable carries out concordant end plate company by the steel column in wallboard 2 It connects, internal partition wall passes through concordant end plate connection with vertical wall;
Step 6, plate stitch processing and waterproof:
Waterproof material, central filler PE rubber bar are filled out in plate stitch between each wallboard 2, outermost selects weatherability preferable One-component silicone sealant is blocked.
Step 7, later stage work:
Door and window, exterior stair 7, corridor railing are installed, the easy application work in later period is carried out.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.

Claims (9)

1. a kind of prefabricated buildings that can be recycled, which is characterized in that including, three-hinged arch roof boarding, the three-hinged arch roofing Plate includes the room plate that multiple groups are arranged at an angle, and every block plate includes two pieces of roof boardings, and one end of two pieces of roof boardings is hinged, often The other end of block roof boarding is arranged diagonally downward and is fixedly connected respectively with wallboard;
The wallboard is used to support three-hinged arch roof boarding, and the lower section of wallboard is fixedly connected with prefabricated foundation, the prefabricated foundation Lower end is installed in ground, and upper end is fixedly connected with wallboard;
The opposite side of two pieces of roof boardings is fixedly connected by horizontally disposed two round tubes, and the roof boarding place of being hinged forms room Ridge.
2. the prefabricated buildings that can be recycled as described in claim 1, which is characterized in that the roof boarding is diagonally downward One end is fixedly connected by bolt with one end of T-type connector, and the other end of T-type connector connects by the way that bolt and round tube are fixed It connects, is connected between two be oppositely arranged round tube by flower basket bolt;Soundproof plate, institute are fixedly installed with below the roof boarding It is horizontally disposed to state soundproof plate, the both ends of soundproof plate are fixedly connected with the medial surface of roof boarding respectively.
3. the prefabricated buildings that can be recycled as described in claim 1, which is characterized in that the wallboard include Side fascia and Internal partition wall;The Side fascia is insulated wall, and the Side fascia includes gable and vertical wall, and steel column is provided in the Side fascia, is mixed Solidifying Tu Liang or girder steel.
4. the prefabricated buildings that can be recycled as claimed in claim 3, which is characterized in that be horizontally disposed between multiple wallboards There is at least one layer of floor component, the prefabricated buildings that can be recycled are separated into multilayered structure by floor component;
Floor component includes multiple floors, is fixedly connected between adjacent floor deck by bowl-shape connector, the lower end point of the floor It She You not steel guide groove.
5. the prefabricated buildings that can be recycled as claimed in claim 4, which is characterized in that the vertical wall is in vertical direction Integral structure, the gable is layered in vertical direction to be arranged, and the upper end of the gable below floor is plugged in steel and leads In slot, the gable is fixedly connected with floor by L shape connector;
Gable is vertically arranged about the hinge axes of three-hinged arch roof boarding, and the two sides of three-hinged arch roof boarding are respectively equipped with the mountain Wall, every side gable include multiple rectangle gable boards and a triangle gable board, and every layer of structure in the multilayered structure passes through Two rectangle gable boards are supported, and multiple rectangle gable boards are respectively fixedly connected with, positioned at the rectangle gable board of top layer and three Angular gable board is fixedly connected, and the triangle gable board is fixedly connected with roof boarding.
6. the prefabricated buildings that can be recycled as claimed in claim 4, which is characterized in that between the roof boarding and gable It is fixedly connected by bolt assembly, the roof boarding is equipped with fixes sleeve, is equipped with screw thread, the fixation in the fixes sleeve Sleeve is fixedly connected by bolt with one end of wall board connector, and the other end of wall board connector is connect by bolt with vertical wall.
7. the prefabricated buildings that can be recycled as claimed in claim 4, which is characterized in that lead between the vertical wall and gable It crosses concordant end plate to be fixedly connected, be fixedly connected between adjacent vertical wall by T-steel plate, the internal partition wall is held with vertical wall by concordant Plate connection.
8. the prefabricated buildings that can be recycled as claimed in claim 4, which is characterized in that the Side fascia and three-hinged arch room Formed between panel inner space, the internal partition wall and floor by inner space be separated into it is more between house.
9. the prefabricated buildings that can be recycled as described in claim 1, which is characterized in that further include being set on wallboard Door and window and the exterior stair outside wallboard.
CN201821721780.9U 2018-10-23 2018-10-23 A kind of prefabricated buildings that can be recycled Active CN209308156U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821721780.9U CN209308156U (en) 2018-10-23 2018-10-23 A kind of prefabricated buildings that can be recycled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821721780.9U CN209308156U (en) 2018-10-23 2018-10-23 A kind of prefabricated buildings that can be recycled

Publications (1)

Publication Number Publication Date
CN209308156U true CN209308156U (en) 2019-08-27

Family

ID=67671410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821721780.9U Active CN209308156U (en) 2018-10-23 2018-10-23 A kind of prefabricated buildings that can be recycled

Country Status (1)

Country Link
CN (1) CN209308156U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984434A (en) * 2019-11-25 2020-04-10 山东大学 Recyclable inner longitudinal partition wall plate and mounting method thereof
CN111088846A (en) * 2018-10-23 2020-05-01 山东大学 Recyclable prefabricated house and installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111088846A (en) * 2018-10-23 2020-05-01 山东大学 Recyclable prefabricated house and installation method
CN110984434A (en) * 2019-11-25 2020-04-10 山东大学 Recyclable inner longitudinal partition wall plate and mounting method thereof

Similar Documents

Publication Publication Date Title
CN105804233A (en) DGC board-type assembled house system and construction method and manufacturing method thereof
CN103821229B (en) Rapid assembly type integrated house and installation method
CN107130684A (en) A kind of fabricated structure and its construction method
CN102587693A (en) Two-storey modular villa building and construction method thereof
CN106703201A (en) Fabricated integrated building and production method thereof
CN206570920U (en) One kind utilizes ALC plates design production assembled architecture
CN206655314U (en) The board-like assembling building systems of DGC
CN106193311A (en) Modular assembled building structure
CN104060853A (en) Lightweight steel structure modularized residential building
CN209308156U (en) A kind of prefabricated buildings that can be recycled
CN202125104U (en) Residential building system formed by cast-in-place beam columns and prefabricated sandwich concrete wall slabs
CN202831672U (en) Detachable movable building with outer frame type composite frame structure
CN111088846A (en) Recyclable prefabricated house and installation method
CN103397695A (en) Concrete filled steel tube combination column high position connected structure provided with bidirectional steel trusses
US20220049488A1 (en) Systems and methods for constructing a multi-storey building
KR101213504B1 (en) Tailor-Made Type Korean House Manufacturing Method for Furniture-style Buildings and Tailor-Made Type Korean House Structure
SK5482000A3 (en) Prefabricated house/building realised according to a metallic-structure modular construction method
CN209384432U (en) A kind of prefabricated gable and its connecting structure that can be recycled
RU80487U1 (en) SYSTEM precast frame housing (ACS) AND COUPLING NODE trough ribbed plate overlap with monolithic prefabricated beams, floors, INTERFACE UNIT PREFABRICATED CONCRETE COLUMN, National COUPLING NODE-MONOLITHIC crossbars CO precast concrete columns and trough ribbed plate SLABS
CN111236416A (en) Prefabricated reinforced concrete structure house and installation method thereof
CN116145857A (en) Modular unit of steel-concrete combined shear wall structure, building and construction method
CN110629885A (en) Assembled light steel structure house
CN216042835U (en) Layer adding device with light wall board for raising frame structure
CN211818281U (en) Net frame sandwich module passive room