CN209293783U - The intelligence drilling detection device of platform is bored based on multi-arm - Google Patents

The intelligence drilling detection device of platform is bored based on multi-arm Download PDF

Info

Publication number
CN209293783U
CN209293783U CN201822173634.3U CN201822173634U CN209293783U CN 209293783 U CN209293783 U CN 209293783U CN 201822173634 U CN201822173634 U CN 201822173634U CN 209293783 U CN209293783 U CN 209293783U
Authority
CN
China
Prior art keywords
detection
drilling
arm
drilling rod
testing equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822173634.3U
Other languages
Chinese (zh)
Inventor
樊启祥
洪文浩
王毅
高鹏
谭志国
吴国林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Three Gorges Projects Development Co Ltd CTG
Original Assignee
China Three Gorges Projects Development Co Ltd CTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Three Gorges Projects Development Co Ltd CTG filed Critical China Three Gorges Projects Development Co Ltd CTG
Priority to CN201822173634.3U priority Critical patent/CN209293783U/en
Application granted granted Critical
Publication of CN209293783U publication Critical patent/CN209293783U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

A kind of intelligence drilling detection device and its detection method boring platform based on multi-arm, multi-arm trolley, drilling rod, detection brill, physical prospecting detector, on-board testing equipment, detection brill is formed by the way that physical prospecting detector is arranged on the basis of one of drilling rod of original multi-arm trolley, connection is bored by physical prospecting detector and on-board testing equipment and detection, by creeping into row detection by detection after drilling rod drills, adjusted when being drilled by remaining drilling rod according to the amendment that detection data drills.The utility model needs sample early period when overcoming former tunnel boring, the low problem of drilling efficiency, has structure simple, is integrated with intelligent and automatic detection drilling, and accuracy is high, and this method is simply applicable in, the high feature of drilling efficiency.

Description

The intelligence drilling detection device of platform is bored based on multi-arm
Technical field
The utility model belongs to technical field of tunnel construction, be related to it is a kind of based on multi-arm bore platform intelligence drilling detection set It is standby.
Background technique
In the Underground Engineering Excavations work progress such as tunnel, tunnel, underground power house, because the structural property of rock mass, underground water, The geological conditions such as the pernicious gases such as gas and crustal stress, the geology calamity such as Yi Fasheng water burst, gas explosion, rock burst, large deformation Evil, seriously threatens construction personnel's personal safety, influences the safe and smooth progress of construction operation.Typically now utilize probing and modern times The means such as physical prospecting, before construction or construction gap carries out detection analysis, to reach the engineering investigated thoroughly in front of excavated surface in advance Geology and hydrological geological conditions instruct engineering construction to carry out.In digging process, especially applying using drilling and blasting method as major technique hand During work, bore operation directly can directly acquire a large amount of geological informations by the contact with rock, further strong to operation Square geological conditions anticipation in front, there is no such technological means or equipment at present, and the utility model innovatively bores multi-arm Combined with geology detecting equipment, can all kinds of geological informations of accurately detecting working face and front in the construction process, fill up well Technique blank.
Summary of the invention
The technical problem to be solved by the utility model is to provide a kind of intelligence drilling detections for boring platform based on multi-arm to set Standby, structure is simple, forms detection brill using physical prospecting detector is arranged on the basis of one of drilling rod of original multi-arm trolley, It is bored with detection and is connected with physical prospecting detector and on-board testing equipment, row detection, remaining drilling rod are crept by detection after drilling rod drilling It is adjusted when drilling according to the amendment that detection data drills, is integrated with intelligent and automatic detection drilling, accuracy is high, bores Hole is high-efficient.
In order to solve the above technical problems, the technical scheme adopted by the utility model is: a kind of bores platform based on multi-arm Intelligence drilling detection device, it includes the multi-arm trolley for being provided with multiple drilling rods, and one of drilling rod is that detection is bored, the body of rod Physical prospecting detector is arranged in front end;The physical prospecting detector is connected with on-board testing equipment;After the drilling rod drilling, detection is drilled into Detection, remaining drilling rod are modified while drilling according to detection data.
The on-board testing equipment includes the working end for receiving and transmitting data, is connect with working end for handling number According to the processing system with analysis data.
The on-board testing equipment is located on the car body at the drilling rod rear portion of multi-arm trolley, bores front end by route and detection The connection of physical prospecting detector.
The power supply of the on-board testing equipment is connect with the power supply of multi-arm trolley.
A kind of intelligence drilling detection device boring platform based on multi-arm, it includes the multi-arm trolley for being provided with multiple drilling rods, One of drilling rod is that detection is bored, and physical prospecting detector is arranged in lever front end;Physical prospecting detector is connected with on-board testing equipment;Drilling rod After drilling, detection drills into detection, remaining drilling rod is modified while drilling according to detection data.Structure is simple, by Physical prospecting detector is set on the basis of one of drilling rod of original multi-arm trolley and forms detection brill, passes through physical prospecting detector and vehicle It carries testing equipment and connection is bored in detection, by creeping into row detection, root when drilling by remaining drilling rod by detection after drilling rod drills The amendment adjustment to drill according to detection data, is integrated with intelligent and automatic detection drilling, and accuracy is high, and this method is simple It is applicable in, drilling efficiency is high.
In the preferred scheme, on-board testing equipment includes the working end for receiving and transmitting data, is connected with working end It connects for handling data and analyzing the processing system of data.Structure is simple, in use, the sample drilled out for going deep into drilling rod is bored in detection It is detected in hole, working end receives detection data, and will test data and be transferred to processing system, will count after processing system processing data On a display screen according to display, it is analyzed convenient for operator.
In the preferred scheme, on-board testing equipment is located on the car body at the drilling rod rear portion of multi-arm trolley, by route with The physical prospecting detector connection of front end is bored in detection.Structure is simple, in use, multi-arm trolley is in moving condition, on car body On-board testing equipment is mobile with car body, without too long connection, more convenient operation.
In the preferred scheme, the power supply of on-board testing equipment is connect with the power supply of multi-arm trolley.Structure is simple, makes Used time, on-board testing equipment and physical prospecting detector, which need to access power supply, to be worked normally, using directly taking from multi-arm trolley Electricity supply on-board testing equipment, can be synchronous with the work of multi-arm trolley, and self-contained power interruptions is avoided to cause in drilling Way stops.
It is a kind of based on multi-arm bore platform intelligence drilling detection device, multi-arm trolley, drilling rod, detection brill, physical prospecting detector, On-board testing equipment forms detection by the way that physical prospecting detector is arranged on the basis of one of drilling rod of original multi-arm trolley It bores, connection is bored by physical prospecting detector and on-board testing equipment and detection, by creeping into row detection by detection after drilling rod drills, It is adjusted when being drilled by remaining drilling rod according to the amendment that detection data drills.When the utility model overcomes former tunnel boring Need sample early period, the low problem of drilling efficiency has structure simple, is integrated with intelligent and automatic detection drilling, accurately Degree is high, the high feature of drilling efficiency.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawings and examples:
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of the utility model on-board testing equipment.
In figure: multi-arm trolley 1, drilling rod 11, detection bore 2, and physical prospecting detector 21, on-board testing equipment 3, working end 31 is located Reason system 32.
Specific embodiment
In Fig. 1 ~ Fig. 2, a kind of intelligence drilling detection device boring platform based on multi-arm, it includes being provided with multiple drilling rods 11 multi-arm trolley 1, one of drilling rod 11 are that detection bores 2, and physical prospecting detector 21 is arranged in lever front end;The physical prospecting inspection It surveys instrument 21 and is connected with on-board testing equipment 3;After the drilling of drilling rod 11, detection bores 2 and enters detection, remaining drilling rod 11 drills same When be modified according to detection data.Structure is simple, by setting on the basis of one of drilling rod 11 of original multi-arm trolley 1 Glove visits the composition detection of detector 21 and bores 2, is connect by physical prospecting detector 21 and on-board testing equipment 3 with detection brill 2, by Drilling rod 11 bores 2 by detection after drilling and is detected, the amendment to be drilled when being drilled by remaining drilling rod 11 according to detection data Adjustment is integrated with intelligent and automatic detection drilling, and accuracy is high, and drilling efficiency is high.
In preferred scheme, the on-board testing equipment 3 includes the working end 31 for receiving and transmitting data, with work 31 connection of end is for handling data and analyzing the processing system 32 of data.Structure is simple, in use, detection bores 2 for deeply boring It is detected in the sample hole that bar 11 drills out, working end 31 receives detection data, and will test data and be transferred to processing system 32, processing system Data are shown on a display screen after 32 processing data of system, are analyzed convenient for operator.
In preferred scheme, the on-board testing equipment 3 is located on the car body at 11 rear portion of drilling rod of multi-arm trolley 1, passes through Route is connect with the physical prospecting detector 21 that 2 front ends are bored in detection.Structure is simple, in use, multi-arm trolley 1 is in moving condition, position It is mobile with car body in the on-board testing equipment 3 on car body, without too long connection, more convenient operation.
In preferred scheme, the power supply of the on-board testing equipment 3 is connect with the power supply of multi-arm trolley 1.Structure letter It is single, in use, on-board testing equipment 3 and physical prospecting detector 21, which need to access power supply, to be worked normally, using directly from multi-arm Electricity supply on-board testing equipment 3 is taken on trolley 1, can be synchronous with the work of multi-arm trolley 1, avoid self-contained power interruptions Drilling midway is caused to stop.
The intelligence drilling detection device for boring platform based on multi-arm as described above, when installing and using, in original multi-arm trolley 1 One of drilling rod 11 on the basis of setting physical prospecting detector 21 form detection bore 2, physical prospecting detector 21 and track test are set Standby 3, which bore 2 with detection, connect, and bores 2 by detection after the drilling of drilling rod 11 and is detected, according to detection data when remaining drilling rod 11 drills The amendment adjustment to drill, is integrated with intelligent and automatic detection drilling, and accuracy is high, and drilling efficiency is high.
It is detected in use, detection bores 2 for going deep into the sample hole that drilling rod 11 drills out, working end 31 receives detection data, and It will test data and be transferred to processing system 32, processing system 32 shows data on a display screen after handling data, convenient for operation Personnel's analysis.
In use, multi-arm trolley 1 is in moving condition, the on-board testing equipment 3 on car body is mobile with car body, is not necessarily to Too long connection, more convenient operation.
In use, on-board testing equipment 3 and physical prospecting detector 21, which need to access power supply, to be worked normally, using directly from Electricity supply on-board testing equipment 3 is taken on multi-arm trolley 1, can be synchronous with the work of multi-arm trolley 1, avoid self-contained power supply Interruption causes drilling midway to stop.
The above embodiments are only the optimal technical scheme of the utility model, and are not construed as the limit for the utility model System, the features in the embodiments and the embodiments of the present application in the absence of conflict, can mutual any combination.This is practical new The protection scope of type should be with the technical solution of claim record, technical characteristic in the technical solution recorded including claim Equivalents are protection scope.Equivalent replacement i.e. within this range is improved, also the protection scope of the utility model it It is interior.

Claims (4)

1. a kind of intelligence drilling detection device for boring platform based on multi-arm, it includes the multi-arm trolley for being provided with multiple drilling rods (11) (1), it is characterized in that: one of drilling rod (11) is that (2) are bored in detection, physical prospecting detector (21) are arranged in lever front end;It is described Physical prospecting detector (21) is connected with on-board testing equipment (3);After drilling rod (11) drilling, detection bores (2) and enters detection, remaining Drilling rod (11) is modified while drilling according to detection data.
2. the intelligence drilling detection device according to claim 1 for boring platform based on multi-arm, it is characterized in that: the vehicle-mounted examination Testing equipment (3) includes being connect with working end (31) for receiving and transmitting the working end of data (31) for handling data and dividing Analyse the processing system (32) of data.
3. the intelligence drilling detection device according to claim 1 for boring platform based on multi-arm, it is characterized in that: the vehicle-mounted examination It tests equipment (3) to be located on the car body at drilling rod (11) rear portion of multi-arm trolley (1), the physical prospecting of (2) front end is bored by route and detection Detector (21) connection.
4. the intelligence drilling detection device according to claim 3 for boring platform based on multi-arm, it is characterized in that: the vehicle-mounted examination The power supply for testing equipment (3) is connect with the power supply of multi-arm trolley (1).
CN201822173634.3U 2018-12-24 2018-12-24 The intelligence drilling detection device of platform is bored based on multi-arm Active CN209293783U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822173634.3U CN209293783U (en) 2018-12-24 2018-12-24 The intelligence drilling detection device of platform is bored based on multi-arm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822173634.3U CN209293783U (en) 2018-12-24 2018-12-24 The intelligence drilling detection device of platform is bored based on multi-arm

Publications (1)

Publication Number Publication Date
CN209293783U true CN209293783U (en) 2019-08-23

Family

ID=67648417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822173634.3U Active CN209293783U (en) 2018-12-24 2018-12-24 The intelligence drilling detection device of platform is bored based on multi-arm

Country Status (1)

Country Link
CN (1) CN209293783U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441428A (en) * 2018-12-24 2019-03-08 中国三峡建设管理有限公司 The intelligence drilling detection device and its detection method of platform are bored based on multi-arm

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441428A (en) * 2018-12-24 2019-03-08 中国三峡建设管理有限公司 The intelligence drilling detection device and its detection method of platform are bored based on multi-arm

Similar Documents

Publication Publication Date Title
CN110424949B (en) Inversion calculation method for coal bed gas parameter rapid measurement while drilling
CN107605536B (en) Coal and gas prominent real-time early warning device and method based on Multi-source Information Fusion
AU2017311614B2 (en) Detection while drilling (DWD) apparatus and method for lithological composition of roadway roof
US9500077B2 (en) Comprehensive advanced geological detection system carried on tunnel boring machine
CN107476822A (en) Coal Seam Outburst Hazard measuring while drilling method and device
CN106197363B (en) A kind of measurement method of protected seam dilatancy amount
CN106593424B (en) Back rock Protodyakonov coefficient based on sound level meter is with brill detection method
CN106703795A (en) Roof rock in the lane grade while drilling detection device and method based on laser distance meter
CN114352299B (en) Parallel advanced ultra-deep geological prediction method under construction condition of TBM (Tunnel boring machine) of deep-buried long tunnel
CN209293783U (en) The intelligence drilling detection device of platform is bored based on multi-arm
CN106052629B (en) A kind of coal seam with gas dilatancy measurement method
CN207863851U (en) A kind of novel hydraulic rock drill
CN105019884A (en) Screen pipe horizontal well production profile testing apparatus and testing method for same
CN111520127A (en) In-situ testing device for engineering rock mechanical parameter advanced drilling and application method thereof
CN201972699U (en) Multi-detector while drilling neutron logging device
CN109441428A (en) The intelligence drilling detection device and its detection method of platform are bored based on multi-arm
CN111287654A (en) Pre-evaluation device and method for coal seam rock burst danger advanced drilling measurement
CN203499679U (en) Online detection device for natural gamma information of rock debris
CN210317398U (en) Device for monitoring abnormal gas emission of gas tunnel
CN105928853B (en) It is a kind of examine tunnel broken surrounding rock grouting after block-water effect test method
Stas et al. Conical strain gauge probes for stress measurement
CN112554948A (en) Harmful gas monitoring system for tunnel excavation
CN208934688U (en) The pre- attenuating drilling negative pressure attenuation test device of a kind of coal-bed gas
CN206693283U (en) A kind of device for having run bridge pile foundation length detection
CN212568025U (en) Quick sampling device of soil detection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant