CN209293358U - One kind is novel to cut plug-in flue entirely - Google Patents

One kind is novel to cut plug-in flue entirely Download PDF

Info

Publication number
CN209293358U
CN209293358U CN201821958867.8U CN201821958867U CN209293358U CN 209293358 U CN209293358 U CN 209293358U CN 201821958867 U CN201821958867 U CN 201821958867U CN 209293358 U CN209293358 U CN 209293358U
Authority
CN
China
Prior art keywords
wall
flue
concrete
concrete walls
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821958867.8U
Other languages
Chinese (zh)
Inventor
赵鹏付
徐旭龙
唐昌宇
林湘杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Vanke Enterprise Management Co Ltd
Original Assignee
Guangxi Vanke Enterprise Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Vanke Enterprise Management Co Ltd filed Critical Guangxi Vanke Enterprise Management Co Ltd
Priority to CN201821958867.8U priority Critical patent/CN209293358U/en
Application granted granted Critical
Publication of CN209293358U publication Critical patent/CN209293358U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a kind of novel plug-in flue is cut entirely, plug-in flue includes concrete wall beam, shear wall, concrete walls, first crossbeam and second cross beam, the concrete walls are set as groove wall structure, the outside that shear wall is set of the concrete walls, the recess of the concrete walls is arranged towards shear wall, the inside casing that the recess and shear wall of the concrete walls are formed is set as the exhaust smoke hole of flue, the concrete wall beam is arranged on concrete walls, and it is arranged in parallel with shear wall, the first crossbeam and second cross beam are separately positioned in the concrete walls of groove, one end is connect with concrete wall beam, the other end is arranged in concrete walls, and it is vertically arranged with concrete walls.Plug-in flue is cut entirely, use C30 concreting, service life is consistent with main structure, quality safety is reliable, and compared to the flue for using aluminum-pinch to install, there is no the risks that falls off after long-time use, security risk can be eliminated, construction in later period risk is not present in flue and main structure one-pass molding, guarantees worker's construction safety.

Description

One kind is novel to cut plug-in flue entirely
Technical field
The utility model relates to arrive a kind of building, the especially plug-in flue of residential quarters bottom commerce, and in particular to Yi Zhongxin Type cuts plug-in flue entirely.
Background technique
Kitchen chimney flue is the vertical duct for excluding oil smoke, is the main composition of house kitchen common exhaust duct system Part.Flue will be arranged by having the place of kitchen discharged lampblack, not allow oil smoke uncontrollable discharge.In the residential quarters for having bottom commerce In, the flue for being provided with smoke evacuation system is required, guarantees that the oil smoke in kitchen is unified and moves towards, based on traditional plug-in flue way After the completion of structure construction, then the remaining outer wall of flue is built, then plastered, then done exterior coating or patch block and (or use aluminium button Plate seals outer wall), liner, anti-leak-stopping cigarette is arranged in flue inside.This plug-in flue has several drawbacks in that:
1, aluminum-pinch outer wall service life is limited, exists after long-time use and falls risk, security risk is larger.
2, flue inner wall needs to increase liner, installs inconvenience, and increase cost.
3, when constructing brick or aluminum-pinch outer wall, construction quality is difficult to ensure, worker operation increases security risk.
4, secondary construction flue again after the completion of structure construction, the duration is longer, is unfavorable for cost savings.
For disadvantage of the existing technology, the utility model provides a kind of novel cuts plug-in flue entirely, it is intended that solves existing There is defect existing for technology.
Utility model content
The purpose of this utility model is to provide a kind of speed of application is fast, the period is short, safe and efficient and do not increase cost, saves About recruitment cost and time, the better one kind of whole service performance is novel to cut plug-in flue entirely, it is intended that solves lacking for the prior art Point.
The technical solution adopted in the utility model is as follows:
One kind is novel to cut plug-in flue, including concrete wall beam, shear wall, concrete walls, first crossbeam and the second cross entirely Beam, the concrete walls are set as groove wall structure, the outside that shear wall is arranged in of the concrete walls, the concrete The recess of wall is arranged towards shear wall, and the inside casing that the recess and shear wall of the concrete walls are formed is set as the smoke evacuation of flue Hole, the concrete wall beam setting are arranged in parallel on concrete walls, and with shear wall, the first crossbeam and second cross beam point It is not arranged in the concrete walls of groove, one end is connect with concrete wall beam, and the other end is arranged in concrete walls, and and coagulation Cob wall is vertically arranged.
The utility model further includes the outside that concrete walls are arranged in across beam across beam, and one end setting is shearing On wall, the other end and in addition external wall connecting, and connect and be arranged across beam concrete walls.
Further, the item number across beam is identical as the number of floor levels of plug-in flue, the top across beam and floor Hold equal, the crossbeam of described one end and roof across beam connects.
Further, the item number of the concrete wall beam is identical as the number of floor levels of plug-in flue, the concrete wall beam with The top of floor is equal, and the width of the concrete wall beam is bigger than the width of concrete walls, the both ends point of the concrete wall beam It is not connect with first crossbeam and second cross beam.
Further, the item number of the first crossbeam and second cross beam is identical as the number of floor levels of plug-in flue, and described first Crossbeam is equal with the top of second cross beam floor, and one end of the first crossbeam and second cross beam is connect with the crossbeam of roof.
Further, insulating layer is provided on the outside of the concrete walls, posted on the outside of the insulating layer wall tile or It is coated with coating for wall surface.
Bar construction is using bar diameter 8mm, spacing 200mmHRB400, single-layer bidirectional arrangement of reinforcement, and concrete strength is C30.The thickness of shear wall and concrete walls is 100mm, single-layer bidirectional spacing 200mm, diameter 8mmHRB400 reinforcing bar.It is described For concrete walls with a thickness of 100mm, concrete walls cantilever thickness is 200mm, and concrete wall beam difference 100mm is prominent in concrete walls Side.
The utility model has the following beneficial effects:
(1) plug-in flue is cut entirely, and using C30 concreting, service life is consistent with main structure, compares and uses aluminium button The flue of plate installation, there is no the risk that falls off after long-time use, security risk can be eliminated.
(2) cigarette would not be run without road in installing, the cost of liner can be saved, meanwhile, with wage for workmen's level It improves, builds plus the way cost of plastering is higher and higher, flue inner wall needs to further increase cost input with building with smearing, overall For, the cost for cutting the every linear meter(lin.m.) of flue entirely is compared with former way, and cost is lower.
(3) it cuts plug-in flue entirely once to construct completion, quality is guaranteed, safe and efficient.Save it is secondary construction flue when Between, working efficiency is improved, safety construction when secondary construction flue is also solved the problems, such as, guarantees worker's construction safety, disappear Except existing security risk.
Detailed description of the invention
Fig. 1 is the plug-in flue top view of the utility model.
Numbering in the drawing: 1- concrete wall beam, 2- shear wall, 3- concrete walls, 4- is across beam, 5- first crossbeam, 6- Two crossbeams.
Specific embodiment
For the purpose of this utility model, technical solution and advantage is more clearly understood, referring to the drawings and enumerate excellent Embodiment is selected, the utility model is further described.However, it is necessary to illustrate, many details listed in specification It is specific even without these just for the sake of making reader have a thorough explanation to the one or more aspects of the utility model Details also may be implemented the utility model these aspect.
In the description of the present invention, it should be understood that term " on ", "lower", "front", "rear", "left", "right", The orientation or positional relationship of the instructions such as level " is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description originally Utility model and simplified description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific Orientation construction and operation, therefore should not be understood as limiting the present invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " Gu It is fixed " etc. terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood as the case may be Concrete meaning in the present invention.
The utility model is described in further detail below in conjunction with attached drawing, but not as the restriction to the utility model.
The technical solution adopted in the utility model is as follows:
According to Fig. 1, it is a kind of it is novel cut plug-in flue entirely, including concrete wall beam 1, shear wall 2, concrete walls 3, the One crossbeam 5 and second cross beam 6, the concrete walls 3 are set as groove wall structure, and the setting of the concrete walls 3 is shearing The recess in the outside of wall 2, the concrete walls 3 is arranged towards shear wall 2, recess and shear wall 2 formation of the concrete walls 3 Inside casing be set as the exhaust smoke hole of flue, the concrete wall beam 1 is arranged on concrete walls 3, and parallel with shear wall 2 sets It sets, the first crossbeam 5 and second cross beam 6 are separately positioned in the concrete walls 3 of groove, and one end connects with concrete wall beam 1 It connects, other end setting is vertically arranged in concrete walls 3, and with concrete walls 3.
By the way that concrete walls 3 and shear wall 2 are built simultaneously, and the structure of concrete walls 3 is identical as theme wall, entirely Cut plug-in flue, using C30 concreting, service life is consistent with main structure, compared to use aluminum-pinch install flue, There is no the risk that falls off after long-time use, security risk can be eliminated.Cigarette would not be run without road in installing, can be saved The cost of liner, meanwhile, with the raising of wage for workmen's level, builds plus the way cost of plastering is higher and higher, flue inner wall It needs to further increase cost input with building with smearing, on the whole, full the cost for cutting the every linear meter(lin.m.) of flue is compared with former way, cost It is lower.It cuts plug-in flue entirely once to construct completion, quality is guaranteed, safe and efficient.It the time for saving secondary construction flue, improves Working efficiency also solves the problems, such as safety construction when secondary construction flue, eliminates existing security risk.
It further include across beam 4, the outside that concrete walls 3 are arranged in across beam 4 one in the utility model embodiment End is arranged on shear wall 2, the other end and in addition external wall connecting, and connects and be arranged across 4 concrete walls 3 of beam.It is described Item number across beam 4 is identical as the number of floor levels of plug-in flue, described equal with the top of floor across beam 4, described across beam 4 The connection of the crossbeam of one end and roof.
By being provided with across beam 4, so that when plug-in flue is arranged among two shear walls of building, across Beam 4 plays fixed shockproof effect, connect across beam 4 with concrete walls 3, to reduce the concrete walls 3 in earthquake The power shaken has the function of protecting well.
In the utility model embodiment, the item number of the concrete wall beam 1 is identical as the number of floor levels of plug-in flue, described mixed Solidifying cob wall beam 1 is equal with the top of floor, and the width of the concrete wall beam 1 is bigger than the width of concrete walls 3, the concrete The both ends of wall beam 1 are connect with first crossbeam 5 and second cross beam 6 respectively.The item number of the first crossbeam 5 and second cross beam 6 and outer The number of floor levels for hanging flue is identical, and the first crossbeam 5 is equal with the top of 6 floor of second cross beam, the first crossbeam 5 and second One end of crossbeam 6 is connect with the crossbeam of roof.Insulating layer, patch on the outside of the insulating layer are provided on the outside of the concrete walls 3 There is wall tile or is coated with coating for wall surface.
The external of concrete walls 3 is arranged as the setting of the external walls of building, therefore can be with the volume of less worker The duration is accelerated in outer processing.Insulating layer is provided with outside concrete walls 3 simultaneously, preferably to the porcelain of the coating of outer layer or patch Brick is protected.It does not need to increase liner in concrete walls 3, can greatly reduce duration and manpower and material resources.Concrete wall beam 1, first crossbeam 5 and each layer of second cross beam 6 can all have, one skeleton when suitable, have the function of reinforcing it is fixed and shockproof, Simultaneously can be very good it is identical as the skeleton framework of the construction of building so that construction be easy.
Constructional concrete wall beam 1, shear wall 2, concrete walls 3, across beam 4, the reinforcing bar of first crossbeam 5 and second cross beam 6 Structure, and with iron wire or framework of steel reinforcement is welded and fixed.The thickness of shear wall 2 and concrete walls 3 is 100mm, single-layer bidirectional Spacing 200mm, diameter 8mmHRB400 reinforcing bar.Flue exterior sheathing and inner template be installed, the exterior sheathing and inner template be using Aluminum alloy pattern plate.Climbing ladder is set in the inner template cavity of flue, and climbing ladder bottom is fastened on low one layer of first crossbeam 5 or On two crossbeams 6, climbing ladder is leant against in inner template.The placing concrete in the mold frame that exterior sheathing and inner template are constituted.Reinforcing bar Structure is to use bar diameter 8mm, spacing 200mmHRB400, single-layer bidirectional arrangement of reinforcement, concrete strength C30.Concrete walls 3 With a thickness of 100mm, for concrete wall beam 1 with a thickness of 200mm, 1 difference 100mm of concrete wall beam is prominent in 3 inside of concrete walls.To After concrete formation, worker dismantles inner template by climbing ladder, and climbing ladder is directly lifted after having dismantled inner template, complete It is collected at climbing ladder.Can be convenient dismounting of the worker to inner template by being provided with climbing ladder, at the same can to concrete walls 3 into Leakproofness etc. is directly checked after row molding, can be very good being built a framework always slave bottom to high-rise workload for few worker, One layer of construction simultaneously is removed and is checked to one layer of inner template, so that the duration is faster.Thermal insulation layer and painting are added outside concrete walls 3 Coating or tiling complete flue construction.
Deepen Design optimized the non-shear wall part of plug-in flue, determined sectional dimension and match according to existing construction drawing early period Muscle.According to the sectional dimension after in-depth, deepens aluminum alloy pattern plate design, complete matching die figure.Deepen achievement according to early period, checks and accepts aluminum dipping form After plate, with Deepen Design confirmation, formal construction of marching into the arena is arranged.Site operation is arranged, without being handled after inner wall demoulding I.e. plastic use, outer wall way is the same as exterior wall other parts.
Plug-in flue is cut entirely, and using C30 concreting, service life is consistent with main structure, compares and uses aluminum-pinch The flue of installation, there is no the risk that falls off after long-time use, security risk can be eliminated.It would not be run without road in installing Cigarette can save the cost of liner, meanwhile, with the raising of wage for workmen's level, the way cost for building plus plastering is increasingly Height, flue inner wall need to further increase cost input with building with smearing, on the whole, entirely cut the cost of the every linear meter(lin.m.) of flue and original is done Method is compared, and cost is lower.It cuts plug-in flue entirely once to construct completion, quality is guaranteed, safe and efficient.Save secondary construction flue Time, improve working efficiency, also solve the problems, such as safety construction when secondary construction flue, it is hidden to eliminate existing safety Suffer from.
Deepen Design optimized the non-shear wall part of plug-in flue, determined sectional dimension and match according to existing construction drawing early period Muscle.The part of existing shear wall and beam is not changed, and rest part wall is optimized for shear wall, shear wall's thickness 100mm.According to Detailing requiments arrangement of reinforcement, single-layer bidirectional spacing 200mm, diameter 8mmHRB400 reinforcing bar.According to the sectional dimension after in-depth, deepen aluminium Stencil design completes matching die figure.Deepen achievement according to early period, after checking and accepting aluminum alloy pattern plate, with Deepen Design confirmation, arranges to march into the arena Formal construction.Site operation is arranged, without being handled i.e. plastic use after inner wall demoulding, outer wall way is the same as other portions of exterior wall Point.After this layer of form removable, supreme one layer of turnover continues to construct, lasting to have enough to meet the need.It installs and removes for convenience of template, grasped for worker Offer working face is provided, a kind of elevated operating platform is arranged in spy, wherein be optimized for concrete wall section with a thickness of 100mm, Beam width 200mm, difference 100mm protrude metope, just can be used as the fixation support section of elevated operating platform.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, without departing from the principle of this utility model, can also make several improvements and retouch, these improve and Retouching also should be regarded as the protection scope of the utility model.

Claims (6)

1. one kind is novel to cut plug-in flue entirely, which is characterized in that including concrete wall beam (1), shear wall (2), concrete walls (3), first crossbeam (5) and second cross beam (6), the concrete walls (3) are set as groove wall structure, the concrete walls (3) setting is arranged in the outside of shear wall (2), the recess of the concrete walls (3) towards shear wall (2), the concrete The inside casing that the recess of wall (3) and shear wall (2) are formed is set as the exhaust smoke hole of flue, and concrete wall beam (1) setting is mixed It on solidifying cob wall (3), and is arranged in parallel with shear wall (2), the first crossbeam (5) and second cross beam (6) are separately positioned on groove Concrete walls (3) in, one end connect with concrete wall beam (1), and the other end is arranged in concrete walls (3), and and concrete Wall (3) is vertically arranged.
2. one kind according to claim 1 is novel to cut plug-in flue entirely, which is characterized in that further include across beam (4), it is described Across beam (4) setting in the outside of concrete walls (3), one end is arranged on shear wall (2), the other end and in addition external wall Connection, and connect and be arranged across beam (4) concrete walls (3).
3. one kind according to claim 2 is novel to cut plug-in flue entirely, which is characterized in that the item number across beam (4) It is identical as the number of floor levels of plug-in flue, described equal with the top of floor across beam (4), described one end and building across beam (4) The crossbeam on top connects.
4. one kind according to claim 2 is novel to cut plug-in flue entirely, which is characterized in that the concrete wall beam (1) Item number is identical as the number of floor levels of plug-in flue, and the concrete wall beam (1) is equal with the top of floor, the concrete wall beam (1) width is bigger than the width of concrete walls (3), the both ends of the concrete wall beam (1) respectively with first crossbeam (5) and second Crossbeam (6) connection.
5. one kind according to claim 2 is novel to cut plug-in flue entirely, which is characterized in that the first crossbeam (5) and The item number of two crossbeams (6) is identical as the number of floor levels of plug-in flue, the top of the first crossbeam (5) and second cross beam (6) floor Equal, one end of the first crossbeam (5) and second cross beam (6) is connect with the crossbeam of roof.
6. one kind according to claim 1 is novel to cut plug-in flue entirely, which is characterized in that on the outside of the concrete walls (3) It is provided with insulating layer, wall tile is posted on the outside of the insulating layer or is coated with coating for wall surface.
CN201821958867.8U 2018-11-26 2018-11-26 One kind is novel to cut plug-in flue entirely Active CN209293358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821958867.8U CN209293358U (en) 2018-11-26 2018-11-26 One kind is novel to cut plug-in flue entirely

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821958867.8U CN209293358U (en) 2018-11-26 2018-11-26 One kind is novel to cut plug-in flue entirely

Publications (1)

Publication Number Publication Date
CN209293358U true CN209293358U (en) 2019-08-23

Family

ID=67646191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821958867.8U Active CN209293358U (en) 2018-11-26 2018-11-26 One kind is novel to cut plug-in flue entirely

Country Status (1)

Country Link
CN (1) CN209293358U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403585A (en) * 2018-11-26 2019-03-01 广西万科企业管理有限公司 One kind is novel to cut plug-in flue and its construction method entirely

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109403585A (en) * 2018-11-26 2019-03-01 广西万科企业管理有限公司 One kind is novel to cut plug-in flue and its construction method entirely
CN109403585B (en) * 2018-11-26 2023-12-01 赵鹏付 Full-shearing externally-hung flue and construction method thereof

Similar Documents

Publication Publication Date Title
CN209293358U (en) One kind is novel to cut plug-in flue entirely
CN103174224B (en) A kind of external thermal insulation system
CN103669707A (en) Light composite prefabricated wallboard for house and preparation method thereof
CN206174447U (en) Demolition -free compound insulation template
CN204510810U (en) A kind of formwork structure for shutoff exterior wall reserved opening
CN104005496A (en) Fabricated environment-friendly external wall
CN109610663B (en) Rock wool composite sheet
CN109403585A (en) One kind is novel to cut plug-in flue and its construction method entirely
CN218091251U (en) Prefabricated concrete slab and ridge wall combined assembled inner bay window
CN203867001U (en) Assemblable and environment-friendly outer wall
CN110295951A (en) A kind of assembled firewall and assembly method applied to cable tunnel
CN212715736U (en) Building outer wall decorative wallboard
CN210857599U (en) Pipeline separation waterproof heat preservation integration wall body and building that constitutes thereof
CN205875384U (en) Outer containment system of stand alone type combination
CN207003989U (en) External hanging type scaffold is climbed in one kind
CN206468003U (en) A kind of Xin Jiamo guard bar structures
CN208563707U (en) A kind of light prefabricated rib floor
CN218161653U (en) Socket type prefabricated joint for wall and top plate of metal bridge
CN215520076U (en) Elevator well head operation layer protection cage
CN212562311U (en) Prefabricated well wallboard of smoke prevention and exhaust system
CN213952821U (en) Prefabricated flue mounting structure for building
CN215519213U (en) House structure
CN214831948U (en) Mounting bracket platform for cable-stayed bridge of vertical steel tower
CN214739518U (en) Novel prefabricated air conditioner board
CN212776022U (en) High-temperature-prevention modularized heat-preservation air pipe for finished product of lampblack discharge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant