CN209277897U - Trestle for single-track tunnel inverted arch template construction - Google Patents

Trestle for single-track tunnel inverted arch template construction Download PDF

Info

Publication number
CN209277897U
CN209277897U CN201821736429.7U CN201821736429U CN209277897U CN 209277897 U CN209277897 U CN 209277897U CN 201821736429 U CN201821736429 U CN 201821736429U CN 209277897 U CN209277897 U CN 209277897U
Authority
CN
China
Prior art keywords
inverted arch
trestle
arch template
vertical guide
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821736429.7U
Other languages
Chinese (zh)
Inventor
刘立红
张鹏宏
王毅
戴鑫
邱荣玖
董贵林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway No 8 Engineering Group Co Ltd
Priority to CN201821736429.7U priority Critical patent/CN209277897U/en
Application granted granted Critical
Publication of CN209277897U publication Critical patent/CN209277897U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses the trestles for single-track tunnel inverted arch template construction, including for driving the main bridge system of trestle of trestle Forward, transverse moving left and right;Inverted arch template system for single-track tunnel inverted arch formwork;The guidance system that working face for inverted arch template system adjusts;The main bridge system of trestle is connect with inverted arch template system by guidance system.The utility model is when carrying out the concreting of single-track tunnel inverted arch, inverted arch trestle integrated construction is able to achieve early closing, the construction requirement of early cyclization, the problem of being able to satisfy single-track tunnel insufficient space, and inverted arch template system is made disposably to move and align by the pushing tow of telescopic and oil cylinder between trestle and inverted arch template system, Construction traffic can be allowed to pass through trestle to excavation face, to cooperate the concrete construction of inverted arch or bottom plate under all kinds of benching tunnelling method digging modes from filled layer.

Description

Trestle for single-track tunnel inverted arch template construction
Technical field
The utility model belongs to single-track tunnel inverted arch formwork construction technology field, and in particular to is used for single-track tunnel inverted arch mould The trestle of plate construction.
Background technique
Single-track tunnel inverted arch template construction in the prior art is all made of the independent construction instrument of dispersion, firm instrument, adjusts Whole position instrument, each section is independent when construction, cannot establish automation height, sequence of construction clear and definite and easy construction Construction procedure.
Therefore in order to meet modern tunnel machine construction requirement, inverted arch trestle integrated construction is applied to single-track tunnel It constructs and proposes a kind of trestle for single-track tunnel inverted arch template construction, can rationally shorten construction period, effectively improve and apply Working medium amount.
Summary of the invention
The purpose of this utility model is that solve the above-mentioned problems and provides a kind of for single-track tunnel inverted arch template The trestle of construction.
The utility model achieves the above object through the following technical schemes:
Trestle for single-track tunnel inverted arch template construction, comprising:
For driving the main bridge system of trestle of trestle Forward, transverse moving left and right;
Inverted arch template system for single-track tunnel inverted arch formwork;
The guidance system that working face for inverted arch template system adjusts;The main bridge system of trestle passes through with inverted arch template system Guidance system connection.
Further, guidance system includes the two sub- guidance systems laid along tunnel direction, every sub- guidance system packet It includes:
The horizontal guide frame that lateral position for inverted arch template system adjusts;
The vertical guide structure that vertical position for inverted arch template system adjusts.
Further, horizontal guide frame includes two groups of son horizontal guide frames symmetrical along tunnel center line;Vertical guide Structure includes two groups of sub- vertical guide structures symmetrical along tunnel center line.
Further, the horizontal guide frame of son includes the laterally steering set being laterally arranged, laterally steering bar, lateral oil cylinder, Laterally steering set is mounted on the main bridge system of trestle, and laterally steering bar is movably disposed in laterally steering set, lateral oil cylinder Piston rod one end and laterally steering bar first end it is hinged;Sub- vertical guide structure include vertically arranged vertical guide sleeve, Vertical guide rod, vertical oil cylinder, the second end of laterally steering bar are fixedly connected with vertical guide sleeve, the piston rod of vertical oil cylinder One end is connect with the first end of vertical guide rod, and the second end of vertical guide rod is connect with vertical guide sleeve, and vertical oil cylinder is fixed It is mounted on inverted arch template system.
Preferably, trestle further includes the support lead screw group for surrounding triangle rock-steady structure, support lead screw group first end with The second end of the connection of inverted arch template system, support lead screw group is connect with sub- vertical guide structure, supports third end and the son of lead screw group Horizontal guide frame connection.
The utility model has the beneficial effects that:
The trestle for single-track tunnel inverted arch template construction of the utility model:
When carrying out the concreting of single-track tunnel inverted arch, inverted arch trestle integrated construction is able to achieve early closing, early cyclization Construction requirement, the problem of being able to satisfy single-track tunnel insufficient space, and inverted arch template system is made to pass through trestle and inverted arch template system The pushing tow of telescopic and oil cylinder between system is disposably moved and is aligned, and Construction traffic can be allowed to pass through trestle to excavation from filled layer Face, to cooperate the concrete construction of inverted arch or bottom plate under all kinds of benching tunnelling method digging modes;Make full use of early strength of concrete It is self-possessed for trestle and current load provides support, increases the contact area of trestle and filling, wanted when concrete reaches demoulding strength After asking can movable trestle, be open to traffic from trestle;And using crawler type or the driving method of motor, it can be achieved that continuous and stable is walked.
Detailed description of the invention
Fig. 1 is the main view of the utility model;
Fig. 2 is the left view of the utility model;
Fig. 3 is the cross-sectional view of guidance system in the utility model.
In figure: 1, the main bridge system of trestle;2, inverted arch template system;3, guidance system;31, vertical guide sleeve;32, it vertically leads To bar;33, vertical oil cylinder;34, laterally steering set;35, laterally steering bar;36, lateral oil cylinder;4, concrete tunnel inverted arch to be poured Face;5, inverted arch face has been poured;6, inverted arch excavation face.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing:
Embodiment 1, as shown in Figure 1 and Figure 2,
Trestle for single-track tunnel inverted arch template construction, comprising:
For driving the main bridge system 1 of trestle of trestle Forward, transverse moving left and right;
Inverted arch template system 2 for single-track tunnel inverted arch formwork;
The guidance system 3 that working face for inverted arch template system 2 adjusts;The main bridge system 1 of trestle and inverted arch template system 2 It is connected by guidance system 3.
The main bridge system 1 of trestle is the main force structure of trestle, and the main bridge system 1 of trestle passes through with inverted arch template system 2 Guidance system 3 is connected to form one structure.
The main bridge system 1 of trestle can drive entire trestle Forward and transverse moving left and right, and the main bridge system 1 of trestle is the prior art, It is not excessive herein that its functional structure is described;Guidance system 3 meets inverted arch template system 2 and adjusts contraposition to specific work Make face, meets live coarse adjustment and fine tuning.
Embodiment 2, as shown in Figure 1, Figure 2 and Figure 3,
The present embodiment the difference from embodiment 1 is that: guidance system 3 include along tunnel direction lay two son guiding system System 3, every sub- guidance system 3 include:
The horizontal guide frame that lateral position for inverted arch template system 2 adjusts;
The vertical guide structure that vertical position for inverted arch template system 2 adjusts.
Embodiment 3, as shown in Figures 2 and 3,
The present embodiment the difference from example 2 is that: horizontal guide frame includes two groups symmetrical along tunnel center line The horizontal guide frame of son;Vertical guide structure includes two groups of sub- vertical guide structures symmetrical along tunnel center line.
Embodiment 4, as shown in figure 3,
The present embodiment and the difference of embodiment 3 are: the horizontal guide frame of son includes laterally steering set 34, the cross being laterally arranged To guide rod 35, lateral oil cylinder 36, laterally steering set 34 is mounted on the main bridge system 1 of trestle, and laterally steering bar 35 is movably In laterally steering set 34, one end of the piston rod of lateral oil cylinder 36 and the first end of laterally steering bar 35 are hinged for setting;Son is perpendicular Guide frame includes vertically arranged vertical guide sleeve 31, vertical guide rod 32, vertical oil cylinder 33, and the second of laterally steering bar 35 End is fixedly connected with vertical guide sleeve 31, and one end of the piston rod of vertical oil cylinder 33 is connect with the first end of vertical guide rod 32, The second end of vertical guide rod 32 is connect with vertical guide sleeve 31, and vertical oil cylinder 33 is fixedly mounted on inverted arch template system 2.
Embodiment 5, as shown in Figures 2 and 3,
The present embodiment and the difference of embodiment 4 are: trestle further includes the support lead screw group for surrounding triangle rock-steady structure, The first end of support lead screw group is connect with inverted arch template system 2, and the second end of support lead screw group is connect with sub- vertical guide structure, is propped up The third end of support wire thick stick group is connect with the horizontal guide frame of son.
When in use, it drives trestle to be advanced to operating position by the hydraulic handle in the operation main bridge system 1 of trestle, then leads to The hydraulic handle crossed in the operation main bridge system 1 of trestle adjusts lateral oil cylinder 36 and adjusts the inverted arch template system 2 of two sides to tunnel The width of inverted arch, then vertical oil cylinder 33 is adjusted for the inverted arch template of two sides by the hydraulic handle in the operation main bridge system 1 of trestle System 2 adjusts the absolute altitude face for arriving tunnel inverted arch, and the support lead screw group in support guide system 3 is reinforced inverted arch template system 2, protected Demonstrate,prove strength and stiffness of the inverted arch template system 2 in concreting process.Single-track tunnel inverted arch concreting is completed, inverted arch After excavation face 6 reaches circulation single-track tunnel inverted arch formwork condition next time, each oil cylinder is shunk, shrinks the demoulding of inverted arch template system 2, Reach trestle Forward condition, sequentially enters next circulation construction.Concrete tunnel inverted arch to be poured face 4 and is also shown in figure Pour inverted arch face 5.
The basic principles and main features and advantage of the utility model have been shown and described above.The technical staff of the industry It should be appreciated that the present utility model is not limited to the above embodiments, the above embodiments and description only describe this The principle of utility model, on the premise of not departing from the spirit and scope of the utility model, the utility model also has various change And improvement, these various changes and improvements fall within the scope of the claimed invention.The utility model requires protection scope It is defined by appending claims and equivalents.

Claims (5)

1. being used for the trestle of single-track tunnel inverted arch template construction characterized by comprising
For driving the main bridge system of trestle of trestle Forward, transverse moving left and right;
Inverted arch template system for single-track tunnel inverted arch formwork;
The guidance system that working face for inverted arch template system adjusts;The main bridge system of trestle and inverted arch template system pass through guiding System connection.
2. the trestle according to claim 1 for single-track tunnel inverted arch template construction, it is characterised in that: guidance system packet The two sub- guidance systems laid along tunnel direction are included, every sub- guidance system includes:
The horizontal guide frame that lateral position for inverted arch template system adjusts;
The vertical guide structure that vertical position for inverted arch template system adjusts.
3. the trestle according to claim 2 for single-track tunnel inverted arch template construction, it is characterised in that: horizontal guide frame Including two groups of son horizontal guide frames symmetrical along tunnel center line;Vertical guide structure includes two groups symmetrical along tunnel center line The sub- vertical guide structure of distribution.
4. the trestle according to claim 3 for single-track tunnel inverted arch template construction, it is characterised in that: the horizontal guiding knot of son Structure includes the laterally steering set being laterally arranged, laterally steering bar, lateral oil cylinder, and laterally steering set is mounted on the main bridge system of trestle On, laterally steering bar is movably disposed in laterally steering set, one end and the laterally steering bar of the piston rod of lateral oil cylinder First end is hinged;Sub- vertical guide structure includes vertically arranged vertical guide sleeve, vertical guide rod, vertical oil cylinder, laterally steering The second end of bar is fixedly connected with vertical guide sleeve, and the first end of one end of the piston rod of vertical oil cylinder and vertical guide rod connects It connects, the second end of vertical guide rod is connect with vertical guide sleeve, and vertical oil cylinder is fixedly mounted on inverted arch template system.
5. the trestle according to claim 4 for single-track tunnel inverted arch template construction, it is characterised in that: trestle further includes The support lead screw group of triangle rock-steady structure is surrounded, the first end of support lead screw group is connect with inverted arch template system, supports lead screw The second end of group is connect with sub- vertical guide structure, and the third end of lead screw group is supported to connect with the horizontal guide frame of son.
CN201821736429.7U 2018-10-25 2018-10-25 Trestle for single-track tunnel inverted arch template construction Expired - Fee Related CN209277897U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821736429.7U CN209277897U (en) 2018-10-25 2018-10-25 Trestle for single-track tunnel inverted arch template construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821736429.7U CN209277897U (en) 2018-10-25 2018-10-25 Trestle for single-track tunnel inverted arch template construction

Publications (1)

Publication Number Publication Date
CN209277897U true CN209277897U (en) 2019-08-20

Family

ID=67599288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821736429.7U Expired - Fee Related CN209277897U (en) 2018-10-25 2018-10-25 Trestle for single-track tunnel inverted arch template construction

Country Status (1)

Country Link
CN (1) CN209277897U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663430A (en) * 2020-06-09 2020-09-15 中铁十一局集团汉江重工有限公司 Angularly adjustable and horizontal adjustable removes landing stage
CN113833495A (en) * 2021-10-20 2021-12-24 广东水电二局股份有限公司 Equipment for slope tunnel inverted arch construction and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111663430A (en) * 2020-06-09 2020-09-15 中铁十一局集团汉江重工有限公司 Angularly adjustable and horizontal adjustable removes landing stage
CN111663430B (en) * 2020-06-09 2022-02-22 中铁十一局集团汉江重工有限公司 Angularly adjustable and horizontal adjustable removes landing stage
CN113833495A (en) * 2021-10-20 2021-12-24 广东水电二局股份有限公司 Equipment for slope tunnel inverted arch construction and construction method thereof

Similar Documents

Publication Publication Date Title
CN205934734U (en) Supplementary handing equipment of prefabricated T roof beam sideslip
CN209277897U (en) Trestle for single-track tunnel inverted arch template construction
CN102022123B (en) Integral lining method for tunnel with altered diameter by model board trolley
CN103556817A (en) Side wall concrete construction method employing side wall trolley
CN204041080U (en) General formula needle beam lining trolley in a kind of
CN110273695A (en) A kind of Tunnel Second Lining formwork jumbo and its stage molding pouring procedure
CN207079477U (en) A kind of mobile formwork bottom web reinforcement skeleton pricks hanging apparatus in advance
CN105041339B (en) Disengaging type formwork jumbo, chassis component and underpass concrete construction method
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN110173281A (en) A kind of sliding mode system for circular tunnel concreting
CN205638481U (en) Tunnel invert fills slot and removes mould
CN110468748A (en) A kind of culvert trolley
CN110158470A (en) It can the longitudinal and transverse method for moving Construction Through Form on Traveler highway continuous beam under a kind of complex environment
CN207295476U (en) One kind moves integrally landing mould bases
CN104018855B (en) General formula needle beam lining trolley in a kind of
CN105604580A (en) Tunnel inverted arch construction movable formwork
CN112177046A (en) Open cut tunnel lining external mold trolley
CN210621491U (en) Transverse micro-mold-opening moving mold frame via hole device
CN107060831A (en) One kind is used for tunnel groove constructing device
CN208748494U (en) A kind of alignment device of highway roadside stone laydown machine
CN207775925U (en) A kind of piping lane pours mold
CN104832194A (en) Full-automatic hydraulic concrete-lining steel-moulding-plate trolley
CN214194642U (en) Open cut tunnel lining external mold trolley
CN205876345U (en) Platform truck system that transports of template is pour to tunnel lateral sulcus cable duct
CN211081965U (en) Self-walking hydraulic trestle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190820

CF01 Termination of patent right due to non-payment of annual fee