CN105041339B - Disengaging type formwork jumbo, chassis component and underpass concrete construction method - Google Patents
Disengaging type formwork jumbo, chassis component and underpass concrete construction method Download PDFInfo
- Publication number
- CN105041339B CN105041339B CN201510450004.4A CN201510450004A CN105041339B CN 105041339 B CN105041339 B CN 105041339B CN 201510450004 A CN201510450004 A CN 201510450004A CN 105041339 B CN105041339 B CN 105041339B
- Authority
- CN
- China
- Prior art keywords
- template
- chassis
- top template
- construction
- underpass
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention discloses disengaging type formwork jumbo, chassis component and underpass concrete construction method, belongs to tunnel construction concreting outfit technical field.The formwork jumbo, including top template chassis and side template, side template are distributed in top template chassis both sides;Side template bottom is provided with moving guide rail, and moving guide rail coordinates drive side template to vertically move with being arranged at the mobile pulley of top template chassis lower end.The formwork jumbo component, including along the underpass longitudinally coaxial setting two top template chassis and a set of side template, the mobile pulley of two top template chassis lower ends dock mutually so that side template longitudinal sliding motion on formwork jumbo component.The construction method comprises the following steps:Formwork jumbo component first is in place;Secondly the construction section of concreting first;Then side template is stripped and moved on the top template chassis of the second construction section and installs;Then the second construction section is poured;So circulation, until completing whole underpass concrete construction.
Description
Technical field
The invention belongs to tunnel construction concreting outfit technical field, more particularly to a kind of disengaging type formwork jumbo,
Chassis component and underpass concrete construction method.
Background technology
Now with metropolitan fast development, the space of surface road is less and less, and development underpass is that solve ground
One of effective means of face congestion in road.When carrying out the construction of underpass, it is necessary to which whole underpass is carried out into segmented
Pouring construction takes the time of construction site and reduces obstruction to traffic above-ground to reduce.Formwork jumbo is that one kind extensively should
For the large-scale steel structure template system in the constructing tunnels such as highway, railway, water power, city railway.The template of formwork jumbo
Formed by being hinged between backform, the side form on both sides, template, top template upper end is provided with grouting port, the grouting port and Grouting Pipe, slip casting
Pump connects, for concreting.Formwork jumbo of the prior art is the monoblock type for integrating walking, support and operation
Formwork jumbo.
However, the side template of monoblock type formwork jumbo is needed after concrete roof reaches design strength, could be overall
Propelling construction, it have impact on the duration.Therefore, a kind of saving duration how is provided, construct easily disengaging type formwork jumbo, chassis group
Part and underpass concrete construction method disengaging type, it is the technical problem of those skilled in the art's urgent need to resolve.
The content of the invention
It is an object of the invention to provide a kind of disengaging type formwork jumbo, chassis component and underpass concrete construction side
Method, integrally it is stripped, is promoted comprehensively with solving formwork jumbo in the prior art, long construction period, cost are high caused by asks
Topic.
To achieve these goals, the technical scheme is that:
A kind of disengaging type formwork jumbo, for underpass concrete pouring construction, including top template chassis and side template,
The side template is distributed in the both sides of the top template chassis and is connected by plank sheathing with the top template chassis;The side form
The bottom of plate is provided with moving guide rail, the moving guide rail and the mobile pulley cooperation drive for being arranged at the top template chassis lower end
The side template vertically moves.
Further, the top template chassis includes at least two top templates for being arranged side by side and passing through detachable connection
Trolley unit, each top template trolley unit include top template, walking mechanism and column, the walking mechanism and described stand
Post is tightly supportted in the lower section of the top template, and the mobile pulley is detachable to be installed on the column of the side template.
Further, the side template also includes lateral retractor device, and the lateral retractor device includes transverse shifting branch
Frame and side template Shift cylinder, the transverse moving support are arranged on the column, and the side template Shift cylinder is detachable
Formula is installed between the column and the walking mechanism, and the side template Shift cylinder drives the side template along the horizontal stroke
Stretched to mobile support.
Further, the side template is provided with top moving leader close to the side of the column.
Further, the side template passes through transverse support bar and the column detachable connection.
Chassis component, including along the underpass longitudinally coaxial setting two top template chassis and a set of institute
Side template is stated, the mobile pulley of two top template chassis lower ends docks mutually so that the side template is in the Schaltisch
Longitudinal sliding motion on car component.
Further, the top template chassis includes top template trolley unit one, the top template of detachable connection successively
Trolley unit two and top template trolley unit three, the top template trolley unit two include the middle backform of detachable connection
The small top plate of plate trolley unit one, detachable and middle top template trolley unit two.
A kind of underpass concrete construction method, the underpass is divided into some construction sections and continuously constructed,
Comprise the following steps:
Step 1:The underpass bottom plate is laid, and chassis component as claimed in claim 7 is located in the bottom
On plate, two top template chassis are respectively to push up top template chassis one and top top template chassis two so that the top top template
Chassis one is located at the first construction section, and the top top template chassis two is located at the second construction section;
Step 2:In the first construction section casting concrete disposably to form the structure side wall of first construction section
And structure roof;
Step 3:After the structure side wall concrete strength of first construction section meets to require, the side template is carried out
It is stripped and vertically moves the side template to second construction section, the side template is installed on the top top template chassis two
On;
Step 4:In the second construction section casting concrete disposably to form the structure side wall of second construction section
And structure roof;
Step 5:After the structure roof concrete strength of first construction section meets to require, the top template is carried out
Demoulding work, and by the top template chassis one pass through the top template chassis two after move to the 3rd construction section, meanwhile, it is described
The structure side wall concrete strength of second construction section meets after requiring, carries out the side template demoulding and vertically moves the side form
The side template is installed on the top top template chassis one by plate to the 3rd construction section;
Step 6:Repeating said steps two are to step 5, until completing the coagulation soil application of the whole underpass
Further, side template described in the step 3, which is stripped and vertically moved between the side template, is also included institute
Side template is stated laterally to move
Further, the step 5 also includes:The top top template chassis one is split as the backform pallet first
Car unit one, the middle top template trolley unit one, the small top plate of the detachable, the middle top template trolley unit two with
And the top template trolley unit three;Then the top template chassis one after fractionation is sequentially passed through into the top template chassis two
And move to the 3rd construction section.
The present invention compared with prior art, has the following advantages that and beneficial effect:
1st, disengaging type formwork jumbo of the invention, for underpass concrete construction, including top template chassis and side form
Plate, side template are distributed in the both sides of top template chassis and are connected by plank sheathing with top template chassis;The bottom of side template is provided with
Moving guide rail, moving guide rail coordinate drive side template to vertically move, saved with being arranged at the mobile pulley of top template chassis lower end
Engineering time, reduce construction cost.
2nd, chassis component of the invention, including along two top template chassis of longitudinally coaxial setting of underpass and a set of
Side template, the mobile pulley of two top template chassis lower ends are docked mutually so that side template is longitudinally slided on formwork jumbo component
It is dynamic.Two top template chassis are one in front and one in back coaxially disposed by the length direction along underpass, and cause two backform pallets
Car is located in adjacent construction section respectively, is applied so as to which alternate cycles can be achieved by two top template chassis and a set of side template
Work, the top template and side template of formwork jumbo component are stripped respectively according to the curing time of respective corresponding casting concrete, so as to
Next workshop section's construction is each independently advanced to after each completing the construction of a workshop section, the continuity of construction is realized, improves
Efficiency of construction.
3rd, underpass concrete construction method of the invention, including:The first step, chassis component is located in underpass
On bottom plate;Second step, casting concrete disposably form the structure side wall and structure roof of the first construction section;3rd step, structure
Side wall concrete carries out the side template demoulding after reaching design strength, and side template is moved into the second construction section, and side template is installed on
On the top template chassis of second construction section;4th step, casting concrete disposably form the structure side wall and knot of the second construction section
Structure top plate;5th step, after the structure roof concrete strength of the first construction section is up to standard, this section of top template demoulding is carried out, and should
The top template chassis of section rests in the 3rd construction section after passing through the second construction section, meanwhile, the structure side wall coagulation of the second construction section
After native intensity is up to standard, the side template demoulding of corresponding section is carried out, and side template is moved into the 3rd construction section, side template is installed on the 3rd
On the top template chassis of construction section;6th step, second step is repeated to the 5th step, until completing the coagulation soil application of whole underpass
Work.The construction method, the top template and side template of chassis component take off respectively according to the curing time of respective corresponding casting concrete
Mould, so as to each each independently be advanced to next workshop section's construction after the construction of one workshop section of completion, so as to shorten the duration, save
Cost, and it is easy to operate, securely and reliably.
Brief description of the drawings
Disengaging type formwork jumbo, chassis component and the underpass concrete construction method of the present invention is by following embodiment
And accompanying drawing provides.
The schematic diagram that Fig. 1 is one embodiment of the invention disengaging type formwork jumbo and side template movement promotes;
Fig. 2 is one embodiment of the invention disengaging type formwork jumbo primary concreting scheme of installation;
Fig. 3 is that the dismounting of top template trolley unit three of one embodiment of the invention top template chassis one promotes schematic diagram;
Fig. 4 is that the dismounting of top template trolley unit one of one embodiment of the invention top template chassis one promotes schematic diagram;
Fig. 5 is that the dismounting of top template trolley unit two of one embodiment of the invention top template chassis one promotes schematic diagram.
In figure:
10- side templates;11- moving guide rails;12- transverse support bars;13- tops moving leader;14- plank sheathings;15- is horizontal
Mobile support;20- vertical supporting bars;21- mobile pulleys;31- top templates;310- top templates trolley unit one;Pushed up among 311-
Formwork jumbo unit one;The small top plate of 312- detachables;Top template trolley unit two among 313-;314- top template trolley units
Three;32- walking mechanisms;33- columns;40- bottom plates.
Embodiment
Disengaging type formwork jumbo proposed by the present invention, chassis component and underground are led to below in conjunction with the drawings and specific embodiments
Road concrete construction method is described in further detail.According to following explanation and claims, advantages and features of the invention
It will become apparent from.It need to illustrate in addition, accompanying drawing uses using very simplified form and non-accurately ratio, only to side
Just the purpose of the embodiment of the present invention, is lucidly aided in illustrating.For sake of convenience, " on ", " under " described below and accompanying drawing
Upper and lower direction is consistent, but this can not turn into the limitation of technical solution of the present invention.
Embodiment one
Disengaging type formwork jumbo, chassis component and its underpass for describing the present invention in detail with reference to Fig. 1 to Fig. 5 mix
Coagulate the construction method of soil.
As shown in figure 1, a kind of disengaging type formwork jumbo, for underpass concrete pouring construction, including backform pallet
Car 31, side template 10 and vertical supporting bar 20, side template 10 are distributed in the both sides of top template chassis 31 and by plank sheathings 14
It is connected with top template chassis 31;The bottom of side template 10 is provided with moving guide rail 11, and moving guide rail 11 is with being arranged at vertical supporting bar
Mobile pulley 21 on 20, which coordinates, drives side template 10 to vertically move.
Top template chassis 31 includes being arranged side by side and by least two top template trolley units of detachable connection, often
Individual top template trolley unit includes top template 31, walking mechanism 32 and column 33, and walking mechanism 32 and column 33 are tightly supportted in top
The lower section of template 31, mobile pulley 21 is detachable to be installed on the column 33 of side template 10.
Specifically, according to construction requirement, the concreting work of underpass bottom plate 40, Ran Houli are completed in first construction
With the concrete pouring construction that underpass structure roof and structure side wall are carried out using disengaging type formwork jumbo.Formwork jumbo exists
The over-assemble of underpass bottom plate 40 is completed.Because the concrete of structure roof and structure side wall reaches supporting required for design strength
Time difference is protected, according to job specfication, the usual structure side wall concrete curing time is the structure roof concrete curing time
Half.Therefore, after the structure side wall concrete strength of previous construction section reaches design requirement, by the form removal of side template 10, cleaning
The pouring construction that next construction section carries out structure side wall concrete is sent into afterwards, so as to save the engineering time.The He of top template 31
It is attached between side template 10 by plank sheathing 14, increases the space of the transverse shifting of side template 10, facilitates side template 10
Cleaning, reduce the time of the foregoing template of on-site consolidation, simplify difficulty of processing.
Especially, side template 10 also includes lateral retractor device (not shown), and lateral retractor device includes being installed on column
Transverse moving support 15 and side template Shift cylinder 16 on 33, side template Shift cylinder 16 is detachable to be installed on column 33
Between walking mechanism 32, side template Shift cylinder 16 drives side template 10 to be stretched along transverse moving support 15.
Certainly, in order to be tumbled when preventing side template 10 from moving, ensure side template 10 along being arranged at moving on column 33
Pulley 21 does linear motion until reaching specified location, and side template 10 is provided with top moving leader 13 close to the side of column 33.
It is preferred that in order to meet the force stability of side template 10, side template 10 passes through transverse support bar 12 and homonymy
The detachable connection of column 33.Detachable connection includes be hinged, bolt connection and bearing pin connection etc., this hair in the present embodiment
It is bright not to be limited herein.
Especially, in order to further shorten the concrete construction cycle of underpass, and cost is saved, improves construction
Quality, a kind of chassis component is provided in another embodiment of the invention.The chassis component is included along the longitudinal direction of underpass
Two top template chassis being coaxially disposed and a set of side template, the mobile pulley of two top template chassis lower ends are docked mutually, made
Obtain side template longitudinal sliding motion on formwork jumbo component.Two top template chassis are respectively top template chassis one and top template chassis
Two.When the concrete strength of the construction section structure side wall where top template chassis one reaches design requirement, such as at 8-12 days, tear open
Except the side template 10 on top template chassis one, and by the cross-direction shrinkage certain distance of side template 10, such as 70 centimetres, side template is carried out
10 cleaning, then side template 10 moves along pulley 21 and is moved at the top template chassis two of next construction section, and pacifies
Loaded on top template chassis two, the structure roof of place construction section of top template chassis two and pouring for structure side wall concrete are carried out
Build work.When concrete strength of structure side wall reaches design requirement at this, the foregoing associative operation to side template 10 is repeated;
At the same time, the concrete strength of the structure roof of the place construction section of top template chassis one is also up to design requirement, thus can
To remove the top template 31 of top template chassis one, and top template 31 is caused to pass through top template chassis under the drive of walking mechanism 32
Two enter the 3rd construction section, will move to the 3rd construction section positioned at the side template 10 of the place construction section of top template chassis two, and install
In on top template chassis one;And monolithic concrete will be carried out to the underpass structure roof of the 3rd construction section and structure side wall
Pour.That is, chassis component includes two top template chassis and a set of side template 10, two top template chassis are one in front and one in back
Set, respectively positioned at adjacent construction section;Realize that alternate cycles are constructed by a set of side template 10 and two top template chassis, it is real
Show the continuity of construction, improve efficiency of construction.
Further, top template chassis includes the top template trolley unit 1 of detachable connection, backform pallet successively
Car unit two (not shown) and top template trolley unit 3 314, top template trolley unit two are included in detachable connection
Between top template trolley unit 1, the small top plate 312 of detachable and middle top template trolley unit 2 313.In structure roof
After concrete strength reaches design requirement, top template 31 is removed, after top template chassis is decomposed, the backform after decomposing can be caused
The width of plate trolley unit is less than the width in the passageway of other top template chassis central post 33 composition, after convenient decompose
Top template trolley unit pass through another top template chassis and installed.Especially, there are lattice among underpass
During structure post, it may be such that the top template chassis after decomposing is driven to up to specified around lattice column by removing the small top plate of detachable and apply
Workshop section.
Embodiment three
Continue with and describe underpass concrete construction method in detail with reference to Fig. 1 to Fig. 5.Underpass concrete construction
Method, underpass is divided into some construction sections and continuously constructed, is comprised the following steps:
S001:Underpass bottom plate 40 is laid, and chassis component is located on bottom plate 40, two chassis components are respectively
Top template chassis one and top template chassis two so that top template chassis one is located at the first construction section, and top template chassis two is positioned at the
Two construction sections;
S002:Please continue to refer to Fig. 2, in the first construction section casting concrete with the disposable structure for forming the first construction section
Side wall and structure roof;
S003:Please continue to refer to Fig. 1, after the structure side wall concrete strength of the first construction section meets to require, side is carried out
Template 10 is stripped and vertically moves the construction section of side template 10 to the second, and side template is installed on top template chassis two;
S004:Please continue to refer to Fig. 2, in the second construction section casting concrete with the disposable structure for forming the second construction section
Side wall and structure roof;
S005:Please continue to refer to Fig. 3 to Fig. 5, after the structure roof concrete strength of the first construction section meets to require, enter
The demoulding work of row top template 31, and the 3rd construction section is moved to after top template chassis one is passed through into top template chassis two, meanwhile, the
The structure side wall concrete strengths of two construction sections meets after requiring, carries out side template 10 and is stripped and vertically moves side template 10 to the
Three construction sections, side template 10 is installed on top template chassis one;
S006:S002 to S005 is repeated, until completing the concrete construction of whole underpass.
Especially, side template 10 is stripped and vertically moved between side template 10 and also includes side template 10 towards template in S003
Transverse shifting preset distance (such as 70 centimetres of cross-direction shrinkage) in the middle part of chassis, carries out the cleaning of side template 10.
Further, S005 also includes top template chassis one is split as into top template trolley unit 1, middle top first
The small top plate 312 of formwork jumbo unit 1, detachable, middle top template trolley unit 2 313 and top template trolley unit three
314;Then the top template chassis one after fractionation is sequentially passed through into top template chassis two and moves to the 3rd construction section.
In summary, disengaging type formwork jumbo of the invention, for underpass concrete construction, including top template chassis
And side template, side template are distributed in the both sides of top template chassis and are connected by plank sheathing with top template chassis;The bottom of side template
Portion is provided with moving guide rail, moving guide rail and the mobile pulley cooperation drive side template longitudinally shifting for being arranged at top template chassis lower end
It is dynamic.After the structure side wall concrete strength of previous construction section reaches design requirement, by side template form removal, cleaning rear side template edge
The dismountable moving pulley installed in top template lower end and carry out the pouring construction that next construction section carries out side wall concrete,
So as to save the engineering time.It is attached between top template and side template by plank sheathing, increases side template transverse shifting
Space, facilitate the cleaning of side template, reduce the time of the foregoing template of on-site consolidation, simplify difficulty of processing.The present invention
Chassis component, including along underpass longitudinally coaxial setting two top template chassis and a set of side template, two backforms
The mobile pulley of pallet car lower end docks mutually so that side template longitudinal sliding motion on formwork jumbo component.By leading to along underground
The length direction in road is one in front and one in back coaxially disposed two top template chassis, and it is adjacent make it that two top template chassis are located in respectively
Construction section, alternate cycles can be achieved so as to passing through two top template chassis and a set of side template and construct, formwork jumbo component
Top template and side template be stripped respectively according to the curing time of respective corresponding casting concrete, so as to each complete a workshop section
Construction after each independently be advanced to next workshop section and construct, realize the continuity of construction, improve efficiency of construction.Underpass
Concrete construction method, the top template and side template of chassis component take off respectively according to the curing time of respective corresponding casting concrete
Mould, so that next workshop section's construction is each each independently advanced to after the construction of one workshop section of completion, with Schaltisch in the prior art
The construction method that car is integrally stripped, promotes comprehensively is compared, and construction method of the invention shortens the duration, saves cost, and
It is easy to operate, securely and reliably.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention.Ability
Any change, the modification that the technical staff in domain does according to the disclosure above content, belong to the protection domain of claims.
Claims (9)
1. a kind of disengaging type formwork jumbo, it is characterised in that including top template chassis and side template, the side template is distributed in institute
State the both sides of top template chassis and be connected by plank sheathing with the top template chassis;The bottom of the side template is provided with movement and led
Rail, the moving guide rail and the mobile pulley cooperation drive side template longitudinally shifting for being arranged at the top template chassis lower end
Dynamic, the top template chassis includes being arranged side by side and by least two top template trolley unit of detachable connection, each
The top template trolley unit includes top template, walking mechanism and column, and the walking mechanism and the column are tightly supportted in institute
The lower section of top template is stated, the mobile pulley is detachable to be installed on the column of the side template.
2. disengaging type formwork jumbo as claimed in claim 1, it is characterised in that the side template also includes lateral flexible dress
Put, the lateral retractor device includes transverse moving support and side template Shift cylinder, and the transverse moving support is arranged at institute
State on column, the side template Shift cylinder is detachable to be installed between the column and the walking mechanism, the side form
Plate Shift cylinder drives the side template to be stretched along the transverse moving support.
3. disengaging type formwork jumbo as claimed in claim 2, it is characterised in that the side template is close to the side of the column
Provided with top moving leader.
4. disengaging type formwork jumbo as claimed in claim 2, it is characterised in that the side template passes through transverse support bar and institute
State column detachable connection.
5. a kind of chassis component, it is characterised in that including the disengaging type mould at least two as described in any one of Claims 1-4
Pallet car, it is included along two top template chassis of the longitudinally coaxial setting of underpass and a set of side template, and two
The mobile pulley of top template chassis lower end docks mutually described in platform so that side template longitudinal direction on the formwork jumbo component
Slide.
6. chassis component as claimed in claim 5, it is characterised in that the top template chassis includes detachable connection successively
Top template trolley unit one, top template trolley unit two and top template trolley unit three, the top template trolley unit two
Middle top template trolley unit one, the small top plate of detachable and middle top template trolley unit two including detachable connection.
7. a kind of underpass concrete construction method, it is characterised in that the underpass is divided into some construction sections and carried out
Continuous construction, comprises the following steps:
Step 1:The underpass bottom plate is laid, and chassis component as claimed in claim 6 is located in the bottom plate
On, two top template chassis are respectively top template chassis one and top template chassis two so that one, the top template chassis
In the first construction section, the top template chassis two is located at the second construction section;
Step 2:In the first construction section casting concrete disposably to form the structure side wall of first construction section and knot
Structure top plate;
Step 3:After the structure side wall concrete strength of first construction section meets to require, the side template demoulding is carried out
And the side template is vertically moved to second construction section, the side template is installed on the top template chassis two;
Step 4:In the second construction section casting concrete disposably to form the structure side wall of second construction section and knot
Structure top plate;
Step 5:After the structure roof concrete strength of first construction section meets to require, the de- of the top template is carried out
Die worker makees, and moves to the 3rd construction section after the top template chassis one is passed through into the top template chassis two, meanwhile, described second
The structure side wall concrete strength of construction section meets after requiring, carries out the side template demoulding and vertically moves the side template extremely
3rd construction section, the side template is installed on the top template chassis one;
Step 6:Repeating said steps two are to step 5, until completing the concrete construction of the whole underpass.
8. underpass concrete construction method as claimed in claim 7, it is characterised in that side form described in the step 3
Plate, which is stripped and vertically moved between the side template, also to be included the side template transverse shifting preset distance, carries out the side form
The cleaning of plate.
9. underpass concrete construction method as claimed in claim 8, it is characterised in that the step 5 also includes:It is first
The top template chassis one is first split as the top template trolley unit one, the middle top template trolley unit one, described
The small top plate of detachable, the middle top template trolley unit two and the top template trolley unit three;Then by after fractionation
The top template chassis one sequentially passes through the top template chassis two and moves to the 3rd construction section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510450004.4A CN105041339B (en) | 2015-07-28 | 2015-07-28 | Disengaging type formwork jumbo, chassis component and underpass concrete construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510450004.4A CN105041339B (en) | 2015-07-28 | 2015-07-28 | Disengaging type formwork jumbo, chassis component and underpass concrete construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105041339A CN105041339A (en) | 2015-11-11 |
CN105041339B true CN105041339B (en) | 2017-12-26 |
Family
ID=54448261
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510450004.4A Active CN105041339B (en) | 2015-07-28 | 2015-07-28 | Disengaging type formwork jumbo, chassis component and underpass concrete construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105041339B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106081671B (en) * | 2016-08-24 | 2018-02-16 | 安徽安凯汽车股份有限公司 | A kind of walking track based on ferry bus traction car is to rail device |
CN106437769B (en) * | 2016-11-09 | 2018-06-01 | 辽宁工程技术大学 | The self-propelled hydraulic formwork jumbo poured for Deep Foundation Pit of Metro Stations engineering top plate |
CN107255034B (en) * | 2017-08-11 | 2019-02-15 | 中铁隧道集团有限公司 | All-hydraulic voluntarily formwork jumbo carries out fission and passes through formula concrete placings construction method |
CN107905818B (en) * | 2017-12-11 | 2019-12-27 | 李信斌 | Tunnel concrete lining construction auxiliary equipment and construction process |
CN110644590B (en) * | 2019-09-24 | 2021-02-19 | 中铁八局集团建筑工程有限公司 | Multi-vehicle pouring method for open-cut and underground channel |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104594918A (en) * | 2014-12-31 | 2015-05-06 | 上海市机械施工集团有限公司 | Split integrated underground passage steel mold plate trolley and construction method thereof |
CN104632251A (en) * | 2014-12-31 | 2015-05-20 | 上海市机械施工集团有限公司 | Integrally cast type mould plate trolley and construction method of concrete pouring of underground passage |
CN104763446A (en) * | 2015-03-24 | 2015-07-08 | 粤水电轨道交通建设有限公司 | Multi-functional trolley for subway station construction |
CN204960948U (en) * | 2015-07-28 | 2016-01-13 | 上海市机械施工集团有限公司 | Separation and reunion formula formworking jumbo and formworking jumbo subassembly |
-
2015
- 2015-07-28 CN CN201510450004.4A patent/CN105041339B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104594918A (en) * | 2014-12-31 | 2015-05-06 | 上海市机械施工集团有限公司 | Split integrated underground passage steel mold plate trolley and construction method thereof |
CN104632251A (en) * | 2014-12-31 | 2015-05-20 | 上海市机械施工集团有限公司 | Integrally cast type mould plate trolley and construction method of concrete pouring of underground passage |
CN104763446A (en) * | 2015-03-24 | 2015-07-08 | 粤水电轨道交通建设有限公司 | Multi-functional trolley for subway station construction |
CN204960948U (en) * | 2015-07-28 | 2016-01-13 | 上海市机械施工集团有限公司 | Separation and reunion formula formworking jumbo and formworking jumbo subassembly |
Also Published As
Publication number | Publication date |
---|---|
CN105041339A (en) | 2015-11-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105041339B (en) | Disengaging type formwork jumbo, chassis component and underpass concrete construction method | |
CN105952482B (en) | Self-propelled tunnel inverted arch lining trolley | |
CN106089253B (en) | A kind of all-hydraulic template system poured for culvert | |
CN104594918B (en) | Split integrated underground passage steel mold plate trolley and construction method thereof | |
CN103967050A (en) | Construction system of subway station | |
CN105736016A (en) | Tunnel secondary lining steel bar framework construction equipment and application thereof | |
CN108858723A (en) | The novel intensive construction technology of highway prefabricated case beam | |
CN104453951B (en) | Combined type subway station lining template trolley for baffle | |
CN107060823B (en) | Non-dismantling trolley for tunnel anchor section secondary lining concrete construction | |
CN202991063U (en) | Large-section tunnel hydraulic trolley | |
CN104695335A (en) | Overall reinforcement binding and hoisting construction method and construction device adopting upstroke movable scaffolding | |
CN205936645U (en) | A full liquid die plate system for culvert is pour | |
CN109355983B (en) | Trackless construction method for urban rail | |
CN107829408B (en) | Rectangular aqueduct construction steel mould trolley | |
CN211547804U (en) | Cantilever type retaining wall rapid construction device | |
CN104060860B (en) | A kind of sectional telescopic rain-proof shelter for precast concrete T-beam and using method | |
CN105019357A (en) | Method for mounting specially-shaped precast bridge decks on open lattice steel beams of arched bridge | |
CN104948203A (en) | Integral construction method for inclined-shaft tunnel linings and asymmetric mid-wall linings | |
CN205975365U (en) | Cast -in -situ box girder combined type moving die carrier | |
CN201554468U (en) | Traveling type hydraulic steel form carrier | |
CN208594572U (en) | Single layer double cabin pipe galleries in underground are hydraulic from walking formwork jumbo | |
CN208430437U (en) | A kind of mobile formwork bridge fabrication machine | |
CN107882578B (en) | A kind of reinforced concrete lined tunnel single stope dual stage vehicle lining cutting continuous placing technology | |
CN205934962U (en) | A system of sliding for underground pipe gallery cast -in -situ construction | |
CN204960948U (en) | Separation and reunion formula formworking jumbo and formworking jumbo subassembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |