CN209244567U CN201821830650.9U CN201821830650U CN209244567U CN 209244567 U CN209244567 U CN 209244567U CN 201821830650 U CN201821830650 U CN 201821830650U CN 209244567 U CN209244567 U CN 209244567U
Authority
CN
China
Prior art keywords
rock burst
rock
deep
hole
prevention
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821830650.9U
Other languages
Chinese (zh)
Inventor
朱镇风
李栋
丘福生
郝佰军
陈亚扁
俞如荧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU TRAFFIC RESEARCH INSTITUTE
Dacheng Engineering Construction Group Co Ltd
Original Assignee
JIANGSU TRAFFIC RESEARCH INSTITUTE
Dacheng Engineering Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU TRAFFIC RESEARCH INSTITUTE, Dacheng Engineering Construction Group Co Ltd filed Critical JIANGSU TRAFFIC RESEARCH INSTITUTE
Priority to CN201821830650.9U priority Critical patent/CN209244567U/en
Application granted granted Critical
Publication of CN209244567U publication Critical patent/CN209244567U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a kind of deep-lying tunnel construction rock burst prevention and control drilling arragement constructions, it drills including multiple rock burst prevention and control, rock burst prevention and control drill by one or more pressure break holes, several pressure relief vents and side wall slot hole are constituted, pressure break hole extends from working face along the rock burst region for being parallel to canal axes direction towards front, pressure relief vent extends towards the rock burst region in front of side at an angle from working face and canal axes, side wall slot hole lags behind working face, and extend to vertical canal axes towards lateral rock burst region, oval groove body and a large amount of microfissure are formed in tunnel side wall rock mass;Tunnel rock burst intersegmental part is goed deep into rock burst prevention and control drilling.The utility model changes the integrality of country rock to a certain extent, can release the high-stress state of country rock, reduces rock burst generation intensity and even is eliminated rock burst.

Description

Deep-lying tunnel construction rock burst prevention and control drilling arragement construction
Technical field
The utility model belongs to the underground engineering fields such as traffic, mine, water conservancy and hydropower, and in particular to a kind of deep-lying tunnel is applied Work rock burst prevention and control drilling arragement construction, releases rock mass suitable for the deep tunnel with the medium and above rockburst intensity in advance and answers Power, softening country rock, prevention and control rock burst hazard.
Background technique
In deep during tunnel excavation, the energy of the rock mass accumulation under high-stress state discharges suddenly, causes to enclose Rock destroys, and fractured rock is dished out, i.e. generation rock burst often can cause casualties, the destruction of equipment damage and construction, sternly Ghost image rings construction speed, increases tunnel maintenance cost.Therefore, before deep-lying tunnel is excavated to rock burst section, prevention and control should be taken to arrange It applies to reduce rock burst occurrence probability and rock burst intensity grade, it is ensured that the construction safety of rock blasting region.
The features such as there are blindness and randomness, is arranged in traditional deep-lying tunnel rock burst prevention and control drilling, and stress relieving is bored Hole aperture is small, and coverage is limited;Charge explosion is taken to release strain method, it is broken to will cause irreversible damage to reservation country rock Bad, influencing tunnel is stability.Practice have shown that existing rock burst preventing control method is difficult to obtain ideal effect.
Summary of the invention
The purpose of this utility model is the deficiency existing for arragement construction that drills for above-mentioned existing deep-lying tunnel rock burst prevention and control, A kind of deep-lying tunnel construction rock burst prevention and control drilling arragement construction is provided, to reduce and bore while release tunnel stress in advance Hole number guarantees the safety of construction personnel, mechanical equipment, it is ensured that safely and fast passes through rock burst section.
To achieve the goals above, the utility model adopts the following technical solution: a kind of deep-lying tunnel rock burst prevention and control drilling Arragement construction, including multiple rock burst prevention and control drilling, rock burst prevention and control drilling by one or more pressure break holes, several pressure relief vents and Side wall slot hole is constituted, and the pressure break hole extends from working face along the rock burst region for being parallel to canal axes direction towards front, The pressure relief vent extends towards the rock burst region in front of side at an angle from working face and canal axes, and side wall slot hole is stagnant Afterwards in working face, and extend to vertical canal axes towards lateral rock burst region, forms elliptical slot in tunnel side wall rock mass Body and a large amount of microfissure;Tunnel rock burst intersegmental part is goed deep into the rock burst prevention and control drilling;Pressure break hole and pressure relief vent are in rock burst section Interior depth is not less than 20m, and depth of the side wall rock burst prevention and control hole in rock burst section is not less than 10m.
Further, borehole bottom location spacing in pressure break hole is 20 ~ 40m, and pressure relief vent borehole bottom location spacing is 5 ~ 8m, and slot hole is whole Hole site spacing is 8 ~ 12m, and pressure break hole sealing of hole segment length is not less than 15m.
Further, pressure break hole and slot hole aperture are 89 ~ 120mm, and release bore dia is 75mm ~ 108mm.
The utility model, can be in tunnel excavation contour line by constructing advanced pressure break hole and pressure relief vent in rock burst section A large amount of release hole and through crack are formed in rock mass, it, can be in tunnel side wall by lagging the side wall slot hole of working face The elliptical slot that certain length is formed in rock mass, is formed simultaneously a large amount of microfissure, changes the complete of country rock to a certain extent Whole property can release the high-stress state of country rock, reduce rock burst generation intensity and even be eliminated rock burst.
High pressure water is injected by pressure break hole and implements pressure break, and while releasing high-stress state, high pressure water passes through pressure break shape At microfissure enter in rock mass, side wall slot hole be used as slot high pressure water also can enter the advance of the face formation crack In, play the role of softening on a large scale that country rock, to reduce country rock brittle.
In addition to this, slot, pressure break are formed slot, gap can absorb after causing surrounding rock failure during tunnel excavation Remaining energy, plays buffer function, is effectively reduced or eliminates rock burst danger.It drills compared to conventional tunnel rock burst prevention and control Arragement construction, this rock burst prevention and control drilling arragement construction are with the obvious advantage.
Detailed description of the invention
Fig. 1 is the cross-sectional view of the utility model deep-lying tunnel construction rock burst prevention and control drilling arragement construction.
Fig. 2 is the profilograph of the utility model deep-lying tunnel construction rock burst prevention and control drilling arragement construction.
In figure: 1- tunnel, 2- pressure break hole, 3- pressure relief vent, 4- slot hole, 5- rock burst section, 6- lag working face distance, 7- peace Full distance.
Specific embodiment
The utility model will be further described for embodiment in reference to the accompanying drawing.
A kind of deep-lying tunnel construction rock burst prevention and control drilling arragement construction, including by one or more pressure break holes 2, several releases Multiple rock burst prevention and control drilling that hole 3 and side wall slot hole 4 are constituted, wherein pressure break hole 2 is parallel to 1 axis side of tunnel from working face edge To the extension of rock burst region 5 towards front, pressure relief vent 3 is from working face and 1 axis of tunnel at an angle towards the rock burst in front of side Region 5 extends, and side wall slot hole 4 lags working face certain distance 6, and vertical 1 axis of tunnel extends towards lateral rock burst region 5, Each rock burst prevention and control drilling is goed deep into inside 1 rock burst section 5 of tunnel, and the depth of pressure break hole 2 and pressure relief vent 3 in rock burst section is not less than 20m, 4 drilling depth of side wall slot hole are not less than 10m.
The utility model by adopting the above technical scheme, in practical application, pressure break hole 2 of constructing first, and implement waterpower Fracturing methods, pressure relief vent 3 of secondly constructing, after advance of the face certain distance 6, side wall slot hole 4 of constructing again;Pressure break hole 2 Borehole bottom location spacing is 20 ~ 40m, and 3 borehole bottom location spacing of pressure relief vent is 5 ~ 8m, and 4 borehole bottom location spacing of slot hole is 8 ~ 12m, pressure 2 sealing of hole segment length of ceasma is not less than 15m;The pressure break hole 2 and 4 aperture of slot hole are 89 ~ 120mm, and 3 diameter of pressure relief vent is 75mm ~108mm;The quantity of all kinds of rock burst prevention and control drillings depends on the factors such as 1 cross dimensions of tunnel and rockburst intensity;The working face is answered It is promoted in the case where the rock burst prevention and control drilling safe distance 7 of no less than 10m is protected.
Although combining attached drawing above describes embodiments of the present invention, those skilled in the art can also be with It makes a variety of changes or modifies in the range of appended claims, these modifications and variations are understood as in model of the invention Within enclosing and being intended to.

Claims (5)

  1. Arragement construction, including multiple rock burst prevention and control drilling 1. a kind of deep-lying tunnel construction rock burst prevention and control drill, it is characterised in that: institute It states rock burst prevention and control drilling to be made of one or more pressure break holes, several pressure relief vents and side wall slot hole, the pressure break hole works certainly Face extends along the rock burst region for being parallel to canal axes direction towards front, and the pressure relief vent is from working face and canal axes in one Determine angle to extend towards the rock burst region in front of side, side wall slot hole lags behind working face, and to vertical canal axes towards side To rock burst region extend, oval groove body and a large amount of microfissure are formed in tunnel side wall rock mass;The rock burst prevention and control are bored Tunnel rock burst intersegmental part is goed deep into hole.
  2. The arragement construction 2. deep-lying tunnel construction rock burst prevention and control according to claim 1 drill, it is characterised in that: the pressure break The depth of hole and pressure relief vent in rock burst section is not less than 20m.
  3. The arragement construction 3. deep-lying tunnel construction rock burst prevention and control according to claim 1 drill, it is characterised in that: the side wall Depth of the slot hole in rock burst section is not less than 10m.
  4. The arragement construction 4. deep-lying tunnel construction rock burst prevention and control according to claim 1 drill, it is characterised in that: the pressure break Hole borehole bottom location spacing is 20 ~ 40m, and pressure relief vent borehole bottom location spacing is 5 ~ 8m, and slot hole borehole bottom location spacing is 8 ~ 12m, pressure Ceasma sealing of hole segment length is not less than 15m.
  5. The arragement construction 5. deep-lying tunnel construction rock burst prevention and control according to claim 1 drill, it is characterised in that: the pressure break Hole and slot hole aperture are 89 ~ 120mm, and release bore dia is 75mm ~ 108mm.
CN201821830650.9U 2018-11-08 2018-11-08 Deep-lying tunnel construction rock burst prevention and control drilling arragement construction Expired - Fee Related CN209244567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821830650.9U CN209244567U (en) 2018-11-08 2018-11-08 Deep-lying tunnel construction rock burst prevention and control drilling arragement construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821830650.9U CN209244567U (en) 2018-11-08 2018-11-08 Deep-lying tunnel construction rock burst prevention and control drilling arragement construction

Publications (1)

Publication Number Publication Date
CN209244567U true CN209244567U (en) 2019-08-13

Family

ID=67527371

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821830650.9U Expired - Fee Related CN209244567U (en) 2018-11-08 2018-11-08 Deep-lying tunnel construction rock burst prevention and control drilling arragement construction

Country Status (1)

Country Link
CN (1) CN209244567U (en)

Similar Documents

Publication Publication Date Title
AU2018330958B2 (en) Method for rock burst prevention by active support reinforcement and active pressure relief
CN107165638B (en) A kind of deep tunnel rock burst active preventing control method
CN103821516B (en) The method of secondary release preventing and treating bump
CN103175451B (en) Construction method for controlling blasting through tunnel damping hole
CN101864961B (en) Method for actively preventing and controlling rock burst
CN104390538B (en) A kind of stress relieving blasting method based on face grooving
CN106869966A (en) A kind of method for blocking of absciss layer water supply source
CN112797860B (en) Construction method for preventing and treating rock burst of high-ground-temperature tunnel
CN110374599A (en) A kind of coal petrography drills the method for forming tunnel erosion control weak structure repeatedly
CN201706988U (en) Annular energy cumulating groove type flat bottom blasting explosive bag
CN104482817B (en) A kind of deep-lying tunnel stress relieving presplit blasting method
CN111350503A (en) Method for forming roadway anti-impact weak structural layer by coal rock pulse controllable strong wave induced cracking coal rock
CN108204775B (en) A kind of deep-lying tunnel instant type rock burst active preventing control method
CN105865281A (en) Method for transverse open excavation controlled blasting construction adjacent to power station and booster station
CN110454164B (en) Hydraulic presetting method for buffering energy-absorbing belt of impact mine pressure roadway
CN105443133A (en) Underground rock cumulative charge explosion device and method for non-excavation construction
CN111102892A (en) Wedge-shaped cut blast hole arrangement method suitable for blasting excavation of deep-buried tunnel
CN110924972A (en) Construction method of hard rock tunnel
CN209244567U (en) Deep-lying tunnel construction rock burst prevention and control drilling arragement construction
RU2554359C1 (en) Method of destruction of frozen soil during drill and fire excavation
CN103711494B (en) The prevention and controls of bottom slab crack and lifting is brought out in a kind of buried hard rock tunnel rock burst
CN110080768B (en) Coal mine tunnel large-scale rock burst prevention and control method
CN208567661U (en) A kind of advanced stress relieving explosion arragement construction of face
CN102980453A (en) Water injection drilling and blasting method for unloading stress of structural strong rock burst area of horizontal structural surface
CN106285777B (en) The method that flood mine mineral building discharges water in advance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190813