CN209244212U CN201822048895.2U CN201822048895U CN209244212U CN 209244212 U CN209244212 U CN 209244212U CN 201822048895 U CN201822048895 U CN 201822048895U CN 209244212 U CN209244212 U CN 209244212U
Authority
CN
China
Prior art keywords
horizontal frame
rectangular horizontal
aisle
grillage
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822048895.2U
Other languages
Chinese (zh)
Inventor
任河滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201822048895.2U priority Critical patent/CN209244212U/en
Application granted granted Critical
Publication of CN209244212U publication Critical patent/CN209244212U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a floor concrete pouring walkway plate frame, which comprises a rectangular horizontal frame, vertical rods, connecting rods, a protective net and vertical sleeves, wherein the number of the vertical rods is four, the vertical rods are respectively arranged on the outer side surfaces of four corners of the rectangular horizontal frame, and the upper parts of the vertical rods are provided with the vertical sleeves for passing through U-shaped bolts; the connecting rods are arranged on the inner side surface of the rectangular horizontal frame at intervals in parallel and are parallel to the short side of the rectangular horizontal frame; the protective net is laid on the lower surface of the rectangular horizontal frame; and adjacent walkway plate frames are connected through U-shaped bolts. The design idea is simple, the preparation is swift convenient, the practicality is high, with low costs, convenient extension and concatenation. The shaping processing is firm and light, and the device can be used repeatedly after being put into use once. The construction and installation workload is small, no later-period workload exists, the resource loss is reduced, and the overall cost and workload are reduced.

Description

Floor concreting aisle grillage
Technical field
The utility model relates to construction auxiliary equipment fields, especially floor concreting aisle grillage.
Background technique
Floor carries out concreting at present, and worker all stands directly in work surface the mobile pump line that walks back and forth and pours It builds.Traditional construction mode has problems in that: first, worker directly walks on casting concrete floor, concreting The reinforcing bar bound can be covered afterwards, and worker will damage floor reinforcing bar there is a phenomenon where trampling reinforcing bar when walking;The Two, placer directly walks on floor template, since floor reinforcing bar can bump to placer's walking, brings inconvenient walking The problem of, to influence to pour efficiency.
Utility model content
The purpose of the utility model is to provide floor concreting aisle grillages, to solve worker and pour in floor concrete Inconvenient walking, floor bar trample that deformation, difficulty in walking, floor concrete apparent mass are poor, are easy to having bound before building Floor steel bar such as damages at the technical problems.
It is poured to achieve the above objectives, the present invention adopts the following technical solutions: the utility model provides floor concrete Aisle grillage, including rectangular horizontal frame, upright bar, connecting rod, protective net and vertical sleeve are built, upright bar there are four and sets respectively The lateral surface in rectangular horizontal frame four corners is set, upright bar top is provided with the vertical sleeve for passing through U-bolt;Connection It is parallel with the short side of rectangular horizontal frame that rectangular horizontal frame medial surface, connecting rod is arranged in bar parallel interval;Protective net laying In rectangular horizontal frame lower surface;It is connected between adjacent aisle grillage by U-bolt.
Further, hanging ring is additionally provided on rectangular horizontal frame horizontal frame.
Further, horizontal frame is welded by square steel tube;Square steel tube is having a size of 30mm*30mm*3mm.
Further, horizontal frame length is 1500mm-2000mm, width 400mm-500mm.
Further, protective net uses steel fabric sheet or stainless steel plate with holes.
Further, anti-slip rubber layer is provided in connecting rod.
Further, the distance between adjacent connecting rod is 200mm-240mm.
Further, the height of upright bar is greater than slab thickness to be poured.
Further, bottom of upright rod is provided with steel base.
Further, rectangular horizontal frame and upright bar surface are coated with antirust paint.
The beneficial effects of the utility model are embodied in:
1, floor concreting provided by the utility model aisle grillage, mentality of designing is simple, production is efficient and convenient, real With property it is high, it is at low cost, facilitate extension and splicing.Regularization processing is solid light, and primary investment can be repeatedly used in turn.Construction peace Dress workload is small, and no later stage work amount reduces resource loss, reduces overall cost and workload.
2, floor concreting provided by the utility model aisle grillage uses aisle before floor concreting Plate edge pours route and is placed on floor face.In casting process, facilitates worker pouring the walking on face, do not contact reinforcing bar.It keeps away Exempt from floor concreting, worker walks directly on pouring face to the damaged condition for having bound floor steel bar.It ensure that reinforcing bar Forming Quality.
3, floor concreting provided by the utility model aisle grillage effectively raises working efficiency and Cheng Pinzhi Amount.The construction environment of good safety also is provided for construction personnel simultaneously.Floor concreting aisle grillage usability is high, value It must widely popularize.
Other features and advantages of the utility model will illustrate in the following description, and partly from specification It becomes apparent, or is understood and implementing the utility model.The main purpose and further advantage of the utility model can lead to Specifically noted scheme in specification, claims is crossed to be achieved and obtained.
Detailed description of the invention
The utility model is described in more detail with reference to the accompanying drawing.
Fig. 1 is the utility model rectangular horizontal frame top view.
Fig. 2 is the side view of the utility model.
Appended drawing reference: 1- rectangular horizontal frame, 2- upright bar, 3- connecting rod, 4- protective net, the vertical sleeve of 5-, 6- hanging ring, 7- Steel base.
Specific embodiment
The technical solution of the utility model is described in detail by the following examples, embodiment below is only exemplary , it is only capable of for explanation and illustration the technical solution of the utility model, and cannot be construed to technical solutions of the utility model Limitation.
As shown in Figure 1, the utility model provides the floor coagulation that mentality of designing is simple, production is efficient and convenient, practicability is high Soil pours aisle grillage, and specifically including rectangular horizontal frame 1, upright bar 2, connecting rod 3, protective net 4 and vertical sleeve 5, upright bar 2 has Four and it is separately positioned on the lateral surfaces of 1 four corners of rectangular horizontal frame, 2 top of upright bar is provided with for across U-shaped spiral shell The vertical sleeve 5 of bolt, 2 bottom of upright bar are provided with steel base 7.The setting of 3 parallel interval of connecting rod is in 1 inside of rectangular horizontal frame Face, connecting rod 3 are parallel with the short side of rectangular horizontal frame 1;Anti-slip rubber layer is provided in connecting rod 3.Floor concreting Before, route is poured using walkway board edge to be placed on floor face.In casting process, worker is facilitated to pour the walking on face, Do not contact reinforcing bar.It can prevent worker from falling down.Avoid floor concreting, worker is walked directly on pouring face to binding The damage of floor steel bar.The distance between adjacent connecting rod 3 can be 200mm-240mm.
As shown in Fig. 2, horizontal frame can be welded by square steel tube;Square steel tube is having a size of 30mm*30mm*3mm.It is horizontal Lengths of frame can be 1500mm-2000mm, width 400mm-500mm.It is additionally provided on 1 horizontal frame of rectangular horizontal frame Facilitate lifting or the hanging ring 6 portable convenient for worker.
Protective net 4 is laid in 1 lower surface of rectangular horizontal frame;Protective net 4 can use steel fabric sheet, and steel fabric sheet can be with Using grade III steel, bar spacing 60mm.It is connected between adjacent aisle grillage by U-bolt, very convenient extension and splicing.It can More Lou Zhouzhuan, residual value is high, and construction and installation workload is small, and no later stage work amount reduces resource loss, reduces overall cost And workload.It after being repeatedly used in turn, needs to check whether welding position has crack, carries out repair welding if any crack.
It is to be noted that the height of upright bar 2 is greater than slab thickness to be poured.2 surface of rectangular horizontal frame 1 and upright bar It is coated with antirust paint.
Single aisle grillage is processed according to design drawing, then according to concreting route, by multiple walkway boards To being stitched together, it is inserted into vertical sleeve 5 using U-bolt and connects use.
Solid light, construction and installation work is processed in floor concreting provided by the utility model aisle grillage, regularization Work amount is small, and no later stage work amount reduces resource loss, reduces overall cost and workload.Effectively raise work effect Rate and final product quality.The construction environment of good safety also is provided for construction personnel simultaneously, is worth promoting.
The foregoing is merely the preferable specific embodiment of the utility model, but the protection scope of the utility model not office Be limited to this, variation that anyone skilled in the art is expected within the technical scope disclosed by the utility model or Replacement, should be covered within the scope of the utility model.

Claims (10)

1. floor concreting aisle grillage, it is characterised in that: including rectangular horizontal frame (1), upright bar (2), connecting rod (3), protective net (4) and vertical sleeve (5), upright bar (2) have four and are separately positioned on rectangular horizontal frame (1) four corners Lateral surface, upright bar (2) top be provided with for pass through U-bolt vertical sleeve (5);The setting of connecting rod (3) parallel interval It is parallel with the short side of rectangular horizontal frame (1) in rectangular horizontal frame (1) medial surface, connecting rod (3);Protective net (4) is laid in Rectangular horizontal frame (1) lower surface;It is connected between adjacent aisle grillage by U-bolt.
2. floor concreting as described in claim 1 aisle grillage, which is characterized in that on rectangular horizontal frame (1) also It is provided with hanging ring (6).
3. floor concreting as described in claim 1 aisle grillage, which is characterized in that rectangular horizontal frame (1) is by side Steel-pipe welding forms;Square steel tube is having a size of 30mm*30mm*3mm.
4. floor concreting as described in claim 1 aisle grillage, which is characterized in that rectangular horizontal frame (1) length For 1500mm-2000mm, width 400mm-500mm.
5. floor concreting as described in claim 1 aisle grillage, which is characterized in that protective net (4) uses steel wire Piece or stainless steel plate with holes.
6. floor concreting as described in claim 1 aisle grillage, which is characterized in that be provided in connecting rod (3) anti- Sliding rubber layer.
7. floor concreting as described in claim 1 aisle grillage, which is characterized in that between adjacent connecting rod (3) Distance is 200mm-240mm.
8. floor concreting as described in claim 1 aisle grillage, which is characterized in that the height of upright bar (2) be greater than to The slab thickness poured.
9. floor concreting as described in claim 1 aisle grillage, which is characterized in that upright bar (2) bottom is provided with steel Pedestal (7).
10. floor concreting as described in claim 1 aisle grillage, which is characterized in that rectangular horizontal frame (1) and vertical Bar (2) surface is coated with antirust paint.
CN201822048895.2U 2018-12-07 2018-12-07 floor concrete pouring walkway plate frame Expired - Fee Related CN209244212U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822048895.2U CN209244212U (en) 2018-12-07 2018-12-07 floor concrete pouring walkway plate frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822048895.2U CN209244212U (en) 2018-12-07 2018-12-07 floor concrete pouring walkway plate frame

Publications (1)

Publication Number Publication Date
CN209244212U true CN209244212U (en) 2019-08-13

Family

ID=67531931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822048895.2U Expired - Fee Related CN209244212U (en) 2018-12-07 2018-12-07 floor concrete pouring walkway plate frame

Country Status (1)

Country Link
CN (1) CN209244212U (en)

Similar Documents

Publication Publication Date Title
CN204040435U (en) High-altitude steel structure welding Hanging Basket
CN104975719A (en) Novel material distribution device and construction method for pouring floor concrete by using same
CN107178203A (en) A kind of planar dimension and adjustable for height operating platform
CN104674992A (en) Supporting method and structure of suspended steel bar truss deck
CN204753397U (en) Temporary mounting hanger for steel box bridge
CN203795311U (en) Multi-leg high pier and slip form construction device
CN209244212U (en) floor concrete pouring walkway plate frame
CN203097253U (en) Elevator shaft triangular support type formwork platform
CN205777412U (en) Roof flower is set a roof beam in place and exterior wall finishing construction mobile operating platform
CN204801846U (en) Civil engineering pipe fitting rack
CN208618838U (en) A kind of safety device
CN206957175U (en) A kind of planar dimension and adjustable for height operating platform
CN206616840U (en) A kind of portable construction operation platform
CN216516954U (en) Self-climbing concrete distributing device in super high-rise well way
CN206971702U (en) A kind of climbing frame with slide-in type protection network
CN207109594U (en) Pier stud constructing operation lantern stand
CN203961258U (en) Builder's jack foot guard structure
CN208023970U (en) Construction discharging platform
CN211596310U (en) Temporary construction platform for surface finishing in garden road construction process
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN203022327U (en) Elevator shaft high-altitude construction platform device
CN207538457U (en) A kind of balcony drop plate hangs modular system
CN203452388U (en) Movable type concrete casting operation platform
CN103669219B (en) Many limbs height pier is with sliding construction equipment
CN205396963U (en) Base is put things in good order to whole steel pipe on scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190813

Termination date: 20211207

CF01 Termination of patent right due to non-payment of annual fee