CN209212270U - Steel pipe draining lock foot stake - Google Patents

Steel pipe draining lock foot stake Download PDF

Info

Publication number
CN209212270U
CN209212270U CN201821816030.XU CN201821816030U CN209212270U CN 209212270 U CN209212270 U CN 209212270U CN 201821816030 U CN201821816030 U CN 201821816030U CN 209212270 U CN209212270 U CN 209212270U
Authority
CN
China
Prior art keywords
steel pipe
steel
plate
pipe
draining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201821816030.XU
Other languages
Chinese (zh)
Inventor
张剑宁
邹增富
田贵洪
黄家君
张军
黄鹏
孙密
陈华琳
王廷璐
李先锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ROAD AND WATERWAY CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
ROAD AND WATERWAY CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ROAD AND WATERWAY CONSTRUCTION ENGINEERING Co Ltd filed Critical ROAD AND WATERWAY CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201821816030.XU priority Critical patent/CN209212270U/en
Application granted granted Critical
Publication of CN209212270U publication Critical patent/CN209212270U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a kind of steel pipe draining lock foot stake herein;The steel pipe draining lock foot stake is connected and fixed between steel arch-shelf, it is characterized by: steel pipe draining lock foot stake is by locating piece, anchor steel pipe, drain steel pipe, Grouting Pipe, stringing ring, interior bulkhead, covering head plate sum aggregate water hole etc. is constituted, stringing ring is located in anchoring steel pipe, anchoring steel pipe is fixed on steel arch-shelf by locating piece, draining steel pipe and Grouting Pipe are embedded in anchoring steel pipe by stringing ring, it drains steel pipe and runs through interior bulkhead, covering head plate is simultaneously fixed to each other, Grouting Pipe is pierced by covering head plate and fixed thereto, anchor the external gully-hole of steel pipe, interior bulkhead is located in anchoring steel pipe and is sealed by O-shaped sealing collar.This patent has both tunnel steel arch frame lock foot and drain function, suitable for carrying out reinforcing and drainage and step-down to the tunnel arch wall preliminary bracing for passing through tomography rich water crushed zone badness geology section.

Description

Steel pipe draining lock foot stake
Technical field
The utility model relates to a kind of lock feet for carrying out Tunnel in tomography rich water crushed zone to reinforce and ejectment water Device is specifically a kind of steel pipe draining lock foot stake.
Background technique
Currently, China's overwhelming majority mountain tunnel is constructed using New Austrian Tunneling Method.New Austrian Tunneling Method is with anchor pole, gunite concrete and steel arch Frame constitutes tunnel arch wall preliminary bracing system, excavates driving using cyclic advance mode.
In Mountain Tunnels work progress, it is frequently encountered and passes through the unfavorable geologies such as karst region, fault belt, when these When harm geological structure water storage itself is enriched, it will bring bigger difficulty of construction to tunnel excavation and supporting.Under normal circumstances, When passing through fault belt badness geology section, after laying long pipe shed advance support, piecewise front pre-grouting paragraph by paragraph can be taken The modes such as excavation are punished, and to improve excavation supporting environment, but advanced long pipe shed is mainly used for the punishment of tunnel arch, advanced pre- Though slip casting can tend not to be used to full section of tunnel grouting and reinforcing because grouting amount is big, at high cost.Therefore, in tunnel In road digging process, when encountering abutment wall position rock crusher and easily collapsing, needs using grouting and reinforcing, improves supporting parameter and enhancing The measure methods such as steel arch frame lock foot, when tomography rich water Area cracked reinforces abutment wall, it is also necessary to tapping pipe be set and implemented purposefully Ground dispersion draining, alleviates country rock rich water pressure, reduces safety for tunnel engineering risk.
Utility model content
The purpose of the utility model is to overcome the deficiencies in the prior art, provide a kind of steel pipe draining lock foot stake herein;This Method has both tunnel steel arch frame lock foot and drain function, suitable for the tunnel for passing through tomography rich water crushed zone badness geology section Arch wall preliminary bracing carries out reinforcing and drainage and step-down.
The utility model is realized in this way a kind of steel pipe draining lock foot stake is constructed, the steel pipe draining lock same steel arch-shelf of foot stake Between be connected and fixed, it is characterised in that: steel pipe draining lock foot stake by locating piece, anchoring steel pipe, draining steel pipe, Grouting Pipe, stringing Ring, interior bulkhead, covering head plate sum aggregate water hole etc. are constituted, and stringing ring is located in anchoring steel pipe, and anchoring steel pipe is solid by locating piece Be scheduled on steel arch-shelf, drain steel pipe and Grouting Pipe and be embedded in anchoring steel pipe by stringing ring, draining steel pipe run through interior bulkhead, Covering head plate is simultaneously fixed to each other, and Grouting Pipe is pierced by covering head plate and fixed thereto, the anchoring external gully-hole of steel pipe, interior bulkhead position It is sealed in anchoring steel pipe and by O-shaped sealing collar.
Lock foot stake is drained according to steel pipe described in the utility model, it is characterised in that: wherein locating piece is in groove profile, and bottom plate is in square Shape, the steel plate using thickness not less than 12mm make, and anchoring steel pipe hole is set in plate, and aperture preferably greater than anchors outer diameter of steel pipes 5mm;
Locating piece has both I type locating piece and II type locating piece, and I type locating piece side plate is trapezoidal, II type locating piece side Plate is in rectangle, and the steel plate for being all made of 8mm thickness vertical is welded in bottom plate edge;
Wherein anchoring steel pipe is made of seamless steel pipe, and length of steel pipe is not preferably less than 4.0m, and caliber is not preferably less than φ 108mm is not provided with eyelet within the scope of the nozzle 50cm of both ends, remaining pipeline section is by pitch-row 150mm and aperture φ 16mm in Guan Si Week bores injected hole and forms steel floral tube;
Wherein coating steel pipe or seamless steel pipe production can be used in draining steel pipe,
Grouting Pipe uses φ 20mm conduit peschel, and anchoring pipe diameter preferably exceeds draining the sum of steel pipe and the outer diameter of Grouting Pipe 15mm or more;
Wherein the production of 8# iron wire, its spacing 1.0m~1.5m, for draining steel pipe and Grouting Pipe in anchor can be used in stringing ring Gu the positioning in steel pipe;
Wherein interior bulkhead is fabricated to circle with steel plate, and steel plate diameter is less than anchoring steel pipe 2mm, and thickness is not preferably less than 6.0mm sets drainpipe through hole in plate, and the O-shaped sealing collar of groove installation rubber or silica gel material, sealing collar are set in the middle part of plate outer rim Line footpath 5.0mm;
Wherein circular slab or square plate can be used in covering head plate, and plate thickness is not preferably less than 3mm, sets drain tube holes and slip casting in plate The gas vent that pore and diameter are 15mm, edges of boards edge is preferably wide to be gone out to anchor steel pipe outer rim 20mm;
Wherein gully-hole is formed using drilling, and the hole length that catchments preferably gos deep into rich water crushed zone and is no less than 4.0m.
Lock foot stake is drained according to steel pipe described in the utility model, it is characterised in that: upper mo(u)ld bottom half is provided on the inside of steel arch-shelf Steel stringer, stiffener and billet, wherein section longitudinal beam preferably uses I-steel, and specification is no less than 16#;Stiffener uses steel Plate production, steel plate thickness are not preferably less than 10mm;Billet is using the sheet pack spell shape of different-thickness at being mainly used for padding fashioned iron Gap between stringer and anchoring steel pipe.The lock foot stake of steel pipe draining at this time connects the steel arch in range by section longitudinal beam Frame, steel pipe draining lock foot stake etc. are concatenated into a rigidity entirety, are suitable for easily collapsing to rock crusher, the insufficient tunnel of self-stable ability The lock foot of road arch wall preliminary bracing anchors.
The utility model has the advantages that the utility model provides a kind of steel pipe draining lock foot stake and construction party herein Method;This method has both tunnel steel arch frame lock foot and drain function, suitable for passing through tomography rich water crushed zone badness geology section Tunnel arch wall preliminary bracing carry out reinforce and drainage and step-down.Utility model device has following good result, rich water after implementing Foot stake is locked in the steel pipe draining of setting when crushed zone carries out tunnel arch wall construction, with large diameter steel pipe instead of common reinforcing bar anchor Bar and slip casting ductule lock foot, and intensity is higher, more rigid, consolidate peripheral rock and locking pile body by slip casting method, improve Bearing capacity of the lock foot to top country rock and preliminary bracing.The drainage pipeline being arranged in stake has discharge crevice water, alleviates The function of country rock rich water pressure.In Tunnel Passing rich water fault belt badness geology section, lock foot stake is drained using steel pipe The function of reinforcing arch wall preliminary bracing and drainage and step-down simultaneously may be implemented, reduce the safety wind of rich water crushed zone constructing tunnel Danger.
Detailed description of the invention
Fig. 1 is steel pipe draining lock foot pilework elevation
Fig. 2 is common shape steel tube draining lock foot stake drawing;
Fig. 3 is enlarged diagram at A1 in Fig. 2;
Fig. 4 is enlarged diagram at A2 in Fig. 2;
Fig. 5 is I-I the schematic diagram of the section structure in Fig. 3 (anchor tube pastes steel arch-shelf arrangement);
Fig. 6 is I-I the schematic diagram of the section structure in Fig. 3 (anchor tube is centrally arranged between steel arch-shelf);
Fig. 7 is reinforced steel pipe draining lock foot stake drawing;
Fig. 8 is enlarged diagram at B1 in Fig. 7;
Fig. 9 is II-II the schematic diagram of the section structure in Fig. 8 (anchor tube pastes steel arch-shelf arrangement);
Figure 10 is II-II the schematic diagram of the section structure in Fig. 9 (anchor tube is centrally arranged between steel arch-shelf);
Figure 11 is I type locating piece schematic view of facade structure;
Figure 12 is I type locating piece side schematic view;
Figure 13 is I type locating piece planar structure schematic diagram;
Figure 14 is II type locating piece schematic view of facade structure;
Figure 15 is II type locating piece side schematic view;
Figure 16 is II type locating piece planar structure schematic diagram;
Figure 17 is anchoring steel pipe injected hole layout drawing;
Figure 18 is stringing ring schematic view of facade structure;
Figure 19 is stringing ring side schematic view;
Figure 20 is interior stopper structure schematic diagram;
Figure 21 is interior plug side schematic view;
Figure 22 is outside head plate structural schematic diagram;
Figure 23 is O-shaped sealing collar schematic diagram;
Figure 24 is O-shaped sealing collar side view;
Figure 25 is III-III the schematic diagram of the section structure in Fig. 4.
Wherein: locating piece 1, I type locating piece 1A, II type locating piece 1B anchor steel pipe hole 1C, anchor steel pipe 2, injected hole 2A drains steel pipe 3, Grouting Pipe 4, stringing ring 5, interior bulkhead 6, drainpipe through hole 6A, covering head plate 7, drain tube holes 7A, note Starch pore 7B, gas vent 7C, gully-hole 8, upper section longitudinal beam 9, lower section longitudinal beam 10, stiffener 11, steel arch-shelf 12, O-shaped sealing Circle 13, arch connector 14, billet 15.
Specific embodiment
The utility model is described in detail below in conjunction with attached drawing 1- Figure 25, to the skill in the utility model embodiment Art scheme is clearly and completely described, it is clear that and the described embodiments are only a part of the embodiments of the utility model, and The embodiment being not all of.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creativeness Every other embodiment obtained, fall within the protection scope of the utility model under the premise of labour.
The purpose of the utility model is to overcome the deficiencies in the prior art, provide steel pipe draining lock foot stake and its construction herein Method;This method has both tunnel steel arch frame lock foot and drain function, suitable for passing through tomography rich water crushed zone badness geology The tunnel arch wall preliminary bracing of section carries out reinforcing and drainage and step-down.
As shown, steel pipe draining lock foot stake described in the utility model is connected and fixed between steel arch-shelf 12, steel pipe draining Lock foot stake is by locating piece 1, anchoring steel pipe 2, draining steel pipe 3, Grouting Pipe 4, stringing ring 5, interior bulkhead 6, covering head plate 7 and catchments Holes 8 etc. are constituted, and stringing ring 5 is located in anchoring steel pipe 2, and anchoring steel pipe 2 is fixed on steel arch-shelf 12 by locating piece 1, drain steel Pipe 3 and Grouting Pipe 4 are embedded in anchoring steel pipe 2 by stringing ring 5, and draining steel pipe 3 is through interior bulkhead 6, covering head plate 7 and phase Mutually fixed, Grouting Pipe 4 is pierced by covering head plate 7 and fixed thereto, the anchoring external gully-hole 8 of steel pipe 2, and interior bulkhead 6, which is located at, to be anchored It is sealed in steel pipe 2 and by O-shaped sealing collar 13.
It is drained in lock foot stake in steel pipe described in the utility model, wherein locating piece 1 is in groove profile, and bottom plate is in rectangle, using thickness Steel plate of the degree not less than 12mm makes, and anchoring steel pipe hole 1C is set in plate, and aperture preferably greater than anchors outer diameter of steel pipes 5mm;Locating piece 1 has There are both I type locating piece 1A and II type locating piece 1B, I type locating piece side plate is trapezoidal, and II type locating piece side plate is in rectangle, adopts Bottom plate edge is welded in the steel plate of 8mm thickness is vertical.
Wherein anchoring steel pipe 2 is made of seamless steel pipe, and length of steel pipe is not preferably less than 4.0m, and caliber is not preferably less than φ 108mm is not provided with eyelet within the scope of the nozzle 50cm of both ends, remaining pipeline section is by pitch-row 150mm and aperture φ 16mm in Guan Si Week bores injected hole 2A and forms steel floral tube;
Wherein coating steel pipe or seamless steel pipe production can be used in draining steel pipe 3,
Grouting Pipe 4 uses φ 20mm conduit peschel, and anchoring pipe diameter preferably exceeds draining the sum of steel pipe and the outer diameter of Grouting Pipe 15mm or more;
Wherein the production of 8# iron wire, its spacing 1.0m~1.5m, for draining steel pipe and Grouting Pipe in anchor can be used in stringing ring 5 Gu the positioning in steel pipe;
Wherein interior bulkhead 6 is fabricated to circle with steel plate, and steel plate diameter is less than anchoring steel pipe 2mm, and thickness is not preferably less than 6.0mm sets drainpipe through hole 6A in plate, and the O-shaped sealing collar of groove installation rubber or silica gel material, sealing are set in the middle part of plate outer rim Astragal diameter 5.0mm;
Wherein covering head plate 7 can be used circular slab or square plate, and plate thickness is not preferably less than 3mm, set in plate drain tube holes 7A and The gas vent 7C that slip casting pore 7B and diameter are 15mm, edges of boards edge is preferably wide to be gone out to anchor steel pipe outer rim 20mm;
Wherein gully-hole 8 is formed using drilling, and the hole length that catchments preferably gos deep into rich water crushed zone and is no less than 4.0m.
The utility model is realized in this way constructing a kind of steel pipe draining lock foot stake and its construction method, which is characterized in that Implement as follows:
(1) steel pipe draining lock foot stake type selecting: when passing through tomography rich water crushed zone, reconnaissance digging spy is aided with by tunnel excavation and is taken off Dew and judge arch wall and wall rock condition below, selectes steel pipe draining and locks foot stake type.Steel pipe draining lock foot stake can be according to tunnel Plain edition and the two types such as reinforced is respectively adopted in road country rock homeostasis condition;
1) common shape steel tube draining lock foot stake: by locating piece, anchoring steel pipe and embedded draining steel pipe, Grouting Pipe, stringing Ring, interior bulkhead, covering head plate sum aggregate water hole etc. are constituted, and wherein locating piece is in groove profile, and bottom plate is in rectangle, are not less than using thickness The steel plate of 12mm makes, and circular hole is set in plate, and aperture preferably greater than anchors outer diameter of steel pipes 5mm;I type locating piece side plate is trapezoidal, II type Locating piece side plate is in rectangle, and the steel plate for being all made of 8mm thickness vertical is welded in bottom plate edge;Wherein anchoring steel pipe uses seamless steel Pipe production, length of steel pipe are not preferably less than 4.0m, and caliber is not preferably less than φ 108mm, is not provided within the scope of the nozzle 50cm of both ends Eyelet, remaining pipeline section drill to form steel floral tube by pitch-row 150mm and aperture 16mm in pipe surrounding;Wherein plating can be used in draining steel pipe Zinc steel pipe or seamless steel pipe production, Grouting Pipe use φ 20mm conduit peschel, and anchoring pipe diameter preferably exceeds draining steel pipe and slip casting The sum of the outer diameter of pipe 15mm or more;Wherein the production of 8# iron wire, its spacing 1.0m~1.5m, for draining steel pipe can be used in stringing ring With positioning of the Grouting Pipe in anchoring steel pipe;Wherein interior bulkhead is fabricated to circle with steel plate, and steel plate diameter is less than anchoring steel pipe 2mm, thickness are not preferably less than 6.0mm, and drainpipe through hole is set in plate, and groove installation rubber or silica gel material are set in the middle part of plate outer rim O-shaped sealing collar, sealing collar line footpath 5.0mm;Wherein circular slab or square plate can be used in covering head plate, and plate thickness is not preferably less than 3mm, plate Set the through hole and diameter of draining steel pipe and Grouting Pipe inside as the gas vent of 15mm, edges of boards edge is preferably wide to be gone out to anchor steel pipe outer rim 20mm;Wherein gully-hole is formed using drilling, and the hole length that catchments preferably gos deep into rich water crushed zone and is no less than 4.0m.Common shape steel tube row Water lock foot stake is connected and fixed between steel arch-shelf, suitable for having the tunnel arch wall preliminary bracing of certain self-stable ability to country rock Lock foot anchoring.
2) the foot stake of reinforced steel pipe draining lock is provided with upper mo(u)ld bottom half in addition to medium-sized structure on the inside of steel arch-shelf Steel stringer, stiffener and billet, wherein section longitudinal beam preferably uses I-steel, and specification is no less than 16#;Stiffener uses steel Plate production, steel plate thickness are not preferably less than 10mm;Billet is using the sheet pack spell shape of different-thickness at being mainly used for padding fashioned iron Gap between stringer and anchoring steel pipe.Reinforced steel pipe draining lock foot stake connects the steel arch in range by section longitudinal beam Frame, steel pipe draining lock foot stake etc. are concatenated into a rigidity entirety, are suitable for easily collapsing to rock crusher, the insufficient tunnel of self-stable ability The lock foot of road arch wall preliminary bracing anchors.During benching tunnelling method tunneling, after the preliminary bracing for completing upper level step, open The country rock that arch wall is carried on the back when digging down level-one step, which occurs to loosen, to collapse, and will likely result in established preliminary bracing above excavation section and loses It is steady to destroy, after using reinforced steel pipe draining lock foot stake that top preliminary bracing connection is integral, when excavating next step again It is aided with short drilling depth excavation supporting engineering method, can effectively avoids this unstable failure, reduces construction safety risk.
(2) boring work face is disposed: answering exposed country rock at drilling hole location, preferably after arch is set up and injection preliminary bracing is mixed Work pit-hole is reserved before solidifying soil, size, which is subject to, is able to satisfy locating piece installation and normal drill construction.It, can employment when not reserved The mode of jetting cement and reinforcing bar within the scope of work forcible entry working face forms work pit-hole.
(3) stake position setting-out: lock foot stake holes position is determined on arch wall back country rock surface with measuring tools such as tape measure and bracing wires, is used in combination Iron nail or red paint etc. obviously identify.
(4) install locating piece: locating piece is installed on steel arch-shelf, for convenient for correction, first by locating piece bottom plate and steel arch-shelf Spot welding connection, then side plate and bottom plate, steel arch-shelf are respectively welded, finally locating piece is expired and is welded on steel arch-shelf, work progress In prevent its deformation displacement, plate plane with lock foot stake design axis it is vertical.Locating piece occupies the reinforcing bar position in existing preliminary bracing When setting, reinforcing bar and locating piece are welded and fixed.
(5) it drills: the drilling such as anchoring drilling machine, down-the-hole drill can be used, fixed drilling machine is accurately installed according to hole location, and stringent Conscientiously carry out seat in the plane adjustment, it is ensured that borehole accuracy: inclination angle allowable error position ± 1.0 °, orientation allowable error ± 1.0 °.
The anchoring steel pipe hole be inserted in locating piece of steel pipe will be anchored and push against country rock, be drilled into bottom hole with pipe with eccentric drilling device, Anchoring steel pipe is exited to anchorage point is designed with drilling machine again, forms gully-hole.
(6) slip casting and drainage arrangement are installed:
1) welding draining steel pipe and interior bulkhead, steel pipe water inlet are pierced by interior bulkhead about 0.2m, pipe axis and interior plug Plate plate face keeps vertical.
2) stringing ring is made, and by itself and Grouting Pipe, draining steel pipe tied silk binding and fixing, the grout outlet distance of Grouting Pipe Interior 0.2~0.3m of bulkhead.
3) O shape sealing collar is nested at interior bulkhead peripheral groove, to prevent sealing collar from falling off, waterproof gluing can be used Patch is fixed, and is then slowly sent into above-mentioned apparatus in anchoring steel pipe.
4) covering head plate is installed, and is fully welded connect respectively with anchoring steel pipe, drainpipe.
(7) welding lock foot stake: forming entirety for the positioning block welding anchored on steel pipe and arch, can be thick with 8mm when needing Trapezoidal stiffener will press vertical "-" type or vertical, laterally cross welding reinforcement between outer wall of steel pipe and locating piece.
(8) it fills up work pit-hole: adding appropriate accelerator with concrete and fill and lead up work pit-hole, when construction avoids concrete stifled Fill in nozzle.
(9) anchoring section slip casting:
1) Grouting Pipe, grouting stop-valve and pneumatic mortar machine are connected.
2) neat slurry or cement+waterglass dual slurry slip casting are selected according to country rock hydrogeologic condition, slip casting uses hole The mode of slurry is returned at bottom, and initial grouting pressure is preferably controlled in 0.5~1.0Mpa, until vent ports overflow fresh slurry when stopper or Plug blocks exhaust outlet, and final pressure is preferably controlled in 2.0Mpa, and closes grouting stop-valve after holding pressure 5min.
(10) lower section longitudinal beam, section longitudinal beam and anchoring successively reinforced steel pipe draining lock foot stake stringer installation: are installed At gap between steel pipe with billet padding and weld it is integral, between section longitudinal beam and steel arch-shelf weld after again with steel of putting more energy into Plate welding is reinforced.
(11) next stage bench excavation method after work: after steel pipe draining lock foot stake is completed in construction, next stage abutment wall portion is excavated When position, using short drilling depth excavation method and it should take measures to weaken the country rock disturbance at abutment wall, it is primary to excavate no more than 3 Pin Arch width, and abutment wall preliminary bracing is applied in time after excavating, make full use of lock foot stake and the abutment wall supporting newly done to improve tunnel The stability of preliminary bracing system.
The utility model, which has the advantages that after utility model device is implemented, following good result, rich water crushed zone The steel pipe draining lock foot stake for carrying out setting when tunnel arch wall construction, with large diameter steel pipe instead of common reinforced anchor bolt and note It starches ductule and locks foot, intensity is higher, more rigid, consolidates peripheral rock and locking pile body by slip casting method, improves lock foot To the bearing capacity of top country rock and preliminary bracing.The drainage pipeline being arranged in stake has discharge crevice water, it is rich to alleviate country rock The function of water pressure.In Tunnel Passing rich water fault belt badness geology section, draining lock foot stake using steel pipe can be real The function of now reinforcing arch wall preliminary bracing and drainage and step-down simultaneously, reduces the security risk of rich water crushed zone constructing tunnel.
The foregoing description of the disclosed embodiments can be realized professional and technical personnel in the field or using originally practical new Type.Various modifications to these embodiments will be readily apparent to those skilled in the art, and determine herein The General Principle of justice can be realized in other embodiments without departing from the spirit or scope of the present utility model.Cause This, the present invention will not be limited to the embodiments shown herein, and is to fit to and principles disclosed herein The widest scope consistent with features of novelty.

Claims (3)

1. a kind of steel pipe draining lock foot stake, steel pipe draining is locked to be connected and fixed between the same steel arch-shelf of foot stake (12), it is characterised in that: steel Pipe draining lock foot stake is by locating piece (1), anchoring steel pipe (2), draining steel pipe (3), Grouting Pipe (4), stringing ring (5), interior bulkhead (6), covering head plate (7) and gully-hole (8) are constituted, and stringing ring (5) is located in anchoring steel pipe (2), and anchoring steel pipe (2) passes through positioning Block (1) is fixed on steel arch-shelf (12), is drained steel pipe (3) and Grouting Pipe (4) by stringing ring (5) and is embedded in anchoring steel pipe (2) Interior, draining steel pipe (3) is through interior bulkhead (6), covering head plate (7) and is fixed to each other, and Grouting Pipe (4) is pierced by covering head plate (7) And it is fixed thereto, steel pipe (2) external gully-hole (8) is anchored, interior bulkhead (6) is located in anchoring steel pipe (2) and passes through O-shaped sealing Enclose (13) sealing.
2. steel pipe draining lock foot stake according to claim 1, it is characterised in that: wherein locating piece (1) is in groove profile, and bottom plate is in square Shape, the steel plate using thickness not less than 12mm make, and anchoring steel pipe hole (1C) is set in plate, and aperture preferably greater than anchors outer diameter of steel pipes 5mm;
Locating piece (1) has both I type locating piece (1A) and II type locating piece (1B), and I type locating piece side plate is trapezoidal, and II type is fixed Position block side plate is in rectangle, and the steel plate for being all made of 8mm thickness vertical is welded in bottom plate edge;
Wherein anchoring steel pipe (2) is made of seamless steel pipe, and length of steel pipe is not preferably less than 4.0m, and caliber is not preferably less than φ 108mm, It is not provided with eyelet within the scope of the nozzle 50cm of both ends, remaining pipeline section is bored in pipe surrounding by pitch-row 150mm and aperture φ 16mm and infused It starches hole (2A) and forms steel floral tube;
Wherein coating steel pipe or seamless steel pipe production can be used in draining steel pipe (3),
Grouting Pipe (4) uses φ 20mm conduit peschel, and anchoring pipe diameter preferably exceeds draining the sum of steel pipe and the outer diameter of Grouting Pipe 15mm or more;
Wherein the production of 8# iron wire can be used in stringing ring (5), and its spacing 1.0m~1.5m is being anchored for draining steel pipe and Grouting Pipe Positioning in steel pipe;
Wherein interior bulkhead (6) is fabricated to circle with steel plate, and steel plate diameter is less than anchoring steel pipe 2mm, and thickness is not preferably less than 6.0mm is set drainpipe through hole (6A) in plate, the O-shaped sealing collar of groove installation rubber or silica gel material is set in the middle part of plate outer rim, only Hydrosphere line footpath 5.0mm;
Wherein covering head plate (7) can be used circular slab or square plate, and plate thickness is not preferably less than 3mm, set in plate drain tube holes (7A) and The gas vent (7C) that slip casting pore (7B) and diameter are 15mm, edges of boards edge is preferably wide to be gone out to anchor steel pipe outer rim 20mm;
Wherein gully-hole (8) is formed using drilling, and the hole length that catchments preferably gos deep into rich water crushed zone and is no less than 4.0m.
3. steel pipe draining lock foot stake according to claim 1, it is characterised in that: be provided with upper mo(u)ld bottom half on the inside of steel arch-shelf (12) Steel stringer (9,10), stiffener (11) and billet (15), wherein section longitudinal beam preferably uses I-steel, and specification is no less than 16#;Stiffener (11) is made of steel plate, and steel plate thickness is not preferably less than 10mm;Billet is spelled using the sheet pack of different-thickness It is formed, be mainly used for padding section longitudinal beam and anchor the gap between steel pipe.
CN201821816030.XU 2018-11-06 2018-11-06 Steel pipe draining lock foot stake Withdrawn - After Issue CN209212270U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821816030.XU CN209212270U (en) 2018-11-06 2018-11-06 Steel pipe draining lock foot stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821816030.XU CN209212270U (en) 2018-11-06 2018-11-06 Steel pipe draining lock foot stake

Publications (1)

Publication Number Publication Date
CN209212270U true CN209212270U (en) 2019-08-06

Family

ID=67458298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821816030.XU Withdrawn - After Issue CN209212270U (en) 2018-11-06 2018-11-06 Steel pipe draining lock foot stake

Country Status (1)

Country Link
CN (1) CN209212270U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109578035A (en) * 2018-11-06 2019-04-05 四川路航建设工程有限责任公司 Steel pipe draining lock foot stake and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109578035A (en) * 2018-11-06 2019-04-05 四川路航建设工程有限责任公司 Steel pipe draining lock foot stake and construction method
CN109578035B (en) * 2018-11-06 2024-04-30 四川路航建设工程有限责任公司 Steel pipe drainage lock foot pile and construction method

Similar Documents

Publication Publication Date Title
CN101929340B (en) Coal mine underground flat inclined tunnel pipe shed pre-grouting advance support construction process
CN109208637A (en) Increase the construction method of open-cut station newly on the basis of existing tunnel
CN104389610B (en) A kind of ultrashort step construction method of traversing operation freeway tunnel
CN106812542B (en) It is a kind of using prefabricated components and preceding slotting shield builds the construction method of subway station
JP7257086B2 (en) Comprehensive Construction Method for Low Overburden Sections of Tunnels
CN108506015A (en) Excavate the construction method of artificial push pipe and application Pipe Jacking in a kind of Large Diameter Pipeline point storehouse
WO2020259059A1 (en) Tbm parallel heading tunnel trunk construction method
CN110043264A (en) A kind of construction method of jacking prefabricated rectangle shaft structure pattern
CN106049195A (en) Method for strengthening subgrade basement of existing high speed railway line
CN110159298A (en) A kind of first branch button arch construction method of Underground Subway Station
CN109578035A (en) Steel pipe draining lock foot stake and construction method
CN110230497A (en) A kind of positive barrel double -side approach construction method in threaded list road
CN102518451B (en) Construction method of shotcrete support for water contained loess geological tunnel
CN203130109U (en) Large-section karst tunnel supporting equipment
CN109973115B (en) Construction method for drainage of vault of tunnel in karst area
CN109209443A (en) A kind of construction method of breaking surrounding rock tunnel structure
CN112377208A (en) Construction method for shallow-buried bias tunnel portal
CN113107501B (en) Initial tunneling construction method for tunnel portal extension steel ring
CN105909265B (en) Pass through the anti-protuberance retrusive deep hole grouting system and method for existing shield tunnel
CN104453915B (en) Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method
CN209212270U (en) Steel pipe draining lock foot stake
CN112012762B (en) Construction method of double-layer secondary lining multi-arch tunnel structure
CN206158753U (en) Shield constructs well end bassoon canopy system of consolidating based on major structure
CN209260739U (en) A kind of foundation pit water-stopping system close to river permeable stratum
CN209523759U (en) A kind of super shallow-buried tunnel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20190806

Effective date of abandoning: 20240430

AV01 Patent right actively abandoned

Granted publication date: 20190806

Effective date of abandoning: 20240430

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned