CN209195431U - Full width inverted arch template based on tunnel trestle - Google Patents

Full width inverted arch template based on tunnel trestle Download PDF

Info

Publication number
CN209195431U
CN209195431U CN201821700414.5U CN201821700414U CN209195431U CN 209195431 U CN209195431 U CN 209195431U CN 201821700414 U CN201821700414 U CN 201821700414U CN 209195431 U CN209195431 U CN 209195431U
Authority
CN
China
Prior art keywords
template
inverted arch
full width
trestle
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821700414.5U
Other languages
Chinese (zh)
Inventor
王亚波
程波
郑怀臣
毛成宝
张维颂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Wuxin Formwork Co Ltd
Original Assignee
Hunan Wuxin Formwork Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Wuxin Formwork Co Ltd filed Critical Hunan Wuxin Formwork Co Ltd
Priority to CN201821700414.5U priority Critical patent/CN209195431U/en
Application granted granted Critical
Publication of CN209195431U publication Critical patent/CN209195431U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of full width inverted arch templates and integral construction method based on tunnel trestle, belong to tunnel inverted arch trestle technical field.It further include full width trolley including trestle main body, full width inverted arch template, monoblock type central trench template, inverted arch layer sealing end template, filled layer block template;Full width trolley is walked by motor along trestle main body certainly, the oil cylinder of full width trolley bottom is connect by otic placode with full width inverted arch template, for the connection and driving mechanism between trestle main body and full width inverted arch template, the utility model has the advantage of inverted arch construction more standards;Inverted arch mould drives without long stringer, no rear end, and template is simpler;Inverted arch layer and filled layer are constructed in same construction area, are greatly accelerated construction speed, are improved construction efficiency, alleviate labor intensity, and personnel's investment is reduced;It ensure that construction quality, ensured the safety of constructing tunnel, adapt to various inverted arch construction operating conditions.

Description

Full width inverted arch template based on tunnel trestle
Technical field
The utility model relates to a kind of full width inverted arch templates and integral construction method based on tunnel trestle, belong to tunnel Inverted arch trestle technical field.
Background technique
With the continuous development of China railways tunnel construction technology, to effectively improve the stability of inverted arch structure and durable Property, realize disposable inverted arch full width construction, therefore full width pouring construction has become the basic demand of constructing tunnel, traditional full width It is general to be applied in combination using the punching block of fritter when inverted arch template construction, it by artificial assembled, disassembly, reinforces, expends a large amount of manpowers Material resources cannot be promoted integrally, be moved integrally;Cause the construction time long, single assembly needs at least four people four hours or so, demoulding At least four people four hours or so is needed, also needs to move forward using traditional means after demoulding, significantly reduces the construction of inverted arch Efficiency.The applicant is analysed in depth by the construction technology to monoblock type inverted arch template and research and innovation, devises tunnel Trestle and full width inverted arch template integrated construction technology.
Utility model content
The purpose of this utility model is that a kind of being applied based on the full width inverted arch template of tunnel trestle and integration by providing Work method, so that overcome the deficiencies in the prior art, realizes disposable inverted arch full width pouring construction.
The utility model is achieved through the following technical solutions, including trestle main body, further includes full width trolley, full width inverted arch mould Plate, monoblock type central trench template, inverted arch layer sealing end template, filled layer block template;
Full width trolley is walked by motor along trestle main body certainly, and the oil cylinder of full width trolley bottom passes through otic placode and full width inverted arch Template connection, connection and driving mechanism between trestle main body and full width inverted arch template,
The arc of full width inverted arch template is bonded the tunnel section of excavation completely, and full width inverted arch template is by camber line template group, ring Xiang Liang, longitudinal beam composition;
Camber line template group integral construction splits construction, and the working face of camber line template group offers working window, longitudinal beam Rear and front end bottom is provided with demoulding oil jar;
Inverted arch layer sealing end template is placed on the front end of full width inverted arch template, and filled layer blocks template and monoblock type central trench mould Plate is connected to the rear end of full width inverted arch template;
Inverted arch layer blocks template, filled layer sealing end template, monoblock type central trench template with full width inverted arch template integral forward lead.
It further include gutter template, when adapted gutter template, gutter template moves forward with filled layer sealing end template;According to construction need Ask apolegamy sealing carrying jig, Reinforcing bar clamp, chute.Demoulding oil jar is set between gutter template and full width inverted arch template.
Trestle main body also adds front end trolley, and filled layer blocks template, monoblock type central trench template with front end trolley entirety Forward.
The utility model has the advantage of, 1, can carry full width type inverted arch template, inverted arch construction more standard;2, trestle is adopted With front and back double small bassinet structure, trestle, which has, carries template function;3, inverted arch mould drives without long stringer, no rear end, and template is simpler It is single;4, inverted arch layer and filled layer are constructed in same construction area, and full width template can be promoted to above the filled layer for having poured and being poured in;5, Meet safe stride requirements, the opposite safe step pitch of construction method one is constructed few 12 meters than being staggered;6, rear end trolley is used to be promoted complete Width template, front end trolley are used to carry central trench template and trestle Forward;7, it greatly accelerates construction speed, improve construction Efficiency alleviates labor intensity, reduces personnel's investment;It ensure that construction quality, ensured the safety of constructing tunnel, adapt to Various inverted arch construction operating conditions.
Detailed description of the invention
Fig. 1 is inverted arch construction positioning states schematic diagram.
Fig. 2 is to promote full width inverted arch template to pouring the filled layer being poured in.
Fig. 3 is that front end trolley drives central trench template advance schematic diagram.
Fig. 4 is that center ditch template and filled layer block Template Location figure.
Fig. 5 is that filled layer is poured one of schematic diagram.
Fig. 6 is that filled layer is poured the two of schematic diagram.
Fig. 7 is that filled layer is poured the three of schematic diagram.
Fig. 8 is the positioning states schematic diagram of circulation construction.
Fig. 9 is full width inverted arch template top view.
Figure 10 is full width inverted arch template main view.
Figure 11 is monoblock type central trench formwork structure figure.
Specific embodiment
The preferred embodiment of 1 to 11 pair of the utility model is described further with reference to the accompanying drawing, including trestle main body 1, It further include full width trolley 2, full width inverted arch template 3, monoblock type central trench template 4, inverted arch layer sealing end template 5, filled layer block mould Plate 6;
Full width trolley 2 is walked by motor along trestle main body 1 certainly, and the oil cylinder of 2 bottom of full width trolley passes through otic placode 9 and full width Inverted arch template 3 connects, connection and driving mechanism between trestle main body 1 and full width inverted arch template 3,
The arc of full width inverted arch template 3 is bonded the tunnel section of excavation completely, and full width inverted arch template 3 is by camber line template group 31, circumferential beam 32, longitudinal beam 33 form;The setting of camber line template group 31 is arranged in circumferential 32 bottom of beam, longitudinal beam 33 in circumferential beam 32 top;
31 integral construction of camber line template group splits construction, and the working face of camber line template group 31 offers working window, longitudinal The rear and front end bottom of beam is provided with demoulding oil jar;
The front end of full width inverted arch template 3 is arranged in inverted arch layer sealing end template 5, and filled layer blocks template 6 and monoblock type center Ditch template 4 is connected to the rear end of full width inverted arch template 3;
It is whole with full width inverted arch template 3 that inverted arch layer blocks template 5, filled layer sealing end template 6, monoblock type central trench template 4 Forward.
When work surface construction, filled layer sealing end template 6 and monoblock type central trench template 4 are connected to 2 rear end of full width trolley, and It is driven and is moved forward by full width trolley 2.
The utility model provides a kind of completely new technical solution:
The first, by the way that full width inverted arch template 3 is designed to overall structure, realize that full width is faced upward using the full width trolley 2 of trestle The functions such as encircle the whole demoulding of template 3, advance, retreat, is traversing;
The second, full width inverted arch template 3 is whole is demoulded using hydraulic way, avoids manual operation when demoulding, such as hammering, It agitates, extends the service life of template, reduce template deformation, reduce the labor intensity of worker, improve construction efficiency;
Third, full width inverted arch template 3 can freedom separated with inverted arch trestle, effectively reduce full width template other processes construction Interference;
Operator does not need the lower section for entering inverted arch trestle for a long time, carries out the installation and dismantling of template, improves construction Efficiency and construction quality reduce the occurrence probability of safety accident.
It further include gutter template 7, when adapted gutter template 7, gutter template 7 moves forward with filled layer sealing end template 6;According to applying Work demand matches sealing carrying jig, Reinforcing bar clamp, chute.Demoulding oil jar is set between gutter template 7 and full width inverted arch template 3 71。
Trestle main body 1 also adds front end trolley 8, and front end trolley 8 is additionally arranged at the bottom of otic placode 9, and filled layer blocks template 6, entirety Formula central trench template 4 passes through otic placode 9 with 8 integral forward lead of front end trolley, as shown in Figures 1 to 4.
The construction procedure of full width inverted arch template based on tunnel trestle:
Step 1, full width inverted arch template 3 is positioned;
Step 2, it is poured inverted arch layer;
Step 3, it demoulds, promotes full width inverted arch template 3, retreat to having poured the filled layer being poured in;
Step 4, front end trolley 8 returns, and connect with monoblock type central trench template 4, before driving monoblock type central trench template 4 Into;
Step 5, monoblock type central trench template 4 and filling sealing end template 6 position,
Step 6, it is poured the filling layer concrete in step 2 above inverted arch layer;Full width inverted arch template 3 and trestle master at this time Body 1 is positioned according to actual excavation demand or movement;It is illustrated in figure 5 the rear end that full width inverted arch template 3 is located at casting filling, stack Bridge main body 1 does not move forward;Fig. 6 is that front end has been excavated, and trestle main body 1 moves forward 12 meters, and full width inverted arch template 3 is upper casting filled layer Side;Fig. 7 is that front end has been excavated, and trestle main body 1 moves forward 12 meters, and full width inverted arch template 3 prepares lower single order in front of casting filled layer The construction of section.
Step 7, full width inverted arch template 3 positions, circulation step 1, as shown in figure 8, until all constructing terminates.
Integral construction method based on tunnel trestle full width inverted arch template includes:
Method one: it in the permission of safe step pitch, adapts in V grades or less country rock construction, inverted arch filling, which is staggered 12 meters, constructs, front end Monoblock type central trench template 4 is filled and is carried in 12 meters of casting inverted arch, the casting of 12 meters of rear end, and filling sealing end mould passes through full width trolley 2 The promotion demoulding oil jar 331 of bottom is lifted up full width inverted arch template 3, demoulds and is promoted to next working face;
Method two: it in the permission of safe step pitch, adapts to first be poured 12 meters of inverted arch concrete, full width in V grades or more country rock construction Trolley 2 promotes demoulding, is up-shifted to fill surface or more, then full width trolley 2 is promoted to above the fill surface poured and be poured in, and passes through Front end trolley 8 draws monoblock type central trench template 4 to the fill surface being poured in, and sets up filled layer sealing end template 6 and starts to be poured, is poured After be promoted to subsequent work face.
The technology is accelerating inverted arch construction speed, improves construction efficiency, reduces labor intensity, and reduces personnel's investment, guarantees Construction quality has ensured the safety of constructing tunnel, adapts to various inverted arch construction operating conditions.

Claims (3)

1. the full width inverted arch template based on tunnel trestle, including trestle main body, it is characterised in that: further include full width trolley, full width Inverted arch template, monoblock type central trench template, inverted arch layer sealing end template, filled layer block template;
Full width trolley is by the way that along trestle main body, from walking, the oil cylinder of full width trolley bottom is connected by otic placode and full width inverted arch template It connects, the connection and driving mechanism between trestle main body and full width inverted arch template,
The arc of full width inverted arch template is bonded the tunnel section of excavation completely, full width inverted arch template by camber line template group, circumferential beam, Longitudinal beam composition;Longitudinal beam is connect with the oil cylinder of full width trolley bottom by otic placode;
Camber line template group integral construction splits construction, and the working face of camber line template group offers working window, the front and back of longitudinal beam Both ends bottom is provided with demoulding oil jar;
Inverted arch layer blocks template-setup in the front end of full width inverted arch template, and filled layer blocks template and monoblock type central trench template connects It connects in the rear end of full width inverted arch template;
Inverted arch layer blocks template, filled layer sealing end template, monoblock type central trench template with full width inverted arch template integral forward lead.
2. the full width inverted arch template according to claim 1 based on tunnel trestle, it is characterised in that: further include gutter mould Plate, when adapted gutter template, gutter template moves forward with filled layer sealing end template;Sealing carrying jig, steel are matched according to construction demand Muscle fixture, chute;Demoulding oil jar is set between gutter template and full width inverted arch template.
3. the full width inverted arch template according to claim 1 based on tunnel trestle, it is characterised in that: trestle main body is also added Front end trolley, filled layer block template, monoblock type central trench template with front end trolley integral forward lead.
CN201821700414.5U 2018-10-19 2018-10-19 Full width inverted arch template based on tunnel trestle Active CN209195431U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821700414.5U CN209195431U (en) 2018-10-19 2018-10-19 Full width inverted arch template based on tunnel trestle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821700414.5U CN209195431U (en) 2018-10-19 2018-10-19 Full width inverted arch template based on tunnel trestle

Publications (1)

Publication Number Publication Date
CN209195431U true CN209195431U (en) 2019-08-02

Family

ID=67408557

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821700414.5U Active CN209195431U (en) 2018-10-19 2018-10-19 Full width inverted arch template based on tunnel trestle

Country Status (1)

Country Link
CN (1) CN209195431U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281689A (en) * 2018-10-19 2019-01-29 湖南五新模板有限公司 Integral construction method based on tunnel trestle full width inverted arch template

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281689A (en) * 2018-10-19 2019-01-29 湖南五新模板有限公司 Integral construction method based on tunnel trestle full width inverted arch template

Similar Documents

Publication Publication Date Title
CN109281689A (en) Integral construction method based on tunnel trestle full width inverted arch template
CN105370298B (en) Loess tunnel once lining hydraulic template trolley
CN106223967B (en) A kind of great burying rectangle or class rectangle tunneling shield constructing device and method
CN106593469B (en) A kind of trolley for inverted arch construction
CN207212365U (en) A kind of wall arch is separable can Monolithic lining chassis
CN210100314U (en) Automatic change cylinder mould circulation system
CN102635369A (en) Construction method for integrally pouring inverted arch concrete by matching trestle with top formwork
CN106593468B (en) Tunnel inverted arch concrete lining sliding formwork and construction method
CN209195431U (en) Full width inverted arch template based on tunnel trestle
CN110273695A (en) A kind of Tunnel Second Lining formwork jumbo and its stage molding pouring procedure
CN109518544A (en) A kind of subway precast track plate railway roadbed laying method
CN203835404U (en) Non-clearance strengthening system for serious cracking of existing tunnel lining arch
CN103953362A (en) Clearance-free strengthening system for serious cracks of existing tunnel arch lining
CN110173281A (en) A kind of sliding mode system for circular tunnel concreting
CN208685933U (en) A kind of post-cast strip template free of demolition
CN213038402U (en) Integrated construction device for rapid pouring of embankment side slope
CN207538841U (en) A kind of hydraulic tunnel inverted arch cambered surface slip form construction device
CN204851287U (en) Big section moving as a whole formula formwork support
CN209243525U (en) A kind of slip-form machine
CN209228383U (en) Tunnel double-lining vault pours trolley
CN209227378U (en) Central hard shoulder formwork jumbo
CN111395344A (en) Reusable secant pile positioning device and construction method
CN204002842U (en) In full section, slide rail moves steel form carrier
CN206015534U (en) The self-propelled running gear of cantilever box beam Hanging Basket
CN202271433U (en) Multifunctional automatic plate discharging machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant