CN209179143U - A kind of inspection shaft pedestal - Google Patents

A kind of inspection shaft pedestal Download PDF

Info

Publication number
CN209179143U
CN209179143U CN201822080228.2U CN201822080228U CN209179143U CN 209179143 U CN209179143 U CN 209179143U CN 201822080228 U CN201822080228 U CN 201822080228U CN 209179143 U CN209179143 U CN 209179143U
Authority
CN
China
Prior art keywords
base body
inspection shaft
blocking part
well bore
pass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822080228.2U
Other languages
Chinese (zh)
Inventor
陈鹤忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hetiantong Global Ecological Technology Engineering Co ltd
Original Assignee
JIANGSU TONGQUANQIU ENGINEERING PIPE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU TONGQUANQIU ENGINEERING PIPE Co Ltd filed Critical JIANGSU TONGQUANQIU ENGINEERING PIPE Co Ltd
Priority to CN201822080228.2U priority Critical patent/CN209179143U/en
Application granted granted Critical
Publication of CN209179143U publication Critical patent/CN209179143U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of inspection shaft pedestals, it is made of plastic material, the pedestal includes the base body of bottom end closure, four by-pass connections facing each other are offered on all side walls of base body, all by-pass connections are communicated with the inner cavity of base body, the interface communicated with the well bore inner cavity of inspection shaft is offered on the upper end of base body, the bottom face of base body is provided with deposit cavity between the lower end surface of by-pass connection, interface is equipped with the plug division in the insertion well bore inner cavity for cooperation, the lateral wall of plug division and the inner sidewall of well bore are fitted close, the junction of each by-pass connection and base body inner cavity is provided with blocking part, when blocking part is used for grafting bypass pipe, it keeps out in the insertion end of bypass pipe.The pedestal of the utility model, practical, capable of effectivelying prevent bypass pipe, there is a situation where siltings, while after connecting with well bore, both reduce the case where junction leaks.

Description

A kind of inspection shaft pedestal
Technical field
The utility model relates to assembling pipe joints, and in particular to a kind of inspection shaft pedestal.
Background technique
Inspection shaft is the auxiliary construction that one in urban drainage system is basic, crucial, is mainly set to drainage ditch At direction turning point, sewer gradient change, pipe duct section, basis, at interface change, pipe duct intersection, on straight line pipe duct At a certain distance and special purpose (such as drop, retention, overflow etc.), for realizing the company between sewer It connects, pipe duct is facilitated to overhaul.In general, inspection shaft is by shaft bottom seat, pit shaft, closing in centrum, well lid or protection cage and inspection shaft accessory Composition.Inspection shaft pedestal in the prior art is usually provided with 2 to 3 by-pass connections, bottom seal, and bottom wall is close to by-pass connection Lower end surface setting, easily lead to silting by-pass connection after impurity in sewage is detained, influence the turnover rate of sewage.
Summary of the invention
The purpose of the utility model is to overcome the deficiencies in the prior art, provide a kind of structurally reasonable, easy for installation, leakproofness Inspection shaft pedestal that is good, being not easy silting.
In order to achieve the above objectives, the technical solution adopted in the utility model is: a kind of inspection shaft pedestal, and the pedestal uses Plastic material is made, and the pedestal includes the base body of bottom end closure, offer two on all side walls of the base body Two opposite four by-pass connections, all by-pass connections are communicated with the inner cavity of the base body, the base body The interface communicated with the well bore inner cavity of inspection shaft is offered on upper end, the bottom face of the base body connects apart from the bypass Deposit cavity is provided between the lower end surface of head, the interface is equipped with the plug division in the insertion well bore inner cavity for cooperation, described The lateral wall of plug division and the inner sidewall of well bore are fitted close, and each by-pass connection and the junction of base body inner cavity are set Blocking part is equipped with to keep out in the insertion end of the bypass pipe when blocking part is used for grafting bypass pipe.
Preferably, all by-pass connections are in sealing design.
Preferably, the blocking part is in semicircular arc, the blocking part by the by-pass connection, close to the pedestal sheet The inward-facing recess formation of the side wall lower ends of body side.
It is further preferred that being additionally provided with the axial direction extension along the by-pass connection on the lateral surface of the blocking part Several reinforcing ribs.
As a kind of specific embodiment, the reinforcing rib is recessed outward by the inner sidewall on the blocking part and is formed.
It is further preferred that the outside sidewall direction of inner sidewall of the cross-sectional width of the reinforcing rib along the blocking part is gradually Narrow.
Preferably, on the by-pass connection from insertion end port to the pipe wall thickness between the blocking part not less than described 1.5 times of the side wall wall thickness of base body.
Preferably, the interface of the base body is equipped with for the ring flange in mating connection with the well bore, The ring flange and the base body, which are integrally formed, to be arranged.
Preferably, the height of the deposit cavity is between the 1/2 to 2/3 of the by-pass connection diameter.
Preferably, ring-shaped step is provided on the inner sidewall of the deposit cavity, the ring-shaped step is located at the bypass and connects The lower section of head, the ring-shaped step are recessed inwardly by the lateral wall of the deposit cavity and are formed.
Due to the application of the above technical scheme, the utility model has the advantage that this is practical new compared with prior art The inspection shaft pedestal of type, by the way that four by-pass connections facing each other are arranged, convenient for user according to self-demand, in any side Upward grafting bypass pipe, is arranged deposit cavity on the bottom end of base body, can collect the partial impurities in sewage heavy Product is intracavitary, effectively prevent in the prior art in the case where not set deposit cavity, the generation of the case where impurity silting bypass pipe occurs, And plug division is arranged in interface on the upper end of base body, can by well bore and pedestal more closely be mounted on one It rises, reduces the case where the two junction leaks, blocking part is set in the junction of by-pass connection and base body, Can bypass pipe grafting on the base when, effectively the insertion end of bypass pipe is fixed.
Detailed description of the invention
Attached drawing 1 is the three-dimensional structure diagram of inspection shaft pedestal described in the utility model;
Attached drawing 2 is the front view of attached drawing 1;
Wherein: 1, base body;2, by-pass connection;3, interface;4, deposit cavity;5, plug division;6, blocking part;7, reinforce Muscle;8, ring-shaped step;9, ring flange.
Specific embodiment
With reference to the accompanying drawing and specific embodiment is further elaborated the technical solution of the utility model.
A kind of inspection shaft pedestal, is made using plastic material.The pedestal includes the base body 1 of bottom end closure, referring to Fig. 1, shown in 2.Four by-pass connections 2 facing each other, all by-pass connections 2 are offered on all side walls of the base body 1 It is communicated with the inner cavity of base body 1, the interface communicated with the well bore inner cavity of inspection shaft is offered on the upper end of the base body 1 3, the bottom face of the base body 1 is provided with deposit cavity 4 between the lower end surface apart from by-pass connection 2, is equipped at the interface 3 for matching Plug division 5 in the insertion well bore inner cavity of conjunction, the lateral wall of the plug division 5 and the inner sidewall of well bore are fitted close, each bypass The junction of connector 2 and 1 inner cavity of base body is provided with blocking part 6, which is used for grafting bypass pipe (not shown) When, it keeps out in the insertion end of bypass pipe.
Here, by the way that by-pass connection 2 facing each other is arranged, can according to the actual demand grafting bypass pipe of user, Using more convenient, specifically, all by-pass connections 2 have been all made of sealing design, bypass is connect according to the demand of user First 2 carry out it is open-minded.
Here, plug division 5 is set at the interface 3 on the upper end of base body 1, well bore and pedestal can be effectively prevent After connection, the case where junction leaks.Deposit cavity 4 is set in the bottom end of base body 1, so that in drainage flow In the process, impurity is collected in deposit cavity 4, impurity silting bypass pipe will not be made, the problem of drainage flow rate difference is caused to occur. Specifically, the height of the deposit cavity 4 is between the 1/2 to 2/3 of 2 diameter of by-pass connection.By the set-up mode, so that deposit cavity 4 accommodating space is completed clearly while ensuring impurity not silting bypass pipe convenient for operator in a reasonable range Silt work.
In this example, by-pass connection 2 Yu 1 inner cavity of base body junction be arranged blocking part 6, ginseng as shown in FIGS. 1 and 2, have When conducive to grafting bypass pipe, bypass pipe is carried out effectively fixed.Specifically, the blocking part 6 be in semicircular arc, the blocking part 6 by It is recessed inwardly to be formed on by-pass connection 2, close to the lower end surface of 1 side of base body.Edge is additionally provided on the lateral surface of the blocking part 6 Several reinforcing ribs 7 that the axial direction of the by-pass connection 2 extends.The reinforcing rib 7 is by the outside concave shape of inner sidewall on blocking part 6 At.The cross-sectional width of the reinforcing rib 7 is become narrow gradually by the outside sidewall direction of inner sidewall of blocking part 6.Have by the way that reinforcing rib 7 is arranged Conducive to the intensity for improving blocking part 6.
Be provided with ring-shaped step 8 on the inner sidewall of the deposit cavity 4, ginseng as shown in FIGS. 1 and 2, which is located at bypass The lower section of connector 2, which is recessed inwardly by the lateral wall of deposit cavity 4 forms.By the way that ring-shaped step 8 is arranged, can subtract Percussion of the slow sewage to deposit cavity 4.
In this example, it is not less than base body to the pipe wall thickness between blocking part 6 from insertion end port on the by-pass connection 2 1.5 times of 1 side wall wall thickness.Through the set-up mode, when the 2 grafting bypass pipe of by-pass connection, it can be ensured that by-pass connection 2 Installation strength.
In this example, the interface 3 of the base body 1 is equipped with for the ring flange 9 in mating connection with well bore, referring to Fig. 1, Shown in 2.The ring flange 9 and base body 1, which are integrally formed, to be arranged.By the way that ring flange 9 is arranged, convenient for base body 1 and well bore it Between installation.
The above embodiments are only for explaining the technical ideas and features of the present invention, and its object is to allow be familiar with technique Personage can understand the content of the utility model and implement accordingly, do not limit the protection scope of the present invention. All equivalent change or modifications according to made by the spirit of the present invention essence, should all cover the protection scope of the utility model it It is interior.

Claims (10)

1. a kind of inspection shaft pedestal, which is characterized in that the pedestal is made using plastic material, and the pedestal includes bottom end envelope The base body closed offers four by-pass connections facing each other, all bypass on all side walls of the base body Connector is communicated with the inner cavity of the base body, and the well bore inner cavity phase with inspection shaft is offered on the upper end of the base body Logical interface, the bottom face of the base body are provided with deposit cavity, the interface between the lower end surface apart from the by-pass connection Place is equipped with the plug division in the insertion well bore inner cavity for cooperation, and the lateral wall of the plug division and the inner sidewall of well bore are closely matched It closes, the junction of each by-pass connection and base body inner cavity is provided with blocking part, and the blocking part is bypassed for grafting Guan Shi is kept out in the insertion end of the bypass pipe.
2. inspection shaft pedestal according to claim 1, which is characterized in that all by-pass connections are in sealing design.
3. inspection shaft pedestal according to claim 1, which is characterized in that the blocking part is in semicircular arc, described to keep out Portion is formed by the inward-facing recess of the side wall lower ends on the by-pass connection, close to the base body side.
4. inspection shaft pedestal according to claim 3, which is characterized in that be additionally provided on the lateral surface of the blocking part along institute State several reinforcing ribs that the axial direction of by-pass connection extends.
5. inspection shaft pedestal according to claim 4, which is characterized in that the reinforcing rib is by the inside on the blocking part Wall is recessed to be formed outward.
6. inspection shaft pedestal according to claim 5, which is characterized in that the cross-sectional width of the reinforcing rib is kept out described in The outside sidewall direction of the inner sidewall in portion becomes narrow gradually.
7. inspection shaft pedestal according to claim 1, which is characterized in that on the by-pass connection from insertion end port to Pipe wall thickness between the blocking part is not less than 1.5 times of the side wall wall thickness of the base body.
8. inspection shaft pedestal according to claim 1, which is characterized in that the interface of the base body, which is equipped with, to be used In the ring flange in mating connection with the well bore, the ring flange and the base body are integrally formed and are arranged.
9. inspection shaft pedestal according to claim 1, which is characterized in that the height of the deposit cavity is the by-pass connection Between the 1/2 to 2/3 of diameter.
10. inspection shaft pedestal according to claim 1, which is characterized in that be provided with ring on the inner sidewall of the deposit cavity Shape step, the ring-shaped step are located at the lower section of the by-pass connection, the ring-shaped step from the lateral wall of the deposit cavity to Sunken inside is formed.
CN201822080228.2U 2018-12-12 2018-12-12 A kind of inspection shaft pedestal Active CN209179143U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822080228.2U CN209179143U (en) 2018-12-12 2018-12-12 A kind of inspection shaft pedestal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822080228.2U CN209179143U (en) 2018-12-12 2018-12-12 A kind of inspection shaft pedestal

Publications (1)

Publication Number Publication Date
CN209179143U true CN209179143U (en) 2019-07-30

Family

ID=67376468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822080228.2U Active CN209179143U (en) 2018-12-12 2018-12-12 A kind of inspection shaft pedestal

Country Status (1)

Country Link
CN (1) CN209179143U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501966A (en) * 2020-04-22 2020-08-07 广东中帆建设有限公司 Novel prefabricated assembly type rainwater and sewage inspection well chute

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501966A (en) * 2020-04-22 2020-08-07 广东中帆建设有限公司 Novel prefabricated assembly type rainwater and sewage inspection well chute

Similar Documents

Publication Publication Date Title
CN209179143U (en) A kind of inspection shaft pedestal
US20200407908A1 (en) Washing machine
CN111810727B (en) Concrete pipe and processing technology thereof
LU504702B1 (en) Rotary Flushing Type Ceramic Body and Pedestal Pan
CN208415478U (en) A kind of filtering sedimentation well
CN209277266U (en) A kind of inspection shaft
US7631659B2 (en) Fluid tank
CN207498991U (en) A kind of exhaust valve pit
CN213329113U (en) Outdoor buried water meter well for tap water
CN212656325U (en) Novel water tank structure
CN110607648B (en) Washing machine
CN109372084A (en) A kind of inspection shaft
CN110747873A (en) Device for sealing post-pouring strip piping and construction method
CN210485296U (en) Anti-leakage gas trap
CN212715026U (en) Novel valve well
CN206457919U (en) A kind of heavy spilling water joint of vertical type floor drain deodorization
CN205637052U (en) Plastic check well with strengthening rib
CN212956875U (en) Self-leveling liquid seal floor drain
KR20070036101A (en) Manhole with insert connector
CN215858067U (en) Blank body connecting structure of toilet with water tank and toilet
CN206434905U (en) The buried settling tank of sewage disposal
CN206784549U (en) A kind of ground groove
CN104818759B (en) Toilet bowl sewage draining structure
CN207633370U (en) Drain well lid
CN212053031U (en) Pipe fitting for drainage of horizontal air conditioner condenser pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220711

Address after: 848100 zone B2, food processing zone, modern agricultural industrial park, Moyu County, Hotan Prefecture, Xinjiang Uygur Autonomous Region

Patentee after: Hetiantong global ecological technology Engineering Co.,Ltd.

Address before: 215626 Hexing Industrial Park, Jinfeng Town, Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee before: JIANGSU TONGQUANQIU ENGINEERING PIPE Co.,Ltd.