CN209277266U - A kind of inspection shaft - Google Patents

A kind of inspection shaft Download PDF

Info

Publication number
CN209277266U
CN209277266U CN201822086163.2U CN201822086163U CN209277266U CN 209277266 U CN209277266 U CN 209277266U CN 201822086163 U CN201822086163 U CN 201822086163U CN 209277266 U CN209277266 U CN 209277266U
Authority
CN
China
Prior art keywords
pit shaft
well bore
ontology
pit
inspection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822086163.2U
Other languages
Chinese (zh)
Inventor
陈鹤忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU TONGQUANQIU ENGINEERING PIPE Co Ltd
Original Assignee
JIANGSU TONGQUANQIU ENGINEERING PIPE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU TONGQUANQIU ENGINEERING PIPE Co Ltd filed Critical JIANGSU TONGQUANQIU ENGINEERING PIPE Co Ltd
Priority to CN201822086163.2U priority Critical patent/CN209277266U/en
Application granted granted Critical
Publication of CN209277266U publication Critical patent/CN209277266U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model discloses a kind of inspection shafts, including the well bore with tubular structure and it is connected on well bore, well head and pedestal in lower two-port, well head, well bore is communicated with base intracavity, well bore includes several pit shafts mutually spliced, each pit shaft includes pit shaft ontology, marking time in the inner cavity of pit shaft ontology, mark time is to be recessed inwardly to be formed by the lateral wall of well bore, marking time, there have to be multiple, multiple mark time intersects, interval is distributed on the inner sidewall of well bore, it marks time including horizontally disposed tyre tread, the arc support being supported below tyre tread and the anti-skidding muscle between tyre tread and support portion, anti-skidding muscle is formed after being folded upward at by the junction of tyre tread and support portion, it marks time and is arranged with this body by integral forming of pit shaft, clamping portion is additionally provided on pit shaft, for two adjacent pit shafts to be connected together.The inspection shaft of the utility model, low manufacture cost, transport, easy to assembly, intensity height are practical, pass in and out inspection shaft convenient for operator.

Description

A kind of inspection shaft
Technical field
The utility model relates to assembling pipe joints, and in particular to a kind of inspection shaft.
Background technique
Inspection shaft is the auxiliary construction that one in urban drainage system is basic, crucial, is mainly set to drainage ditch At direction turning point, sewer gradient change, pipe duct section, basis, at interface change, pipe duct intersection, on straight line pipe duct At a certain distance and special purpose (such as drop, retention, overflow etc.), for realizing the company between sewer It connects, pipe duct is facilitated to overhaul.In general, inspection shaft is by shaft bottom seat, pit shaft, closing in centrum, well lid or protection cage and inspection shaft accessory Composition.Inspection shaft in the prior art generallys use brick concrete inspection well, is primarily present following defect: intensity first Low, the support strength of brickwork construction is low, and especially the brickwork construction variable diameter necking part close to road surface is easily collapsed because active force impacts It falls into;Secondly well body long construction period, construction is complicated, due to must manual scene pile up, civil engineering is required high, standardizes, is general Change, seriation degree are poor, and use well body made of plastic material, solve the above problem, and in order to facilitate the operation of under personnel Inspection shaft is checked, ladder is usually arranged in well body, and time-consuming for ladder production, and makes the inner space of well bore significantly It reduces, it is timid and hesitant during operator's climbing, it is unfavorable for operator's work.
Summary of the invention
The purpose of the utility model is to overcome the deficiencies in the prior art, provide a kind of inspection shaft, and structure is simple, is conducive to Operator checks that structural strength is high, easy to transportation and installation.
In order to achieve the above objectives, the technical solution adopted in the utility model is: a kind of inspection shaft, including with tubular structure Well bore and the well head and pedestal that are connected on the well bore upper/lower terminal mouth, the well head, the well bore with it is described Base intracavity communicates, and the well bore includes several pit shafts mutually spliced, and each pit shaft includes pit shaft ontology, is set to institute Marking time in the inner cavity of pit shaft ontology is stated, described mark time is to be recessed inwardly to be formed by the lateral wall of the well bore, and described mark time has It is multiple, it is multiple it is described mark time intersect, being distributed on the inner sidewall of the well bore of be spaced, it is described to mark time including being horizontally disposed with Tyre tread, the arc support that is supported below the tyre tread and the anti-skidding muscle between the tyre tread and the support portion, The anti-skidding muscle is formed after being folded upward at by the junction of the tyre tread and the support portion, described to mark time and the pit shaft This body by integral forming is arranged, and is additionally provided with clamping portion on the pit shaft, for two adjacent pit shafts to be connected together, institute Stating clamping portion includes the insertion section in the upper port of the pit shaft, the annular on the lower port inner sidewall of the pit shaft Card slot, the insertion section are matched with the card slot shape, size.
Preferably, the pit shaft further includes several first reinforcing ribs being set on the inner sidewall of the pit shaft ontology, is set to Several second reinforcing ribs on the lateral wall of the pit shaft ontology.
It is further preferred that first reinforcing rib includes on the inner sidewall of the pit shaft ontology, along the pit shaft Strip reinforcing rib that the axial direction of ontology extends and on the inner sidewall of the pit shaft ontology, with the pit shaft ontology The ring stiffener of coaxial inner conductor setting.
It is further preferred that second reinforcing rib includes on the lateral wall of the pit shaft ontology, along the pit shaft Strip reinforcing rib that the axial direction of ontology extends and on the lateral wall of the pit shaft ontology, with the pit shaft ontology The ring stiffener of coaxial inner conductor setting.
Preferably, the pedestal of the inspection shaft include include bottom end closure base body and be set to the pedestal On all side walls of ontology, four by-pass connections facing each other, the inner cavity phase of all by-pass connections and the base body Logical, the upper end aperture of the base body is arranged between the bottom end of the base body and the lower end surface of the by-pass connection Have deposit cavity, the insertion section also be provided on the upper end of the base body, for the pit shaft on well bore bottom Lower port on the card slot be mutually fitted close, each by-pass connection and the junction of the inner cavity of the base body are set Blocking part is equipped with to keep out in the insertion end of the bypass pipe when blocking part is used for bypass pipe grafting.
It is further preferred that the blocking part is in semicircular arc, the blocking part by the by-pass connection, close to described The inward-facing recess formation of the side wall lower ends of base body side.
Preferably, the well head of the inspection shaft includes the wellhead body with hollow cavity, the wellhead body Described mark time also is provided in inner cavity.
It is further preferred that the wellhead body includes the cylindrical portion set gradually along the vertical direction and flare, institute's loudspeaker Portion is located on the cylindrical portion lower end, gradually opens from top to bottom, and the well head passes through the flare and the well bore It is connected.
Preferably, the pit shaft ontology is three-decker, is followed successively by anticorrosive PTFE layer from inside to outside, polyurethane is protected Warm layer and polyethylene anti-aging layer.
It is further preferred that the well head, the pedestal are made with the pit shaft ontology with material.
Due to the application of the above technical scheme, the utility model has the advantage that this is practical new compared with prior art The inspection shaft of type, well bore use multiple pit shafts mutually spliced, so that transport becomes simple with installation process, and in pit shaft Setting is marked time in ontology, is conducive to operator's climbing, while anti-skidding muscle is arranged, is not only prevented operator in climbing process Middle there is a phenomenon where appearance of skidding, while also acting as the effect of handgrip, and the tread structure is simple, convenient for inspection shaft under operator It is checked, while clamping portion is set in pit shaft ontology, be beneficial to prevent after splicing between pit shaft, let out between adjacent pit shaft The case where leakage.
Detailed description of the invention
Attached drawing 1 is the structural schematic diagram of inspection shaft described in the utility model;
Attached drawing 2 is the structural schematic diagram of pit shaft in inspection shaft described in the utility model;
Attached drawing 3 is the structural schematic diagram of well head in inspection shaft described in the utility model;
Attached drawing 4 is the structural schematic diagram of pedestal in inspection shaft described in the utility model;
Wherein: 1, well head;2, well bore;3, pedestal;4, ring flange;5, lifting lug;
10, wellhead body;101, cylindrical portion;102, flare;20, pit shaft ontology;21, it marks time;22, insertion section;23, One reinforcing rib;24, the second reinforcing rib;30, base body;31, by-pass connection;32, blocking part;33, deposit cavity.
Specific embodiment
With reference to the accompanying drawing and specific embodiment is further elaborated the technical solution of the utility model.
A kind of inspection shaft including the well bore 2 with tubular structure and is connected on 2 upper/lower terminal mouth of well bore Well head 1 and pedestal 3, the well head 1, well bore 2 are communicated with 3 inner cavity of pedestal, shown in Figure 1.
Here, which includes several pit shafts mutually spliced.Each pit shaft includes pit shaft ontology 20, is set to pit shaft 21 are marked time in the inner cavity of ontology 20, and shown in Figure 2, it 21 is to be recessed inwardly to be formed by the lateral wall of well bore 2 that this, which is marked time, is marked time 21 have it is multiple, it is multiple mark time 21 intersect, being distributed on the inner sidewall of well bore 2 of being spaced, marking time 21 includes horizontally disposed Tyre tread, the arc support being supported below tyre tread and the anti-skidding muscle (not shown) between tyre tread and support portion, should Anti-skidding muscle is formed after being folded upward at by the junction of tyre tread and support portion, mark time 21 with pit shaft ontology 20 integrated molding set It sets.Here, it is additionally provided with clamping portion on the pit shaft, for two adjacent pit shafts to be connected together, which includes being set to Insertion section 22 in the upper port of pit shaft, the annular slot (not shown) on the lower port inner sidewall of pit shaft, insertion Portion 22 is matched with card slot shape, size.
Here, by the way that well bore 2 to be arranged to mutually be spliced by multiple pit shafts, the transport and peace of inspection shaft have been convenient for it Dress.And setting marks time 21 in pit shaft ontology 20, be conducive to operator climbs in inspection shaft, and the setting on 21 of marking time is anti- Sliding muscle, having not only acted as prevents operator during climbing there is a phenomenon where skidding, while also acting as the effect of handgrip.? The clamping portion being mutually clamped is set on pit shaft, so that after 2 assembly of well bore, the feelings that will not be leaked between two adjacent pit shafts Condition.
In this example, which further includes several first reinforcing ribs 23 being set on the inner sidewall of pit shaft ontology 20, is set to well Several second reinforcing ribs 24 on the lateral wall of cylinder ontology 20, it is shown in Figure 2.First reinforcing rib 23 includes being set to pit shaft sheet Strip reinforcing rib that axial direction on the inner sidewall of body 20, along pit shaft ontology 20 extends and in pit shaft ontology 20 Ring stiffener on side wall, with the setting of 20 coaxial inner conductor of pit shaft ontology.Second reinforcing rib 24 includes being set to pit shaft ontology 20 Lateral wall on, along pit shaft ontology 20 axial direction extend strip reinforcing rib and set on the lateral wall of pit shaft ontology 20 Ring stiffener upper, with the setting of 20 coaxial inner conductor of pit shaft ontology.By the way that above-mentioned reinforcing rib is arranged, the intensity of pit shaft is improved.
In this example, the pedestal 3 of the inspection shaft include include bottom end closure base body 30 and be set to base body 30 All side walls on, four by-pass connections 31 facing each other, shown in Figure 4, all by-pass connections 31 are in sealing design.Institute There are by-pass connection 31 and the inner cavity of base body 30 to communicate, the upper end aperture of base body 30, the bottom end of base body 30 Deposit cavity 33 is provided between the lower end surface of by-pass connection 31, it is shown in Figure 4, it also is provided with inserting on the upper end of base body 30 Enter portion 22, for being mutually fitted close with the card slot in the lower port of the pit shaft on 2 bottom of well bore, each by-pass connection 31 and bottom The junction of the inner cavity of seat ontology 30 is provided with blocking part 32, shown in Figure 4, when blocking part 32 is used for bypass pipe grafting, supports Gear is in the insertion end of bypass pipe.
By the way that four by-pass connections 31 are arranged, operator can carry out aperture to by-pass connection 31 according to actual needs to connect Connect bypass pipe.And deposit cavity 33 is set on the bottom end of base body 30 and is facilitated while ensuring not silting bypass pipe Operator carries out dredging to deposit cavity 33.
In this example, by the way that blocking part 32 is arranged, so that keeping out in the insertion end of bypass pipe, having in grafting bypass pipe It is effectively fixed conducive to being carried out to bypass pipe.Specifically, the blocking part 32 is in semicircular arc, the blocking part 32 is by by-pass connection 31 The inward-facing recess formation of side wall lower ends upper, close to 30 side of base body.
In this example, it is not less than pedestal sheet to the pipe wall thickness between blocking part 32 from insertion end port on the by-pass connection 31 1.5 times of the side wall wall thickness of body 30.By thickening the thickness of by-pass connection 31, so that the by-pass connection 31 is in grafting bypass pipe When, it can be ensured that the installation strength of by-pass connection 31.
Here, ring flange 4 is equipped on the well head of inspection shaft 1, pit shaft, pedestal 3, it is shown in Figure 1, it is used for adjacent two Installation between a component.Lifting lug 5 is additionally provided on the lateral wall of well head 1, referring to shown in Fig. 1,3, for lifting, in order to enhance well Mouthful 1 intensity also has equipped with reinforcing rib on the inner sidewall and lateral wall of the well head 1.
In this example, the well head 1 of the inspection shaft includes the wellhead body 10 with hollow cavity, shown in Figure 3, well head sheet It also is provided with marking time 21 in the inner cavity of body 10.21 are marked time by setting, allow the operator to facilitate disengaging well head 1.
The wellhead body 10 includes the cylindrical portion 101 set gradually along the vertical direction and flare 102, shown in Figure 3, Institute's flare 102 is located on 101 lower end of cylindrical portion, gradually opens from top to bottom, and well head 1 passes through flare 102 and 2 phase of well bore Even.By the way that the wellhead body 10 is divided into cylindrical portion 101 and flare 102, the production raw material of well head 1 is not only reduced, is passed through Flare 102 is set, the lower end of cylindrical portion 101 can smoothly be extended into and be connected to each other with well bore 2, improve the peace of well head 1 Fill intensity.
In this example, which is three-decker, is followed successively by anticorrosive PTFE layer from inside to outside, polyurethane is protected Warm layer and polyethylene anti-aging layer.The well head 1, pedestal 3 and pit shaft ontology 20 are made with material.By using above-mentioned material system At well bore 2, well head 1 and pedestal 3, so that the intensity of the inspection shaft is high, good corrosion resistance.
The inspection shaft of the utility model, low manufacture cost, transport, easy to assembly, intensity height are practical, convenient for operation Personnel pass in and out inspection shaft.
The above embodiments are only for explaining the technical ideas and features of the present invention, and its object is to allow be familiar with technique Personage can understand the content of the utility model and implement accordingly, do not limit the protection scope of the present invention. All equivalent change or modifications according to made by the spirit of the present invention essence, should all cover the protection scope of the utility model it It is interior.

Claims (10)

1. a kind of inspection shaft including the well bore with tubular structure and is connected on the well bore upper/lower terminal mouth Well head and pedestal, the well head, the well bore are communicated with the base intracavity, which is characterized in that the well bore includes several phases The pit shaft mutually spliced, each pit shaft include pit shaft ontology, marking time in the inner cavity of the pit shaft ontology, described to step on Step is to be recessed inwardly to be formed by the lateral wall of the well bore, and described mark time has multiple, and multiple described mark time intersect, are spaced It is distributed on the inner sidewall of the well bore, it is described to mark time including horizontally disposed tyre tread, the arc being supported below the tyre tread Support portion and the anti-skidding muscle between the tyre tread and the support portion, the anti-skidding muscle are by the tyre tread and the support What the junction in portion was formed after being folded upward at, described mark time is arranged with described this body by integral forming of pit shaft, also sets on the pit shaft There is clamping portion, for two adjacent pit shafts to be connected together, the clamping portion includes set on the upper end of the pit shaft Insertion section on mouth, the annular slot on the lower port inner sidewall of the pit shaft, the insertion section and the card slot shape, Size matches.
2. inspection shaft according to claim 1, which is characterized in that the pit shaft further includes set on the interior of the pit shaft ontology Several first reinforcing ribs on side wall, several second reinforcing ribs on the lateral wall of the pit shaft ontology.
3. inspection shaft according to claim 2, which is characterized in that first reinforcing rib includes being set to the pit shaft ontology Inner sidewall on, along the pit shaft ontology axial direction extend strip reinforcing rib and in the pit shaft ontology Ring stiffener on side wall, with pit shaft ontology coaxial inner conductor setting.
4. inspection shaft according to claim 2, which is characterized in that second reinforcing rib includes being set to the pit shaft ontology Lateral wall on, along the strip reinforcing rib that extends of axial direction of the pit shaft ontology and set on the outer of the pit shaft ontology Ring stiffener on side wall, with pit shaft ontology coaxial inner conductor setting.
5. inspection shaft according to claim 1, which is characterized in that the pedestal of the inspection shaft includes bottom end closure Base body and on all side walls of the base body, four by-pass connections facing each other, all bypass connect Head is communicated with the inner cavity of the base body, the upper end aperture of the base body, the bottom end of the base body and institute It states and is provided with deposit cavity between the lower end surface of by-pass connection, the insertion section also is provided on the upper end of the base body, is used for Mutually be fitted close with the card slot in the lower port of the pit shaft on well bore bottom, each by-pass connection with it is described The junction of the inner cavity of base body is provided with blocking part and keeps out when the blocking part is used for bypass pipe grafting in the bypass In the insertion end of pipe.
6. inspection shaft according to claim 5, which is characterized in that the blocking part be in semicircular arc, the blocking part by The inward-facing recess formation of side wall lower ends on the by-pass connection, close to the base body side.
7. inspection shaft according to claim 1, which is characterized in that the well head of the inspection shaft includes having in hollow The wellhead body of chamber also is provided with described mark time in the inner cavity of the wellhead body.
8. inspection shaft according to claim 7, which is characterized in that the wellhead body includes setting gradually along the vertical direction Cylindrical portion and flare, institute's flare be located on the cylindrical portion lower end, gradually open from top to bottom, the well head passes through The flare is connected with the well bore.
9. inspection shaft according to claim 1, which is characterized in that the pit shaft ontology be three-decker, from inside to outside according to Secondary is anticorrosive PTFE layer, polyurethane insulation coating and polyethylene anti-aging layer.
10. inspection shaft according to claim 9, which is characterized in that the well head, the pedestal and the pit shaft ontology are same Material is made.
CN201822086163.2U 2018-12-12 2018-12-12 A kind of inspection shaft Expired - Fee Related CN209277266U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822086163.2U CN209277266U (en) 2018-12-12 2018-12-12 A kind of inspection shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822086163.2U CN209277266U (en) 2018-12-12 2018-12-12 A kind of inspection shaft

Publications (1)

Publication Number Publication Date
CN209277266U true CN209277266U (en) 2019-08-20

Family

ID=67610750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822086163.2U Expired - Fee Related CN209277266U (en) 2018-12-12 2018-12-12 A kind of inspection shaft

Country Status (1)

Country Link
CN (1) CN209277266U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372084A (en) * 2018-12-12 2019-02-22 江苏通全球工程管业有限公司 A kind of inspection shaft

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372084A (en) * 2018-12-12 2019-02-22 江苏通全球工程管业有限公司 A kind of inspection shaft

Similar Documents

Publication Publication Date Title
CN208416553U (en) A kind of Structural Test of Tunnel Segments
CN209277266U (en) A kind of inspection shaft
CN109372084A (en) A kind of inspection shaft
CN206090779U (en) Municipal administration water supply and drainage pipeline connection structure
CN201605599U (en) Integrated prefabricated inspection well
CN201762723U (en) Plastic-steel winding pipe network inspection well
CN203755310U (en) Pile washing nozzle of self-elevating platform pile shoe
CN207500654U (en) A kind of high-strength polyethylene double-wall corrugated pipe
CN108643601B (en) Plugging device for hole of formwork wall-penetrating counter-pulling screw and operation method
CN209179143U (en) A kind of inspection shaft pedestal
KR100877732B1 (en) Constructing method and pipe articulated joint of manhole
CN210888064U (en) Civil engineering is with reserving hole template
CN220486688U (en) Quick assembly type pipe well
CN208564132U (en) Chimney top opening glass reinforced plastic inner cylinder connection structure
CN208088346U (en) Closing type composite plastic water meter well
CN207092231U (en) A kind of combined inspection shaft of embedded cat ladder
CN205742489U (en) The drainage system device of integral type
CN209040161U (en) Inspection shaft biasing is closed up
CN221589133U (en) Blanking device for asphalt paving
CN109339203A (en) A kind of split type gutter
CN218905998U (en) CPVC reinforcing double-walled bellows moulded module
CN215715867U (en) Siphon type drainage channel
CN105297873B (en) A kind of combined inspection shaft in finished product gutter
CN203256789U (en) Combined plastic inspection well
CN214530781U (en) Inspection shaft convenient to installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190820

Termination date: 20211212

CF01 Termination of patent right due to non-payment of annual fee