CN209162846U CN201822017579.9U CN201822017579U CN209162846U CN 209162846 U CN209162846 U CN 209162846U CN 201822017579 U CN201822017579 U CN 201822017579U CN 209162846 U CN209162846 U CN 209162846U
Authority
CN
China
Prior art keywords
pile
support
support pile
barricade
waist rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822017579.9U
Other languages
Chinese (zh)
Inventor
何腊平
龙照
孙志虎
郭志元
刘博怀
李军鹏
魏永孝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Zhongjian Municipal Engineering Survey Design And Research Institute Co Ltd
Original Assignee
Gansu Zhongjian Municipal Engineering Survey Design And Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Zhongjian Municipal Engineering Survey Design And Research Institute Co Ltd filed Critical Gansu Zhongjian Municipal Engineering Survey Design And Research Institute Co Ltd
Priority to CN201822017579.9U priority Critical patent/CN209162846U/en
Application granted granted Critical
Publication of CN209162846U publication Critical patent/CN209162846U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a kind of pile anchoring technologies of no waist rail locking support pile, including more support piles, the more support piles are arranged side by side, multiple reserved lock holes are equipped on the more support piles, the upper end of the more support piles is fixedly connected with same root beam hat, the side of the beam hat is equipped with barricade, the barricade is abutted with Liang Guan, the support pile is equipped with anchor pole close to the side of barricade, the support pile is equipped with anchorage far from the side side wall of barricade, and one end of the anchor pole passes through reserved lock hole and is anchored by anchorage and support pile.The utility model does not need setting waist rail, but directly anchor pole is set on support pile, and latching force is transferred directly on support pile, and Path of Force Transfer is simple and clear, saves fertile slot space, has saved cost, and unilateral formwork also may be implemented.

Description

A kind of pile anchoring technology of no waist rail locking support pile
Technical field
The utility model relates to technical field of civil engineering more particularly to a kind of pile-anchor retainings of no waist rail locking support pile Technology.
Background technique
In traditional anchored pile supporting, anchor cable position is arranged between every two support piles, and anchor cable is not direct and supporting Staking touching, the latching force of anchor cable are that support pile is passed to by steel waist rail, therefore more Path of Force Transfer of a steel waist rail.Steel Waist rail mainly brings 3 problems:
1, the Path of Force Transfer of steel waist rail anchored pile supporting is anchor cable → anchorage → steel waist rail → support pile.Steel waist rail and branch Fender pile gap leads to anchor cable discontinuity, and support pile deviations and perpendicularity deviation lead to crater wall big rise and fall, cause type Steel waist rail and support pile usually have very wide arc gap, and general way is that steel waist rail and support pile gap location stack steel cushion block.Practice It proves that this link is difficult to control construction quality, forms common quality defect.Once inevitably collide in work progress steel simultaneously Waist rail then brings risk to foundation pit often such that waist rail fails;
2, steel waist rail itself has certain altitude, occupies the fertile slot space of foundation pit, and fertile slot needs therefore to increase.Fertile slot increases Afterwards, pit earthwork amount is also significantly increased, to increase project cost.Many obstacles are caused when also backfilling simultaneously to foundation pit, Inconvenience construction, backfill construction quality are difficult to ensure;
3, due to there is steel waist rail to take up space, such pile-anchor system can not achieve the unilateral branch of structure construction in foundation pit Mould.
For this purpose, it is proposed that the pile anchoring technology for carrying out a kind of no waist rail locking support pile solves the above problems.
Utility model content
Purpose of the utility model is to solve the waist rail occupancy in waist rail in the prior art and support pile interconnection technique Foundation pit fertilizer slot space causes the bad construction of foundation pit backfill, increases the problem of the problem of supporting cost, and a kind of no waist proposed The pile anchoring technology of beam locking support pile.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of pile anchoring technology of no waist rail locking support pile, including more support piles, the more support piles are side by side It is arranged, is equipped with multiple reserved lock holes on the more support piles, the upper end of the more support piles is fixedly connected with same Root Liang Guan, the side of the beam hat are equipped with barricade, and the barricade is abutted with Liang Guan, and the support pile is close to the side of barricade Equipped with anchor pole, the support pile is equipped with anchorage far from the side side wall of barricade, and one end of the anchor pole passes through reserved lock hole And it is anchored by anchorage and support pile.
Preferably, the reserved lock hole is to be obliquely installed.
Preferably, the anchorage includes riser and hang plate, and the upper end of the riser and the upper end of hang plate are in a clamp Angle is fixedly connected, and is fixedly connected between the lower end of the riser and the lower end of hang plate by support plate, and the anchor pole is through perpendicular Plate and hang plate setting, the hang plate are vertical setting with anchor pole, and the hang plate is equipped with threaded block far from one end of riser, The threaded block is connect with spiral thread on anchor bolt, and washer is equipped between the threaded block and hang plate.
Preferably, the support pile and Liang Guan are concreting.
Compared with prior art, the utility model has the following beneficial effects:
This does not need setting waist rail without waist rail lock-in techniques, but directly anchor pole is set on support pile, and latching force is straight It connects and is transferred on support pile, Path of Force Transfer is simple and clear, saves fertile slot space, has saved cost, and unilateral branch also may be implemented Mould;Its key implemented is that the position of reserved lock hole is had good positioning, this, which needs to refine construction, can be realized.
The utility model can reduce fertile slot space, saving construction cost, and mention for the unilateral formwork construction of foundation pit structure therein Having supplied may.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of no waist rail lock support pile pile anchoring technology Facad structure signal Figure;
Fig. 2 is the enlarged drawing in Fig. 1 at A;
Fig. 3 be the utility model proposes a kind of no waist rail lock support pile pile anchoring technology side structure signal Figure;
Fig. 4 is the enlarged drawing that B goes out in Fig. 3.
In figure: 1 support pile, 2 reserved lock holes, 3 beams hat, 4 barricades, 5 anchor poles, 6 anchorages, 7 risers, 8 hang plates, 9 screw threads Block, 10 support plates.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Referring to Fig.1-4, a kind of pile anchoring technology of no waist rail locking support pile, including more support piles 1, more supportings Stake 1 is arranged side by side, and multiple reserved lock holes 2 are equipped on more support piles 1, it should be noted that reserved lock hole 2 is inclination Setting, the upper end of more support piles 1 is fixedly connected with same root beam hat 3, specifically, support pile 1 and Liang Guan 3 are concrete It pours, the side of Liang Guan 3 is equipped with barricade 4, and barricade 4 and Liang Guan 3 is abutted, and support pile 1 is equipped with anchor pole close to the side of barricade 4 5。
In the utility model, support pile 1 is equipped with anchorage 6 far from the side side wall of barricade 4, it should be noted that anchorage 6 Including riser 7 and hang plate 8, the upper end of riser 7 with the upper end of hang plate 8 is in a certain angle is fixedly connected, the lower end of riser 7 with It is fixedly connected between the lower end of hang plate 8 by support plate 10, the sliding of anchor pole 5 is arranged through riser 7 and hang plate 8, hang plate 8 It is vertical setting with anchor pole 5, hang plate 8 is equipped with threaded block 9 far from one end of riser 7, and threaded block 9 is threadedly coupled with anchor pole 5, spiral shell Washer is equipped between line block 9 and hang plate 8, one end of anchor pole 5 passes through reserved lock hole 2 and by anchorage 6 and 1 anchor of support pile It is fixed.
When the utility model is constructed: after levelling of the land, the top mark for being excavated to crown beam 3 is high, machine drilling, for construction branch Fender pile 1 prepares, and three steel pipes are welded on the steel reinforcement cage of support pile 1, which is reserved lock hole 2;By the reinforcing bar of support pile 1 Cage is inserted into the hole that aforementioned mechanical bores, this process must assure that the direction of reserved lock hole 2 is accurate, can carry out subsequent anchor pole 5 constructions after steel reinforcement cage is placed, then carry out concreting and form support pile 1.
After the completion of support pile 1 pours, that is, pouring for crown beam 3 is carried out, carries out the construction of barricade 4 thereafter, reach to concrete After intensity, earth excavation to the absolute altitude of first layer anchor pole 5 or less 500mm is carried out.Across reserved lock hole 2 carry out anchor pole 5 at Hole and grouting;The concrete perfusion in the steel pipe of reserved lock hole 2 after the concrete reaches intensity, can carry out of anchor pole 5 It draws, anchor pole 5 is anchored on support pile 1 with anchorage 6, is then repeated the above process, foundation pit bottom absolute altitude is excavated to.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (4)

1. a kind of pile anchoring technology of no waist rail locking support pile, including more support piles (1), which is characterized in that more institutes It states support pile (1) to be arranged side by side, is equipped with multiple reserved lock holes (2), the more support piles on the more support piles (1) (1) upper end is fixedly connected with same root beam hat (3), and the side of the beam hat (3) is equipped with barricade (4), the barricade (4) and beam Hat (3) abuts, and the support pile (1) is equipped with anchor pole (5) close to the side of barricade (4), and the support pile (1) is far from barricade (4) side side wall is equipped with anchorage (6), one end of the anchor pole (5) pass through reserved lock hole (2) and by anchorage (6) with Support pile (1) anchoring.
2. a kind of pile anchoring technology of no waist rail locking support pile according to claim 1, which is characterized in that described pre- Staying lock hole (2) is to be obliquely installed.
3. a kind of pile anchoring technology of no waist rail locking support pile according to claim 1, which is characterized in that the anchor Tool (6) includes riser (7) and hang plate (8), the upper end fixation in a certain angle of the upper end and hang plate (8) of the riser (7) Connection is fixedly connected between the lower end and the lower end of hang plate (8) of the riser (7) by support plate (10), the anchor pole (5) Sliding is arranged through riser (7) and hang plate (8), and the hang plate (8) is vertical setting with anchor pole (5), the hang plate (8) One end far from riser (7) is equipped with threaded block (9), and the threaded block (9) is threadedly coupled with anchor pole (5), the threaded block (9) and Washer is equipped between hang plate (8).
4. a kind of pile anchoring technology of no waist rail locking support pile according to claim 1, which is characterized in that the branch Fender pile (1) and Liang Guan (3) are concreting.
CN201822017579.9U 2018-12-03 2018-12-03 A kind of pile anchoring technology of no waist rail locking support pile Expired - Fee Related CN209162846U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822017579.9U CN209162846U (en) 2018-12-03 2018-12-03 A kind of pile anchoring technology of no waist rail locking support pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822017579.9U CN209162846U (en) 2018-12-03 2018-12-03 A kind of pile anchoring technology of no waist rail locking support pile

Publications (1)

Publication Number Publication Date
CN209162846U true CN209162846U (en) 2019-07-26

Family

ID=67341793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822017579.9U Expired - Fee Related CN209162846U (en) 2018-12-03 2018-12-03 A kind of pile anchoring technology of no waist rail locking support pile

Country Status (1)

Country Link
CN (1) CN209162846U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236280A (en) * 2020-03-19 2020-06-05 中国有色金属工业西安勘察设计研究院有限公司 Prefabricated square pile for deep foundation pit and side slope support and pile splicing method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236280A (en) * 2020-03-19 2020-06-05 中国有色金属工业西安勘察设计研究院有限公司 Prefabricated square pile for deep foundation pit and side slope support and pile splicing method thereof

Similar Documents

Publication Publication Date Title
CN101338678B (en) Supporting arch hidden digging top-down construction method
CN104895092A (en) Method for using inner-support temporary latticed column as permanent structure column
CN107700366B (en) Deep water high-block bridge degree the bridge construction naked rock river bed trestle of hard stone and construction method
CN108915728B (en) Tunnel arch wall preliminary bracing based on gantry type support invades limit and changes arch construction method
CN108103939A (en) Oblique section steel trestle construction composite reinforcement mode and construction technology
CN104452812A (en) Construction method of basement outer wall
CN105862930A (en) Protection structure on existing tunnel below new underground engineering
CN110905530A (en) Stability control construction method for water-rich soft rock tunnel penetrating fault fracture zone
CN106065628B (en) Based on the major diameter running water pipe security protection construction method faced forever with reference to theory
CN106049679A (en) Super high-rise steel reinforced concrete framework core barrel structural system and construction method
CN109057801B (en) Construction method for excavating and supporting double-side-wall pilot tunnel composite step type large-section tunnel
CN109667587A (en) Using the drill+blast tunnel structure of prefabrication and assembly construction inverted arch
CN207109812U (en) A kind of reinforced anchor rod support system
CN109056810A (en) The transverse direction that open cut or lid dig underground main structure below existing building digs construction and its construction method
CN209162846U (en) A kind of pile anchoring technology of no waist rail locking support pile
CN100473787C (en) Connecting structure for use in piled anchor supporting system and construction method thereof
CN204959798U (en) Basement superelevation outer wall self -supporting unilateral component die body system
CN104612719B (en) The anti-collapse processing method in a kind of soft rock tunnel hole
CN208486272U (en) A kind of constructing structure of two-tube diagonal brace deep basal pit
CN110939139A (en) Pile slab wall structure based on rigid contact of post-pile special-shaped retaining wall and construction method thereof
CN100429354C (en) Concrete combined cushion wedge for supporting waist beam for pile anchoring system, and its constrection method
CN211368731U (en) A foundation ditch construction high strength supporting beam for construction
CN211690359U (en) Pile slab wall structure based on rigid contact of post-pile special-shaped retaining wall
CN208456633U (en) Tunnel arch wall preliminary bracing invades limit and changes arch construction gib system
CN111636435A (en) Foundation pit counter-pulling anchor rod supporting system and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190726

Termination date: 20191203

CF01 Termination of patent right due to non-payment of annual fee