CN208456633U CN201821090142.1U CN201821090142U CN208456633U CN 208456633 U CN208456633 U CN 208456633U CN 201821090142 U CN201821090142 U CN 201821090142U CN 208456633 U CN208456633 U CN 208456633U
Authority
CN
China
Prior art keywords
arch
tunnel
change
construction
interim inverted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201821090142.1U
Other languages
Chinese (zh)
Inventor
郭朋超
刘文武
张广友
肖小群
王洪坤
张忠义
李校珂
胡广华
贾志荣
田雄辉
马军红
王淑华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 20th Bureau Group Corp
Original Assignee
China Railway 20th Bureau Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 20th Bureau Group Corp filed Critical China Railway 20th Bureau Group Corp
Priority to CN201821090142.1U priority Critical patent/CN208456633U/en
Application granted granted Critical
Publication of CN208456633U publication Critical patent/CN208456633U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

Limit is invaded the utility model discloses a kind of tunnel arch wall preliminary bracing and changes arch construction gib system, is located at side bottom in the body of tunnel top hole including being laid in the interim inverted arch that need to be changed in arch section and multiple gantry type support constructions laid from front to back, interim inverted arch;The arch that needs to change that need to be changed in arch section in addition to arch is replaced in starting is that need to support steel arch-shelf, every Pin need to support steel arch-shelf to pass through a gantry type support construction support, interim inverted arch includes multiple interim inverted arch brackets and longitudinal connection structure, and each gantry type support construction includes a gate type support frame and is laid in the support component on same tunnel cross section with gate type support frame.The structure design of the utility model is reasonable, easy construction and using effect are good, based on interim inverted arch and use gantry type support construction, structural integrity is strong, basis is firm, it can effectively solve the problems such as tunnel changes the inclination of arch steelframe, collapses, it is safe and reliable to change arch work progress, and does not influence Tunnel Construction Schedule.

Description

Tunnel arch wall preliminary bracing invades limit and changes arch construction gib system
Technical field
The utility model belongs to technical field of tunnel construction, invades limit more particularly, to a kind of tunnel arch wall preliminary bracing and changes arch Construction gib system.
Background technique
With the fast development of high-speed railway, highway capacity requires to continue to increase, the special tunnel of two-wire big cross section visitor, three vehicles Road, four-lane highway large cross-section tunnel are commonplace.
Tunnel Engineering is still generally drill bursting construction at present, using New Austrian Tunneling Method principle: the bearing capacity of country rock itself is utilized, Weak surrounding rock applies steelframe (also referred to as steel arch-shelf or arch) support after excavating, anchor, net, the flexible preliminary bracing limitation country rock of spray become Shape, i.e. Tunnel structure;After surrouding rock deformation convergence, then row applies secondary lining.Tunnel support structure and later period branch Protection structure (i.e. Tunnel Second Lining) forms composite lining of tunnel structure.For narrow-bore tunnel, large cross-section tunnel Construction is easier to cause preliminary bracing to invade limit, and features as poor geologic condition, construction operation be lack of standardization, construction technology or construction organization are unreasonable Etc. factors cause preliminary bracing vault sinking, abutment wall convergence, arch deformation intrusion secondary lining range.To ensure tunnel double-lining knot The arch that needs to change that Tunnel must just be invaded limit section by structure thickness removes replacement, and also referred to as tunnel arch wall preliminary bracing is invaded Limit changes arch construction.Tunnel invades limit section (also referred to as limit section is invaded in tunnel arch wall preliminary bracing) and refers to Tunnel knot Structure deforms and invades the tunnel construction sections (also referred to as tunnel segment) of the locating construction section of Tunnel Second Lining, referred to as invades limit section.
Traditional arch dismounting replacement way that needs to change is off excavation operation, closes face, limits section arch base to invading Plinth does the perpendicular support of backing plate erection or diagonal brace using steel plate and needs to change arch to support, and arch striking after slip casting is digged and installed new Arch, last combined bolting and shotcrete.Such tradition changes arch method while influencing tunnel excavation construction speed, however it remains safety is hidden Suffer from, there are certain defects: if the vertical, horizontal of the perpendicular support of single-point or diagonal brace does not connect, built on the sand, dismantling concrete uses more on basis Impact grinding hammer, it is easy to because vertical or oblique fulcrum unbalance stress causes arch inclination to be collapsed;It will cause " to close the door " when serious Accident.
Utility model content
The technical problem to be solved by the utility model is in view of the deficiency of the prior art, provide a kind of tunnel Arch wall preliminary bracing invades limit and changes arch construction gib system, reasonable in design, easy construction and using effect is good, to face When inverted arch based on and use gantry type support construction, structural integrity is strong, and basis is firm, can effectively solve tunnel and changes arch steelframe It is safe and reliable to change arch work progress, and does not influence Tunnel Construction Schedule for the problems such as tilting, collapsing.
In order to solve the above technical problems, the technical solution adopted in the utility model is: a kind of tunnel arch wall preliminary bracing is invaded Limit change arch construction gib system, it is characterised in that: including be laid in need to change arch section in interim inverted arch and it is multiple by it is preceding extremely It is laid on the interim inverted arch afterwards and to the gantry type support construction for needing to change arch and being supported, the arch section that need to change is tunnel The tunnel construction sections that the intracorporal Tunnel structure in road top hole has constructed completion and tunnel lower part hole body does not excavate;It is described interim Inverted arch is laid along tunnel longitudinal extension, and the interim inverted arch is located at side bottom in the body of tunnel top hole;It is described to need to change arch Frame is the steel arch-shelf for carrying out supporting in the Tunnel structure to the arch wall of tunnel top hole body, described to change in arch section All steel arch-shelfs in the Tunnel structure are to need to change arch;Arch is changed for starting in described one end that need to change arch section End, it is described need to change arch section near it is described starting change needed to change described in a Pin of arch abutment arch for starting replacement arch, it is described All arches that need to change that need to be changed in arch section in addition to the starting replacement arch are that need to support steel arch-shelf;It needs to prop up described in every Pin Support steel arch-shelf passes through the gantry type support construction and is supported, and support steel arch-shelf is needed to carry out with to it described in every Pin The gantry type support construction of support is laid on same tunnel cross section;It is described to change arch section as need to be into institute's construction tunnel Row change arch tunnel construction sections and its by invade limit section and two be located at invade limit section front and rear sides extended segment be formed by connecting, it is described to invade Limit section deforms for the intracorporal Tunnel structure in tunnel top hole and invades the tunnel construction sections of limit, and two extended segments are The adjacent and interconnected tunnel construction sections of section are limited with described invade in institute's construction tunnel, it is described in two extended segments to need to change arch Quantity be no less than 3 Pin;
The interim inverted arch includes multiple interim inverted arch brackets laid from the front to the back along tunnel longitudinal extension and will Multiple interim inverted arch brackets are fastenedly connected the longitudinal connection structure being integrated, and the longitudinal connection structure includes that multiple tracks edge is faced When inverted arch bracket the longitudinal connecting member laid from left to right of length direction, the longitudinal connecting member is along tunnel longitudinal extension It lays, longitudinal connecting member described in per pass is fastenedly connected with multiple interim inverted arch brackets;The interim inverted arch bracket is cloth The arch support of side bottom in the body of tunnel top hole is needed to change described in every Pin and is provided with described in one immediately below arch Interim inverted arch bracket, arch is needed to change described in every Pin, and to be laid in same tunnel with the interim inverted arch bracket being located at immediately below it horizontal On section and the two form a closed support frame, the left and right ends of each interim inverted arch bracket respectively be located at its just The left and right sides lower part for needing to change arch of top is fastenedly connected;It is provided with described in one in each closed support frame Gantry type support construction, in each closed support frame need to change arch and interim inverted arch bracket passes through the door frame Formula support construction, which is fastenedly connected, to be integrated;
Each gantry type support construction include one be fixed on interim inverted arch bracket and to need to change arch into The gate type support frame and be laid in the support component on same tunnel cross section, the support component with gate type support frame that row supports It is laid on gate type support frame;The gate type support frame be located at interim inverted arch bracket in the same closed support frame with It needs to change between arch, the gate type support frame and needs to change to be fastenedly connected between arch by the support component and be integrated, The support component includes being supported on the left of gate type support frame and needing to change Left-side support part between arch left lower, support On the right side of gate type support frame and needs to change right side supporting piece and Duo Gen between arch lower right side and be supported in gate-type from left to right At the top of support frame and need to change the top support between arch, the Left-side support part, right side supporting piece and top support It is laid on same plane.
Above-mentioned tunnel arch wall preliminary bracing invades limit and changes arch construction gib system, it is characterized in that: two extended segments Needing to change the quantity of arch described in interior is 3 Pin.
Above-mentioned tunnel arch wall preliminary bracing invades limit and changes arch construction gib system, it is characterized in that: the interim inverted arch branch Frame is supported in the tunnel lower part that need to be changed in arch section and does not excavate on rock mass, and the interim inverted arch further includes not opening in tunnel lower part The inverted arch concrete pouring structure of pouring molding on rock mass is dug, the inverted arch concrete pouring structure is located at gantry type support Below structure;The interim inverted arch bracket and the longitudinal connection structure are poured in inverted arch concrete pouring structure.
Above-mentioned tunnel arch wall preliminary bracing invades limit and changes arch construction gib system, it is characterized in that: institute's construction tunnel is big Bore tunnel;The interim inverted arch bracket is the arch support that the left and right sides is gradually bent upwards.
Above-mentioned tunnel arch wall preliminary bracing invades limit and changes arch construction gib system, it is characterized in that: the interim inverted arch branch Frame is shape steel bracket, the both ends of the interim inverted arch bracket and needs to change between arch plug and is filled with billet, the billet With interim inverted arch bracket and need to change arch and be welded and fixed and be integrated.
Above-mentioned tunnel arch wall preliminary bracing invades limit and changes arch construction gib system, it is characterized in that: the interim inverted arch branch Frame is bent by an I-steel.
Above-mentioned tunnel arch wall preliminary bracing invades limit and changes arch construction gib system, it is characterized in that: the gate type support frame For by the assembled molding support frame of more fashioned iron rod pieces, the Left-side support part, right side supporting piece and top support are type Steel rod elements, the Left-side support part, right side supporting piece and top support and gate type support frame and need to change between arch with Welding manner is fixedly connected.
Above-mentioned tunnel arch wall preliminary bracing invades limit and changes arch construction gib system, it is characterized in that: the longitudinal connecting member For longitudinally connected fashioned iron;The longitudinal connection structure further includes the longitudinally connected reinforcing bar of multiple groups, longitudinally connected type described in adjacent twice Longitudinally connected reinforcing bar described in being laid with one group between steel, longitudinally connected reinforcing bar described in every group include that multiple tracks is laid from left to right Longitudinally connected reinforcing bar, the longitudinally connected reinforcing bar lays along tunnel longitudinal extension, and longitudinally connected reinforcing bar described in per pass is equal It is fastenedly connected with multiple interim inverted arch brackets.
Above-mentioned tunnel arch wall preliminary bracing invades limit and changes arch construction gib system, it is characterized in that: needing to change described in every Pin The left and right sides lower part of arch is laid with a support bracket, and two support brackets on arch are needed to change described in every Pin It is symmetrically laid in above interim inverted arch bracket and the two is respectively positioned on and needs to change on the inside of arch, the left and right ends of interim inverted arch bracket With need to change arch left and right sides lower part between be fastenedly connected by a support bracket;It is described to need to change arch Frame is grid steel frame, and each support bracket includes that multiple tracks is connected in parallel to interim inverted arch bracket and needs to change between arch Spiral, the spiral tilts gradually downward from outside to inside, and spiral described in multiple tracks is from top to bottom laid and it It is laid on same plane with the arch that needs to change being connect.
Above-mentioned tunnel arch wall preliminary bracing invades limit and changes arch construction gib system, it is characterized in that: the gate type support frame It is arranged vertically, arch, gate type support frame and the interim inverted arch bracket of needing to change is laid on same vertical plane;It is described Gate type support frame include lower beam, the upper beam right above lower beam, more be supported in lower beam and upper cross from left to right The vertical supports of vertical strut and two symmetric supports lower section at left and right sides of lower beam between beam, the length of the lower beam Greater than the length of upper beam, the upper beam and lower beam are respectively positioned on the surface of interim inverted arch bracket;Two vertical branch Clear distance between frame is not less than 4.5m, and the clear distance between the lower beam and interim inverted arch mid-stent is not less than 4.5m.
Compared with the prior art, the utility model has the following advantages:
1, simple structure and reasonable design and easy construction, investment construction cost are lower.
2, used interim inverted arch is reasonable in design, easy construction and can provide a solid, firm branch support group Plinth, interim inverted arch include and need to change interim inverted arch bracket that arch is correspondingly arranged, all interim inverted arch brackets are connected as one It the longitudinal connection structure of body and is supported in tunnel lower part and does not excavate inverted arch concrete pouring structure on rock mass, interim inverted arch bracket With invade limit arch composition gate type support frame and can make need to change the Tunnel features simple structure of arch section inner tunnel top hole body, quickly Closing cyclization, longitudinal connection structure and interim inverted arch bracket are poured in inverted arch concrete pouring structure, and structural integrity is strong, It is firm to support.
4, the gantry type support construction being made of gate type support frame and support component is correspondingly arranged with arch is needed to change, to face When inverted arch based on and be supported using gantry type support construction, thoroughly solve tunnel change arch steelframe inclination collapse it is equal safely Hidden danger.
5, gantry type support construction can be used as operation platform, and convenient operating personnel carries out changing arch by Pin.
6, change in arch work progress that traffic is unaffected in hole, face each process can normal operation, do not influence tunnel and apply Work progress.
7, it changes that arch easy construction, using effect are good and practical value is high, changes before arch using interim inverted arch and gantry type support Structure connection is supported reinforcing to tunnel, and support is firm, and construction safety can be effectively ensured;Also, it is basic to change arch operation process Face normal construction is not influenced, and there is easy construction, do not influence the distinguishing features such as tunnel normal construction progress, safe and reliable. The utility model proposes a kind of completely new large cross-section tunnels to change arch construction method, using interim inverted arch and gantry type support construction group At change structural support, have safety coefficient is high, easy to operate, front face can normally excavation construction, do not influence work The distinguishing features such as phase;In addition, invading preliminary bracing in limit usually tunnel top hole body due to tunnel arch wall preliminary bracing invades limit sternly Weight, the used structural support that changes is the intracorporal support construction in tunnel top hole, and tunnel changes arch work progress only on tunnel It is carried out in the body of portion hole, can significantly save and change arch construction cost, simplified and change arch work progress, save the duration, and tunnel changes arch Work progress carries out before tunnel lower part hole body excavation, Tunnel not yet full-face tunneling at this time, thus changes structural support It supports firm performance to be further guaranteed, and changes arch work progress and be easier to carry out, while tunnel arch wall supporting is stronger, More effectively in safety for tunnel engineering, it is particularly suitable for large cross-section tunnel and changes arch construction.Meanwhile change arch work progress it is safe and reliable, In steel arch-shelf replacement process, each gantry type support construction moves back one by one and the replacement steel arch-shelf adjacent to rear side carries out continuing branch Support can be effectively ensured all gantry type support constructions during changing arch and be in effective holding state, ensure tunnel to the full extent Supporting effect effectively overcomes the defect that tradition changes arch construction method.
In conclusion the structure design of the utility model is reasonable, easy construction and using effect are good, based on interim inverted arch And gantry type support construction is used, structural integrity is strong, and basis is firm, can effectively solve tunnel and changes arch steelframe and tilts, collapses It is safe and reliable to change arch work progress, and does not influence Tunnel Construction Schedule for problem.
Below by drawings and examples, the technical solution of the utility model is described in further detail.
Detailed description of the invention
Fig. 1 is the holding state schematic diagram of the utility model interim inverted arch bracket and gantry type support construction.
Fig. 2 is the structural schematic diagram of the utility model interim inverted arch bracket and gantry type support construction.
Fig. 3 is the planar structure schematic diagram of the interim inverted arch of the utility model.
Fig. 4 is the holding state schematic diagram that the utility model supports bracket.
Description of symbols:
1-tunnel top hole body;2-interim inverted arch brackets;3-gate type support framves;
3-1-lower beam;3-2-upper beam;3-3-vertical supports;
The vertical strut of 3-4-;4-need to change arch;5-Left-side support parts;
6-right side supporting pieces;7-top supports;
Rock mass is not excavated in 8-tunnels lower part;9-billets;
10-inverted arch concrete pouring structures;11-support brackets;12-longitudinally connected fashioned iron;
13-longitudinally connected reinforcing bars;14-arch springing concrete pouring structures;
15-lock foot anchoring stocks.
Specific embodiment
As shown in Figure 1, Figure 2 and Figure 3, the utility model includes being laid in the interim inverted arch and multiple by preceding that need to be changed in arch section It is laid in after on the interim inverted arch and to the gantry type support construction for needing to change arch 4 and being supported, it is described to change arch section Completion has been constructed for the Tunnel structure in tunnel top hole body 1 and tunnel construction sections that tunnel lower part hole body does not excavate;Institute It states interim inverted arch to lay along tunnel longitudinal extension, the interim inverted arch is located at 1 inside bottom of tunnel top hole body;The need Replacing arch 4 is the steel arch-shelf for carrying out supporting in the Tunnel structure to the arch wall of tunnel top hole body 1, described All steel arch-shelfs that need to be changed in arch section in the Tunnel structure are to need to change arch 4;It is described to change the one of arch section Arch abutment is changed for starting in end, it is described need to change to change in arch section near the starting arch 4 is needed to change described in a Pin of arch abutment as starting Arch is replaced, all arches 4 that need to change that need to be changed in arch section in addition to the starting replacement arch are that need to support steel arch Frame;It needs support steel arch-shelf to pass through the gantry type support construction described in every Pin to be supported, needs supporting steel described in every Pin Arch is laid on same tunnel cross section with the gantry type support construction supported;It is described need to change arch section be Needed in institute's construction tunnel the tunnel construction sections for carrying out changing arch and its by invade limit section and two be located at invade limit section front and rear sides extension Section is formed by connecting, and the limit section of invading is that the Tunnel structure in tunnel top hole body 1 deforms and invades the tunnel of limit Section, two extended segments are to invade the adjacent and interconnected tunnel construction sections of limit section with described in institute's construction tunnel, described in two The quantity for needing to change arch 4 is no less than 3 Pin in extended segment;
The interim inverted arch includes multiple interim inverted arch brackets 2 laid from the front to the back along tunnel longitudinal extension and will Multiple interim inverted arch brackets 2 are fastenedly connected the longitudinal connection structure being integrated, and the longitudinal connection structure includes multiple tracks edge The longitudinal connecting member that the length direction of interim inverted arch bracket 2 is laid from left to right, the longitudinal connecting member longitudinally extend along tunnel Direction is laid, and longitudinal connecting member described in per pass is fastenedly connected with multiple interim inverted arch brackets 2;The interim inverted arch bracket 2 be the arch support for being laid in 1 inside bottom of tunnel top hole body, and the underface that arch 4 is needed to change described in every Pin is provided with One interim inverted arch bracket 2 needs to change arch 4 described in every Pin and lays with the interim inverted arch bracket 2 being located at immediately below it In on same tunnel cross section and the two form a closed support frame, the left and right ends of each interim inverted arch bracket 2 It is fastenedly connected respectively with the left and right sides lower part for needing to change arch 4 being located at right above it;In each closed support frame It is provided with the gantry type support construction, needs to change arch 4 and interim inverted arch in each closed support frame Bracket 2 is fastenedly connected by the gantry type support construction and is integrated;
Each gantry type support construction includes one and is fixed on interim inverted arch bracket 2 and to needing to change arch 4 The gate type support frame 3 that is supported and the support component on same tunnel cross section, the support are laid in gate type support frame 3 Component is laid on gate type support frame 3;The gate type support frame 3 is located at the interim inverted arch in the same closed support frame It bracket 2 and needs to change between arch 4, the gate type support frame 3 and needs to change to fasten between arch 4 by the support component and connect It is connected in one, the support component includes being supported in 3 left side of gate type support frame and needing to change the left side between 4 left lower of arch Supporting element 5 is supported in the right side of gate type support frame 3 and needs to change right side supporting piece 6 between 4 lower right side of arch and Duo Gen by a left side In 3 top of gate type support frame and the top support 7 between arch 4, the Left-side support part 5, right side are needed to change to right support Supporting element 6 and top support 7 are laid on same plane.
The Tunnel structure is tunnel arch wall preliminary bracing structure.
In the present embodiment, described in two extended segments to need to change the quantity of arch 4 be 3 Pin.
When practice of construction, according to specific needs, to the quantity for needing to change arch 4 described in two extended segments into The corresponding adjustment of row.Wherein, the quantity that arch 4 is needed to change in the extended segment is more, and the length of the extended segment is longer.By Extended segment is respectively set in the limit section front and rear sides of invading, and can effectively ensure construction safety, keeps tunnel structure after changing arch construction more steady Gu.
The interim inverted arch bracket 2 is supported in the tunnel lower part that need to be changed in arch section and does not excavate on rock mass 8, described to face When inverted arch further include not excavating the inverted arch concrete pouring structure 10 of pouring molding on rock mass 8 in tunnel lower part, the inverted arch is mixed Solidifying soil pouring structure 10 is located at below the gantry type support construction.
In the present embodiment, the interim inverted arch bracket 2 and the longitudinal connection structure are poured in inverted arch concreting In structure 10.
Thus, the globality of the interim inverted arch is strong, stabilized structure, solid base can be provided interim inverted arch bracket 2, with Firm support is carried out to arch 4 is needed to change.
The supporting construction of institute's construction tunnel is composite lining structure, and the composite lining structure includes tunnel just branch knot Structure and positioned at the Tunnel Second Lining at the beginning of the tunnel on the inside of branch structure.The country rock of institute's construction tunnel is that IV grade of country rock or V grade enclose Rock, surrounding rock stability are poor.Also, institute's construction tunnel is large cross-section tunnel.
The large cross-section tunnel refers to tunnel cross section product > 50m2Tunnel.In the present embodiment, the large cross-section tunnel Excavation width is not less than 10m and its tunnel height is not less than 8m.Wherein, excavation width, which refers to, considers secondary lining, tunnel The maximum excavation width of outline excavation after preliminary bracing structure and deformation allowance, thus excavation width is tunnel excavation contour line Maximum width.Tunnel height is the maximum height of tunnel excavation contour line, i.e. height in the middle part of tunnel excavation contour line.
In the present embodiment, when being excavated to institute's construction tunnel, excavated using bench cut method;Institute's construction tunnel Tunnel includes tunnel top hole body 1 and the tunnel lower part hole body positioned at 1 lower section of tunnel top hole body.The first branch structure in the tunnel Including to tunnel top hole body 1 arch wall carry out preliminary bracing the Tunnel structure and two under the tunnel The left and right sides abutment wall of portion hole body carries out the abutment wall preliminary bracing structure of supporting, two abutment wall preliminary bracing symmetrical configuration cloth Below the left and right sides of the Tunnel structure, two abutment wall preliminary bracing structures and the tunnel initial-stage Supporting construction, which is fastenedly connected, to be integrated.
When being excavated using bench cut method to institute's construction tunnel, first along tunnel longitudinal extension from the front to the back to tunnel Road top hole body 1 is excavated, and synchronous split digging molding tunnel top hole body 1 from the front to the back carries out initial stage branch in digging process Shield, and obtain the Tunnel structure;Tunnel top hole body 1 is carried out in digging process, along the longitudinal extension side in tunnel It is excavated to being synchronized from the front to the back to tunnel lower part hole body;The excavation progress of tunnel lower part hole body is later than on tunnel The excavation progress of portion hole body 1.
When being excavated using bench cut method, excavated using up/down steps excavating load or three benching tunnelling methods.Using upper When excavating load of getting out of a predicament or an embarrassing situation is excavated, the interim inverted arch bracket 2 is supported in get out of a predicament or an embarrassing situation on;It is excavated using three benching tunnelling methods When, the interim inverted arch bracket 2 is supported on middle step.
The limit section of invading is that the Tunnel structure in tunnel top hole body 1 deforms and invades the tunnel construction sections of limit, real When border is constructed, during tunnel the longitudinal extension from the front to the back progress of tunnel top hole body 1 preliminary bracing, become using tunnel Shape monitors system and carries out deformation monitoring to the Tunnel structure of construction molding, and judges tunnel according to monitoring result Whether preliminary bracing structure, which deforms, is invaded limit, and deform to Tunnel structure invade limit tunnel construction sections carry out it is true It is fixed, it specifically deforms to Tunnel structure and invades the front and back end positions of the tunnel construction sections of limit and be determined respectively.
As shown in Figure 1 and Figure 2, the interim inverted arch bracket 2 is the arch support that the left and right sides is gradually bent upwards.Thus, The interim inverted arch bracket 2 is antiarch shape.Compared to linear bracket, the interim inverted arch bracket 2 of antiarch shape by bottom collapse with Support can effectively improve the supporting power for needing to change the external side wall rock of arch 4, and can carry out firm support to arch 4 is needed to change, together When to be formed by closed support frame globality stronger, and be more convenient for and need to change 4 lower part of arch and be reliably connected.
Firm to support, the bottom shape of tunnel top hole body 1 is identical as the shape of interim inverted arch bracket 2, thus The bottom of tunnel top hole body 1 is antiarch shape, and the structure of formed tunnel top hole body 1 in this way is more firm.When practice of construction, The bottom of tunnel top hole body 1 may be plane.
In the present embodiment, the shape of the transverse shape of the inverted arch concrete pouring structure 10 and interim inverted arch bracket 2 It is identical.The cross section of the inverted arch concrete pouring structure 10 is antiarch shape.
Firm for simple processing and support, the interim inverted arch bracket 2 is shape steel bracket.It is further in the present embodiment Enhance the connection reliability of interim inverted arch bracket 2 and inverted arch concrete pouring structure 10, and interim inverted arch bracket 2 of being more convenient for Easy, steady installation, the interim inverted arch bracket 2 are bent by an I-steel.
It is described interim to ensure interim inverted arch bracket 2 and needing to change the connection reliability between arch 4 in the present embodiment The both ends of inverted arch bracket 2 and need to change between arch 4 plug and be filled with billet 9, the billet 9 and interim inverted arch bracket 2 and It needs to change arch 4 and is welded and fixed and be integrated.
In the present embodiment, the upper surface phase of the upper surface of the inverted arch concrete pouring structure 10 and interim inverted arch bracket 2 Concordantly, 3 bottom of gate type support frame is welded and fixed with interim inverted arch bracket 2.
As shown in figure 3, the longitudinal connecting member is longitudinally connected fashioned iron 12.For further enhance longitudinally connected fashioned iron 12 with The connection reliability of inverted arch concrete pouring structure 10, further increases the globality of the interim inverted arch, and is more convenient for indulging Easy, steady installation to connection fashioned iron 12, the longitudinally connected fashioned iron 12 be channel steel and its notch upward.
Simplicity is removed for the later period, and reduces steel using amount, saves construction cost, the longitudinal connection structure further includes multiple groups Longitudinally connected reinforcing bar 13, be laid with one group between longitudinally connected fashioned iron 12 described in adjacent twice described in longitudinally connected reinforcing bar 13, Longitudinally connected reinforcing bar 13 described in every group includes the longitudinally connected reinforcing bar 13 that multiple tracks is laid from left to right, the longitudinally connected reinforcing bar 13 lay along tunnel longitudinal extension, and longitudinally connected reinforcing bar 13 described in per pass is fastened with multiple interim inverted arch brackets 2 Connection.
In the present embodiment, the interim inverted arch bracket 2 is I22 shape steel bracket or I20 shape steel bracket, the interim inverted arch branch Frame 2 is correspondingly arranged with arch 4 is needed to change, and interim inverted arch bracket 2 is integrated and is formed envelope with needing to change arch 4 and be fastenedly connected Enclosed support frame, the interim inverted arch of construction molding make the arch wall closure cyclization that need to change arch section, can effectively reduce tunnel top Hole body 1 is further restrained and is sunk.
Spacing between longitudinally connected fashioned iron 12 described in adjacent twice is 140cm~160cm, longitudinally connected steel described in every group Spacing in muscle 13 between longitudinally connected reinforcing bar 13 described in adjacent twice is 40cm~60cm.In the present embodiment, the longitudinal direction connects Direct type steel 12 be [100mm channel steel and its be welded as a whole with interim inverted arch bracket 2, longitudinally connected reinforcing bar 13 be φ 22mm reinforcing bar, Spacing between longitudinally connected fashioned iron 12 described in adjacent twice is 150cm, adjacent twice in longitudinally connected reinforcing bar 13 described in every group Spacing between the longitudinally connected reinforcing bar 13 is 50cm.When practice of construction, according to specific needs, to longitudinally connected fashioned iron 12 The size of used channel steel, the diameter of longitudinally connected reinforcing bar 13, the spacing between longitudinally connected fashioned iron 12 described in adjacent twice with And the spacing in longitudinally connected reinforcing bar 13 described in every group between longitudinally connected reinforcing bar 13 described in adjacent twice is accordingly adjusted respectively It is whole.
As shown in Figure 1 and Figure 2, firm to splice convenient and support, the gate type support frame 3 is by more fashioned iron rod pieces spellings Molding support frame is filled, the Left-side support part 5, right side supporting piece 6 and top support 7 are fashioned iron rod piece, the left side Supporting element 5, right side supporting piece 6 and top support 7 and gate type support frame 3 and need to change between arch 4 with welding manner into Row is fixedly connected.
In the present embodiment, to further enhance support stability, the fashioned iron rod piece is I-steel.
In the present embodiment, the Left-side support part 5 is symmetrically arranged with right side supporting piece 6.Thus, the support component is adopted With radial supporting way, symmetrical, multi-point, omnidirectional support are carried out to arch 4 is needed to change, can effectively reduce and need to change arch 4 further sink.
As shown in Figure 1 and Figure 2, the gate type support frame 3 is arranged vertically, described to need to change arch 4, gate type support frame 3 It is laid on same vertical plane with interim inverted arch bracket 2;The gate type support frame 3 includes lower beam 3-1, is located at lower beam 3- Upper beam 3-2, the more vertical strut 3-4 being supported between lower beam 3-1 and upper beam 3-2 from left to right right above 1 and The length of two symmetric supports vertical supports 3-3, the lower beam 3-1 of lower section at left and right sides of lower beam 3-1 are greater than upper cross The length of beam 3-2, the upper beam 3-2 and lower beam 3-1 are respectively positioned on the surface of interim inverted arch bracket 2;Two described vertical Clear distance between bracket 3-3 is not less than 4.5m, and the clear distance between 2 middle part the lower beam 3-1 and interim inverted arch bracket is not less than 4.5m.In this way, it is current to enable 3 effective guarantee face excavation construction machinery of gate type support frame, and support firm, stable.
In the present embodiment, the quantity of the top support 7 is three, the left and right of the lower beam 3-1 and upper beam 3-2 Two upper sides are symmetrically arranged with the top support 7, and the top support 7 is vertical supporting bar;The left side The quantity of supporting element 5 and right side supporting piece 6 is one and both for inclined inclined shore bar gradually downward from outside to inside, The Left-side support part 5 and right side supporting piece 6 are all connected to vertical supports 3-3 and need to change between arch 4.
When practice of construction, according to specific needs, to the number of top support 7, Left-side support part 5 and right side supporting piece 6 Amount and installation position adjust accordingly respectively.
As shown in figure 4, for the connection reliability for further enhancing interim inverted arch bracket 2 with needing to change arch 4, described in every Pin The left and right sides lower part for needing to change arch 4 is laid with a support bracket 11, and two institutes on arch 4 are needed to change described in every Pin State that support bracket 11 is symmetrically laid in 2 top of interim inverted arch bracket and the two is respectively positioned on and needs to change 4 inside of arch, interim inverted arch It is carried out tightly by a support bracket 11 between the left and right ends of bracket 2 and the left and right sides lower part for needing to change arch 4 It is solidly connected.
In the present embodiment, the arch 4 that needs to change is grid steel frame, and each support bracket 11 is flat including multiple tracks Row is connected to interim inverted arch bracket 2 and needs to change the spiral between arch 4, and the spiral is from outside to inside gradually downward It tilts, spiral described in multiple tracks is from top to bottom laid and it is laid on same plane with the arch 4 that needs to change being connect.
To ensure to support the bonding strength between bracket 11 and the interim inverted arch, the globality of structure is further enhanced, It is provided with arch springing concrete pouring structure 14 at left and right sides of the bottom of tunnel top hole body 1, arch is needed to change described in every Pin The left and right sides arch springing of frame 4 is both secured on the arch springing concrete pouring structure 14, and two arch springing concrete pour Building structure 14 is symmetrically arranged and the two is poured with inverted arch concrete pouring structure 10 and is integrated;The arch springing concreting knot Structure 14 is laid along tunnel longitudinal extension, and the two support brackets 11 needed to change on arch 4 described in every Pin pour respectively In in two arch springing concrete pouring structures 14, the upper surface of each arch springing concrete pouring structure 14 is and in it The upper surface flush of the support bracket 11 in portion.
In this way, it is mixed by support bracket 11, arch springing concrete pouring structure 14 and inverted arch to need to change arch 4 described in every Pin Solidifying soil pouring structure 10 is fastenedly connected with the interim inverted arch bracket 2 being located at immediately below it and is integrated, the institute that need to be changed in arch section It needs to change arch 4 and is fastenedly connected by two arch springing concrete pouring structures 14 with the interim inverted arch and is integrated.
In the present embodiment, the spiral and interim inverted arch bracket 2 and need to change tight with welding manner between arch 4 It is solidly connected, thus connects reliable.
Before actually carrying out changing arch operation, first construct to the utility model, it specifically first need to be into institute's construction tunnel The need that row changes arch change the interim inverted arch of construction in arch section, then erect on the interim inverted arch of construction molding multiple to needing to change arch The gantry type support construction that frame 4 is supported.
When practical progress interim inverted arch construction, process is as follows:
Step 101, interim inverted arch rack construction: encircle the underface that arch 4 is needed to change described in every Pin of section in described need to change Be respectively provided with the interim inverted arch bracket 2, and make each interim inverted arch bracket 2 be located at its right above needing to change Arch 4, which is fastenedly connected, to be integrated;
Step 102, longitudinal connection structure construction: it is respectively provided with to the arch all underfaces for needing to change arch 4 of section that need to change It after interim inverted arch bracket 2, constructs to the longitudinal connection structure, and described is faced by the longitudinal connection structure by multiple When inverted arch bracket 2 be fastenedly connected and be integrated;
Step 103, inverted arch concreting: concreting is carried out to inverted arch concrete pouring structure 10.
When practice of construction, according to tunnel cross section size and wall rock geology condition, the interim inverted arch bracket 2 uses I22 Fashioned iron or I20 profile steel frame;It the interim inverted arch bracket 2 and needs to change and stoppers and weld using billet between arch 4, fill in steel Before backing plate, the Surface layer's concrete for needing to change arch 4 need to be cut;It is especially grid steel frame when needing to change arch 4, then using is needing Replacement 4 two sides of arch are all made of the mode that 3 groups of φ 22mm spirals reinforce connection, by interim inverted arch bracket 2 and need more It changes arch 4 and is welded into bracket type of attachment, C20 concrete is perfused in bracket, to increase stability.Thus, the arch springing concrete pours The strength grade of concrete of building structure 14 is C20.
To be removed convenient for the later period to the interim inverted arch, the strong concrete of the inverted arch concrete pouring structure 10 Degree grade is C15 or C10, and when pouring to inverted arch concrete pouring structure 10, concrete need to fill make firm by ramming it is closely knit.
After the 10 casting concrete final set of inverted arch concrete pouring structure, gate-type is erected by Pin on the interim inverted arch Support frame 3, the radial erection I20 fashioned iron in the top and two sides of gate type support frame 3 (the i.e. described support component) are used to support original Preliminary bracing arch (needs to change arch 4), and the support component is welded with needing to change arch 4 and hold out against.
To further ensure that support stability, described need to change all gate type support framves 3 in arch section longitudinally connected by multiple tracks Component, which is fastenedly connected, to be integrated, and the longitudinal connecting component is laid along tunnel longitudinal extension.In the present embodiment, the longitudinal direction Connecting elements is spliced by multiple fashioned iron segments laid from back to front, and each fashioned iron segment is all connected to two neighboring Between the gate type support frame 3.The fashioned iron segment is I20 fashioned iron.
Since the headroom of the gate type support frame 3 is not less than 4.5m × 4.5m, when conditions permit, clear span is set as 5m, because And can ensure that face excavation construction mechanical energy is smoothly passed through, the interim inverted arch does not influence to slap with the gantry type support construction Sub- face normal construction.
When practice of construction, mesh sheet can be set up on gate type support frame 3,3 one side of gate type support frame, which can be used as, changes Arch, pneumatically placed concrete job platform, safety coefficient are high;On the other hand, the gate type support frame 3 is to lower part vehicular traffic, Ren Yuantong Row plays effective protective action.
In the present embodiment, when the replacement steel arch-shelf 4 is shaped steel arch, under the left and right sides for needing to change arch 4 No setting is required in portion support bracket 11;When the replacement steel arch-shelf 4 is grillage, the left and right sides for needing to change arch 4 A support bracket 11 is laid in lower part, and is provided with arch springing concrete at left and right sides of the bottom of tunnel top hole body 1 and pours Building structure 14.
Using the interim inverted arch and the gantry type support construction, described need to change can be made to encircle circumferential quick-make in section, Be conducive to control further sedimentation, convergence.
In the present embodiment, the arch abutment that changes is the rear end that need to change arch section;
When actually carrying out changing arch construction, since arch abutment is changed in the starting, from the front to the back to the institute that need to be changed in arch section Tunnel structure is stated to be removed.
In the present embodiment, the Tunnel structure in tunnel top hole body 1 is using steel arch-shelf and Bolt net and jet The steel arch-shelf of Support Method construction molding and the structure of anchor net unit support structure and the two are all the same, the steel arch-shelf It is branch structure at the beginning of carrying out the arch wall of supporting to the tunnel arch wall of tunnel top hole body 1 with anchor net unit support structure.
The steel arch-shelf and anchor net unit support structure include that more Pin are laid from the front to the back along tunnel longitudinal extension The steel arch-shelf, multiple suspension roof support structures laid from the front to the back along tunnel longitudinal extension, be mounted on it is multiple described Reinforced mesh on steel arch-shelf and the concrete ejection layer being injected on Tunnel inner wall, the reinforced mesh and multiple steel Arch is both secured in concrete ejection layer;The steel arch-shelf is located on the inside of the reinforced mesh;Each suspension roof support knot Structure includes multiple anchor poles being laid in tunnel arch wall along tunnel excavation contour line, and multiple anchor poles are laid in same On tunnel cross section;Anchor pole in the two neighboring suspension roof support structure in front and back is in be laid staggeredly.
In the present embodiment, steel arch-shelf described in more Pin in the Tunnel structure is in uniformly distributed, adjacent two Pin Spacing between the steel arch-shelf is d, thus the length of the extended segment is 3d.
When practice of construction, the left and right sides bottom outside of steel arch-shelf described in every Pin is provided with a lock foot anchoring stock 15.
When actually carrying out changing arch construction, since arch abutment is changed in the starting, at the beginning of the tunnel that need to be changed in arch section Phase supporting construction is removed, and is synchronized in demolishing process and is carried out preliminary bracing construction, tunnel after being replaced to the arch section that need to change Road preliminary bracing structure.
When being removed to the Tunnel structure, according to the outline excavation that need to change arch section being pre-designed Line cuts the concrete ejection layer along tunnel longitudinal extension from the front to the back, and carries out secondary open to the arch section that need to change It digs;
During being cut to the concrete ejection layer, the concrete ejection layer is cut from the front to the back rear exposed The steel arch-shelf replaced one by one.
During being cut to the concrete ejection layer, synchronized from the front to the back to inverted arch concrete pouring structure 10 The left and right sides is cut respectively, and 10 left and right sides of inverted arch concrete pouring structure cuts progress and concrete spray Penetrate layer to cut progress identical.
In the present embodiment, when being removed to the Tunnel structure that need to be changed in arch section, first to described Starting replacement arch is replaced, then steel arch-shelf need to be supported to carry out by Pin more to described from the front to the back along tunnel longitudinal extension It changes;
When being replaced to starting replacement arch, starting replacement arch is removed, and is replaced in the starting Again steel arch-shelf is erected at arch present position, the steel arch-shelf erected again is to have replaced steel arch-shelf;
To it is described steel arch-shelf need to be supported to replace when, steel arch-shelf and the gantry type support construction need to be supported by first disconnecting this Between connection, then this it is described steel arch-shelf need to be supported to remove, and frame again need to be supported at steel arch-shelf present position at this Vertical steel arch-shelf, the steel arch-shelf erected again are to have replaced steel arch-shelf;Steel arch-shelf need to be supported to carry out in demolishing process this, it will be to this The gantry type support construction that steel arch-shelf need to be supported to be supported moves backward and steel arch-shelf rear side need to be supported adjacent this Steel arch-shelf has been replaced to be supported.
As shown in the above, it is removed the first Pin steel steelframe (the i.e. described starting replacement arch) that arch is changed since quasi- dismounting Raw steel arch applies steel arch-shelf again, and carries out the preliminary bracings such as Bolt net and jet construction;According to site specific, remove previous Gantry type support construction described in Pin, which is displaced to, has changed on arch steel arch-shelf (having replaced steel arch-shelf).Thus, steel arch-shelf is removed, weight Steel arch-shelf is newly applied, it is a Pin that Bolt net and jet preliminary bracing and preceding Pin door frame gantry type support construction, which are moved back to having changed on arch steel arch-shelf, The steel arch-shelf changes arch working procedure, and repeatedly circulation carries out, until completing the whole that need to change all steel arch-shelfs in arch section Change arch work progress.It is displaced to as removing gantry type support construction described in previous Pin and has changed arch steel arch-shelf and (replaced steel Arch) on, thus can be effectively ensured and change arch construction period multiple gantry type support constructions with interim inverted arch simultaneously to described Entirety, the joint support of arch section need to be changed, it is ensured that work progress is safe and reliable.
It changes in arch work progress and changes after the completion of arch construction, be all made of tunnel deformation monitoring system at the beginning of tunnel after replacement Phase supporting construction carries out deformation monitoring, after Tunnel malformation is stablized after the replacement, then longitudinally prolongs along tunnel Direction is stretched from the front to the back to excavate tunnel lower part hole body;Tunnel lower part hole body is carried out in digging process, by The utility model is removed before backward, while preliminary bracing is carried out to tunnel lower part hole body from the front to the back.
The above is only the preferred embodiment of the utility model, not imposes any restrictions to the utility model, all According to any simple modification to the above embodiments of the utility model technical spirit, change and equivalent structural changes, still Belong in the protection scope of technical solutions of the utility model.

Claims (10)

1. a kind of tunnel arch wall preliminary bracing invades limit and changes arch construction gib system, it is characterised in that: need to be changed including being laid in It interim inverted arch in arch section and multiple is laid on the interim inverted arch from front to back and to needing to change what arch (4) was supported Gantry type support construction, it is described need to change arch section be tunnel top hole body (1) in Tunnel structure constructed completion and The tunnel construction sections that tunnel lower part hole body does not excavate;The interim inverted arch is laid along tunnel longitudinal extension, the interim inverted arch position In tunnel top hole body (1) inside bottom;Described need to change arch (4) are in the Tunnel structure to tunnel top The arch wall of hole body (1) carries out the steel arch-shelf of supporting, all steel arches that need to be changed in arch section in the Tunnel structure Frame is to need to change arch (4);Arch abutment is changed for starting in described one end that need to change arch section, described to change in arch section near described Beginning, which changes, needs to change arch (4) as starting replacement arch described in a Pin of arch abutment, described need to change is encircleed in section except starting replacement arch All arches (4) that need to change except frame are that need to support steel arch-shelf;Support steel arch-shelf is needed to pass through described in one described in every Pin Gantry type support construction is supported, and support steel arch-shelf is needed to tie with the gantry type support supported described in every Pin Structure is laid on same tunnel cross section;It is described need to change arch section for needed in institute's construction tunnel the tunnel construction sections for carrying out changing arch and its by invading Limit section and two be located at invade limit section front and rear sides extended segment be formed by connecting, it is described invade limit section be tunnel top hole body (1) Interior Tunnel structure, which deforms, invades the tunnel construction sections of limit, two extended segments be in institute's construction tunnel with it is described The adjacent and interconnected tunnel construction sections of limit section are invaded, the quantity for needing to change arch (4) is no less than 3 in two extended segments Pin;
The interim inverted arch includes multiple interim inverted arch brackets (2) laid from the front to the back along tunnel longitudinal extension and will be more A interim inverted arch bracket (2) is fastenedly connected the longitudinal connection structure being integrated, and the longitudinal connection structure includes multiple tracks edge The longitudinal connecting member that the length direction of interim inverted arch bracket (2) is laid from left to right, the longitudinal connecting member longitudinally prolong along tunnel Direction laying is stretched, longitudinal connecting member described in per pass is fastenedly connected with multiple interim inverted arch brackets (2);The interim inverted arch Bracket (2) is the arch support for being laid in tunnel top hole body (1) inside bottom, needed to change described in every Pin arch (4) just under Side be provided with the interim inverted arch bracket (2), needed to change described in every Pin arch (4) be located at its immediately below it is interim Inverted arch bracket (2) is laid on same tunnel cross section and the two forms a closed support frame, each interim inverted arch The left and right ends of bracket (2) are fastenedly connected with the left and right sides lower part for needing to change arch (4) being located at right above it respectively;Each The gantry type support construction is provided in the closed support frame, the need in each closed support frame are more It changes arch (4) and is fastenedly connected by the gantry type support construction with interim inverted arch bracket (2) and is integrated;
Each gantry type support construction includes one and is fixed on interim inverted arch bracket (2) and to needing to change arch (4) The gate type support frame (3) being supported and the support component being laid in gate type support frame (3) on same tunnel cross section, it is described Support component is laid on gate type support frame (3);The gate type support frame (3) is located in the same closed support frame It interim inverted arch bracket (2) and needs to change between arch (4), the gate type support frame (3) and needs to change and pass through institute between arch (4) It states support component and is fastenedly connected and be integrated, the support component includes being supported on the left of gate type support frame (3) and needing to change arch (4) the Left-side support part (5) between left lower, be supported on the right side of gate type support frame (3) and need to change arch (4) lower right side Between right side supporting piece (6) and more be supported at the top of gate type support frame (3) and needed to change between arch (4) from left to right Top support (7), the Left-side support part (5), right side supporting piece (6) and top support (7) are laid in same plane On.
2. tunnel arch wall preliminary bracing described in accordance with the claim 1 invades limit and changes arch construction gib system, it is characterised in that: Needing to change the quantity of arch (4) described in two extended segments is 3 Pin.
3. tunnel arch wall preliminary bracing according to claim 1 or 2 invades limit and changes arch construction gib system, feature exists In: the interim inverted arch bracket (2) is supported in the tunnel lower part that need to be changed in arch section and does not excavate on rock mass (8), described interim Inverted arch further includes not excavating the inverted arch concrete pouring structure (10) of pouring molding on rock mass (8), the inverted arch in tunnel lower part Concrete pouring structure (10) is located at below the gantry type support construction;The interim inverted arch bracket (2) and the longitudinal direction connect Binding structure pours in inverted arch concrete pouring structure (10).
4. tunnel arch wall preliminary bracing according to claim 1 or 2 invades limit and changes arch construction gib system, feature exists In: institute's construction tunnel is large cross-section tunnel;The interim inverted arch bracket (2) is the arch branch that the left and right sides is gradually bent upwards Frame.
5. tunnel arch wall preliminary bracing according to claim 1 or 2 invades limit and changes arch construction gib system, feature exists It is shape steel bracket in: the interim inverted arch bracket (2), the both ends of the interim inverted arch bracket (2) and needs to change between arch (4) Plug is filled with billet (9), the billet (9) and interim inverted arch bracket (2) and to need to change arch (4) and be welded and fixed be one Body.
6. tunnel arch wall preliminary bracing according to claim 1 or 2 invades limit and changes arch construction gib system, feature exists In: the interim inverted arch bracket (2) is bent by an I-steel.
7. tunnel arch wall preliminary bracing according to claim 1 or 2 invades limit and changes arch construction gib system, feature exists In: the gate type support frame (3) is by the assembled molding support frame of more fashioned iron rod pieces, the Left-side support part (5), right side branch Support member (6) and top support (7) are fashioned iron rod piece, the Left-side support part (5), right side supporting piece (6) and top braces Part (7) and gate type support frame (3) and needing to change is fixedly connected between arch (4) with welding manner.
8. tunnel arch wall preliminary bracing according to claim 1 or 2 invades limit and changes arch construction gib system, feature exists In: the longitudinal connecting member is longitudinally connected fashioned iron (12);The longitudinal connection structure further includes the longitudinally connected reinforcing bar of multiple groups (13), be laid with one group between longitudinally connected fashioned iron (12) described in adjacent twice described in longitudinally connected reinforcing bar (13), every group of institute State the longitudinally connected reinforcing bar (13) that longitudinally connected reinforcing bar (13) is laid including multiple tracks from left to right, the longitudinally connected reinforcing bar (13) laid along tunnel longitudinal extension, longitudinally connected reinforcing bar (13) described in per pass with multiple interim inverted arch brackets (2) it is fastenedly connected.
9. tunnel arch wall preliminary bracing according to claim 1 or 2 invades limit and changes arch construction gib system, feature exists In: the left and right sides lower part that arch (4) is needed to change described in every Pin is laid with a support bracket (11), needs to change described in every Pin Two support brackets (11) on arch (4), which are symmetrically laid in above interim inverted arch bracket (2), and the two is respectively positioned on needs It replaces on the inside of arch (4), between the left and right ends of interim inverted arch bracket (2) and the left and right sides lower part for needing to change arch (4) It is fastenedly connected by a support bracket (11);Described need to change arch (4) are grid steel frame, each support Bracket (11) includes that multiple tracks is connected in parallel to interim inverted arch bracket (2) and needs to change the spiral between arch (4), described Spiral tilts gradually downward from outside to inside, spiral described in multiple tracks from top to bottom lay and its with the need that are connect more Arch (4) is changed to be laid on same plane.
10. tunnel arch wall preliminary bracing according to claim 1 or 2 invades limit and changes arch construction gib system, feature Be: the gate type support frame (3) is arranged vertically, described to need to change arch (4), gate type support frame (3) and interim inverted arch Bracket (2) is laid on same vertical plane;The gate type support frame (3) includes lower beam (3-1), is located at lower beam (3-1) The upper beam (3-2) of surface, the more vertical struts being supported between lower beam (3-1) and upper beam (3-2) from left to right The vertical supports (3-3) of (3-4) and two symmetric supports lower section at left and right sides of lower beam (3-1), the lower beam (3-1) Length is greater than the length of upper beam (3-2), and the upper beam (3-2) and lower beam (3-1) are respectively positioned on interim inverted arch bracket (2) Surface;Clear distance between two vertical supports (3-3) is not less than 4.5m, the lower beam (3-1) and interim inverted arch branch Clear distance between in the middle part of frame (2) is not less than 4.5m.
CN201821090142.1U 2018-07-10 2018-07-10 Tunnel arch wall preliminary bracing invades limit and changes arch construction gib system Withdrawn - After Issue CN208456633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821090142.1U CN208456633U (en) 2018-07-10 2018-07-10 Tunnel arch wall preliminary bracing invades limit and changes arch construction gib system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821090142.1U CN208456633U (en) 2018-07-10 2018-07-10 Tunnel arch wall preliminary bracing invades limit and changes arch construction gib system

Publications (1)

Publication Number Publication Date
CN208456633U true CN208456633U (en) 2019-02-01

Family

ID=65172136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821090142.1U Withdrawn - After Issue CN208456633U (en) 2018-07-10 2018-07-10 Tunnel arch wall preliminary bracing invades limit and changes arch construction gib system

Country Status (1)

Country Link
CN (1) CN208456633U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868834A (en) * 2018-07-10 2018-11-23 中铁二十局集团有限公司 Tunnel arch wall preliminary bracing invades limit and changes arch construction gib system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868834A (en) * 2018-07-10 2018-11-23 中铁二十局集团有限公司 Tunnel arch wall preliminary bracing invades limit and changes arch construction gib system

Similar Documents

Publication Publication Date Title
CN108915728B (en) Tunnel arch wall preliminary bracing based on gantry type support invades limit and changes arch construction method
CN108843332B (en) Pass through fault belt large cross-section tunnel excavation and method for protecting support
CN208502796U (en) Tunnel arch wall preliminary bracing invades limit and changes arch construction gantry type support construction
CN108868834A (en) Tunnel arch wall preliminary bracing invades limit and changes arch construction gib system
CN108915720B (en) A kind of large cross-section tunnel passes through fault belt construction method
CN106337686B (en) Three layers of subway station canopy structure of rocky stratum tunneling and construction method
CN106437726B (en) Shallow-depth-excavation tunnel crosses ground fissure crushed zone construction method
CN108979667B (en) Penetrating ground crushed zone tunnel top bar interval wall construction method
CN107605489B (en) Three line Large span tunnel inclined shafts are into positive cavity construction method
KR101391218B1 (en) Construction methods of close-twin tunnel by blast shock-controlling and rebar reinforced shotcrete
CN103696784B (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN108678771A (en) Pass through fault belt Tunnel and median septum strengthening supporting system
CN104329095B (en) A kind of existing tunnel Widening Construction method
CN110439571A (en) Flat pilot tunnel leads to the adit construction method and transverse passage-way of main tunnel
CN108547643B (en) A kind of construction method encircleed for handling tunnel top large size cavity solution cavity shield
CN211081876U (en) Pass through weak surrounding rock tunnel preliminary bracing structure of rich water in broken area of fault
CN108412519A (en) The slight large deformation single-track tunnel suspension device of highlands soft rock and construction method
CN106979021A (en) Large-section loess tunnel is excavated and preliminary bracing quick closure looping technique
CN109989407B (en) Roadbed pile tube curtain supporting structure behind newly-added two-line platform of railway
CN101838957A (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN107355008A (en) A kind of prefabricated attachment structure and method of newly-increased steel core concrete column and existing structure
CN208456633U (en) Tunnel arch wall preliminary bracing invades limit and changes arch construction gib system
CN204097889U (en) A kind of piling and the built bridge abutment structure of increase platform cap composite reinforcement
CN208456616U (en) Pass through fault belt Tunnel and median septum strengthening supporting system
CN107762528B (en) Lateral Hole and tunnel main tunnel infall construction method in a kind of break wall rock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned