CN209145056U - A kind of assembled composite wall structure being welded to connect key based on mild steel plate - Google Patents

A kind of assembled composite wall structure being welded to connect key based on mild steel plate Download PDF

Info

Publication number
CN209145056U
CN209145056U CN201821090145.5U CN201821090145U CN209145056U CN 209145056 U CN209145056 U CN 209145056U CN 201821090145 U CN201821090145 U CN 201821090145U CN 209145056 U CN209145056 U CN 209145056U
Authority
CN
China
Prior art keywords
steel plate
wall board
combined wall
prefabricated combined
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821090145.5U
Other languages
Chinese (zh)
Inventor
黄炜
凌柯
苗欣蔚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Matrix Matrix Industrial Co Ltd
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201821090145.5U priority Critical patent/CN209145056U/en
Application granted granted Critical
Publication of CN209145056U publication Critical patent/CN209145056U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

A kind of assembled composite wall structure being welded to connect key based on mild steel plate, including prefabricated combined wall board, at other girt strip both ends of the prefabricated combined wall board in addition to top girt strip and bottom girt strip, pre-embedded steel slab is set, pre-embedded steel slab is parallel with prefabricated combined wall board, by consuming energy, junction steel plate connects the pre-embedded steel slab between contiguous prefabricated combined wall board, realizes the connection of contiguous prefabricated combined wall board;The utility model uses Wasted-energy steel plate, and the geological process that can preferably dissipate inputs to the energy of structure, while having both energy dissipation capacity, and the utility model piece processing mode is easy to operate, and density is good.

Description

A kind of assembled composite wall structure being welded to connect key based on mild steel plate
Technical field
The invention belongs to technical field of buildings, are related to assembled composite wall structure wall connecting, in particular to one kind is based on The assembled composite wall structure of mild steel plate welded connecting key.
Background technique
Currently, the building industry in China still uses traditional handicraft in large quantities, traditional handicraft exists: the waste of raw material scene Greatly, long construction period, building energy consumption are big, build the garbage environment pollution generated, influence of noise resident living, dust pollution air The disadvantages of.In view of the above problems, development is applicable in, economy, green building, horizontal Building technology, safety standard and engineering matter are improved Amount, wideling popularize assembled architecture is a trend.Assembled architecture has design standard, component production industrialization, construction The features such as mechanization, can greatly reduce situ wet operation and the use of labour by prefabricated construction, be that China will be built in future The main direction of development built.
The key of prefabricated concrete structure success or failure be between prefabricated components and prefabricated components with it is cast-in-place and after pour it is mixed Contour connection technology between solidifying soil, the tectonic sieving of selection and connecting node including jointing.Prefabricated panel Interconnection technique can be divided into wet type connection by construction method and connect with dry type.Wet type connection is passed through between two prefabricated components Grouting material is perfused to be attached in casting concrete;Wet type connection is commonly used and is easily connected in prefabricated components connection type Mode, has that construction is more convenient, quality of connection is good, integrality performance of the structure is closer to cast-in-place concrete structure.Dry type connection It is then to be attached by being implanted into reinforced bar sleeve or built-in fitting in prefabricated components by sleeve grouting, bolt or welding etc. Mode;Dry type connection is higher with precision, shorten construction period, easily reparation is damaged after node shake, convenient for remote districts installation etc. Advantage is the development trend of the following assembled interconnection technique.Dry type is connected and is mutually tied with energy-dissipating and shock-absorbing principle by seminar's novelty Conjunction forms novel energy-consumption connection, and applies it in assembled composite wall structure, and structure is not only enable to have good carrying Power also makes it show preferable energy dissipation capacity, it is proposed that for the interconnection technique that assembled combined wall vertically stitches, the technology It is lower to design reasonable, easy for construction and input cost, and switching performance is also relatively good, realizes industrialized production, mechanization Construction, economizes on resources, is environmentally protective, meeting current housing industrialization developing direction.
Summary of the invention
In order to overcome the disadvantages of the above prior art, the purpose of the present invention is to provide one kind is welded to connect based on mild steel plate The assembled composite wall structure of key.
To achieve the goals above, the technical solution adopted by the present invention is that:
A kind of assembled composite wall structure being welded to connect key based on mild steel plate, including prefabricated combined wall board 3, prefabricated multiple Close other girt strip both ends of the wallboard 3 in addition to top girt strip and bottom girt strip and pre-embedded steel slab 2 be set, pre-embedded steel slab 2 with it is prefabricated compound Wallboard 3 is parallel, and by consuming energy, junction steel plate 5 connects the pre-embedded steel slab 2 between contiguous prefabricated combined wall board 3, realizes contiguous prefabricated The connection of combined wall board 3.
The prefabricated combined wall board 3 is made of concrete sash and its embedded light ecological filling bulk.
The pre-embedded steel slab 2 is arranged in the reserved groove 4 on prefabricated combined wall board 3, and embedded board dowel 6 is welded at the back side, Embedded board dowel 6 stretches in prefabricated combined wall board 3.
The energy consumption junction steel plate 5 is welded in the front of pre-embedded steel slab 2, and after welding energy consumption junction steel plate 5 with it is prefabricated compound Wallboard 3 is concordant.
It is Low Yield Point Steel in the middle part of the energy consumption junction steel plate 5, boundary is provided with boundary ribs 7.
The energy consumption junction steel plate 5 and pre-embedded steel slab 2 are rectangle.
The present invention also provides the construction method of the assembled composite wall structure that key is welded to connect based on mild steel plate, steps It is rapid as follows:
Step 1: the production of prefabricated combined wall board 3
Dedicated steel form is assembled first, is well placed pre-embedded steel slab 2, and bottom casting concrete puts ecological bulk immediately, will Cross rib, the reinforcing bar with longitudinal ribs processed is put into template, it is to be confirmed it is errorless after, then casting concrete then catches up with flat, plastering, prefabricated Standard curing is carried out after the completion, and when intensity reaches requirement, form removal forms prefabricated combined wall board 3;
Step 2: the vertical seam connection of wall
It is connected up to requirement to two pieces of prefabricated 3 horizontal joints of combined wall board, energy consumption junction steel plate 5 and two Pin of level is prefabricated multiple The pre-embedded steel slab 2 for closing wallboard 3 is welded, and is had the prefabricated combined wall board 3 of two Pin and is reliably connected;
Step 3: vertical piece processing
HDPE plate is filled in prefabricated combined wall board 3 vertically seam, then fine gap is sealed using sealant and is filled out Plug, it is finally levelling to vertically stitching using mortar.
Compared with prior art, the beneficial effects of the present invention are:
1. the connection type is dry type connection, there is higher precision, shortening construction period, node shake compared with traditional wet connection It is damaged afterwards and easily repairs, is convenient for the advantages that remote districts installation.
2. dry type connection uses low yield point steel plate, plastic deformation ability is preferable, and ribs is arranged in surrounding, can both increase Strong Wasted-energy steel plate stress-bearing capability, and active force can be made to be evenly distributed in Wasted-energy steel plate, and built-in fitting washability is good, is easy to make.
3. the geological process that can preferably dissipate inputs to the energy of structure using the structure of Wasted-energy steel plate connection, connection is same When have both energy dissipation capacity.
4. piece processing mode is easy to operate, density is good.
Detailed description of the invention
Fig. 1 is the embedded board arragement construction schematic diagram of the prefabricated combined wall board of the present invention.
Fig. 2 is connecting key organigram of the present invention.
Fig. 3 is piece structural schematic diagram of the present invention.
Specific embodiment
The embodiment that the present invention will be described in detail with reference to the accompanying drawings and examples.
A kind of assembled composite wall structure that key is welded to connect based on mild steel plate of the present invention, innovative point mainly includes pre-buried Piece processing mode between the arrangement of part, horizontal wallboard between the structural form and wallboard of connecting key.
The arrangement of prefabricated combined wall board built-in fitting:
As shown in Figure 1, prefabricated combined wall board 3 is with section and the lesser concrete sash of arrangement of reinforcement, embedded light ecological is filled out Fill bulk composition, with ordinary reinforced concrete is cast-in-place compared with light weight, ductility is good, anti-seismic performance is excellent, economic and practical etc. excellent Point.Built-in fitting uses the pre-embedded steel slab 2 of the thin rectangular shape shape having a size of 90mm*200mm*6mm, prefabricated in prefabricated combined wall board 3 When, pre-embedded steel slab 2 is arranged in the reserved groove 4 at prefabricated 3 girt strip both ends of combined wall board, and embedded board is welded at 2 back side of pre-embedded steel slab Dowel 6, embedded board dowel 6 stretch to prefabricated combined wall board 3, and pre-embedded steel slab 2 is parallel with prefabricated combined wall board 3, prefabricated composite wall Pre-embedded steel slab 2 is not provided at the top girt strip and bottom girt strip of plate 3.
The structural form of connecting key between horizontal wallboard:
As shown in Fig. 2, the core of connecting key is energy consumption junction steel plate 5, energy consumption junction steel plate 5 is also rectangle, surface size 200mm*200mm, middle part use Low Yield Point Steel, and boundary is reinforced using boundary ribs 7, compared to the steel of no ribs Plate improves the energy consumption mode of Wasted-energy steel plate, becomes the energy consumption of curved scissors type from shearing-type energy-consumption, steel plate is preferably played low The characteristics of yield point steel.Pass through the welding of energy consumption junction steel plate 5 and pre-embedded steel slab 2 between horizontally adjacent prefabricated combined wall board 3 Realize connection.Specifically, energy consumption junction steel plate 5 is welded in the front of pre-embedded steel slab 2, and after welding energy consumption junction steel plate 5 with it is prefabricated Combined wall board 3 is concordant.
Piece processing mode between wallboard:
As shown in figure 3, using energy consumption junction steel plate 5, connection can there are pieces between prefabricated combined wall board 3, for edge joint position Reason uses HDPE plate+sealant+mortar processing mode.
The present invention also provides the construction method of the assembled composite wall structure that key is welded to connect based on mild steel plate, steps It is rapid as follows:
Step 1: the production of prefabricated combined wall board 3
Dedicated steel form is assembled first, is well placed pre-embedded steel slab 2, and bottom pours 20mm thickness C30 pea gravel concreten, puts immediately State bulk is freeed, the cross rib processed, reinforcing bar with longitudinal ribs are put into template, pre-embedded steel slab is placed at the girt strip around wall, It is to be confirmed it is errorless after, then pour C30 pea gravel concreten, then catch up with flat, plastering, standard curing is carried out after the completion of prefabricated, to intensity When reaching requirement, form removal forms prefabricated combined wall board 3;
Step 2: the vertical seam connection of wall
It is connected up to requirement to two pieces of prefabricated 3 horizontal joints of combined wall board, mild steel junction steel plate 5 and two Pin of level is prefabricated multiple The pre-embedded steel slab 2 for closing wallboard 3 is welded, and is had the prefabricated combined wall board 3 of two Pin and is reliably connected;
Step 3: vertical piece processing
The HDPE plate of 20mm thickness is filled in prefabricated combined wall board 3 vertically seam, then use sealant by fine gap into Row sealing filling, it is finally levelling to vertically stitching using mortar.
The present invention is only described in detail vertical seam connection, and horizontal joint connection is similar with vertical seam connection, therefore herein not Horizontal joint connection method is illustrated.

Claims (3)

1. a kind of assembled composite wall structure for being welded to connect key based on mild steel plate, including prefabricated combined wall board (3), feature exists In, at other girt strip both ends of the prefabricated combined wall board (3) in addition to top girt strip and bottom girt strip, pre-embedded steel slab (2) are set, it is pre-buried Steel plate (2) is parallel with prefabricated combined wall board (3), is connected between contiguous prefabricated combined wall board (3) by energy consumption junction steel plate (5) Pre-embedded steel slab (2), realizes the connection of contiguous prefabricated combined wall board (3), and the pre-embedded steel slab (2) is arranged in prefabricated combined wall board (3) in the reserved groove (4) on, embedded board dowel (6) are welded at the back side, and embedded board dowel (6) stretches to prefabricated combined wall board (3) In, the energy consumption junction steel plate (5) be welded in pre-embedded steel slab (2) front, and weld after energy consumption junction steel plate (5) with it is prefabricated compound Wallboard (3) is Low Yield Point Steel in the middle part of the energy consumption junction steel plate (5), boundary is provided with boundary ribs (7) concordantly.
2. the assembled composite wall structure of key is welded to connect based on mild steel plate according to claim 1, which is characterized in that described Prefabricated combined wall board (3) is made of concrete sash and its embedded light ecological filling bulk.
3. the assembled composite wall structure of key is welded to connect based on mild steel plate according to claim 1, which is characterized in that described Energy consumption junction steel plate (5) and pre-embedded steel slab (2) are rectangle.
CN201821090145.5U 2018-07-10 2018-07-10 A kind of assembled composite wall structure being welded to connect key based on mild steel plate Active CN209145056U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821090145.5U CN209145056U (en) 2018-07-10 2018-07-10 A kind of assembled composite wall structure being welded to connect key based on mild steel plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821090145.5U CN209145056U (en) 2018-07-10 2018-07-10 A kind of assembled composite wall structure being welded to connect key based on mild steel plate

Publications (1)

Publication Number Publication Date
CN209145056U true CN209145056U (en) 2019-07-23

Family

ID=67263551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821090145.5U Active CN209145056U (en) 2018-07-10 2018-07-10 A kind of assembled composite wall structure being welded to connect key based on mild steel plate

Country Status (1)

Country Link
CN (1) CN209145056U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700446A (en) * 2019-10-22 2020-01-17 广州大学 Take hybrid junction's assembled shear force wall
CN110700444A (en) * 2019-10-22 2020-01-17 广州大学 Assembled slotting energy-consuming shear wall with steel connecting nodes

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110700446A (en) * 2019-10-22 2020-01-17 广州大学 Take hybrid junction's assembled shear force wall
CN110700444A (en) * 2019-10-22 2020-01-17 广州大学 Assembled slotting energy-consuming shear wall with steel connecting nodes
CN110700444B (en) * 2019-10-22 2024-08-20 广州大学 Assembled slotting energy-consuming shear wall with steel connection nodes

Similar Documents

Publication Publication Date Title
CN108625506A (en) A kind of connection method of the prefabricated combined wall board being welded to connect key based on mild steel plate and its construction method
CN104594210B (en) A kind of concrete prefabricated board and its preparation method and application
CN108589982A (en) A kind of assembled composite wall structure and its construction method being welded to connect indirectly based on reinforcing bar
CN205857448U (en) A kind of assembly concrete shear wall structure
CN108589986A (en) One kind being based on bolted assembled composite wall structure and its construction method
CN206189455U (en) Piping lane
CN106013432B (en) A kind of high ductility prefabricated integral frame interior joint connection structure and construction method
CN208379842U (en) One kind being based on bolted assembled composite wall structure
CN108797840A (en) Prefabricated concrete shear force wall assembled connected node
CN206873767U (en) A kind of reinforcing bar grout sleeve for the connection of prefabricated concrete structure ductility
CN105863155A (en) Heat insulation and energy storage type RPC prefabricated wall panel system
CN101424106A (en) Steel sheet regeneration mixed wall and construction method thereof
CN209145056U (en) A kind of assembled composite wall structure being welded to connect key based on mild steel plate
CN206916775U (en) A kind of underground pipe gallery of assembled steel and concrete structure
CN212295247U (en) Assembled light full precast slab
CN112695794A (en) Precast concrete L shape post rim of a cup basis
CN207079626U (en) A kind of assembled underground pipe gallery
CN106499045A (en) A kind of prefabricated composite construction parapet and construction method
CN106088657A (en) Reinforcing structure of empty bucket wall and construction method thereof
CN205976091U (en) Steel construction building thermal insulation wall
CN105951984B (en) A kind of high ductility prefabricated integral frame mid-side node connection structure and construction method
CN206189456U (en) Three cabin piping lanes
CN108018972A (en) Full precast floor slab and laminated floor slab combining structure, making and assembly method
CN208347059U (en) A kind of assembled composite wall structure being welded to connect indirectly based on reinforcing bar
CN206189458U (en) Multi -deck formula piping lane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190828

Address after: 712034 Building E, BDEF International Business Center, Xixian New District, Xi'an City, Shaanxi Province, No. 10302, Level 3

Patentee after: Matrix matrix Industrial Co., Ltd.

Address before: 710055 Shaanxi province Xi'an Yanta Road No. 13

Patentee before: Xi'an Architectural Sci & Tech. Univ.