CN108797840A - Prefabricated concrete shear force wall assembled connected node - Google Patents
Prefabricated concrete shear force wall assembled connected node Download PDFInfo
- Publication number
- CN108797840A CN108797840A CN201810875161.3A CN201810875161A CN108797840A CN 108797840 A CN108797840 A CN 108797840A CN 201810875161 A CN201810875161 A CN 201810875161A CN 108797840 A CN108797840 A CN 108797840A
- Authority
- CN
- China
- Prior art keywords
- concrete shear
- shear wall
- connecting steel
- precast concrete
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Sewage (AREA)
Abstract
Description
技术领域technical field
本发明属于预制混凝土剪力墙装配式技术领域,涉及一种预制混凝土剪力墙装配式连接节点。The invention belongs to the technical field of prefabricated concrete shear wall assembly, and relates to a prefabricated concrete shear wall assembly connection node.
背景技术Background technique
预制装配式建筑是一种在工厂生产预制梁、板、柱和墙等建筑构件,经过养护并验收合格后运输至现场安装施工完成的建筑方式。装配式建筑具有建筑构件标准化设计,工厂化加工,装配式施工的特点,有利于降低施工造成的环境污染,缩短施工周期,节约人力物力。Prefabricated building is a construction method in which prefabricated beams, slabs, columns, walls and other building components are produced in the factory, and after maintenance and acceptance, they are transported to the site for installation and construction. The prefabricated building has the characteristics of standardized design of building components, factory processing, and prefabricated construction, which is conducive to reducing environmental pollution caused by construction, shortening the construction period, and saving manpower and material resources.
在建筑结构中,剪力墙主要承受风荷载或地震作用引起的水平荷载和竖向荷载。在装配式混凝土结构中,剪力墙水平连接主要采用灌浆套筒连接技术,预制剪力墙内埋灌浆套筒,现场安装后注入灌浆料完成墙体之间的连接。但在实际应用中,灌浆套筒连接技术存在诸多缺点,一是预制混凝土剪力墙配筋量大,施工时套筒与钢筋对接难度大;二是套筒灌浆密实度检测困难,容易出现漏浆和夹空现象,施工质量难以保证;三是套筒工艺复杂、造价高昂,增加装配式混凝土建筑整体造价。专利CN107460969A公开一种新型预制混凝土剪力墙的装配方法,该种连接方式取消了灌浆套筒,施工质量可得到保证,但施工时现场仍需绑扎钢筋浇筑混凝土,现场作业量大;专利CN207079756U公开一种干式连接混凝土剪力墙与墙干式连接方法,该方法采用现场无需灌浆的干作业方式,但施工过程中钢筋与套筒之间仍存在大量对接问题,施工难度大。In building structures, shear walls mainly bear horizontal and vertical loads caused by wind loads or earthquakes. In the prefabricated concrete structure, the horizontal connection of the shear wall mainly adopts the grouting sleeve connection technology. The grouting sleeve is embedded in the prefabricated shear wall, and the grouting material is injected after the on-site installation to complete the connection between the walls. However, in practical application, there are many shortcomings in the grouting sleeve connection technology. First, the precast concrete shear wall has a large amount of reinforcement, and it is difficult to connect the sleeve and the steel bar during construction; The phenomenon of slurry and voids makes it difficult to guarantee the construction quality; the third is that the sleeve process is complicated and the cost is high, which increases the overall cost of the prefabricated concrete building. Patent CN107460969A discloses a new type of assembly method for prefabricated concrete shear walls. This connection method eliminates the grouting sleeve, and the construction quality can be guaranteed. However, it is still necessary to bind steel bars and pour concrete on site during construction, and the site workload is large; patent CN207079756U discloses A dry connection method for concrete shear walls and walls. This method adopts a dry operation method that does not require grouting on site. However, there are still a lot of docking problems between steel bars and sleeves during the construction process, and the construction is difficult.
发明内容Contents of the invention
本发明的目的在于针对现有技术的不足,提供一种连接安全可靠、施工简单、经济性好,连接质量检测方便的预制混凝土剪力墙装配式连接节点。The purpose of the present invention is to provide a prefabricated concrete shear wall assembly connection node which is safe and reliable in connection, simple in construction, good in economy, and convenient in connection quality detection.
本发明的技术方案:一种预制混凝土剪力墙装配式连接节点,上部预制混凝土剪力墙片底端预埋外伸连接钢板,下部预制混凝土剪力墙片顶端预埋外伸连接钢板,上下两片预制混凝土剪力墙连接钢板通过高强螺栓连接,连接空隙内填充有混凝土。The technical solution of the present invention: a prefabricated concrete shear wall assembly type connection node, the bottom end of the upper precast concrete shear wall piece is pre-embedded with an overhanging connecting steel plate, and the top of the lower precast concrete shear wall piece is pre-embedded with an overhanging connecting steel plate, and the upper and lower Two pieces of prefabricated concrete shear walls are connected by high-strength bolts, and the connection gap is filled with concrete.
优选的是,连接钢板预埋于混凝土剪力墙段布置有抗剪键。Preferably, the connecting steel plate is pre-embedded in the concrete shear wall section, and a shear key is arranged.
本发明的有益效果:上、下预制混凝土剪力墙片之间采用高强螺栓连接,构造简单,传力可靠;连接质量方便检查,成品质量可控;施工安装快捷,效率高,符合装配式建筑的要求。The beneficial effects of the present invention: the upper and lower precast concrete shear wall pieces are connected by high-strength bolts, the structure is simple, and the force transmission is reliable; the connection quality is convenient to check, and the quality of the finished product is controllable; the construction and installation are quick and efficient, and conform to the prefabricated building requirements.
附图说明Description of drawings
图1为本发明实施例的立体示意图;Fig. 1 is the three-dimensional schematic diagram of the embodiment of the present invention;
图2为本发明实施例的分解立体示意图;2 is an exploded perspective view of an embodiment of the present invention;
图3为本发明实施例连接节点剖面图。Fig. 3 is a sectional view of a connection node according to an embodiment of the present invention.
具体实施方式Detailed ways
下面结合附图并通过实施例对本发明做进一步说明。The present invention will be further described below in conjunction with the accompanying drawings and examples.
实施例Example
一种预制混凝土剪力墙装配式连接节点,包括上部预制混凝土剪力墙片1,下部预制混凝土剪力墙片2,连接钢板3,高强螺栓4,抗剪键5。上部预制混凝土剪力墙片1底端预埋外伸连接钢板3,连接钢板3预埋段布置有抗剪键5;下部预制混凝土剪力墙片2顶端预埋外伸连接钢板3,连接钢板3预埋段布置有抗剪键5;预制混凝土剪力墙片1、2的连接钢板3通过高强螺栓4连接,连接钢板3外侧包有混凝土。A prefabricated concrete shear wall assembly connection node, comprising an upper precast concrete shear wall piece 1, a lower prefabricated concrete shear wall piece 2, a connecting steel plate 3, a high-strength bolt 4, and a shear key 5. The bottom end of the upper precast concrete shear wall piece 1 is pre-embedded with an overhanging connecting steel plate 3, and the pre-embedded section of the connecting steel plate 3 is provided with a shear key 5; 3 The pre-embedded section is arranged with shear keys 5; the connecting steel plates 3 of the precast concrete shear wall pieces 1 and 2 are connected by high-strength bolts 4, and the outer sides of the connecting steel plates 3 are covered with concrete.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810875161.3A CN108797840A (en) | 2018-08-03 | 2018-08-03 | Prefabricated concrete shear force wall assembled connected node |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810875161.3A CN108797840A (en) | 2018-08-03 | 2018-08-03 | Prefabricated concrete shear force wall assembled connected node |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN108797840A true CN108797840A (en) | 2018-11-13 |
Family
ID=64079078
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810875161.3A Pending CN108797840A (en) | 2018-08-03 | 2018-08-03 | Prefabricated concrete shear force wall assembled connected node |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108797840A (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109339244A (en) * | 2018-11-21 | 2019-02-15 | 福建工程学院 | A prefabricated slab and shear wall connection structure and construction method |
| CN109898667A (en) * | 2019-03-22 | 2019-06-18 | 中南大学 | A kind of the assembled RC shear wall structure and its construction method of dry type connection |
| CN110016856A (en) * | 2019-05-14 | 2019-07-16 | 福州大学 | Prestressed prefabricated UHPC plank road column structure and its construction method |
| CN110042946A (en) * | 2019-04-30 | 2019-07-23 | 山东汇源杭萧钢构有限公司 | Fabricated shear wall and its construction method |
| CN110056098A (en) * | 2019-03-19 | 2019-07-26 | 中国建筑第八工程局有限公司 | Vertical joint connection structure and connection method of assembled integral concrete shear wall structure |
| CN110158806A (en) * | 2019-05-24 | 2019-08-23 | 东南大学 | A kind of assembled steel reinforced concrete shear force wall bolt fastening structure and preparation method thereof |
| CN112459260A (en) * | 2020-10-28 | 2021-03-09 | 上海建工二建集团有限公司 | Steel structure connecting device of prefabricated vertical component construction node |
| CN112832415A (en) * | 2021-02-25 | 2021-05-25 | 浙江大学建筑设计研究院有限公司 | A partially clad steel-concrete composite shear wall member |
| CN114991320A (en) * | 2022-06-29 | 2022-09-02 | 沈阳建筑大学 | An assembled shear wall horizontal connection structure |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH10176378A (en) * | 1996-12-18 | 1998-06-30 | Maeda Corp | Installation structure of earthquakeproofing wall |
| JP2003034997A (en) * | 2001-07-26 | 2003-02-07 | Toda Constr Co Ltd | Steel plate shear wall and method of constructing the same |
| CN201972269U (en) * | 2011-01-20 | 2011-09-14 | 陈云 | Prefabricated reinforcing steel bar concrete shear wall |
| CN206752735U (en) * | 2017-03-29 | 2017-12-15 | 河北建筑工程学院 | Precast shear wall insert-type steel board connecting structure |
| CN207609053U (en) * | 2017-11-14 | 2018-07-13 | 华西能源工程有限公司 | A kind of wall body structure for assembly concrete frame structure |
-
2018
- 2018-08-03 CN CN201810875161.3A patent/CN108797840A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH10176378A (en) * | 1996-12-18 | 1998-06-30 | Maeda Corp | Installation structure of earthquakeproofing wall |
| JP2003034997A (en) * | 2001-07-26 | 2003-02-07 | Toda Constr Co Ltd | Steel plate shear wall and method of constructing the same |
| CN201972269U (en) * | 2011-01-20 | 2011-09-14 | 陈云 | Prefabricated reinforcing steel bar concrete shear wall |
| CN206752735U (en) * | 2017-03-29 | 2017-12-15 | 河北建筑工程学院 | Precast shear wall insert-type steel board connecting structure |
| CN207609053U (en) * | 2017-11-14 | 2018-07-13 | 华西能源工程有限公司 | A kind of wall body structure for assembly concrete frame structure |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109339244A (en) * | 2018-11-21 | 2019-02-15 | 福建工程学院 | A prefabricated slab and shear wall connection structure and construction method |
| CN109339244B (en) * | 2018-11-21 | 2024-02-20 | 福建工程学院 | Prefabricated plate and shear wall connection structure and construction method |
| CN110056098A (en) * | 2019-03-19 | 2019-07-26 | 中国建筑第八工程局有限公司 | Vertical joint connection structure and connection method of assembled integral concrete shear wall structure |
| CN109898667A (en) * | 2019-03-22 | 2019-06-18 | 中南大学 | A kind of the assembled RC shear wall structure and its construction method of dry type connection |
| CN110042946A (en) * | 2019-04-30 | 2019-07-23 | 山东汇源杭萧钢构有限公司 | Fabricated shear wall and its construction method |
| CN110016856A (en) * | 2019-05-14 | 2019-07-16 | 福州大学 | Prestressed prefabricated UHPC plank road column structure and its construction method |
| CN110158806A (en) * | 2019-05-24 | 2019-08-23 | 东南大学 | A kind of assembled steel reinforced concrete shear force wall bolt fastening structure and preparation method thereof |
| CN112459260A (en) * | 2020-10-28 | 2021-03-09 | 上海建工二建集团有限公司 | Steel structure connecting device of prefabricated vertical component construction node |
| CN112832415A (en) * | 2021-02-25 | 2021-05-25 | 浙江大学建筑设计研究院有限公司 | A partially clad steel-concrete composite shear wall member |
| CN114991320A (en) * | 2022-06-29 | 2022-09-02 | 沈阳建筑大学 | An assembled shear wall horizontal connection structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108797840A (en) | Prefabricated concrete shear force wall assembled connected node | |
| CN103883034B (en) | A kind of fabricated shear wall of belt edge confining part and wall-beam syndeton | |
| CN103195170B (en) | Prefabricated reinforced concrete frame structure system | |
| CN105239720A (en) | Prefabricated assembled steel-concrete composite beam connected by adopting high-strength bolt | |
| CN203213282U (en) | Fabricated reinforced concrete frame structure system | |
| CN103924710B (en) | Low layer assembled combined wall house Plate Welding node structure | |
| CN205242848U (en) | Adopt prefabricated assembled steel - concrete combination beam of high strength bolt connection | |
| CN106759879A (en) | Precast prestressed concrete frame is from rehabilitation energy dissipation node and its construction method | |
| CN204126048U (en) | Bracket steel bar concrete shear force wall connecting pin contact assembled architecture | |
| CN104763078A (en) | Shock-absorption type frame-shear wall combination structure system and construction method thereof | |
| CN105952044B (en) | Fully-prefabricated prestressed concrete floor structure and prestressed assembly method | |
| CN108301531A (en) | Assembled built-in heat insulation layer concrete composite wall-light steel frame-floor connecting node | |
| CN104179249A (en) | Assembled composite-structure earthquake-resistant wall and assembly method thereof | |
| CN109403509A (en) | Assembled composite shear wall based on self-resetting combined end post-slurry anchor shear wall | |
| CN103541433B (en) | Assembly concrete hook-hang type node | |
| CN103696607B (en) | A kind of prestressing force assembling slab column system with bracing members and construction method thereof | |
| CN206942196U (en) | The structure of attached assembling type node power consumption frame strengthening outside a kind of existing framework | |
| CN209227836U (en) | Prefabricated concrete structure wall-column full steel key connection structure | |
| CN104532952A (en) | Short angle iron connection type reinforced concrete assembling integrated frame and construction method thereof | |
| CN206298957U (en) | Bilateral formula precast prestressed concrete frame is from rehabilitation energy dissipation node | |
| CN115637722A (en) | Prefabricated independent foundation | |
| CN204850139U (en) | Prefabricated assembled concrete shear force wall that reinforcing bar dislocation was laid | |
| CN204081090U (en) | The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post | |
| CN204357000U (en) | A kind of precast and assembled reinforced concrete spinous process of the seventh cervical vertebra frame | |
| CN218176242U (en) | A prefabricated high performance concrete confined shear wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181113 |
|
| RJ01 | Rejection of invention patent application after publication |