CN209130851U - The double reheat system of integral external steam condenser and regenerative steam turbine - Google Patents

The double reheat system of integral external steam condenser and regenerative steam turbine Download PDF

Info

Publication number
CN209130851U
CN209130851U CN201821318723.6U CN201821318723U CN209130851U CN 209130851 U CN209130851 U CN 209130851U CN 201821318723 U CN201821318723 U CN 201821318723U CN 209130851 U CN209130851 U CN 209130851U
Authority
CN
China
Prior art keywords
steam
steam turbine
pressure
regenerative
turbine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821318723.6U
Other languages
Chinese (zh)
Inventor
段立强
孙婧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Original Assignee
North China Electric Power University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University filed Critical North China Electric Power University
Priority to CN201821318723.6U priority Critical patent/CN209130851U/en
Application granted granted Critical
Publication of CN209130851U publication Critical patent/CN209130851U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Engine Equipment That Uses Special Cycles (AREA)

Abstract

The utility model discloses the double reheat systems of a kind of integral external steam condenser and regenerative steam turbine, externally arranged steam cooler is arranged on the bleed steam pipework of the first high-pressure heater, wherein one ultra-high pressure cylinder steam discharge with higher temperature and the degree of superheat is introduced into externally arranged steam cooler, after the higher main water supply heat exchange of the first high-pressure heater outlet temperature, then enters back into the first high-pressure heater and exchange heat with the lower main water supply of temperature.The more bleedings degree of superheat can be effectively reduced, the temperature of water supply is improved simultaneously, to reduce the irreversible loss of bleeder heater and boiler, but also the energy consumption of unit reduces, what it is compared to conventional individually integrated regenerative steam turbine is that double reheat system has significant thermodynamics and economic performance advantage.

Description

The double reheat system of integral external steam condenser and regenerative steam turbine
Technical field
The utility model belongs to ultra supercritical double reheat electricity generation system energy efficient and utilizes field, and in particular to Yi Zhongji At the double reheat system of externally arranged steam cooler and regenerative steam turbine.
Background technique
Coal accounts for the principal status of public economy of China's energy resource structure and consumption, and does not have larger change in coming few decades.Wherein Fired power generating unit is consumption coal rich and influential family, accounts for about the 50% of coal in China consumption.However fired power generating unit is always the master of China's power supply Pillar is wanted, although generation of electricity by new energy mode sharply develops in recent years, the critical role of thermal power generation can not be shaken.With section Energy emission reduction and the continuous implementation for advocating the policies such as cleaning coal power generation, thermal power generating technology are constantly rectified and improved and are innovated.It is secondary again Thermal technology is then current more one of efficient, low consumption, the thermal power generating technology of low pollution.However, double reheat ultra supercritical machine Group has double reheating due to steam parameter height again, and the steam extraction degree of superheat for allowing to carry out water supply backheat is excessively high, leads to water supply backheat There are biggish irreversible losses for heater, to reduce the power savings advantages of double reheat power generation sets.And the conventional steam extraction degree of superheat By in the way of only focus on close to reheating after steam extraction the degree of superheat, have ignored remaining grade of high problem of the steam extraction degree of superheat, especially Into the steam extraction of No. 1 high-pressure heater, the degree of superheat and temperature are all higher, cannot make full use of there are steam extraction degree of superheat energy and high The problem of quality steam can be with that can waste, and bleeder heater is caused to have biggish irreversible loss, thus affect it is secondary again The economy of heat engine group.
To solve the above-mentioned problems, the utility model proposes a kind of integral external steam condenser and back-heating type vapour simultaneously The double reheat system scheme of turbine, not only can be effectively reduced and make full use of the degree of superheat of more bleedings, but also can also be into One step improves the temperature into water supply before boiler, and the irreversible loss of one side bleeder heater substantially reduces, on the other hand makes The heat transfer temperature difference for obtaining boiler decreases, and irreversible loss accordingly reduces, to further increase the economy of double reheat power generation sets Property.
Utility model content
The purpose of this utility model is to provide the secondary of a kind of integral external steam condenser and regenerative steam turbine Reheat system increases setting externally arranged steam cooler on the bleed steam pipework of the first high-pressure heater, is effectively reduced to enter and be somebody's turn to do The degree of superheat of the steam extraction of grade heater.
A kind of double reheat system of integral external steam condenser and regenerative steam turbine, including boiler, condenser, Shaft sealing cooler, steam turbine ultra-high pressure cylinder, steam turbine high-pressure cylinder, Steam Turbine Through IP Admission, turbine low pressure cylinder, back-heating type steamer Machine, externally arranged steam cooler, four high-pressure feed-water heaters, oxygen-eliminating device, five low-pressure heaters, feed pump, condensate pump, Drainage pump, two generators, it is characterised in that: externally arranged steam cooler is arranged in the bleed steam pipework of the first high-pressure heater On, wherein one ultra-high pressure cylinder steam discharge with higher temperature and the degree of superheat is introduced into the externally arranged steam cooler, with After the higher main water supply of first high-pressure heater outlet temperature is exchanged heat, first high-pressure heater is then entered back into In exchange heat with the lower main water supply of temperature.
Further, water supply is absorbed heat in the boiler becomes the steam of high temperature, high pressure, into the steam turbine ultra-high pressure cylinder After middle expansion work, part steam discharge enters the boiler and carries out single reheat;Steam after carrying out single reheat enters the vapour Continue to do work in turbine high pressure cylinder, then expand after steam enter the boiler absorb heat, progress double reheat after steam into Enter and do work in the Steam Turbine Through IP Admission, then respectively enters expansion work in two low pressure (LP) cylinders of the steam turbine, then steam exhaust Into condensation cooling in the condenser, condensed water successively passes through five low-pressure heatings after entering condensate pump pressurization Device, oxygen-eliminating device, feed pump and four high-pressure heaters become the water supply of high pressure-temperature, then in the first high-pressure heater steam extraction It further increases to be fed again into the boiler after temperature and carry out heating power in the externally arranged steam cooler added on pipeline and follow Ring.
Further, the steam discharge of the steam turbine ultra-high pressure cylinder is divided into three strands, wherein one steam enter the boiler in into Row single reheat;Second burst of vapour source as the first high-pressure heater water supply backheat, this strand of steam is introduced into described external The water supply that partial heat heating higher temperature is discharged in formula steam condenser, then enters back into first high-pressure heater and adds The water supply of hot lower temperature;Third stock enters expansion work in the regenerative steam turbine, 4 grades of steam extractions point of regenerative steam turbine Not as the second to the 4th high-pressure heater and the oxygen-eliminating device water supply backheat vapour source, steam discharge enter the first low-pressure heater Middle progress water supply backheat, the second to the 5th low-pressure heater import steam extraction respectively from Steam Turbine Through IP Admission part steam discharge and Three sections of steam extractions of the turbine low pressure cylinder.
It further, cannot be synchronous with power needed for the feed pump in order to solve the sent out power of the regenerative steam turbine With the problem of, the feed pump use electrically driven (operated) mode.
Further, the regenerative steam turbine into vapour from the ultra-high pressure cylinder steam discharge without reheating, steam extraction Vapour source with steam discharge as the second to the 4th high-pressure heater, oxygen-eliminating device and the first low-pressure heater;Regenerative steam turbine connection First generator, sent out power is for grid-connected and driving feed pump.
Further, the steam turbine high-pressure cylinder is not provided with extraction opening, and steam discharge fully enters the boiler and carries out once again Heat.
Further, the Steam Turbine Through IP Admission is not provided with extraction opening, and steam discharge is divided to two strands, one is as the second low-pressure heating The vapour source of device, another strand is continued to do work into the turbine low pressure cylinder.
The double reheat system of integral external steam condenser and regenerative steam turbine disclosed by the utility model, for Traditional secondary reheat system thermodynamic advantages and the insufficient status of economic sexual clorminance, propose integral external steam condenser and The double reheat system of regenerative steam turbine was reduced by integral external steam condenser simultaneously and regenerative steam turbine The higher steam extraction of temperature, makes new integrated system can be effectively reduced and make full use of the degree of superheat of more bleedings, and then backheat adds Hot device irreversible loss is minimized, while can be further improved the temperature of water supply, reduces the heat transfer temperature difference of boiler, thus The energy consumption of unit is significantly reduced, relatively the system of the integrated regenerative steam turbine of tradition, there is higher thermodynamic advantages and economy Sexual clorminance.
Detailed description of the invention
Fig. 1 is the schematic diagram for the double reheat system that tradition individually integrates regenerative steam turbine;
Fig. 2 is that the integral external steam condenser of the utility model and the double reheat system of regenerative steam turbine show It is intended to.
Attached drawing respectively marks are as follows: 1 is boiler;2 be condenser;3 be shaft sealing cooler;SHP is steam turbine ultra-high pressure cylinder;HP is Steam turbine high-pressure cylinder;IP is turbine low pressure cylinder;LP1, LP2 are turbine low pressure cylinder;RT is regenerative steam turbine;OSC is outer Set formula steam condenser;H1 is No. 1 high-pressure feed-water heater;H2 is No. 2 high-pressure feed-water heaters;H3 is that No. 3 high-pressure feed waters add Hot device;H4 is No. 4 high-pressure feed-water heaters;DEA is oxygen-eliminating device;H6 is No. 6 low-pressure heaters;H7 is No. 7 low-pressure heaters; H8 is No. 8 low-pressure heaters;H9 is No. 9 low-pressure heaters;H10 is No. 10 low-pressure heaters;FP is feed pump;CP is condensed water Pump;DP is drainage pump;A1, a2 are generator.
Specific embodiment
The utility model integrates the double reheat system of regenerative steam turbine based on reference, external by increasing integrated one Formula steam condenser proposes a kind of performance more preferably system integration scheme, below by the drawings and specific embodiments to this Utility model is described further.
The double reheat system of traditional individually integrated regenerative steam turbine is as shown in Figure 1, the system includes boiler 1, condensing Device 2, shaft sealing cooler 3, steam turbine ultra-high pressure cylinder SHP, steam turbine high-pressure cylinder HP, turbine low pressure cylinder IP, turbine low pressure cylinder LP1 and LP2, regenerative steam turbine RT, 1-4 high-pressure feed-water heater H1-H4, oxygen-eliminating device DEA, 6-10 low-pressure heater H6-H10, feed pump FP, condensate pump CP, drainage pump DP, generator a1 and a2.When work, water supply is absorbed heat in boiler 1 to be become The steam of high temperature, high pressure, into after expansion work in steam turbine ultra-high pressure cylinder SHP, steam discharge is divided into three strands, and wherein one enters pot Furnace 1 carries out single reheat, and second strand is directly entered No. 1 high-pressure heater H1 heating water supply, and third stock is as regenerative steam turbine RT into vapour.Steam after reheating, which enters in high pressure cylinder HP, to be continued to do work, and steam discharge enters the progress double reheat of boiler 1 and followed by send Enter and do work in intermediate pressure cylinder IP, then its steam discharge enters expansion work in turbine low pressure cylinder LP1 and LP2, and last steam exhaust is solidifying Cooling condensation in vapour device 2.
Condensed water becomes high pressure-temperature with the steam extractions at different levels heat exchange from cylinder in feed-water heaters at different levels (H1-H10) Water supply.Part steam discharge of the steam extraction of No. 1 high-pressure heater H1 import from high pressure cylinder, this grade of steam extraction are directly entered No. 1 high pressure The water supply of lower temperature is heated in heater H1;No. 2 high-pressure heater H2, No. 3 high-pressure heater H3, No. 4 high-pressure heater H4 With steam extraction of the oxygen-eliminating device DEA import steam extraction from regenerative steam turbine RT cylinder, No. 6 low-pressure heater H6 import steam extractions are come from The steam discharge of regenerative steam turbine RT, No. 7 to No. 10 low-pressure heater H7-H10 import steam extractions are respectively from Steam Turbine Through IP Admission IP Three sections of steam extractions of part steam discharge and low pressure (LP) cylinder LP.
Double reheat system of the utility model based on independent integrated regenerative steam turbine, increases an integrated external and steams Vapour cooler, as shown in Figure 2.Increase by one externally arranged steam cooler of setting on the bleed steam pipework of No. 1 high-pressure heater H1 OSC so that the part steam discharge from high pressure cylinder be introduced into externally arranged steam cooler OSC discharge partial heat heating it is higher Then the water supply of temperature enters back into No. 1 high-pressure heater H1 and heats the water supply of lower temperature.
When the system works, the steam that water supply is absorbed heat in the boiler as high temperature, high pressure, into steam turbine ultra-high pressure cylinder After expansion work, part steam discharge enters boiler and carries out single reheat;Steam after carrying out single reheat, which enters in high pressure cylinder, to be continued Acting, the steam after then expanding enter boiler heat absorption, and the steam after carrying out double reheat, which enters in intermediate pressure cylinder, to do work, and then divide Not Jin Ru expansion work in steam turbine two low pressure (LP) cylinders LP1 and LP2, then steam exhaust enters cooling condensation, condensed water in condenser Successively pass through No. 6-10 five low-pressure heater H6-H10, oxygen-eliminating device DEA, feed pump FP and 1-4 after into condensate pump pressurization Number four high-pressure heaters at H1-H4 are the water supply of high pressure-temperature, then add on the bleed steam pipework of No. 1 high-pressure heater outer It sets and is fed again into boiler (1) progress thermodynamic cycle after further increasing temperature in formula steam condenser (OSC).
The steam discharge of ultra-high pressure cylinder is divided into three strands, and wherein one steam, which enters, carries out single reheat in boiler 1;Second burst of conduct The vapour source of No. 1 high-pressure heater water supply backheat, this strand of steam be introduced into added on No. 1 high-pressure heater bleed steam pipework it is external The main water supply that partial heat heating higher temperature is discharged in formula steam condenser OSC, then enters back into No. 1 high-pressure heater and adds The water supply of hot lower temperature;Third stock enters expansion work in regenerative steam turbine, 4 grades of steam extractions difference of regenerative steam turbine RT The vapour source of water supply backheat as 2-4 high-pressure heater and oxygen-eliminating device, steam discharge, which enters, carries out water supply time in No. 6 low-pressure heaters Heat, three section steam extractions of the 7-10 low-pressure heater import steam extraction respectively from Steam Turbine Through IP Admission part steam discharge and low pressure (LP) cylinder.
In order to solve the problems, such as that power needed for the sent out power of regenerative steam turbine RT and feed pump FP is unable to simultaneously match, give Water pump FP uses electrically driven (operated) mode.Regenerative steam turbine into vapour from the ultra-high pressure cylinder steam discharge without reheating, steam extraction Vapour source with steam discharge as 2-4 high-pressure heater, oxygen-eliminating device and No. 6 low-pressure heaters;Regenerative steam turbine connects a hair Motor, sent out power is for grid-connected and driving feed pump.
The system high pressure cylinder is not provided with extraction opening, and steam discharge fully enters boiler and carries out single reheat.Intermediate pressure cylinder is not also set Extraction opening is set, steam discharge is divided to two strands, one vapour source as No. 7 low-pressure heaters, and another strand is continued to do work into low pressure (LP) cylinder.
The design of the above system of the utility model can not only efficiently use the degree of superheat of this grade of steam extraction, reduce and correspond to The irreversible loss of feed-water heater, and before can be further improved into boiler water supply temperature, reduce the heat exchange of boiler The temperature difference improves unit economy.
Below with reference to specific one embodiment, the effect of Tthe utility model system is illustrated.
Boundary condition: legacy system turbine parameters are 31MPa/600 DEG C/620 DEG C/620 DEG C, back pressure 4.65kPa, Generated output is 660MW, generator efficiency 0.9898.The system of the utility model main steam pressure identical with legacy system Poor with temperature, each cylinder inlet parameter and feed-water heater end, extraction pressures at different levels are also identical, and the external steam added is cold But the end difference of device is 10K.
Generating efficiency and heat consumption rate are the important indicators for being commonly used to evaluation fired power generating unit thermal performance;Analysis can be into one Step locating energy loss position, quantity and disclose generate irreversible loss the reason of.
Generating efficiency are as follows:
η=W/E (1)
In formula: the generating efficiency of η expression unit;The power that steam turbine issues in W expression system, kW;When E refers to unit The gross energy of interior input system.Generating efficiency can directly and effectively reflect the thermal performance of power plant.
The computation model of damage are as follows:
Ii=Ein-Eout (2)
In formula: IiRefer to the irreversible of certain systemLoss, kW;EinRefer to the available energy into the system, kW; EoutRefer to leaving the available energy of the system, kW.Damage is that a parameter of the loss of energy, value can be used in the heat exchange of reflection system It is bigger, then it can be used the loss of energy bigger.
Table 1 is the irreversible of bleeder heaters at different levelsDamage value;The system 1 of the utility model is high as can be seen from Table 1 Press heater H1'sDamage is smaller than legacy system, reduces 700MW or so.
Table 1: bleeder heaters at different levels it is irreversibleDamage
Table 2 is that carbonated drink parameter and bleeder heater are totalDamage;It is available according to table 2, water supply in Tthe utility model system Temperature improves 9 DEG C than legacy system, and bleeder heater is totalDamage reduces 631.07KW, is that increasing integrated external steams Vapour cooler utilizes the steam extraction partial heat for entering No. 1 high-pressure heater H1 import to heat water supply, so that the steam extraction degree of superheat reduces And feed temperature improves, therefore No. 1 high-pressure heaterDamage reduces.
Table 2: carbonated drink parameter and bleeder heater are totalDamage
Table 3 is all parts in systemSituation is damaged, by data in table 3 it can be found that pot in Tthe utility model system FurnaceDamage is significantly less than legacy system, and Tthe utility model system enters boiler feed temperature compared to legacy system known to analysis It improves, the furnace heat transfer temperature difference is reduced, so that boiler is irreversibleDamage reduces.
Table 3: all parts in systemDamage situation
Table 4 is the energy consumption of system.In table 4 it can be found that comparison legacy system, Tthe utility model system it is totalDamage Reduce, generating efficiency improves 0.095%, and heat consumption rate reduces 13.841kJ/kWh, and coal consumption for power generation reduces 0.503g/kWh.
Table 4: the energy consumption of system
Significantly change it can thus be seen that the system of the utility model has in terms of properties compared to legacy system It is kind.The utility model increases an integrated externally arranged steam cooler in the double reheat system of traditional regenerative steam turbine and is used to The cooling ultra-high pressure cylinder part steam discharge as water supply backheat vapour source, solves this grade of steam extraction degree of superheat in traditional secondary reheat system Higher and unserviceable problem, reduces the irreversible loss of corresponding regenerative water heaters, and makes feed temperature into one Step improves, to improve the thermal performance and economy of whole system.

Claims (7)

1. a kind of double reheat system of integral external steam condenser and regenerative steam turbine, including boiler, condenser, axis Seal cooler, steam turbine ultra-high pressure cylinder, steam turbine high-pressure cylinder, Steam Turbine Through IP Admission, turbine low pressure cylinder, regenerative steam turbine, Externally arranged steam cooler, oxygen-eliminating device, five low-pressure heaters, feed pump, condensate pump, is dredged four high-pressure feed-water heaters Water pump, two generators, it is characterised in that: externally arranged steam cooler is arranged on the bleed steam pipework of the first high-pressure heater, Wherein one ultra-high pressure cylinder steam discharge with higher temperature and the degree of superheat is introduced into the externally arranged steam cooler, and described After the higher main water supply of first high-pressure heater outlet temperature is exchanged heat, then enter back into first high-pressure heater with The lower main water supply of temperature exchanges heat.
2. the double reheat system of a kind of integral external steam condenser and regenerative steam turbine according to claim 1 System, it is characterised in that: the steam that water supply is absorbed heat in the boiler as high temperature, high pressure, into the steam turbine ultra-high pressure cylinder After middle expansion work, part steam discharge enters the boiler and carries out single reheat;Steam after carrying out single reheat enters the vapour Continue to do work in turbine high pressure cylinder, then expand after steam enter the boiler absorb heat, progress double reheat after steam into Enter and do work in the Steam Turbine Through IP Admission, then respectively enters expansion work in two low pressure (LP) cylinders of the steam turbine, then steam exhaust Into condensation cooling in the condenser, condensed water successively passes through five low-pressure heatings after entering condensate pump pressurization Device, oxygen-eliminating device, feed pump and four high-pressure heaters become the water supply of high pressure-temperature, then in the first high-pressure heater steam extraction It further increases to be fed again into the boiler after temperature and carry out heating power in the externally arranged steam cooler added on pipeline and follow Ring.
3. the double reheat system of a kind of integral external steam condenser and regenerative steam turbine according to claim 2 System, it is characterised in that: the steam discharge of the steam turbine ultra-high pressure cylinder is divided into three strands, and wherein one steam enters in the boiler and carries out Single reheat;Second burst of vapour source as the first high-pressure heater water supply backheat, this strand of steam are introduced into the external The water supply that partial heat heating higher temperature is discharged in steam condenser, then enters back into first high-pressure heater and heats The water supply of lower temperature;Third stock enters expansion work in the regenerative steam turbine, 4 grades of steam extractions difference of regenerative steam turbine The vapour source of water supply backheat as the second to the 4th high-pressure heater and the oxygen-eliminating device, steam discharge enter in the first low-pressure heater Water supply backheat is carried out, the second to the 5th low-pressure heater import steam extraction is respectively from Steam Turbine Through IP Admission part steam discharge and institute State three sections of steam extractions of turbine low pressure cylinder.
4. the double reheat system of a kind of integral external steam condenser and regenerative steam turbine according to claim 1 System, it is characterised in that: cannot be synchronous with power needed for the feed pump in order to solve the sent out power of the regenerative steam turbine With the problem of, the feed pump use electrically driven (operated) mode.
5. the double reheat system of a kind of integral external steam condenser and regenerative steam turbine according to claim 3 System, it is characterised in that: the regenerative steam turbine into vapour from the ultra-high pressure cylinder steam discharge without reheating, steam extraction and Vapour source of the steam discharge as the second to the 4th high-pressure heater, oxygen-eliminating device and the first low-pressure heater;Regenerative steam turbine connection the One generator, sent out power is for grid-connected and driving feed pump.
6. the double reheat system of a kind of integral external steam condenser and regenerative steam turbine according to claim 3 System, it is characterised in that: the steam turbine high-pressure cylinder is not provided with extraction opening, and steam discharge fully enters the boiler and carries out once again Heat.
7. the double reheat system of a kind of integral external steam condenser and regenerative steam turbine according to claim 3 System, it is characterised in that: the Steam Turbine Through IP Admission is not provided with extraction opening, and steam discharge is divided to two strands, one is as the second low-pressure heating The vapour source of device, another strand is continued to do work into the turbine low pressure cylinder.
CN201821318723.6U 2018-08-15 2018-08-15 The double reheat system of integral external steam condenser and regenerative steam turbine Active CN209130851U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821318723.6U CN209130851U (en) 2018-08-15 2018-08-15 The double reheat system of integral external steam condenser and regenerative steam turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821318723.6U CN209130851U (en) 2018-08-15 2018-08-15 The double reheat system of integral external steam condenser and regenerative steam turbine

Publications (1)

Publication Number Publication Date
CN209130851U true CN209130851U (en) 2019-07-19

Family

ID=67228734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821318723.6U Active CN209130851U (en) 2018-08-15 2018-08-15 The double reheat system of integral external steam condenser and regenerative steam turbine

Country Status (1)

Country Link
CN (1) CN209130851U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109099414A (en) * 2018-08-15 2018-12-28 华北电力大学 The double reheat system of integral external steam condenser and regenerative steam turbine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109099414A (en) * 2018-08-15 2018-12-28 华北电力大学 The double reheat system of integral external steam condenser and regenerative steam turbine

Similar Documents

Publication Publication Date Title
CN105003351B (en) Gas machine waste heat energy is carried out the energy tower of the multi-energy form output of step recovery
CN204402598U (en) Join the double reheat supercharging steam turbine thermodynamic system of backpressure small turbine
CN102900478B (en) Novel heat supply steam turbine system and regulation method thereof
CN202645658U (en) Fuel-steam-organic working medium combined cycle power generation unit
CN107542508A (en) A kind of light four combined production device of Ship Waste Heat cascade utilization formula cool and thermal power and method of work
CN105863754A (en) 700 DEG C ultra-supercritical secondary reheating thermodynamic system
CN109826681A (en) A kind of the industrial heating system and its operation method integrated for Combined cycle gas-steam turbine unit steam extraction
CN109869204A (en) A kind of heat supply for Combined cycle gas-steam turbine unit and power peak regulation coupled system and its operation method
CN206683276U (en) A kind of absorption type heat pump heat distribution system that driving vapour source is adjusted using injector
CN108843412A (en) A kind of Steam Turbine Regenerative System
CN109855147A (en) A kind of combined cycle power plant and its operation method coupled based on heat supply with power peak regulation
CN101638998B (en) Front-end double pressure heat absorbing and heat returning circulating thermal system for thermal generator set
CN106761982A (en) A kind of new part backheating gas turbine combined cycle system
CN112856363B (en) System and method for improving heat supply steam parameters of deep peak shaving heat supply unit
CN109869786A (en) A kind of extraction for heat supply integrated system and its operation method for combined cycle unit power peak regulation
CN109099414A (en) The double reheat system of integral external steam condenser and regenerative steam turbine
CN209130851U (en) The double reheat system of integral external steam condenser and regenerative steam turbine
CN103982252A (en) Novel process combination of high-speed and efficient single reheating steam turbine and power generation of small power plant
CN108708835A (en) A kind of novel solar complementation association circulating power generation system of cooling burning machine inlet air
CN209621420U (en) A kind of heat supply for Combined cycle gas-steam turbine unit and power peak regulation coupled system
KR101935637B1 (en) Combined cycle power generation system
CN115478921A (en) Multi-energy-level utilization system suitable for thermal generator set
CN206683029U (en) A kind of two-stage based on heat supply network progressive solution takes out solidifying heating system
CN211316126U (en) Reheating steam combined middle-discharge steam heating water supply and heat supply system
CN212376702U (en) Steam turbine bypass system heated by combustion engine gas

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant