CN209115982U - A kind of measurement control point Fast Installation combination unit for civil engineering - Google Patents
A kind of measurement control point Fast Installation combination unit for civil engineering Download PDFInfo
- Publication number
- CN209115982U CN209115982U CN201821942795.8U CN201821942795U CN209115982U CN 209115982 U CN209115982 U CN 209115982U CN 201821942795 U CN201821942795 U CN 201821942795U CN 209115982 U CN209115982 U CN 209115982U
- Authority
- CN
- China
- Prior art keywords
- mounting plate
- vertical bar
- control point
- shaped frame
- civil engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005259 measurement Methods 0.000 title claims abstract description 24
- 238000009434 installation Methods 0.000 title claims abstract description 19
- 230000000694 effects Effects 0.000 claims description 4
- 238000012544 monitoring process Methods 0.000 claims description 4
- 239000007787 solid Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 10
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 238000009412 basement excavation Methods 0.000 description 5
- 239000011435 rock Substances 0.000 description 5
- 238000000034 method Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of measurement control point Fast Installation combination units for civil engineering, it includes the first mounting plate, the top edge of first mounting plate is vertically installed with the second mounting plate, the center of second mounting plate is machined with the first threaded hole, vertical bar is installed on first threaded hole, the bottom end of the vertical bar is fixedly installed with U-shaped frame, is hinged with master prism by shaft on the U-shaped frame and observes board.When solving the construction survey work of precipitous vertical side slope landform in large-scale power station dam and workshop, when pier is marked at embedded conventional concrete forced centering control point, embedded point is not easy to select, marks the problem of pier is at high cost, production is buried period length, is not easy to mark pier progress security protection.
Description
Technical field
The utility model relates to one kind hydraulic and hydroelectric engineering is precipitous, in vertical side slope landform and concrete construction, installation
With use a kind of high precision three-dimensional measurement control point for measuring work to combine the unit more particularly to a kind of need Fast Installation
With the combination unit of high-acruracy survey.
Background technique
Large hydropower station construction terminates since slope excavating and concreting to completion of works, and project scale is big, work
Phase is long, needs on the dam or workshop side slope riding track in power station or upright metope, hierarchical layered measures control net encryption
Work.
Hydropower Project considers control point using the time is long, displacement is small, centering when making and installing measurement control point
The factors such as error is small use concrete forced centering pier mostly, but require installation to bury when fabrication and installation concrete forced centering pier
If place is larger and is not easy to select, concrete material and centering stainless steel bidding quotation higher cost, and from the foundation excavation of mark pier, mixed
Solidifying soil pours, bidding quotation install it is longer to pier settlement stability process time, especially for dam excavate highwall bench under dig
When speed is fast, the feature that blasting vibration is big, such control point is difficult to meet the requirements in timeliness and safety.
Utility model content
The purpose of the utility model is to provide a kind of measurement control point Fast Installation combination unit for civil engineering, solutions
Determined the construction survey work of precipitous vertical side slope landform in large-scale power station dam and workshop when, embedded conventional concrete pressure is returned
When pier is marked at heart control point, embedded point is not easy to select, mark that pier is at high cost, makes that the embedded period is long, it is safe to be not easy to carry out mark pier
The problem of protection.
In order to realize above-mentioned technical characteristic, purpose of the utility model is realized as follows: a kind of be used for civil engineering
Measurement control point Fast Installation combination unit, it include the first mounting plate, the top edge of first mounting plate is vertically set
It is equipped with the second mounting plate, the center of second mounting plate is machined with the first threaded hole, installs on first threaded hole
Have a vertical bar, the bottom end of the vertical bar is fixedly installed with U-shaped frame, on the U-shaped frame by shaft be hinged with master prism and
Observe board.
The quadrangle of first mounting plate is machined with bolt mounting holes, and the bolt mounting holes and expansion bolt assembly match
It closes, and whole device is fixed on to the position for the measurement point that needs to deploy to ensure effective monitoring and control of illegal activities.
The both ends of the vertical bar are all threaded bar, wherein the threaded rod and the first corresponding threaded holes at top close,
The first locking nut is set in vertical bar, vertical bar is locked on the second mounting plate by first locking nut;It is perpendicular
The threaded rod of straight-bar bottom is matched with screw thread on U-shaped frame, and the second locking nut, second locking are set in vertical bar
U-shaped frame is locked in the bottom end of vertical bar by nut.
The utility model has the advantages that:
The utility model is that one kind is easy to make, low in cost, quick for installation, control range is big, three-dimensional coordinate measurement is smart
High construction Survey Control point device for marking is spent, by large hydropower station dome dam excavation of dam abutment supporting and underground power house
Using practice in concreting, this device improve the timeliness of control point Embedment and installation than the timeliness of common survey mark pier
3~5 times, cost of manufacture only has 1/10th of common mark pier cost, and the quickly lower life for digging supporting of dam abutment slot is effectively guaranteed
Requirement of the production progress to measurement working efficiency;Meanwhile under identical observation condition, the measurement accuracy and common survey of the device
The measurement accuracy for marking pier control point is suitable, can satisfy millimetre-sized surveying and locating completely, but is not necessarily to personnel in use
Cost of labor on duty, having saved.The present apparatus is biggish to improve measurement working efficiency, has met the precision of measurement work,
Material and cost of labor are saved.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is the utility model main view.
Fig. 2 is the utility model left view.
Fig. 3 is the utility model top view.
Fig. 4 is the utility model three-dimensional figure.
Fig. 5 is the utility model installation condition structure chart.
In figure: the second mounting plate 1, the first mounting plate 3, observes board 4, U-shaped frame 5, master prism 6, shaft at bolt mounting holes 2
7, the second locking nut 8, vertical bar 9, the first locking nut 10, the first threaded hole 11, expansion bolt assembly 12.
Specific embodiment
The embodiments of the present invention is described further with reference to the accompanying drawing.
Embodiment 1:
Fig. 1~5 are please referred to, a kind of measurement control point Fast Installation combination unit for civil engineering, it includes first
Mounting plate 3, the top edge of first mounting plate 3 are vertically installed with the second mounting plate 1, the center of second mounting plate 1
Position is machined with the first threaded hole 11, and vertical bar 9 is equipped on first threaded hole 11, and the bottom end of the vertical bar 9 is fixed
U-shaped frame 5 is installed, master prism 6 is hinged with by shaft 7 on the U-shaped frame 5 and observes board 4.It is filled by using combinations of the above
It sets, when using this device, by the U-shaped frame 5 that can be rotated in threaded post in vertical bar 9 and master prism 6, can control dress
Sight of the front within the scope of 180 degree is set, total station passes through the normal line that board 4 is observed on sighting means, or realizes to master prism 6
Center is accurately sighted, and achievees the purpose that measurement distance, angle and height difference three-dimensional element, device is made to play the work of network point
With the second mounting plate of device 1 can also play the role of to prism security protection.
Further, the quadrangle of first mounting plate 3 is machined with bolt mounting holes 2, the bolt mounting holes 2 and expansion
Bolt assembly 12 matches, and whole device is fixed on to the position for the measurement point that needs to deploy to ensure effective monitoring and control of illegal activities.Pass through the bolt mounting holes 2
, can be by the second mounting plate 1 is fixedly mounted expansion bolt assembly 12 side slope during Specific construction, and then realize
Side amount point is deployed to ensure effective monitoring and control of illegal activities.
Further, the both ends of the vertical bar 9 are all threaded bar, wherein the threaded rod and the first threaded hole at top
11 match, and the first locking nut 10 is set in vertical bar 9, and vertical bar 9 is locked by first locking nut 10
On the second mounting plate 1;The threaded rod of 9 bottom of vertical bar is matched with screw thread on U-shaped frame 5, is set with second in vertical bar 9
U-shaped frame 5 is locked in the bottom end of vertical bar 9 by locking nut 8, second locking nut 8.Pass through the vertical bar 9
It can be connected simultaneously with the U-shaped frame 5 of the second mounting plate 1 and master prism 6, realize the fixed installation of master prism 6, and pass through
Vertical bar 9 can be fixed for first locking nut 10 and the second locking nut 8.
In the specific manufacturing process of above-mentioned apparatus, first that length and width are 30 centimeters each, 1 centimeter of thickness of the first mounting plate 3
It is welded into an entirety wherein to intersect 90 degree on one side with the second mounting plate 1, bores the in the center of the second mounting plate 1
One threaded hole 11 bores 12 millimeters bolt mounting holes 2 four in the iron plate surrounding of the first mounting plate 3.12 centimeters of a root long is made again
Vertical bar 9,9 top threaded post of vertical bar matches with the first threaded hole 11 of the second mounting plate 1,9 lower thread of vertical bar
Column is consistent with the threaded hole on the U-shaped frame 5 of standard manufacturer's standard prism 6.Vertical bar 9 is first screwed in the first of the second mounting plate 1
On threaded hole 11, then by master prism screw in vertical bar 9 lower part be completed.When in-site installation, according to the first mounting plate 3 four
The position of a bolt mounting holes 2 drills in selected rock slope or concrete surface in advance, reuses expansion bolt assembly
12 are fixed on assembled device on bedrock surface or concrete surface.
The application process and operating method of the present apparatus:
When this device is installed, rock face or concrete surface to be mounted, foundation are needed by making an on-the-spot survey this selected good device on the spot
The spacing of bolt mounting holes 2 drills on the whole in rock on first mounting plate 3, reuses expansion bolt assembly 12 and consolidates device
It is scheduled on rock or concrete surface, the camera lens of master prism is substantially adjusted to the direction that measurement work Instrumental is set up.
Before this device, the three-dimensional of the prism centers of device can be determined according to the method that conventional encryption measures control point
Coordinate, in use, according in measured zone measurement content and required precision by total station set up in front of this device outline, shine
Standard observes board center, achievees the purpose that, using this device as measuring basis measurement distance, height difference and orientation angle, having for usual purposes is complete
Instrument Free Station of standing determines survey station coordinate, orientation by backsight and three-dimensional coordinate inspection.
1: Wu Dongde power station dome dam dam abutment groove width about 350m of example, high about 300m, excavation supporting is by 10m~15m
One bench is constructed, and three bench is dug under every month, the duration is very nervous, according to conventional forced centering concrete mark pier
Mode is completed since construction riding track does not excavate cleaning, is not only buried point and is difficult to choose, and the embedded period is long, at high cost, Wu Faman
The requirement of sufficient construction speed.By planning, the every lower digging about 50m of dam abutment divides the upstream and downstream of dam abutment slot on established bedrock surface
And left and right banks distinguishes this multiple device of Fast Installation, so that the total station in work surface can at least observe three or more this dress
It sets, realizes and set up the purpose of survey station and setting-out inspection, the basement rock excavation setting-out precision that specifications of surveys determines is ± 5cm, therefore instrument
Device is set up in front of this device within the scope of about 120 degree, can achieve this precision without arranging staff on duty to rotate prism,
So that the position that instrument is set up is very flexible, execute-in-place and cooperation are greatly facilitated, excavation construction pair is preferably met
The requirement of quality and progress.
2: Wu Dongde power station left bank underground power station transformer chamber of example is about 300m, wide 18.8m, height about 35m, main transformer
Room, auxiliary power house are frame layered arrangement, and structure is complicated, and the required precision of mirror surface engineering wall surface is high.According to plan, in transformer chamber left end
Wall, auxiliary power house right end wall upper layer and dike beam vertical wall install four this devices, and illuminator is installed by device, solve
The problem of underground engineering insufficient light.Since transformer chamber is sleeve configuration building, no matter instrument is set up in the where other than 50m,
In front of this device within the scope of about 20 degree, sight and work well, can guarantee to measure every time completely operating accuracy reach ± 5mm with
It is interior, and this device of once mounting is used in the entire construction time, therefore building overall precision is unified, metope is superior in quality,
Solve concrete mark pier nowhere bury and easily view obstruction and using layering on metope turn set general point control point accumulation miss
Poor big, precision deficiency problem.
Above-described embodiment is used to illustrate the utility model, rather than limits the utility model, practical at this
In novel spirit and scope of protection of the claims, to any modifications and changes that the utility model is made, this reality is both fallen within
With novel protection scope.
Claims (3)
1. a kind of measurement control point Fast Installation for civil engineering combines the unit, feature its be: it includes the first peace
The top edge of loading board (3), first mounting plate (3) is vertically installed with the second mounting plate (1), second mounting plate (1)
Center be machined with the first threaded hole (11), vertical bar (9), the vertical bar are installed on first threaded hole (11)
(9) bottom end is fixedly installed with U-shaped frame (5), is hinged with master prism (6) by shaft (7) on the U-shaped frame (5) and is observed board
(4).
2. a kind of measurement control point Fast Installation for civil engineering according to claim 1 combines the unit, feature
Be: the quadrangle of first mounting plate (3) is machined with bolt mounting holes (2), the bolt mounting holes (2) and expansion bolt group
Part (12) matches, and whole device is fixed on to the position for the measurement point that needs to deploy to ensure effective monitoring and control of illegal activities.
3. a kind of measurement control point Fast Installation for civil engineering according to claim 1 combines the unit, feature
Be: the both ends of the vertical bar (9) are all threaded bar, wherein the threaded rod and the first threaded hole (11) at top match
It closes, is set on vertical bar (9) the first locking nut (10), first locking nut (10) locks vertical bar (9) solid
It is scheduled on the second mounting plate (1);The threaded rod of vertical bar (9) bottom is matched with screw thread on U-shaped frame (5), on vertical bar (9)
It is set with the second locking nut (8), U-shaped frame (5) is locked in the bottom end of vertical bar (9) by second locking nut (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821942795.8U CN209115982U (en) | 2018-11-23 | 2018-11-23 | A kind of measurement control point Fast Installation combination unit for civil engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821942795.8U CN209115982U (en) | 2018-11-23 | 2018-11-23 | A kind of measurement control point Fast Installation combination unit for civil engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209115982U true CN209115982U (en) | 2019-07-16 |
Family
ID=67206285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821942795.8U Expired - Fee Related CN209115982U (en) | 2018-11-23 | 2018-11-23 | A kind of measurement control point Fast Installation combination unit for civil engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209115982U (en) |
-
2018
- 2018-11-23 CN CN201821942795.8U patent/CN209115982U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104197852B (en) | Reservoir dam depression and horizontal displacement monitoring system | |
Kovtun et al. | Improving the reliability of calculations of bases and soil massifs based on geotechnical control methods | |
CN102409703A (en) | Monitoring method for horizontal displacement of foundation pit pile top and monitoring device thereof | |
CN204007521U (en) | Reservoir dam depression and horizontal displacement monitoring device | |
CN104180759A (en) | Reservoir dam body settlement and horizontal displacement datum point detecting device and method | |
CN110513116A (en) | A kind of monitoring device and monitoring method of tunnel jacking construction guiding | |
CN109611156A (en) | A kind of monitoring method of overlapping tunnel information-aided construction | |
CN107238377B (en) | A kind of measurement method suitable for large underground hole speedy lofting bolthole position | |
CN113236260A (en) | Construction monitoring method for all-dimensional shield underpass of existing subway station | |
CN108930262A (en) | Across high speed subway line construction in shield in a kind of mud | |
CN106017435A (en) | Laser device and application method thereof | |
CN204007536U (en) | Reservoir dam depression and horizontal shift reference point pick-up unit | |
CN209115982U (en) | A kind of measurement control point Fast Installation combination unit for civil engineering | |
CN103741726B (en) | A kind of open caisson settlement measurement metering method | |
CN109556524A (en) | Fracture width based on Fiber Bragg Grating technology monitors system and method | |
CN103016914A (en) | Multifunctional forced centering leg bracket | |
CN113431016A (en) | Soft rock large deformation section tunnel shallow-buried underground surface-penetrating building surface monitoring method | |
CN209055073U (en) | Fracture width based on Fiber Bragg Grating technology monitors system | |
CN104655099A (en) | Safe settlement observing method | |
CN109811771A (en) | Make the simple and easy method not bent when anchor bar steel waist rail tensioning | |
Wang et al. | Structural deformation monitoring during tunnel construction: a review | |
CN205808407U (en) | Excavation construction auxiliary device | |
CN203023751U (en) | Multifunctional forced centering foot stool | |
CN106764055B (en) | Push pipe sight alignment construction | |
Caroti et al. | 100 Years of Geodetic Measurements in the Piazza del Duomo (Pisa, Italy): Reference Systems, Data Comparability and Geotechnical Monitoring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190716 |
|
CF01 | Termination of patent right due to non-payment of annual fee |