CN209115982U - A kind of measurement control point Fast Installation combination unit for civil engineering - Google Patents

A kind of measurement control point Fast Installation combination unit for civil engineering Download PDF

Info

Publication number
CN209115982U
CN209115982U CN201821942795.8U CN201821942795U CN209115982U CN 209115982 U CN209115982 U CN 209115982U CN 201821942795 U CN201821942795 U CN 201821942795U CN 209115982 U CN209115982 U CN 209115982U
Authority
CN
China
Prior art keywords
mounting plate
vertical bar
control point
shaped frame
civil engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821942795.8U
Other languages
Chinese (zh)
Inventor
陈兆斌
罗琛
邱章云
李哲
杨旗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gezhouba Surveying And Mapping Geographic Information Technology Co Ltd
Original Assignee
Gezhouba Surveying And Mapping Geographic Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gezhouba Surveying And Mapping Geographic Information Technology Co Ltd filed Critical Gezhouba Surveying And Mapping Geographic Information Technology Co Ltd
Priority to CN201821942795.8U priority Critical patent/CN209115982U/en
Application granted granted Critical
Publication of CN209115982U publication Critical patent/CN209115982U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of measurement control point Fast Installation combination units for civil engineering, it includes the first mounting plate, the top edge of first mounting plate is vertically installed with the second mounting plate, the center of second mounting plate is machined with the first threaded hole, vertical bar is installed on first threaded hole, the bottom end of the vertical bar is fixedly installed with U-shaped frame, is hinged with master prism by shaft on the U-shaped frame and observes board.When solving the construction survey work of precipitous vertical side slope landform in large-scale power station dam and workshop, when pier is marked at embedded conventional concrete forced centering control point, embedded point is not easy to select, marks the problem of pier is at high cost, production is buried period length, is not easy to mark pier progress security protection.

Description

A kind of measurement control point Fast Installation combination unit for civil engineering
Technical field
The utility model relates to one kind hydraulic and hydroelectric engineering is precipitous, in vertical side slope landform and concrete construction, installation With use a kind of high precision three-dimensional measurement control point for measuring work to combine the unit more particularly to a kind of need Fast Installation With the combination unit of high-acruracy survey.
Background technique
Large hydropower station construction terminates since slope excavating and concreting to completion of works, and project scale is big, work Phase is long, needs on the dam or workshop side slope riding track in power station or upright metope, hierarchical layered measures control net encryption Work.
Hydropower Project considers control point using the time is long, displacement is small, centering when making and installing measurement control point The factors such as error is small use concrete forced centering pier mostly, but require installation to bury when fabrication and installation concrete forced centering pier If place is larger and is not easy to select, concrete material and centering stainless steel bidding quotation higher cost, and from the foundation excavation of mark pier, mixed Solidifying soil pours, bidding quotation install it is longer to pier settlement stability process time, especially for dam excavate highwall bench under dig When speed is fast, the feature that blasting vibration is big, such control point is difficult to meet the requirements in timeliness and safety.
Utility model content
The purpose of the utility model is to provide a kind of measurement control point Fast Installation combination unit for civil engineering, solutions Determined the construction survey work of precipitous vertical side slope landform in large-scale power station dam and workshop when, embedded conventional concrete pressure is returned When pier is marked at heart control point, embedded point is not easy to select, mark that pier is at high cost, makes that the embedded period is long, it is safe to be not easy to carry out mark pier The problem of protection.
In order to realize above-mentioned technical characteristic, purpose of the utility model is realized as follows: a kind of be used for civil engineering Measurement control point Fast Installation combination unit, it include the first mounting plate, the top edge of first mounting plate is vertically set It is equipped with the second mounting plate, the center of second mounting plate is machined with the first threaded hole, installs on first threaded hole Have a vertical bar, the bottom end of the vertical bar is fixedly installed with U-shaped frame, on the U-shaped frame by shaft be hinged with master prism and Observe board.
The quadrangle of first mounting plate is machined with bolt mounting holes, and the bolt mounting holes and expansion bolt assembly match It closes, and whole device is fixed on to the position for the measurement point that needs to deploy to ensure effective monitoring and control of illegal activities.
The both ends of the vertical bar are all threaded bar, wherein the threaded rod and the first corresponding threaded holes at top close, The first locking nut is set in vertical bar, vertical bar is locked on the second mounting plate by first locking nut;It is perpendicular The threaded rod of straight-bar bottom is matched with screw thread on U-shaped frame, and the second locking nut, second locking are set in vertical bar U-shaped frame is locked in the bottom end of vertical bar by nut.
The utility model has the advantages that:
The utility model is that one kind is easy to make, low in cost, quick for installation, control range is big, three-dimensional coordinate measurement is smart High construction Survey Control point device for marking is spent, by large hydropower station dome dam excavation of dam abutment supporting and underground power house Using practice in concreting, this device improve the timeliness of control point Embedment and installation than the timeliness of common survey mark pier 3~5 times, cost of manufacture only has 1/10th of common mark pier cost, and the quickly lower life for digging supporting of dam abutment slot is effectively guaranteed Requirement of the production progress to measurement working efficiency;Meanwhile under identical observation condition, the measurement accuracy and common survey of the device The measurement accuracy for marking pier control point is suitable, can satisfy millimetre-sized surveying and locating completely, but is not necessarily to personnel in use Cost of labor on duty, having saved.The present apparatus is biggish to improve measurement working efficiency, has met the precision of measurement work, Material and cost of labor are saved.
Detailed description of the invention
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is the utility model main view.
Fig. 2 is the utility model left view.
Fig. 3 is the utility model top view.
Fig. 4 is the utility model three-dimensional figure.
Fig. 5 is the utility model installation condition structure chart.
In figure: the second mounting plate 1, the first mounting plate 3, observes board 4, U-shaped frame 5, master prism 6, shaft at bolt mounting holes 2 7, the second locking nut 8, vertical bar 9, the first locking nut 10, the first threaded hole 11, expansion bolt assembly 12.
Specific embodiment
The embodiments of the present invention is described further with reference to the accompanying drawing.
Embodiment 1:
Fig. 1~5 are please referred to, a kind of measurement control point Fast Installation combination unit for civil engineering, it includes first Mounting plate 3, the top edge of first mounting plate 3 are vertically installed with the second mounting plate 1, the center of second mounting plate 1 Position is machined with the first threaded hole 11, and vertical bar 9 is equipped on first threaded hole 11, and the bottom end of the vertical bar 9 is fixed U-shaped frame 5 is installed, master prism 6 is hinged with by shaft 7 on the U-shaped frame 5 and observes board 4.It is filled by using combinations of the above It sets, when using this device, by the U-shaped frame 5 that can be rotated in threaded post in vertical bar 9 and master prism 6, can control dress Sight of the front within the scope of 180 degree is set, total station passes through the normal line that board 4 is observed on sighting means, or realizes to master prism 6 Center is accurately sighted, and achievees the purpose that measurement distance, angle and height difference three-dimensional element, device is made to play the work of network point With the second mounting plate of device 1 can also play the role of to prism security protection.
Further, the quadrangle of first mounting plate 3 is machined with bolt mounting holes 2, the bolt mounting holes 2 and expansion Bolt assembly 12 matches, and whole device is fixed on to the position for the measurement point that needs to deploy to ensure effective monitoring and control of illegal activities.Pass through the bolt mounting holes 2 , can be by the second mounting plate 1 is fixedly mounted expansion bolt assembly 12 side slope during Specific construction, and then realize Side amount point is deployed to ensure effective monitoring and control of illegal activities.
Further, the both ends of the vertical bar 9 are all threaded bar, wherein the threaded rod and the first threaded hole at top 11 match, and the first locking nut 10 is set in vertical bar 9, and vertical bar 9 is locked by first locking nut 10 On the second mounting plate 1;The threaded rod of 9 bottom of vertical bar is matched with screw thread on U-shaped frame 5, is set with second in vertical bar 9 U-shaped frame 5 is locked in the bottom end of vertical bar 9 by locking nut 8, second locking nut 8.Pass through the vertical bar 9 It can be connected simultaneously with the U-shaped frame 5 of the second mounting plate 1 and master prism 6, realize the fixed installation of master prism 6, and pass through Vertical bar 9 can be fixed for first locking nut 10 and the second locking nut 8.
In the specific manufacturing process of above-mentioned apparatus, first that length and width are 30 centimeters each, 1 centimeter of thickness of the first mounting plate 3 It is welded into an entirety wherein to intersect 90 degree on one side with the second mounting plate 1, bores the in the center of the second mounting plate 1 One threaded hole 11 bores 12 millimeters bolt mounting holes 2 four in the iron plate surrounding of the first mounting plate 3.12 centimeters of a root long is made again Vertical bar 9,9 top threaded post of vertical bar matches with the first threaded hole 11 of the second mounting plate 1,9 lower thread of vertical bar Column is consistent with the threaded hole on the U-shaped frame 5 of standard manufacturer's standard prism 6.Vertical bar 9 is first screwed in the first of the second mounting plate 1 On threaded hole 11, then by master prism screw in vertical bar 9 lower part be completed.When in-site installation, according to the first mounting plate 3 four The position of a bolt mounting holes 2 drills in selected rock slope or concrete surface in advance, reuses expansion bolt assembly 12 are fixed on assembled device on bedrock surface or concrete surface.
The application process and operating method of the present apparatus:
When this device is installed, rock face or concrete surface to be mounted, foundation are needed by making an on-the-spot survey this selected good device on the spot The spacing of bolt mounting holes 2 drills on the whole in rock on first mounting plate 3, reuses expansion bolt assembly 12 and consolidates device It is scheduled on rock or concrete surface, the camera lens of master prism is substantially adjusted to the direction that measurement work Instrumental is set up.
Before this device, the three-dimensional of the prism centers of device can be determined according to the method that conventional encryption measures control point Coordinate, in use, according in measured zone measurement content and required precision by total station set up in front of this device outline, shine Standard observes board center, achievees the purpose that, using this device as measuring basis measurement distance, height difference and orientation angle, having for usual purposes is complete Instrument Free Station of standing determines survey station coordinate, orientation by backsight and three-dimensional coordinate inspection.
1: Wu Dongde power station dome dam dam abutment groove width about 350m of example, high about 300m, excavation supporting is by 10m~15m One bench is constructed, and three bench is dug under every month, the duration is very nervous, according to conventional forced centering concrete mark pier Mode is completed since construction riding track does not excavate cleaning, is not only buried point and is difficult to choose, and the embedded period is long, at high cost, Wu Faman The requirement of sufficient construction speed.By planning, the every lower digging about 50m of dam abutment divides the upstream and downstream of dam abutment slot on established bedrock surface And left and right banks distinguishes this multiple device of Fast Installation, so that the total station in work surface can at least observe three or more this dress It sets, realizes and set up the purpose of survey station and setting-out inspection, the basement rock excavation setting-out precision that specifications of surveys determines is ± 5cm, therefore instrument Device is set up in front of this device within the scope of about 120 degree, can achieve this precision without arranging staff on duty to rotate prism, So that the position that instrument is set up is very flexible, execute-in-place and cooperation are greatly facilitated, excavation construction pair is preferably met The requirement of quality and progress.
2: Wu Dongde power station left bank underground power station transformer chamber of example is about 300m, wide 18.8m, height about 35m, main transformer Room, auxiliary power house are frame layered arrangement, and structure is complicated, and the required precision of mirror surface engineering wall surface is high.According to plan, in transformer chamber left end Wall, auxiliary power house right end wall upper layer and dike beam vertical wall install four this devices, and illuminator is installed by device, solve The problem of underground engineering insufficient light.Since transformer chamber is sleeve configuration building, no matter instrument is set up in the where other than 50m, In front of this device within the scope of about 20 degree, sight and work well, can guarantee to measure every time completely operating accuracy reach ± 5mm with It is interior, and this device of once mounting is used in the entire construction time, therefore building overall precision is unified, metope is superior in quality, Solve concrete mark pier nowhere bury and easily view obstruction and using layering on metope turn set general point control point accumulation miss Poor big, precision deficiency problem.
Above-described embodiment is used to illustrate the utility model, rather than limits the utility model, practical at this In novel spirit and scope of protection of the claims, to any modifications and changes that the utility model is made, this reality is both fallen within With novel protection scope.

Claims (3)

1. a kind of measurement control point Fast Installation for civil engineering combines the unit, feature its be: it includes the first peace The top edge of loading board (3), first mounting plate (3) is vertically installed with the second mounting plate (1), second mounting plate (1) Center be machined with the first threaded hole (11), vertical bar (9), the vertical bar are installed on first threaded hole (11) (9) bottom end is fixedly installed with U-shaped frame (5), is hinged with master prism (6) by shaft (7) on the U-shaped frame (5) and is observed board (4).
2. a kind of measurement control point Fast Installation for civil engineering according to claim 1 combines the unit, feature Be: the quadrangle of first mounting plate (3) is machined with bolt mounting holes (2), the bolt mounting holes (2) and expansion bolt group Part (12) matches, and whole device is fixed on to the position for the measurement point that needs to deploy to ensure effective monitoring and control of illegal activities.
3. a kind of measurement control point Fast Installation for civil engineering according to claim 1 combines the unit, feature Be: the both ends of the vertical bar (9) are all threaded bar, wherein the threaded rod and the first threaded hole (11) at top match It closes, is set on vertical bar (9) the first locking nut (10), first locking nut (10) locks vertical bar (9) solid It is scheduled on the second mounting plate (1);The threaded rod of vertical bar (9) bottom is matched with screw thread on U-shaped frame (5), on vertical bar (9) It is set with the second locking nut (8), U-shaped frame (5) is locked in the bottom end of vertical bar (9) by second locking nut (8).
CN201821942795.8U 2018-11-23 2018-11-23 A kind of measurement control point Fast Installation combination unit for civil engineering Expired - Fee Related CN209115982U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821942795.8U CN209115982U (en) 2018-11-23 2018-11-23 A kind of measurement control point Fast Installation combination unit for civil engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821942795.8U CN209115982U (en) 2018-11-23 2018-11-23 A kind of measurement control point Fast Installation combination unit for civil engineering

Publications (1)

Publication Number Publication Date
CN209115982U true CN209115982U (en) 2019-07-16

Family

ID=67206285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821942795.8U Expired - Fee Related CN209115982U (en) 2018-11-23 2018-11-23 A kind of measurement control point Fast Installation combination unit for civil engineering

Country Status (1)

Country Link
CN (1) CN209115982U (en)

Similar Documents

Publication Publication Date Title
CN104197852B (en) Reservoir dam depression and horizontal displacement monitoring system
Kovtun et al. Improving the reliability of calculations of bases and soil massifs based on geotechnical control methods
CN102409703A (en) Monitoring method for horizontal displacement of foundation pit pile top and monitoring device thereof
CN204007521U (en) Reservoir dam depression and horizontal displacement monitoring device
CN104180759A (en) Reservoir dam body settlement and horizontal displacement datum point detecting device and method
CN110513116A (en) A kind of monitoring device and monitoring method of tunnel jacking construction guiding
CN109611156A (en) A kind of monitoring method of overlapping tunnel information-aided construction
CN107238377B (en) A kind of measurement method suitable for large underground hole speedy lofting bolthole position
CN113236260A (en) Construction monitoring method for all-dimensional shield underpass of existing subway station
CN108930262A (en) Across high speed subway line construction in shield in a kind of mud
CN106017435A (en) Laser device and application method thereof
CN204007536U (en) Reservoir dam depression and horizontal shift reference point pick-up unit
CN209115982U (en) A kind of measurement control point Fast Installation combination unit for civil engineering
CN103741726B (en) A kind of open caisson settlement measurement metering method
CN109556524A (en) Fracture width based on Fiber Bragg Grating technology monitors system and method
CN103016914A (en) Multifunctional forced centering leg bracket
CN113431016A (en) Soft rock large deformation section tunnel shallow-buried underground surface-penetrating building surface monitoring method
CN209055073U (en) Fracture width based on Fiber Bragg Grating technology monitors system
CN104655099A (en) Safe settlement observing method
CN109811771A (en) Make the simple and easy method not bent when anchor bar steel waist rail tensioning
Wang et al. Structural deformation monitoring during tunnel construction: a review
CN205808407U (en) Excavation construction auxiliary device
CN203023751U (en) Multifunctional forced centering foot stool
CN106764055B (en) Push pipe sight alignment construction
Caroti et al. 100 Years of Geodetic Measurements in the Piazza del Duomo (Pisa, Italy): Reference Systems, Data Comparability and Geotechnical Monitoring

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190716

CF01 Termination of patent right due to non-payment of annual fee